Loading...
HomeMy WebLinkAbout20191658 Ver 1_BR0002_hyd_PERMIT DRAWINGS_20191014_20191206H1ghWdy StOCCY1jf (Version 2.08; Released April 2018) North Carolina Department of Transportation °� °t Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS WBS Element: 67002.1.1 TIP No.: BR-0002 County(ies): Ashe Page 1 of 2 General Project Information WBS Element: TIP Number: BR-0002Project T pe: brid ere lacement Date: 9/15/2019 NCDOT Contact: 7§71.1 e Ber , PE Contractor / Desi ner: Michelle Ber , PE NCDOTAddreirch Ridge Dr. h,NC 27610 Address: same Phone: 919-707-6719 Phone: same Email: mgber[y(@.ncdot.gov Email: same City/Town: Warrensville Count ies : Ashe River Basin(s): New ICAMA County? no Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.322 mi. I Surrounding Land Use: wooded/residential Proposed Project stin Site Project Built -Upon Area ac. 1.6 ac. 1.2 ac. Typical Cross Section Description: The proposed cross-section is 2 lane undivided, 12' wide lanes with 8' shoulder (11' in guardrail locations). The clear roadway width of the proposed bridge is 35'. The clear roadway width is 23', while the existing bridge is 26'. The typical section is 2 lane undivided with grass shoulders. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 4100 Year: 2040 Existing: 4010 Year: 2020 General Project Narrative: (Description of Minimization of Water Quality Impacts) Project will replace existing 6 span bridge with a 3 span 54" pre -stressed concrete girder bridge with 4' deep caps with 1.5:1 spill through abutments. The span arrangement will be 1 @ 85', 1 @ 11 0'and 1 @ 85'. Proposed bents will be located outside of the stream and the existing bents will be removed from the stream. Deck drains will be placed on the bridge where they do not discharge over water. One SR and one driveway will be realigned due to site distances of the proposed bridge. Construction will be staged to maintain traffic on site. Existing drainage patterns will be maintained. 2:1 roadway fill slopes are used to minimize footprint of the overall project. Ditches will be vegetated where possible. Riprap pads are used at pipe outlets to dissipate energy and prevent erosion. A retaining wall was included to prevent significant impacts to Buffalo Creek (10- 2-20) which is a NCDWQ Trout Stream. There will be an in -water moratorium for Hellbender from August 15 to Norember 15. No wetland impacts are anticipated. Waterbody Information Surface Water Body (1): North Fork New River NCDWR Stream Index No.: 10-2-(12)b NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: (ORW) Other Stream Classification: None Impairments: Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? 1yes I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? INo I (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) HighwayNorth Carolina Department of Transportation gSYOPri1WS1t0T Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 67002.1.1 TIP No.: BR-0002 Count ies : Ashe Page 2 of 2 Additional Waterbody Information Surface Water Body (2): Buffalo Creek NCDWR Stream Index No.: 10-2-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Trout Waters Jr) (HQW) Other Stream Classification: None Impairments: Aquatic T&E Species? No Comments: NRTR Stream ID: Buffalo Creek Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? INo I (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body (3): 1 UT to Buffalo Creek NCDWR Stream Index No.: 10-2-20 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Trout Waters Jr) (HQW) Other Stream Classification: None Impairments: turbidity Aquatic T&E Species? No Comments: NRTR Stream ID: SA, SB, SC Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body (4): UT/ North Fork New River NCDWR Stream Index No.: 10-2-(12)b NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: (ORW) Other Stream Classification: None Impairments: Aquatic T&E Species? No Comments: NRTR Stream ID: SD Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I C C s 2 H LL a U, c 01 C O � 2 0 E M I I See Sheet IA For Index of Sheets See Sheet tB For Conventional Symbols 1502 1351 504 1688 1351 1503 134] 1502 TIP PROJECT BR-0002 AMht sent rt�dK 9 CDQnry Elementary School Middle School 164 $$ IS05 Warrensville 1506 194 50] 88 I 16]2 VICINITY MAP STATE OF NORTH CAROLINA DIVISION OF HiGHWAYS ASHE COUNTY LOCATION: BRIDGE NO. 8 ON NC 194 OVER NORTH FORK NEW RIVER TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN TIP PROJECT BR-0002 -L- STA. 15+25.00 A RF 2 ;IN CONSTRUCT SITE 1 SITE 3 O / END BRIDGE BEGIN BRIDGE /' —L— 25+20.00 —L— STA. 22 + 40.00—Y— _ 111 2 —L— NC 194 N —�— STA. 15 + 15.00 N BUFFALO CREEK d` 7 III"- 0 N DESIGN EXCEPTION FOR SAG VERTICAL CURVE VTHIS PROJECT HAS NO CONTROLLED —ACCESS. SITE THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. IV 'I H�j GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) 04 DESIGN DATA PROJECT LENGTH ADT 2020 = 4010 ADT 2040 = 4100 K = 12 % LENGTH OF ROADWAY TIP PROJECT BR-0002 = 0.269 MI D = 55 % LENGTH OF STRUCTURE TIP PROJECT BR-0002 = 0.053 MI T = 7 % V = 60 MPH TOTAL LENGTH OF TIP PROJECT BR-0002 = 0.322 MI * TTST = 2% DUAL = 5% FUNC CLASS = MAJOR COLLECTOR REGIONAL TIER ACESTATE PROJECT REFERENCE NO. SHEET BR-0002:�t 78 -.NO. . . R6CRIPTWN 67002.1.1 P.E. 67002.2.1 ROW PERMIT DRAWING SHEET 1 OF ' SITE 4 LANSING END TIP PROJECT BR-0002 -L- STA. 32 +25.00 Prepored In the Office of: DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 2018 STANDARD SPECIFICATIONS TATIA L. WHITE, PE, PLS RIGHT OF WAY DATE: September 20.2019 PIOTR J. STOJDA PROJECT TEAM LEAD LETTING DATE: MAY 19, 2020 HYDRA ULICS ENGINEER P.E. SIGNATURE: ROADWAY DESIGN ENGINEER SIGNATURE: P.E. I INCOMPL]E°Jl°]E PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SITE 1 3X \ MARY L. R. NARTSOE — — — — — — — — — oG RRe�o T Fo `o p° R,PC Sta. I0TW �p— — EysT %L— PT SIM 12 DETAIL A DETAIL G SPECIAL CUT 4' BASE DITCH PIPE OUTLET CHANNEL STABILIZATION (N. to Sc.I.) (NolN Smle) �'N Pr� e��so e"B Min. D= 1 R.B=4 H.en lalaM\� -L- FROM STA.I5+ZS TO STA. 18+84 LT I"eg*- S F' `11'en-A TEMP. IMPACTS IN SURFACE WATER ""°�° "— Ce- STA. 8+99 Q -L- STA. 18+9111 PROP. RAW IMPACTS IN SURFACE WATER hil 4'X'4 PApSTS ISMTLBUS 48, 4S µ \\ \ 0 0 0 0 NEST ENO„\W THS. L VA—R GR _ 1, \ l\\\ \ \ O 00040PGOO O OC NtLIAM R.JOINSON MIKE ELORETH e �I DOW ELDRETH WELLQD S 3- QO/ x 24 ST, FO • \� \�. / //MIKE E ELORET \ U / DIAN ELDRETX `r / DENOTES TEMPORARY IMPACTS IN SURFAC�WATER BY2-15 / _ DENOTES IMPA9�S IN SURFACE WA R h / ——P • SPECIAL CUT 4' BASE DITCH SEE DETAIL 400 P BELIE L. BARKER ,EARETTE J.BARKER Q HW TEMP. CAUSEWAY & TEMP. IMPACTS IN SURFACE WATER C —Y— PT IT S/oe 20M 4 28zGl 8 ST,F REMOVE HW E BL ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINCOMPLEP' E PLANS W NOT USE MR / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL 1 PERMIT DRAWING SHEET 2 OF 7 E. RED CRAIG KAY G. CRAIG O. 10f00A0 RETAIN SYSTEM] Ta. Jv*oo. rn�j E IN m � a 4 / U h/ h a EI / � a I PHYLLIS A.IHERLANC WETLAND AND SURFACE WATER IMPACTS PERMIT / FOR -L- PROFILE, SEE SHEET 6 FOR -Y- PROFILE, SEE SHEET 7 r SITE 2 3XL, - .�/�. �S/\ RETAIN SYSTEM PIPE OUTLET STABILIZATION SEE DETAIL 0 + r- —� CREEK ITE 3 I RETAINING WALL I I IMPACTS IN SURFACE WATER TEMP. IMPACTS IN SURFACE WATER —� ASHE COUNTY BOARD OF EDUCATION • • T H LLI LLI N LLI W N 0 Lo CV H N J LLI J V • DRIVE TURNOUT RADII ARE 10' UNLESS OTHERWISE Ndt D 1 aEc 4•X. ISMTLBUS S75 m ;z - _ tee, yv DENOTES TEMPORARY / IMPACTS IN SURFArATER BY2-15 a DENOTES IMPA S IN SURFACE WATER / / WETLAND AND i N,ST'ENDA DETAIL A DETAIL G SPECIAL CUT 4' BASE DITCH PIPE OUTLET CHANNEL STABILIZATION IN. t. S.1.1 (N.Iro Style) N' rcm D A'� ergs p Gr..n Bewn.�luBad � �� P°a si.p. B Min D= 1 F 1 B=4 F Gee,eMile —L— FROM STA. . IBM O1STA.15+25 TO STA. LT �N TEMP. IMPACTS IN SURFACE WATER IA.,A.,_,re, In A -L- STA. 18+9 0 RT �p-- PROP. RNV IMPACTS IN SURFACE WATER bl / JEAETTE JL. BARKER BARKER TEMP. CAUSEWAY & TEMP. IMPACTS IN SURFACE WATER i PROJECT REFERENCE NO. SHEET NO. BR_ 4_ RW SHEET NO. IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC©MPd E FE PLANS OO NOT CSe FOR / W ACOCISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 3 OF 7 E. REID CRAIG KAY G. CRAIG t LLI LLI co LLI LLI ci y. /� \ —.� ...� \ BL_ \ RETAIN Lo I -- J D E •e� — ` ! � z TY P O P \ h C \\\ `� \ \ �•—� fir, ,` (' RETAIN SYSTEM PIPE OUTLET CH --STAP.ILVATIeN- R `SEE DETAIL �� / LI.J KER PHYLLIS M HERLAND BASKETBALRLTTENNIS I yl��� \\ \\\\\ l \ \ \\ cou I I '��%�%AA�\\\ RETAIN I G AL I4ACTS IM SU FAE WATER TEMP. IMPACTS IN SURFE\NYXT It SURFACE WATER IMPACTS PERMIT FOR -L- PROFILE, SEE SHEET 6 FOR -Y- PROFILE, SEE SHEET 7 a DRIVE TURNOUT RADII ARE 10' UNLESS OTHERWISE NOW z O SITE 4 DENOTES TEMPORARY SHEET NO. ROADWAY DES DESIGN HYDRAULICS / IMPACTS IN SURFACE WATER ENGINEER ENGINEER 3 X INC®A'IPLE ]E PLANS DO NOT USE FOR / W ACQUISITION I O TEMP. IMPACTS IN SURFACE WATER DENOTES IMPACTS IN 105 SURFACE WATER �Po / \ PROP. CONST. EASEMENT DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING BLUE RIDGE ELECTRIC 1 IMPACTS IN SURFACE WATER SHEET 5 OF _7 >>7 MEMBERSHIP �`- CORPORATION CH & 1 � ���� � ///////////// llllllllll�l I1,4 � j (hL. � %%�rr��'i�� •�`% _ _ _ __-��__� _ _ - / .�/j//\`_ a'� �� � 42� ' "Jjll%� //�/�/�` f l�l ///% /� f fi I 1 l I I I I I I W / / / l�f (/ / \ ��I�; W _ ��- III llllllll \\ I� Ur)i I- .11 IRS W / IIIIII IIIII�I 11` ile\ a= 3•�� �i /� /� / \ _ _— — — �� cLu /// / I \ � � t��/� // �an.•� \ � � � 1 LAN R K //// /. I� \\ \ '1 O �� �+ � _ /i �� � % \ � \` BRID E ASO D FL AIN _ CN 71 a — _ _ T24 RCP 30 A N LAS4 JA�A/ `� —�srMi Lu °Al— J RETAIN F— YL \'�T \N� A a Z�gst /m I S / / �\ \���r� _�_/�„`�,///��/ A°•��. r G � —1 \, RETAIN \ ' 1 IM— '� I XATHRYN ASHLEy.. ��t, ,co R. +SrN S'� 3� �i %`�S—� i=i= ti-i--�✓^�✓ �����_ _ _ j� �/�j�//t-'j1/J w I -� /// /— _ �- \— CHARLE L. RHODEs \ ARDEEN BAHODES WETLAND AND SURFACE WATER IMPACTS PERMIT �/ .ea, �,a�,a_.°�,a—�_.° .ems,°�..•_ FOR -L- PROFILE, SEE SHEET 6 FOR -Y1- PROFILE, SEE SHEET 7 \ FOR -DRI- PROFILE, SEE SHEET 7 DRIVE TURNOUT RADII ARE 10' UNLESS OTHERWISE NOTED ff 11+ L- •DES/ N EXCEP /ON FOR SAG VER /CAL B G/N PRO /LE - STA /5 25.00 PIPE YDRAU /C DATA _ 2f.0 P__ Sta. 18+8Q9Q DES/G FREOU CY = 5Q_ YRS DES/G D1SCH E = 17;6 CFS DES/G HW EL NATION = z66/;4_ FT AR HW EVATION = 268/;4 FT R OPP/NG F EOUEN = 5QQ YRS l7ozY R OPP/NG SCHARGE = 26____ _CFSFT P1 = 7+20.00 EL = 2.688.87' Now BM• RR SP/K /N BASE TRIPLE 5' SYCAMO E -BL STA. l7+ 9.Op 65' T.ELEV.2 6358' -L- STA 23+ 9.98 /l1.78 RT. BRILGE HY AULIC )ATA D SIGN DISCHARGE = /48 Cf S 0 SIGN FR OUENCY = 5Q_ Y S D 7SIGN HW ELEVAT/0 = 26_ 1.9__ F B E DISCt 1ARGE = 179 Cj S B E FREC VENCY = lQQ Y S BASE HW i LEVAT/ON = 267 ;2F WERTOPPIA G DISCHMGE = 22 ±__ cj S ERTOPP/ FREOU NCY= +5 Y S D TE OF RVEY = 02 12019 W AT .ELEVAT/ DATE Of N SURVEY = 2 .35 f a 24- CSP BRIDG (STRU T( 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00� TEMP. CAUSEWAY -L EL. 2661.35" - 1 t ABOVE OWS CLASS II RIPRAP WITH V OF CLASS I RIPRAP ON TOP TEMP. CAUSEWAY SHOULD NOT BLOCK MORE THAN 50% OF STREAM AT ANY TIME Pl= 3 +55A0 [� ND PROF L- STA LEV = 2 LE 2+25DO /2 5/ EL = 70826' P1=26'75DO OS = 5MPH ____ -- ___ EL = 2 ELVC 926' - - - =90 nS = X, UP14 c n0002 .. j I j -.`4 2670 \ U NN U NN m i 2660 BR DGE EXC NATION (S RUCTURE PAY ITEM 2650 24+00 25+00 26+00 27+00 PROJECT REFERENCE NO. SHEET NO. BR-0002 6 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER lE PLAINS IIN(C©MPLE DO NOT USE FOR / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PE IT RA 1NG wil R"1l .. 1 I���III�JJJJJJrr � r� mom 11 23f 11 11 immomme fI0 N WETLAND AND SURFACE WATER IMPACTS PERMIT II 41 BM•3 R SPIKE /N BASE 8'WH/TE PINE -BL- TA 24+16. 98 LT. LEV.27/9. 0 -L- S A 30+30. 0 114.30' T. +00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 LEFT OITCH - RIGHT bITCH - I - - - - - K WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 15+24 LT to Ditch Excavation < 0.01 < 0.01 22 16 -L- 15+41 LT 2 -L- 18+77 RT to Outlet Protection < 0.01 < 0.01 18 11 -L- 19+05 RT 3 -L- 23+26 to Temp Causeway 0.07 81 -L- 23+79 4 -L- 30+58 LT to Replace pipe, add headwall < 0.01 < 0.01 1 15 -L- 30+76 LT TOTALS`: < 0.01 0.07 41 123 0 "Rounded totals are sum of actual impacts NOTES: Temporary Causeway should not block more than 50% of stream at any time.