Loading...
HomeMy WebLinkAbout19990383 Ver 1_CAMA Application_19990421DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Somerset Plantation HOA/Michael O'Connor, President 2. LOCATION OF PROJECT SITE: Adjacent to Bogue Sound east of Jumpin' Run Creek, off of Highway 24 in the Newport area of Carteret County, within the common area of the development known as Somerset Plantation. Photo Index - 1995: 41-519, grid K-4 1989: 154-36, grid E-3 State Plane Coordinates - X: 2642250 Y:362000 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 1/99, 3/17/99 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - April 12, 1999 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret County Land Classification From LUP - Developed/Conservation (B) AEC(s) Involved: EW, PT (C) Water Dependent: Yes (D) Intended Use: Community (E) Wastewater Treatment: Existing - Septic Planned -None (F) Type of Structures: Existing - Residences, docks, bulkhead, boatramp Planned - Riprap (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7 HABITAT DESCRIPTION: [AREA] DRFnnFn PTT T FT) nTUF7u (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Other Shallow Bottom Area 2500 sf High Ground 600 sf (D) Total Area Disturbed: 3100 sf s (E) Primary Nursery Area: No (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: Applicant proposes to place riprap 6' to 10' waterward of a failing bulkhead. FIELD INVESTIGATION REPORT: Somerset Plantation HOA/Michael O'Connor, President PAGE #2 9. NARRATIVE DESCRIPTION: The project site is a 35 acre single family subdivision located off of Highway 24 in the Newport area of Carteret County. The subdivision lies adjacent to Bogue Sound, east of Jumpin' Run Creek. The lots average '/z acre in size, with an average site elevation of 12' above mean sea level. The residences are existing, as are finger piers and a community boatramp. The shoreline has been stabilized by a vertical bulkhead. Residences in the development are serviced by private wells and septic systems. The project site is carries a Carteret County Land Use Plan classification of Developed outside of the CAMA AEC, and Conservation within the CAMA AEC. The Division of Marine Fisheries has not designated the waters of Bogue Sound at this site as Primary Nursery Area; the area is closed to the taking of shellfish for consumption; the Division of Water Quality classifies the waters as SA. There is a peninsula extending approximately 320' into Bogue Sound which is owned by the Somerset Plantation HOA. The association docks extend westward from this peninsula, which is stabilized with a traditional bulkhead. This area is vegetated with typical lawn grasses. There was a pier to serve the homeowners extending from the point of the peninsula. There is no marsh grass around the point of the peninsula, nor is there any evidence of shellfish or SAV beds. The SAV beds to the east side do not extend to within the project area. The substrate in the project area is very sandy. The applicants have received CAMA General #021193-C to place riprap waterward of the bulkhead for a distance of 5', and replace the pier. After discussions with their marine contractor, the applicants have now determined that 5' is not sufficient, and have consequently applied for a major CAMA permit. The existing bulkhead is failing. The structure has a low profile construction, and consequently, storm waters have flowed over the wall, causing stress and resulting in a "bowing" effect. Portions of the fill behind the wall have washed out as well. The deadmen have pulled forward, and tiebacks are exposed. The contractor has determined that he cannot construct a sufficient rock structure to support the failing wall within the 5' area allowed under the General Permit. I would concur with this assessment. Replacement of the bulkhead is not financially feasible for the HOA. Therefore, they are requesting to place the rock for a distance of 6' to 10' waterward of the wall around the point, for a length of 250'. Although the application requests 6' to 10', site evaluations and discussions with the contractor have led me to believe that the structure will be constructed to an average overall width of 10'. Additionally, the applicant will perform some maintenance work to the bulkhead, in the form of tieback and deadman replacement, with the need for additional fill. The proposal is to fill a 40' x 15' high ground area that has scoured behind the wall during recent hurricanes. 10. ANTICIPATED IMPACTS: The project as proposed will require the filling of approximately 600 square feet of high ground, and approximately 2500 square feet of sandy, shallow bottom area within Bogue Sound. T. Barrett April 20,1999 Morehead City Form DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT a. Landowner: NameSoin-,rset Piantation Homeowners's Assoc is ae O'Connor, President Address P. 0. Box 2338 City Morehead City State NC Zip 28557 Day Phone 466-2885 or 2123 Fax 466-2992 b. Authorized Agent: Name Chuck Bissette, T.D. Eure, Inc. Address P.O. Box 650 City Morehead City b. City, town, community or landmark Newport c. Street address or secondary road number Somerset Way d. Is proposed work within city limits or planning jurisdiction? Yes x No e. Name of body of water nearest project (e.g. river, creek, sound, bay) B o g u e Sound 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Addition of rip rap in front of State NC existing wooded bulkhead. Zip 28557 Day Phone 252-728-4191 Fa?52-728-4192 c. Project name (if any) NOTE: Perndt will be hawed in name of iandowner(a), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Carteret b. Is the proposed activity maintenance of an existing project, new work, or both? b o t h c. Will the project be for public, private or commercial use? private d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. _AAL-4 . 1. R i P R A rv T 0 S 1 1 Ls AY u? P4A e-- .- R t P 2 A 4J T' H E u c .4 u s4 -r n Revised 03/95 Form DCM-MP-1 m. Describe existing wastewater treatment facilities. 4. LAND AND WATER single family septic tanks CHARACTERISTICS a. Size of entire tract 35 acres n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individual lot(s) 0.5 acres wastewater, industrial /commercial effluent, "wash down" and residential discharges.) c. Approximate elevation of tract above M H W or overland surface r u n o f f NWL 12 f t . d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source. sandy loam private, single family wells e. Vegetation on tract grass, a few l i v e oak, pine and hickory trees f. Man-made features now on tract boat ramp, paved streets, wooden bulknea , residences $. ADDITIONAL INFORMATION cocks g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) In addition to the completed application form, the following items must be submitted: " Conservation Transitional Developed Community 0 A copy of the deed (with state application only) or Rural Other other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then residential, R-50 forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? x Yes No (Anach zoning compliance certificate, if applicable) • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 1R" by 11" white paper. (Refer to done for the tract? Yes X No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? Yes x No Coastal (marsh) Other If yes, has a delineation been conducted? (Attach documentation, if available) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger.plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the D ......._J A1IflL Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name David Miller Address 101 Mary Lane, Newport, NC 28570 Phone 726-0023 Name Les Brant Address 270 Brant Landing Rd. , Newport, NC Phone 726-4004 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. O,Z / ! 9 3 - C Se~ t s rer PAA v-rwrlO tJ s ?.3 ?`1?7 018621, Somerset Plantation H.O.A., 3/98 C-8841, George E. Young et al., 10191 • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. X • A signed AEC hazard notice for projects in oceanfront and inlet areas. k • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND T understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the 2 8 5 7 Oproject. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the S day of P i L , 19 2 4. Print Name C S c3155 J---T 7-f Zj-R Signature Landowner o Authorized Ag Please indicate attachments pertaining to your proposed project. x DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes No f. Does the disposal include any area in the water? Yes No )3. SHORELINE STABII,IZATION a. Type of shoreline stabilization Bulkhead x Riprap b. Length 250 feet c. Average distance waterward of MHW or NWL 6 feet d. Maximum distance waterward of MHW or NWL 10 ft e. Shoreline erosion during preceding 12 months none (Source of information) f. Type of bulkhead or ripra material /41A R L Cr. Amount of fill in cubic yards to be placed below water level (1) Riprap - 3 6 (2) Bulkhead backfill h. Type of fill material i. Source of fill material 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? Yes No If yes, (1) Amount of material to be placed in the water /vc,v 0 (2) Dimensions of fill area _wo u (3) Purpose of fill --3A c A F,LL. E , 81--4A- 4A;4,-::' CP n i,w Z-L b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes X No If yes, (1) Dimensions of fill area (2) Purpose of fill 15. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? XiS7-1JJ4C 3 1J_LleW_ -? AND - FI?Tr__ ?1 _FA CZ, R1 b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? F-RC-A L/A i a2 c. Will wetlands be crDssed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. Somerset Plantation Home Owners' Assoc. Applicant or Project Name Signature - / -- Date Revised 03/95 c' cJ '? ?? v 8'W i 1= u ??? Ii ;I .. _ ?.?J?• ?! e 0- % "1 ,?ou.L-" ;"' ? •, •79 X17_' tt?•+ •- & -. w ° I • 8 I - - ?i t 1 Nr? u?ye0,lf w ?•? -ro - Is -5qi ? v °' ld 9t ?Q'Q1 "E_a I ?rf' Z6,?YL (?1W?? ?J -i .'?w'.•-.-w? ° N I I? „ ! I O - A - - - ' l , OP.Orl y? \?\ i ?I? EN `J 0 r J? 4?U1 1? • Rnl O ' POO.00' p•. I 1d • ? A \{ 1 Q °?I I d r? 1? j ? %1 a O y I I! ry (h ? h } `\ 114N, ism r TIC +'y Y ? Y- I ?oa - _- w I, N `01y?'` w????Y?i4r•TL,;4' L?/--- - - - 70?M8.1_ _f Ili _ ? 6? I ? cr it '•?'' 1 t{pI%yLr`U? a i 115.OC' !14 ro' ?jlr• • I ^ OA `??^r u HARX NGcR / .v e ' 40 04 w OR/Fl 1 I ; y A ti 50' R. W - "4.40' t"E r 1 1 ' in '611,.,er iQ0 00' 7i 00 .. • - _ NS?'_ L1RtK SAC I -- -..'? '••'ry J? ,? I,Pii i .! 0',,• D. L ? I 1 p i ZOO-00, N "• i . I. M y `? >? 1 I• I u h t? P o 0 I lp w ?? o lO a? ?a .r,? A ?ti?/,n Qj ?1 jy $I ?a8 ' o to r °o ;S e4* 40'04'.£--?°' 41 a 1 1 it I ?A Ul I ?? /Rdl1g b t0000 ?n ^{ M. I - at OZ 14/N I d'p1 iK a wrr °• $g$gs ° E'sw r ti PO 40'04 f S 84' r. a A'# rfr ?' i 4 ?' N o f 100.00' - O 44'10"W !/ >?70' at 11 '-? _ • .Jh ?atv q x.7.7.9/' hl a I w ;®4:,ce4r/gyp MOO' N Rl I ; fi n?Sx?v ? A d•`. ?fAu2. ifl4! ?1'_. ?'•?-?- k?6 Q OwJ A+17.10' .•?- --IYAm .- / - r . A ' PO Ir b? a. e°. A- W-00 I I 1 4 ti r1 1 I - l? • •?F .`^ .J ?.r_OH_D.L ) L'?N.P.t00'.'?,. / •'/ /???+,rw?'?I? ------ _ 90.00 ' ao. 00' .C'*ype y li 6 - ?l e I Y LANE •.60' Fi'/!?/ j? f.l.sr. .y(/LL/pCLwE--??•,y - saao "0.170 j tar . a 1 1 II p to I R? 1?R??kRS? R °I •? h ?9 ?'? 111717 ?}y? al I ! 4 I j r? I a? , 1 I an ?AAI i ,? / N LAIRD ROGUE ° a y \ A° t A' 4 • b Z - "as • C, S 0UND 0 3 CD o pp Q CD LO 77 cD r . R CD 0 La = ' 3 C5 111 ?yy i7 1 r ? ?J J+"n Go 3 X m x - v O -, - O a CL ro 1 ? (A 0 ) CD C/) CL 0 c ? Q O D ' r X . K? N J, Yr ? X m 013 ^• G7 a a T to CD CD U) K N O O N rn CL m m a5 ca Q v m co O Q) is 0 n a m o ? .r aw U, Joins Chart 32 1? t 270 o < _ .. - rn \f?lllllllllll llllll?ll I `ry N NII - - I -- II-try/- j --- _. p4 q' ? r 7 A it 270 280 790 % m n - 30 m w Ir Idull?lruh"'/„nba? 0 3 N rn II ?f I I I I I 1, ' i ,? fo ""? 1 W II 07 L ?" 3,o O j' I OD W 'it LA 1 1 0 W W Sf?' -DuD y• 'y^ z O ?_ r co I +? A ? 11 / Y1 A J IN r ?i 1 I: N V 2 Y o -?' = m v ?0 I w D 11 A o m W _ _ o I ? r D 11 i't r ° v y \\ \ N? ?:I:?u?l?nllul?nupal? ?? A Q) h I? v u ?? O iii I a N W - en t 06 p8 oo > D N 2 I _. - _- -- -- - IN 'I Z 0 C n?Inl?uulu l1" O9 - P N u D 06 r U L, u I cn u n0 M co p o °' 3? I - - o W r .d ? 2 h r W ? r P _. I 1 =r cr r Ln ii ? Lr (X ?O N INt EL6L A Z ii =' '•O . loo JJ \ `C r oL N - .. N O J e .Tlml ? o r :Vy Ll u J i C l z (7 7c - W CP I? o cn = r r = I_ ~ ? \ ? ?r o v ??=i r r po? = L ? 0 \r? N 1 _ m N ? I \ ? Q i O?1` ns<2m<x \ CmODmp- '? 'C y N ? O =? ? 0 mv31?7JZmo s N = W j r 7P 0 pp ? "' -?nC-??oa ?m I i - I ? ? ? ? 000 m vl rr r ?' ? o, °?, BB OOC v - I I ? ? 4 rJW r? z ? p I n? O I ? II(I?I LA Ap 0-6 Z C, o ?+ w , 3 W „ R c' N 4 Q`"5g611 r t n .. n N i _ mm ?? \ W V' n ? o a I ?p W \ N ? :?' tl 3 A z. Ny `np 'r m. mo?I ?+ a W 'rs m v v3?°r > It > ID f t J m y I ?\ Icr 9 ZL7I N -(C w 4' _ L im ? I r m?\:J I m UI O? Qi p?? - T y C Rr j. N W 3d m ? _ -?'O N W _ _ 15 tr r cn ^ cND a G9 (D o ?O u,a0o ??? ° ?^+ ? ? cn •atyum- r, ? y\r •? i?? N N W ^ t ^ r ?y ae T, l m N _ LP OD N m n O ?• r O „? r ? Cp n- AS'? 0 D ,o ID