Loading...
HomeMy WebLinkAbout20191591 Ver 1_Jon Little - Page 2_20191209Property size (acres): 3.36 acres Subdivision name or site address (include phase/lot number): _... . -__ LOT 2Clearwater Ln�i; Directions to site - please include road names and numbers, landmarks, etc.: Starting HWY 119N,_turn right on Cunningham Rd right on Franklin Rd, Left on Heritage Harbor Dr, right on Clearwater Ln. 112mi on right Latitude (in decimal degrees)36`514986 Longitude (decimal degrees)-79.070523 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): _._Residential lot-4Adeve€oiled 6. describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Installation of riprap along shoreline to prevent further erosion of lend 7. Will work be conducted from land? V From water? 11 B. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfiill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet; 3000 sift �. _ .. y Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: __.. .., 1000,sgft Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ NorTI Water Level and s0 feet landward to be lm acted (number of trees, for instance): Broh and sa lin s will only be affe ; mature treEI will be left untaurhpd nnIPCC rlPari riirine nr 1n ;n., 11. Sigp6ture ....___ C. 2 1`i Owner/A ent's Signature* [15A NCAC 02H .05D2 1 [date Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the fallowing information on this plan and provide dimenslans far each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed Structures such as buildings, retaining walls, docks, etc.