HomeMy WebLinkAboutNCG090019_Inspection Report_20191210ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Rpm Wood Finishes Group Inc.
Attention: Aaron Berwick
Post Office Box 22000
Hickory, North Carolina 28603
NORTH CAROLINA
Environmental Quality
December 10, 2019
Subject: Compliance Evaluation Inspection
Permit: NCG090000
Certificate of Coverage: NCG090019
Caldwell County, North Carolina
Dear Mr. Berwick:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on November 26, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sin�eky'%
I aia Reed, CPSWQ, CEPSCI, MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
re
D_EQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
rvarrH caAourun
^•w^^A^^�a^�•^•^�a�� / 828.296.4500
Permit: NCG090019
SOC:
County: Caldwell
Region: Asheville
Contact Person: Alicia Boppe
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 11/01/18 Expiration: 05/31/21 Owner: Rpm Wood Finishes Group Inc
Effective: Expiration: Facility: RPM Wood finishes Group, Inc.
3194 Hickory Blvd
Title: EHS Manager
Certification:
Hudson NC 28638
Phone: 828-728-8266 Ext.1819
Phone:
Inspection Date: 11/26/2019 EntryTime: 11:00AM Exit Time: 12:OOPM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Paints, Varnishes, Lacquers Slormwater Discharge COG
Facility Status: ❑ Compliant Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCGO90019 Owner- Facility: Rpm Wood Finishes Group Inc
Inspection Date: 11/26/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On November 26, 2019 this facility was inspected to determine what progress had been made in response to the Notice of
Violation previously issued. The following items were noted onsite.
1) An additional building which is planned to contain a secondary containment area is currently under construction.
2) Liquid products in the upper storage area were observed to be without secondary containment as well.
The facility remains under Notice of Violation. The permittee is directed to submit a long term summary of all secondary
containment efforts on site to this office. The summary should include an estimated date of completion for all site
modifications.
If you have any questions, please contact this office at (828) 296-4614.
Page 2 of 3
Permit: NCG090019 Owner- Facility: Rpm Wood Finishes Group Inc
Inspection Date: 11126/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Page 3 of 3