HomeMy WebLinkAboutNCG210241_Inspection Report_20191210ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
December 10, 2019
Sonoco Products Company - Granite Falls
Attention: Robert Cooley
4608 Helton Road
Granite Falls, North Carolina 28630
Subject: Compliance Evaluation Inspection
Permit: NCG210000
Certificate of Coverage: NCG210241
Caldwell County, North Carolina
Dear Mr. Cooley:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on September 26, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincere ,
Isaiah Reed, CPSWQ, CEPSCI, M 4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
D_EQ5 North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 l Swannanoa, North Carolina 28778
NCNIH CMIXINP
828.296.4500
Permit: NOG210241
SOC:
County: Caldwell
Region: Asheville
Contact Person: Russell Craig
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Compliance Inspection Report
Effective: 08/01/18 Expiration: 07/31/23 Owner: Sonoco Products Company- Granite Falls
Effective: Expiration: Facility: Sonoco Products Co -Granite Fal
4608 Helton Rd
Inspection Date: 11/26/2019
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Granite Falls NC 28630
Title: Phone: 828-396-3196 Ext.14
Certification: Phone:
Entry Time: 02:OOPM Exit Time: 03:OOPM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: Compliant Not Compliant
Question Areas:
Storm water
(See attachment summary)
Page 1 of 3
Permit: NCG210241 Owner -Facility: Sonoco Products Company - Granite Falls
Inspection Date: 11/26/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary
On November 26, 2019 this facility was inspected for compliance. I met with Dane Mader on site. During the inspection the
following items were noted:
1) A Stormwater Pollution Prevention Plan (SWPPP) has been created, but not maintained. The permittee is directed to
review and update the SWPPP as outlined in the NCG210000 General Permit.
2) Qualitative and Analytical monitoring has not been performed on site. The permittee is directed to immediately begin
monitoring efforts as outlined in the NCG210000 General Permit.
Please give the above items your immediate attention. This facility will be re -inspected on or after January 14, 2020. If the
above items have not been addressed, further action will be taken.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG210241 Owner -Facility: Sonoco Products Company -Granite Falls
Inspection Date: 11126/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0
❑ ❑ ❑
# Does the Plan include a BMP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
E
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑
N ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
❑ ❑
Comment: See summary for more information
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑
Comment: See summary for more information.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑
Comment: See Summary for more information.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑
Comment:
Page 3 of 3