Loading...
HomeMy WebLinkAboutNC0021253_INSTREAM ASSESSMENT_19861229 NPDES DOCYMEMT SCANNING COVER SHEET NPDES Permit: NC0021253 Havelock WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Engineering Alternatives Analysis 201 Facilities Plan Instream Assessment (67B) Correspondence re: Mercury Permit History Document Date: December 29, 1986 Tlzis documeat is priated oa reuse paper-ignore aay content on the reverse side DIVISION OF ENVIRONMENTAL MANAGEMENT December 29, 1986 MEMORANDUM TO: Kent Wiggins FROM: Steve Zoufaly THRU: Trevor Clements SUBJECT: Havelock WWTP Addendum to In-Stream Assessment (12/17/86) A level B estuary model was run for the Town of Havelock in order to assess an SOC request at 1.062 MGD with limits of BOD 15 mg/l and NH3 2 mg/l. At this set of proposed limits the model predicted a violation of the requirements to grant an SOC. Upon your request, the Town was reevaluated at BOD 20 mg/1 rather than the previously modeled BOD 23 mg/l. At BOD5 14 mg/l and NH3 1.5 mg/1 (BODu 20 mg/l = BODS 14 + � NH3 1.5) , the Town of Havelock meets the requirements for granting an SOL SZ/gh cc: Jim Mulligan DIVISION OF ENVIRONMENTAL MANAGEMENT December 17 , 1986 M E M O R A N D U M TO: Jim Mulligan FROM: Steve Zoufaly I L THROUGH: Trevor Clement Steve W. Tedder SUBJECT: In-Stream Assessment Town of Havelock WWTP Craven County The Town of Havelock in Craven County is requesting permission to increase their SOC wasteflow from a pre-SOC average of 0 . 889 MGD to 1 .062 MGD. The town ' s WWTP discharges into East Prong Slocum Creek , (c-swamp, 7010,=0, tidal influ- ence) , which is located within the Neuse River Basin . The facility was averaging BODO 7 . 17 mg/ l , NH*-N 0.26 mg/ I and D.O. 8 . 47 mg/ I for the period of December 1985 through September 1986 . The facility has been having troubles meeting its BODE and solids limits during wet weather periods and thus entered into an SOC in September of this year . The current request expands the amount of additional wasteflow originally approved . A level B estuary modeling analysis was completed using wasteflows of 0.889 MGD and 1 .062 MGD. The Washington Regional Office suggested limits that the facility should be able to comply with : BODO 15 mg/ l , NH,-N 2 mg/ I and D.O. 6 mg/ I . The model predicts that the additional increase in flow at the proposed limits will cause instream D.O. to drop below 5.0 mg/ 1 for 8/ 10 of a mile . This is 3/ 10 of a mile greater than the requirements for granting an SOC allows , although the expected net change in minimum D.O. is only 0 . 23 mg/ l . The following is a summary of the results . t 0. 889 MGD 1 .062 MGD D.O. minimum 5 .0 4 .77 D.O. sag point (miles below discharge) 0. 1 0 . 1 * miles D.O. <5 .0 mg/ I 0 0 .8 K miles D.O. = 8 0 0 The model summary data is as follows : 1010,=0 cfs Design temperature: 290C Stream segment length : 1 .5 miles Depth : 5 ft . (average) Width : 65 ft . (average) Max . tidal velocity : 0. 2 fps Inflow background D .O. : 1 .0 mg/ I Estuary D.O. : 6 . 22 mg/ I (80% saturation) Dispersion : 0 . 3 sq. mi . /day K, : 0 .53 per day KQ: 0 . 4 per day If any additional information is required, please advise . SZ/ps CC : Page Benton Kent Wiggins 14CHAR'GER HAVELOCK WWTF' NAME OF ESTUARY E PRONG SLOCUM CREEK DEPTH 4 5 , 00 FEET QIDTH 63 . 00 FEET VOLUME 1 2 . 574E}006 CUBIC FEET FRESHWATER INFLOW 0 , 00 CFS WASTEWATER FLOW t 0 . 89 MOD ULT . POD OF WASTE 20 , 00 MG/L MAX TIDAL. VELOCITY 0 . 12 KNOTS CROSS-SECTION AREA 325 . 00 SO . FT . ADVECTIVE VEL . S 0 . 07 MI/DAY I•ISF'L:RSIO?d I 0 . 30 SO . MI . /DAY K1 0 . 53 PER DAY K2 0 .40 PER DAY POD AT DUTFALL = 1 . 7333812394 MG/L . D . O. AT DUTFALL = 5 . 16220405794 MG/L MILEPOT_NT UPSTREAM POD UPSTREAM D . O . 0 .00 1 . 73 5 . 16 MILEPOINT DOWNSTREAM POD DOWNSTREAM DO 0 . 00 1 . 73 5 . 16 0 . 10 1 . 53 5 . 16 sag A 0 . 20 1 . 36 5 . 17 0 . 30 1 . 20 5 . 18 SAG 0 . 40 1 . 06 5 . 21 _ 4.95 0 . 50 0 . 94 5 . 24 0 . 60 0 , 83 5 . 28 0 , 70 0 .74 5 , 32 0 . 80 0 , 65 5 . 36 0 . 90 0 . 58 5 . 41 1 . 00 0 . 51 5 . 45 1 . 10 0 . 45 . 5 , 50 1 . 20 0 . 40 504 1 . 30 0 . 36 5 . 58 1 . .40 0 . 31 5 . 62 1 . 50 0 . 28 5 . 66 THE WASTE.LOAD ALLOCATION FOR HAVELOCK WWTF IS 20 MG/L 0I'SCHARGER I HAVELOCK WWTP NAME OF ESTUARY E WRONG SLOCUM CREEK DEPTH 2 5 . 00 FELT WIDTH 65 . 00 FEET VOLUME ; 2 . 574E+006 CUBIC FEET FRESHWATER INFLOW 0 . 00 CFS WASTEWATER FLOW I 1 .06 MGD ULT , ROD OF WASTE. 20 .00 MG/L MAX TIDAL VELOCITY I 0 . 12 KNOTS CROSS-SECTION AREA 325 . 00 SO FT . ADVECTIVE VEL . 0 . 08 MI/DAY DISPERSION t 0 . 30 SO . MT . /DAY K1 2 0 . 53 PER DAY K2 0 . 40 PER DAY ROD AT OUTFALL = 2 . 06738501631 MG/L . D .Q . AT IIUTFALL = 4 .96335967896 MG/L MILEPOINT UPSTREAM ROD UPSTREAM D . O . 0 . 00 2 .07 4 .96 MILEPOINT DOWNSTREAM ROD DOWNSTREAM DO 0 . 00 2 . 07 4 .96 0 . 10 1 . 63 4 . 95 // 0 .'20 1 . 63 4 .96 �Ao m'.�c S3�c 6clow S.Uwq�l 0 . 30 1 . 44 4 . 98 C1 0 . 40 1 .28 5 . 01 0 . 50 1 . 14 5 . 05 0 . 60 1 . 01 5 . 09 0 . 70 0 . 89 5. 14 0 . 80 0 . 79 5 . 19 0 . 90 0 . 70 5 . 24 1 . 00 0 . 62 5 . 29 1 . 10 .0 . 55 5 . 34 1 . 20 0 . 49 5 . 39 1 . 30 0 . 44 5 . 44 1 . 40 0 . 39 5 . 49 1. . 50 0 . 34 5. 53 THE WASTELOAD ALLOCATION FOR HAVELOCK WWTP IS 201MG/L DISCHARGER 1 HAVELOCK WWTP NAME OF ESTUARY E PRONG SL.000M CREEK DEPTH 5 . 00 FEET WIDTH 65 , 00 FEET VOLUME 1 2 . 574E+006 CUBIC FEET FRESHWATER INFLOW 0 . 00 CFS WASTEWATER FLOW 1 0 . 89 MGD ULT . BOD OF WASTE 1 23 . 00 MG/L MAX TIDAL_ VELOCITY 0 . 12 KNOTS CROSS-SECTION AREA 325 . 00 St7 . FT . ADVECTIVE VEL.. . 0 . 07 MI/DAY DISPERSION 1 0 . 30 80 . MI . /DAY K1 1 0 . 53 PER DAY K2 1 0 . 40 PER DAY I:tOD AT OUTFAL.L. = 1 . 97696450874 MG/L . D . O . AT OUTFALL _ 5 , 00647014142 MG/I_ MIL.EPOINT UPSTREAM DOD UPSTREAM D . O . 0 . 00 102 5 . 01 MIL.EPOINT DOWNSTREAM BOD DOWNSTREAM DO 0 . 00 1198 5 . 01 0 . 10 1 . 75 5 . 00 0 . 20 1. . 55 5 . 01 5'OO 0 . 30 1 . 37 5 . 03 - U'3- 0 . 40 1 . 21 5 . 0;:) d3 0 . 50 1 . 07 5 + 10 0 . 60 0 . 95 5 . 14 0 . 70 0 . 84 5 . 19 0 . 80 0 . 75 5 . 24 0 . 90 0 . 66 5 . 29 1 . 00 0 . 58 5 . 34 1 . 10 0 . 52 5 . 39 1 .20 0 . 46 5 , 44 1 . 30 0 . 41 5 . 49 1 . 40 0 . 36, 5 . 53 1 . 50 0 . 32 5 ♦ 58 THE WASTELOAD ALLOCATION FOR HAVELOCK WWTP IS 23 MG/I_ DISCHARGER 1 HAVELOCK WWTP NAME OF ESTUARY E PRONG SLOCUM CREEK DEPTH 1 5 . 00 FEET WIDTH 65 . 00 FEET VOLUME 2 , 574E+006 CUBICC FEET FRESHWATER INFLOW 0 . 00 CFS WASTEWATER FLOW 1 1 . 06 MOD ULT . BOD OF WASTE 1 23 . 00 MG/L MAX TIDAL VELOCITY 0 . 12 KNOTS CROSS-SECTION AREA ! 325 . 00 SOFT . ADVE.CTIVE VEL . 0 . 09 MI/DAY DISPERSION 0 . 30 SO .MI . /DAY K1. 0 . 53 PER DAY K2 1 0 . 40 PER DAY BOD AT OUTFAL.L - 2 .35796601036 MG/L . D . O , AT OUTFALL. = 4 , 77825341.453 MG/L MILEPt7INT UPSTREAM BOD UPSTREAM D . O . 0 . 00 2 , 36 4 . 78 MILEPOINT DOWNSTREAM BOD DOWNSTREAM DO 0 . 00 2 . 36 4 . 70 0 . 10 2 . 09 4 . 77 0 .20 1 . 96 4 , 78 8�io O.o, 6daw 5.ovok 0 . 30 1 . 65 4 . 60 0 . 40 1 . 46 4 ,S3 0 . 50 1 . 29 4 . 8S 0 . 60 1. . 15 4 , 92 0 . 70 1. . 02 4 . 98 0 .90 0 . 90 503 0 . 90 0 . 80 5 . 05' 1 . 00 0 . 71 5 , 15 1 . 10 0 . 63 5. 21 1 . 20 0 . 56 5 . 27 1 . 30 0 . 50 5 . 32 1 . 40 0 , 44 5 . 38 1 .50 0 . 35' 5 . 43 THE; WASTELOAD ALLOCATION FOR HAVELOCK WWTP IS 23 MP,/L Request Form for In-stream Assessment for 67B NAME OF FACILITY H 1_—(N TA -----_ SUBBASIN 03, 5; ye-/G COUNTY GNa1/<� ----_ REGION NO 6 ---- DESIGN FLOW 1. 25- *nQ RECEIVING STREAM-_Ea ,['t'___ptv�n Gv�-¢�---------- -- — BACKGROUND DATA A . Why is SOC needed? (Facility is out of compliance with which effluent limits?) B . History of SOC requests : 1 . Monthly Average waste flow RLC'�, lfe'l�prior to any SOC -_----Q _� ��--- mgd ` '`- .r 410V 2 Q 1985 Time period averaged thru SfSC_'fA; 2 . Previously approved SOC ' s : Pa Date : 91/2_1.-r flow : ! I 3So Date :--- flow :_-----_-----mgd total of previously approved SOC flow: /IS 3. -0 3 . Flows lost from plant flow : —__mgd ( facilities that have gone off line) 4 .. Current SOC request flow: ---- S76SG 9u S . Total plant flow post-SOC ( sum of original flow and SOC flow minus losses) flow: --- � _Q6 2--mgd 6 . Is this an accurate flow balance for plant? Why/why not? �� � QV yr . t: C . Please attach DMR summary for past year for all permitted parame- ters . If possible , include reports from previous years if facility has been under SOC for more than a year . CURRENT SOC RE UEST A . Request is for domestic or industrial waste? If it is a combin- ation , please specify percentages . Al( +"L^'J-`G B . What type of industry? Please attach any pertinent data . A/A C . The region proposes the following SOC limits : BODS IS mg/1 NH3 2 mg/l DO 6 mg/1 TSS 5-0 mg/l fecal coliform-----L&G ---#/100m1 pH------- 6; -C/ SU other parameters D . What is the basis for these limits? a re a A,. G s �. 5Z 03o�io -- - - -- — - -- ---- -- - ---- ---50-� - -DO .- 7-Is -- l�e, J _= 5- - - - ------ - - -- - -- - -- - - - - -- ---- - LtL I•• DISCHARGER : HAVELOCK WWTP NAME OF ESTUARY : E PRONG SLOCUM CREEK IIEPTH : 5 . 00 FEET WID'1'N : 65. 00 FEET VOLUME : 2 . 574E+006 CUBIC FEET FRESHWATER INFLOW 0.00 CFS WASTEWATER FLOW 0 . 89 MGI1 ULT . BOB OF WASTE : 23 . MG/L MAX AX TIDAL : 0 . 1212 KNOTS ADVEC -SECTION AREA : 320 . 07 SOFT . n AI�VECTIVE: VEL . : U . 07 MI/DAY "a)- DISPERSION : 0 , 12 so . MI . /DAY r�� z K1 0 . 53 PER DAY yK' � t:2 0 . 44 PER DAY BOB AT OUTFALL = 3 . 13421624047 MG/L . (�` �z �' �✓Nv�QI' •"�L D . G . AT OUTFALL = 4 .4584698'2686 MG/t. F ��' MILEPOINT UPSTREAM DOD UPSTREAM D . O . 4 V_ 0 . 00 3 . 13 4 . 46 � MILEPOINT DOWNSTREAM BOD DOWNSTREAM DO 0 . 00 3 . 13 4 . 46 0 . 10 2 . 61 4 . 44 0 , 20 2 . 17 4 . 47 y, � H 0 . 30 1 .81 4 . 54 0 . 40 1 .51. 4 . 63 33 0 .50 1 . 25 4 . 73 0 . 60 1104 4 , 84 0 . 70 0 , 87 4 . 96 0 . 80 0 . 72 5 , 07 0 . 90 0 . 60 5 . 18 1 &0 0 . 50 5 , 28 1 . 10 0 . 42 5 , 38 1 . 20 0.35 5 « 47 1 . 30 0 . 29 5 . 55 1 . 40 0 . 24 5 . 63 1 . 50 0 . 20 5. 69 THE WASTELOAD ALLOCATION FOR HAVELOCK WWTP 13 23 MG/L DISCHARGER HAVELOCK WWTP ?TAME OF ESTUARY E PRONG SLOCUM CREEK DEPTH : 5 . 00 FEET WIDTH : 65 , 00 FEET VOLUME 2 . 574E+006 CUBIC FEET FRESHWATER INFLOW : 0 . 00 CFS WASTEWATER FLOW : 1 . 06 MGD ULT . POD OF WASTE : 23 . 00 MG/L MAX TIDAL.. VELOCITY : 0 . 12 KNOTS CROSS-SECTI:DN AREA 325 . 00 SQ , FT , ADVECTIVE VEL . : 0 . 08 MI/DAY DISPERSION : 0 . 12 SQ . MI . /DAY KI : 0 . 53 PER DAY K2 : 0 . 44 PER DAY POD AT OUTFALL 3 . 72937807137 MG/L . D . O . AT OUTFALL = 4 . 14287536106 MG/L MILEPOINT UPSTREAM BOD UPSTREAM D . O . 0 . 00 3 .73 4 , 14 MILEPOINT DOWNSTREAM BOD DOWNSTREAM DO 0 . 00 3 . 73 4 , 14 0 . 10 3 . 12 4 . 1I. 000 2 . 61 4 , 14 0 . 30 2 . 18 4 . 21. 0 . 40 1 . 83 4 .30 0 . 50 1 . 53 4 . 42 0 . 60 1 . 28 4 . 55 0 . 70 1 . 07 4 . 68 0 . 80 0 . 89 4 . 81 0 . 90 0 . 75 4 . 93 1 . 00 0 . 63 5 . 06 1 . 10 0 . 52 5 . 17 1 . 20 0 . 44 5 . 28 1 . 30 0 . 37 5 . 38 1 . 40 0 . 31 5 . 47 1 . 50 0 . 26 5 . 55 J THE WASTELOAD ALLOCATION FOR HAVELOCK WWTF IS 23 MG/L.