Loading...
HomeMy WebLinkAbout20191484 Ver 1_17BP.2.R.92_Utility_Permit_Drawings_2019-12-03_20191209Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) TOTALS*: *Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 5OF 5No Stream Impacts for Utilities UTILITY WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSPITT COUNTY17BP.2.R.92 NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS12/3/19 Site Station StructureNo. (From/To) Size / Type1 -L- 12+60 to 13+35 RT Permanent Utility Easementx 386 215 6011 -L- 13+60 to 14+30 RT Permanent Utility Easementx 396 262 658782 477 125900000NOTES:Revised 2018 Feb SHEET 5OF6ALLOWABLE MITIGABLE12/3/19ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)PITT COUNTY17BP.2.R.92BUFFER REPLACEMENTIMPACTSUTILITY RIPARIAN BUFFER IMPACTS SUMMARYTotal Buffer Impacts for Utilities= 0.04 Ac.NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPE ZONE 1 (ft2)ZONE 2 (ft2)0000NOTES:No wetlands in buffer impacts at site for utilities.Revised 2018 Feb SHEET 6OF6UTILITY WETLANDS IN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS12/3/19PITT COUNTY17BP.2.R.92WETLANDS IN BUFFERSSITE NO.STATION (FROM/TO)TOTAL:Rev. Jan 2009