HomeMy WebLinkAboutNC0021423_INSTREAM ASSESSMENT_19960403 NPDES DOCUMENT SCANNINS COVER SHEET
NPDES Permit: NC0021423
Spruce Pine WWTP
Document Type: Permit Issuance
Wasteload Allocation
Authorization to Construct (AtC)
Permit Modification
Engineering Alternatives Analysis
201 Facilities Plan
Instream Assessment (6713)
Correspondence re: Mercury method
Permit History Date Range:
Document Date: April 3, 1996
r.
.ft
DIVISION OF ENVIRONMENTAL MANAGEMENT
April 3, 1996
MEMORANDUM
TO; Roy Davis
r;
FROM: Jacquelyn M. No-well W`
THRU: Donald L. Sam
Ruth Swanek �'-C -
Carla Sanderson
SUBJECT: Instream Assessment for SOC 67(b) Request
Spruce Pine WWTP (SOC #96-03)
NPDES Permit No. NC0021423
Mitchell County
Summary and Recommendation
The Insuvam Assessment Unit has reviewed the request for an instream assessment
for the Spruce Pine WWTP. The Town is requesting a Special Order of Consent (SOC)
during improvements to the wastewater treatment plant. The existing design flow is 0.600
MGD, and there are future plans for expansion to 1.8 MGD. The total requested SOC flow
is 300,000 GPD, which includes excess inflow/infiltration, wasteflow from two
correctional facilities and domestic wastewater. SOC limits are requested in stages: Stage 1
has BODS = 50 mg/l and TSS of 60 mg/l; Stage 2 has BODS = 82 mg/1 and TSS = 86 mg/I
after the addition of 75,000 GPD proposed prison flow. The SOC also requests a fecal
coliform limit of 4001100ml. ;
The results of the Level B model analysis indicated that according to the EMC 67
(b) criteria,the predicted dissolved oxygen concentration in the North Toe River was not
significantly affected by the additional flow. The EMC 67 (b) criteria, which states that the
discharge will not increase the DO minimum by more than 0.5 mg/I or will not extend the .
stream length of the DO minimum by more than 0.5 miles, was not violated with the
addition of 300,000 GPD. Our analysis determined that the facility can accept the
additional flow under the requested SOC limits.
Back rg ound
The Town of Spruce Pine discharges into the North Toe River in the French Broad
River Basin and has a stream classification of C-Trout. The summer 7Q10 flow has been
estimated to be 44 cfs with an average flow of 266 cfs.
A review of compliance evaluation data shows that from February 1995 to January
1996, Spruce Pine has had eleven contraventions of the flow limit, two contraventions of
the BODS limit and three contraventions of the fecal coliform limit. This seems to be a
continuation of historical problems, the plant has had meeting these parameters. Eight flow
violations occurred in 1993, while there were problems with BOD and TSS in 1991. The
yearly average wasteflow of Spruce Pine is 0.691 MGD.
r
i
Instream Assessment for Spruce Pine SOC
page 2
Analysis and Discussion
An instream assessment was performed using the Level B model framework. The
current design flow of the Spruce Pine W WTP is 0.600 MGD and is used as the pre-SOC
flow. The Stage 1 SOC flow is 0.825 MGD, which allows for 225,000 GPD of 1/I,
existing prison wasteflow and domestic flow that will be added until September 30, 1997.
The SOC limits recommended at 0.825 MGD are 50 mg/1 of BODS and 82 mg/1 of TSS.
The Stage 2 SOC flow after October 1, 1997 is 0.900 MGD, which allows for the
additional 300,000 GPD of III, proposed prison wasteflow and domestic flow. The SOC
limits recommended are 82 mg/I of BODS and 86 mg/l of TSS.
Three models were run at the flows of 0.600, 0.825 and 0.900 MGD. Waste
inputs into the models included 60 mg/l CBOD at 0.6, 100 mg/l of CBOD (50 mg/1 * 2.0)
at 0.825 and 164 mg/l of CBOD (82 mg/l * 2.0) at 0.900 MGD. NBOD of 90 mg/l (
NH3 value of 20 mg/l * 4.5) was used at all three flows. The model results predict DO
minimums of 7.56, 7.50, and 7.46 mg/l, respectively. This is a difference of 0.06 and
0.08 mg/1 in the instream DO levels and does not demonstrate a significant depression of
the instream DO level per 67(b) criteria.
Recommendation
Based on the model results, the Instream Assessment Unit recommends approval
of the 300,000 GPD of additional wasteflow for the Spruce Pine WWTP and the SOC
limits of 50 mg/1 of BODS and 60 mg/l of TSS until September 31, 1997; 82 mg/1 of
BODS and 86 mg/1 of TSS on October 1, 1997 and until the expiration of the SOC. It is
also recommended that the fecal limit of 400/100ml be allowed.
All other permitted limitations, and effluent and instream monitoring requirements
shall remain the same as in the current NPDES permit.
cc: Jeff Bouchelle
Central Files
WLA File
Table 1. Instream Assessment Summary for the Town of Spruce Pine
Wasteflow Assumptions
Design Capacity 0.600 MGD
Pre-SOC Flow 0.600 MGD
SOC Flows Requested 0.225 MGD
0.300 MGD
Pre-SOC + SOC Flows 0.825 MGD
0.900 MGD
Model Input Summary
Headwater conditions:
s7Q10 flow 44 cfs
w7Q10 flow 63 cfs
Average flow 266 cfs
Design Temperature 23 "C
CBOD 2.0 mg/I
NBOD 1.0 mg/1
DO (90% saturation) 7.72 mg/l
Wastewater Inputs:
Pre- SOC Wasteflow. 0.600 MGD
Requested SOC Wasteflow(s) 0.225 MGD
0.300 MGD
Recommended SOC Wasteflow(s) 0.825 MGD
0.900 MGD
CBOD (1) 100 mg/1
CBOD (2) 164 mg/1
NBOD 90 mg/1
Model Output Summary
Qw DO Net Distance DO Net
(MGD) min. Change <5.0 mg/I Change
(mg/1) (mg/1) (mi.) (mi.)
0.600 7.56 NA 0.0 NA
0.825 7.50 0.06 0.0 0.0
0.900 7.48 0.08 0.0 0.0
i
Spruce Pine Instream Assessment Notes jmn
North Toe River C-Trout 4/1/96
040306
ARO requesting SOC for City of Spruce Pine. Requesting SOC for flow, BOD5, TSS, and
Fecal Coliform. SOC flow requested is 0.300 MGD, increasing plant flow to 0.900 MGD.
(It should be noted that Avg. Qw prior to SOC is given as 0.691 MGD with the SOC flow
requested, post SOC flow should/could be 0.991 MGD. ) Will have to verify with ARO
and Compliance Group as to what the post SOC flow requested should be.
Last WLA done 2/94 by Goodrich, existing flow of 0.6 MGD and expansion of 0.8 MGD
through rerating the plant. Some concern with this rerating expansion with the marginal
treatment at the existing flow. Many exceedances for flow and TSS between 1991 and
1993. Application indicated that facility was having some overflow problems in the sewer
collection system due to "surcharged" conditions that take place during heavy rainfalls or
stream flooding. Can't predict frequency or duration due to unpredictable nature and
location of occurrences. Permit issued in June 1994 for 0.6 and 0.8 MGD.
Telecon w/ Mike Parker: Spruce Pine has requested for 0.300 MGD of flow which
includes:
105,000 GPD - daily excess Inflow/Infiltration
112,500 GPD - WNC correctional facility, existing state prison
75,000 GPD - WNC correctional facility, proposed private prison
7,500 GPD - unspecified domestic flow, can assume new homes etc.
300,000 GPD
-75,000 GPD - WNC correctional facility, proposed private prison
225,000 GPD
The amount of SOC flow requested by Spruce Pine is only 0.900 MGD. According to
Mike, the rerating expansion to 0.8 MGD was never done because Spruce Pine would have
had to add a chlorine contact chamber and some other things and they have not done them.
Therefore, the design is still at 0.6 MGD. Also said that Spruce Pine was proposing to
expand to 1.8 MGD.
SOC Limits requested:
BODS = 50 mg/I & 82 mg/I
TSS = 60 mg/I & 86 mg/I
Fecal = 400/100ml
The two sets of requested SOC limits for BOD and TSS are before the private prison ties
on and after the prison ties on after Oct. 1, 1997. ( Although there is no set date for this
prison, Mike does not believe it will occur before this time. There is still some uncertainty
as to whether it will actually be constructed in Spruce Pine.)
Model Runs
Ran Level B models at three Qws: 1) the design flow of 0.6 MGD.(Although the yearly
average flow was 0.691 MGD, with ARO saying that Spruce Pine only requested 0.900
MGD, decided to allow only that amount . In order to allow the requested flow of 300,000
MGD, had to use the design capacity of 0.600 MGD. 2) proposed SOC flow of 0.825
MGD, includes the requested flow without the proposed prison flow. 3) Proposed
SOC flow of 0.900 MGD, includes the requested flow with the proposed prison flow
Spruce Pine Instream Assessment Notes jmn
North Toe River C-Trout 4/1/96
040306
page 2
Ows DO Min, Chan=
0.600 7.56 mg/l
0.825 7.50 mg/l 0.06
0.900 7.48 mg/l 0.08
Recommend approval of the SOC @ 0.825 MGD and 0.900 MGD.
SUMMER
@ EXISTING DESIGN @ SECONDARY
LIMITS
---------- MODEL RESULTS ----------
Discharger : SPRUCE PINE
Receiving Stream : NORTH TOE RIVER
----------------------------------------------------------------------
The End D . O. is 7 . 78 mg/l .
The End CBOD is 3 . 09 mg/l .
The End NBOD is 2 . 72 mg/l .
----------------------------------------------------------------------
WLA WLA WLA
DO Min CBOD NBOD DO Waste Flow
(mg/1 ) Milepoint Reach # (mg/1 ) (mg/1 ) (mg/1 ) (mgd)
------ --------- ------- ---- ---- -- ----------
Segment 1 7 . 56 0 . 00 1
Reach 1 60 . 00 90 . 00 0 . 00 0 . 60000
*** MODEL SUMMARY DATA ***
Discharger : SPRUCE PINE Subbasin 040306
Receiving Stream : NORTH TOE RIVER Stream Class : C—TROUT
Summer 7Q10 : 44 . 0 Winter 7Q10 : 63 . 0
Design Temperature : 23 . 0
ILEIIGTHI SLOPEI VELOCITY I DEPTHI Kd I Kd I Ka I Ka I KH I KN I KNR I OR I SOD 1 500 1
I mile I ft/miI fps I ft Idesignl @201 Idesignl @201 Idesignl @20° Idesignl @201 Idesignl @20' 1
-------------------------------------------------------------------------------------------------------------------
I I I I I I I I I I I I I I I
Segment 1 1 1.101 8.001 0.557 1 2.32 1 0.28 1 0.25 1 4.19 1 3.921 0.38 1 0.30 1 0.38 1 0.00 1 0.00 1 0.00 1
Reach 1 I I I I I I I I I I I I I
-----------------------------------------------------------------------------------------------------
Flow I CBOD I NBOD I D . C . I
I cfs I mg/l I mg/l I mg/l I
Segment 1 Reach 1
Waste 1 0 . 930 1 60 . 000 1 90 . 000 1 0 . 000
Headwaters ) 44 . 000 1 2 . 000 1 1 . 000 1 7 . 720
Tributary 1 0 . 000 l 2 . 000 1 1 . 000 1 7 . 720
* Runoff 1 0 . 000 l 2 . 000 l 1 . 000 I 7 . 720
* Runoff flow is in cfs/mile
SUMMER
@ EXISTING DESIGN @ SECONDARY
LIMITS
Seg # I Reach # I Seg Mi I D .O. I CBOD I NBOD I Flow
1 1 0 . 00 7 . 56 3 . 20 2 . 84 44 . 93
1 1 0 . 10 7 . 58 3 . 19 2 . 83 44 . 93
1 1 0 . 20 7 . 61 3 . 18 2 . 82 44 . 93
1 1 0 . 30 7 . 63 3 . 17 2 . 81 44 . 93
1 1 0 . 40 7 . 65 3 . 16 2 . 80 44 . 93
1 1 0 . 50 7 . 67 3 . 15 2 . 78 44 . 93
1 1 0 . 60 7 . 69 3 . 14 2 . 77 44 . 93
1 1 0 . 70 7 . 71 3 . 13 2 . 76 44 . 93
1 1 0 . 80 7 . 73 3 . 12 2 . 75 44 . 93
1 1 0 . 90 7 . 75 3 . 11 2 . 74 44 . 93
1 1 1 . 00 7 . 76 3 . 10 2 . 73 44 . 93
1 1 1 . 10 7 . 78 3 . 09 2 . 72 44 . 93
Seg # I Reach # I Seg Mi I D . O. CBOD I NBOD I Flow
SUMMER
" QSOC QW=0 . 825 MGD, B005=50
---------- MODEL RESULTS ----------
Discharger : SPRUCE PINE
Receiv ing Stream : NORTH TOE RIVER
---------------------------------------------------------------------
The End D. O. is 7 . 68 mg/l .
The End CBDD is 4. 61 mg/l .
The End NBOD is 3. 36 mg/l .
----------------------------------------------------------------------
WLA WLA WLA
DO Min CBDD NBDD DO Waste Flow
(mg/1 ) Milepoint Reach 9 (mg/1 ) (mg/1 ) (mg/1 ) (mgd )
------ --------- ------- ---- ---- -- ----------
Segment 1 7 . 50 0 . 00 1
Reach 1 100. 00 90 . 00 0 . 00 0 . 82500
www MUDEL SUMMARY DATA www
Discharger, : SPRUCE FINE Subbasin 040306
Receiving Stream : NORTH TOE RIVER Stream Class : C—TROUT
Summer, 7Q1O : 44 .0 Winter• 7Q1O : 63. 0
Design Temper•atur•e : 23 . 0
ILEH6THI SLOPEI VELOCITY I DEPTHI Kd I Kd I Ka I Ka I KH I KH I KHR I PR I SOD I SOD I
I mile I ft/mil fps I ft Idesignl @20' Idesignl @201 Idesignl @20' Idesignl @20' Idesignl @200 1
-------------------------------------------------------------------------------------------------------------------
I I I I I I I I I I I I I I I
Segment I I 1.101 8.001 0.560 1 2.32 1 0.29 1 0.25 1 4.21 1 3.951 0.38 1 0.30 1 0.38 1 0.00 1 0.00 1 0.00 1
Reach I I I I I I I I I I I I I I
-----------------------------------------------------------------------------------------------------
I Flow I CBOD I NBO0 I D. D. I
I cfs I mg/1 I mg/l I mg/1 I
Segment 1 Reach 1
Waste 1 1 . 279 1100 . 000 1 9O .00O 1 0.000
Headwater,sl 44 . 000 1 2 . 000 1 1 . 000 1 7 . 720
Tr•ibutar,y 1 0 . 000 1 2 . 000 1 1 .000 1 7 .720
* Runoff 1 0. 000 1 2 . 000 1 1 . 000 1 7 . 720
* Runoff flow is in cfs/mile
:;UMMEK
@SOC QW=0.825 MGD, BOD5=50
Seg H Reach 0 Seg Mi D.O. C60D N60D Flow
1 1 0. 00 7 . 50 4 . 77 3 . 51 45 .28
1 1 0. 10 7 . 52 4 . 75 3 . 50 45 . 28
1 1 0. 20 7 . 54 4 .74 3 . 48 45.28
1 1 0. 30 7 . 56 4 . 72 3 . 47 45 . 28
1 1 0.40 7 . 58 4 . 71 3 . 46 45 . 28
1 1 0. 50 7 . 59 4 .69 3 . 44 45 . 28
1 1 0. 60 7 . 61 4 . 68 3 . 43 45. 28
1 1 0 . 70 7 . 63 4 .67 3. 41 45 . 28
1 1 0 . 80 7 . 64 4 . 65 3 . 40 45. 28
1 1 0 . 90 7 . 65 4 .64 3 . 39 45 . 28
1 1 1 . 00 7 .67 4 . 62 3 . 37 45.28
1 1 1 . 10 7 . 68 4 .61 3 . 36 45 .28
Seg 4 Reach 4 Seg Mi D. O. CEOD N60D Flow
SUMMER
SOC QW=0 . 9 MGD , BOD5=82 MG/L
---------- MODEL RESULTS ----------
Discharger : SPRUCE PINE
Receiving Stream : NORTH TOE RIVER
----------------------------------------------------------------------
The End D . O . is 7 . 60 mg/l .
The End CBOD is 6 . 74 mg/l .
The End NBOD is 3 . 57 mg/l .
----------------------------------------------------------------------
WLA WLA WLA
DO Min CBOD NBOD DO Waste Flow
(mg/1 ) Milepoint Reach # (mg/1 ) (mg/1 ) (mg/1 ) ( mgd)
------ -- ------- ------- ---- ---- -- ----------
Segment 1 7 . 48 0 . 00 1
Reach 1 164 . 00 90 . 00 0 . 00 0 . 90000
*** MODEL SUMMARY DATA ***
Discharger : SPRUCE PINE Subbasin 040306
Receiving Stream : NORTH TOE RIVER Stream Class : C-TROUT
Summer• 7Q10 : 44 . 0 Winter, 7Q10 : 63 . 0
Design Temperature : 23 . 0
ILEHGTHI SLOPEI VELOCITY I DEPTHI Rd I Rd I Ka I Re I KH I KN I KHR I KHR I SOD I SOD I
I mile I ft/oil fps I ft Idesignl @201 Idesignl @20° Idesignl @201 Idesignl @20' Idesignl @201 1
-------•--------• ---------- -------------------------------------------------------------------------------
I I I I I I I I I I I I I I I
Segment I 1 1.101 8.001 0.562 1 2.32 1 0.29 1 0.25 1 4.22 1 3.951 0.38 1 0.30 1 0.38 1 0.00 1 0.00 1 0.00 1
Reach 1 1 1 1 I 1 1 1 1 1 I 1 1 1
-------------------------------------•------------ -----------•--------------------------------------
I Flow I CBOD I NBOD I D .O. I
I cfs I mg/l I mg/l I mg/l I
Segment 1 Reach 1
Waste 1 1 . 395 1164 . 000 1 90 . 000 1 0 . 000
Headwatersl 44 . 000 1 2 . 000 1 1 . 000 1 7 . 720
Tributary 1 0 . 000 1 2 . 000 1 1 . 000 1 7 . 720
* Runoff 1 0 . 000 1 2 . 000 1 1 . 000 1 7 . 720
* Runoff flow is in cfs/mile
SUMMER
@ SOC QW=0 . 9 MGD , BOD5=82 MG/L
Seg # Reach # Seg Mi D .G. CBOD NBOD Flow
1 1 0 . 00 7 . 48 6 . 98 3 . 73 '45 .40
1 1 0 . 10 7 . 50 6 . 96 3 . 72 45 .40
1 1 0 . 20 7 . 51 6 . 94 3 . 70 45 .40
1 1 0 . 30 7 . 52 6 . 91 3 . 69 45 . 40
1 1 0 . 40 7 . 53 6 . 89 3 . 67 45 . 40
1 1 0 . 50 7 . 54 6 . 87 3 . 66 45 .40
1 1 0 . 60 7 . 56 6 . 85 3 . 64 45 . 40
1 1 0 . 70 7 . 57 6 . 83 3 . 63 45 . 40
1 1 0 . 80 7 . 58 6 . 81 3 . 61 45 . 40
1 1 0 . 90 7 . 59 6 . 79 3 . 60 45 .40
1 1 1 . 00 7 . 60 6 . 77 3 . 58 45 . 40
1 1 1 . 10 7 . 60 6 . 74 3 . 57 45 . 40
Seg # Reach # Seg Mi D .O . CBOD NBOD Flow
DFS36501 SESSION READY FOR INPUTGKEX88/MP
COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 1
PERMIT--NC0021423 PIPE--001 REPORT PERIOD: 9502-9601 LOC---E
FACILITY--SPRUCE PINE WWTP, TOWN OF DESIGN FLOW-- . 6000 CLASS--3
LOCATION--SPRUCE PINE REGION/COUNTY--01 MITCHELL
50050 00310 00530 00610 31616 50060 00300 TG23B
MONTH Q/MGD BOD RES/TSS NH3+NH4- FEC COLI CHLORINE DO CERI7DPF
LIMIT F .6000 F 30.00 F 30 .0 NOL F 200.0 NOL NOL
95/02 .5918 29.90 29.9 1.50 12.7 17 .280 7 .48 1
95/03 .682 F 21.73 29.2 2 .40 4. 9 111.282 7 .02
95/04 .6496F 19.05 18 .7 1.48 7 .8 55.063 7 .05
95/O5 . 6364E 21 .86 19 .0 .23 30 .1 37 .795 7 .32 1
95/06 .7833E 23.22 11 .3 .33 526.1E .000 6. 69
95/07 . 6832E 25.70 13 .2 .36 125.3 22 .145 6.53
95/08 .7699E 23.34 12 .3 .88 102 .1 35.382 6.14 1
95/09 . 6821E 31.25E 21 .9 .00 325. 1 . 940 6.08
95/10 . 6913E 27 . 13 21 .1 .06 154.7 58 . 945 6.23
95/11 . 6854E 19. 69 16.3 .22 189.1 77 .200 6.81 1
95/12 .7690E 15.52 16. 4 .25 29.5 100 .173 7 .23
96/01 . 6689F 54 . 68F 57. 1F 2 .86 Qi
1.7E 17 .409 7 .06
AVERAGE .6911 08 22 .2 . 88 147.4 44.551 6.80 1
MAXIMUM 1. 4500 132 .0 273.3 9.36 17500.0 517.000 9. 90 1
MINIMUM .2380 4.5 LESSTHAN LESSTHAN .000 4.50 1
UNIT MGD MG/L MG/L MG/L #/100ML UG/L MG/L PASS/FAI
N.
GKEX88/MP 04/01/96
COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 2
PERMIT--NC0021423 PIPE--001 REPORT PERIOD: 9502-9601 LOC---E
FACILITY--SPRUCE PINE WWTP, TOWN OF. DESIGN FLOW-- .6000 CLASS--3
LOCATION--SPRUCE PINE REGION/COUNTY--01 MITCHELL
00010 00095 00400 00600 00665 01027 01034 01042
MONTH TEMP CNDUCTVY PH TOTAL N PHOS-TOT CADMIUM CHROMIUM COPPER
LIMIT NOL NOL 9 .0 6.0 NOL NOL NOL NOL NOL
95/02 5.10 262 .8 6.7-6.0 .0000 .0000 .0000
95/03 7 . 60 285.9 6.9-6. 1
95/04 9.89 292 .3 6.4-6.0
95/05 12 .77 410 .7 6.8-6.0 13.200 3.0000 .0000 .0000 .0220
95/06 14 . 68 380 .1 6.4-6.0
95/07 17 .20 429. 6 6. 6-6.1
95/08 20 .30 384. 9 6. 6-6.2 .0000 .0000 .0130
95/09 22 .20 407 .2 6. 6-6.0
95/10 19.81 599.0 6.6-6. 1
95/11 15 .28 532 .1 6.9-6.3 16.100 2 .3000 .0000 .0000 .0130
95/12 12.36 526. 6 6.8-S.SF
96/01 10.09 490 .7 7 . 1-6.2
AVERAGE 13. 94 416.8 14. 650 2. 6500 .0000 .0000 .0120
MAXIMUM 25.00 1098.0 7 . 100 16.100 3.0000 .0220
MINIMUM 3.00 .1 5.500 13.200 2.3000 .0130
UNIT DEG.0 UMHOS/CM SU MG/L MG/L MG/L MG/L MG/L
GKEX88/MP 04/01/96
COMPLIANCE EVALUATION ANALYSIS REPORT PAGE 3
PERMIT--NC0021423 PIPE--001 REPORT PERIOD: 9502-9601 LOC---E
FACILITY--SPRUCE PINE WWTP, TOWN OF DESIGN FLOW-- . 6000 CLASS--3
LOCATION--SPRUCE PINE REGION/COUNTY--01 MITCHELL
01051 01067 01092 71900
MONTH LEAD NICKEL ZINC MERCURY
NOL NOL NOL NOL
95/02 .0000 .0000 .0740 .0000
95/03
95/04
95/05 . 0000 .0000 .0680 .0003
95/06
95/07
95/08 . 0000 .0000 .0370 .0000
95/09
95/10
95/11 .0000 .0000 .0700 .0011
95/12
96/01
AVERAGE .0000 .0000 .0622 .0003
MAXIMUM .0740 .0011
MINIMUM .0370 .0003
UNIT MG/L MG/L MG/L MG/L
Request Form for In-stream Assessment for 67B
NAME OF FACILITY SUBBASINrBF Ob
��2= 5--------------
COUNT]' 0�11----- REGION4&-L_& - DESIGN FLOW
RECEIVING STREAM-�✓ ,���--- t)�2.- 21-V- ,�
BACKGROUND DATA :
A . why is SOC needed ? (Facility is out of compliance with which
effluent limits?)
Fl @ '-J AS S
B . History of SOC requests :
1 . Monthly Average waste flow
' prior to any SOC --- 6 91 mgd
j Time period averaged
2 . Previously approved SOC ' s : AIIA
i
Date :------- f low : U'----m g d
Date :------- flow : I mgd
total of previously approved SOC flow: / mgd
3 . Flows lost from plant flow :___ g_ mgd
n/
(Facilities that have gone ----
off line)
4 . Current SOC request � - oM. ; m
-- . 9d
5 . Total plant flow post-SOC
( sum of original flow and
SOC flow minus losses ) f1 ow : _�_1-''(JQ-- mad
6 . Is this an accurate /flow balance for p/-lant? Why/why not ?/
I. �WN�S l�L�'.S7 e�( C'C �/�P.�L �� ,D/�✓✓N� Fj/1'� f G� �J! U L�
P/uJPCPS fo ,eOe.P .'U— �e
C . Please attach DMR summary for past year for all permitted parame-
ters . If possible , include reports from previous years if
facility has been under SOC for more than a year .
CURRENT-SOC-REgUEST
A . Request is for domestic or industrial waste? If it is a combin-
ation , please specify percentages .
G(JNG CoFOGe C/� oNAI ��rt(,f� ��M nri 7/e-�) �� -21 .$ 0V Ci-D D
(�JNG CC7P ,2[c-'E7 pNA� �IQ Ct�tT`�d C�f.c�10S��� 7$-j 000 Gp -0
71 -S 0 a G
B . what type of industry? Please attach any pertinent data .
se- A b z)v -- Fr".
u-N;+f ate. 7
C . The region proposes the following SOC limits :
BOD5+-_��--mg/1 U M4lX—
N H 3---- ----m g/1 Cl
DO--- -----mg/1
T S S----- G U --m g/l
fecal coliform -Y-00 #/looml "4v0 /iI)b,-'�'
PH SU
other parameters_E/-OW 700 /.'?
iD , what is the basis for these limits )?
np ft�a L� C/S 7`�� �ii1n fs A��oOC
CJ7 " chat✓ IAV CC"4,/ lei fc
I