Loading...
HomeMy WebLinkAboutNC0021156_wasteload allocation_19780307 ` FOR DATA MANAGEMENT USE ONLY: FACILITY NO. WASTE LOAD ALLOCATION BEQUEST i„�,`/i /r/ Actual Facility � � �B Proposed Facility Date of Request / / 3 .7'_ TO: Mike McGhee, Technical Services Date Needed FROM: �21 OVerecy SY F0 SUBJECT: Effluent .Limits for NPDES .Permit No. (001 ) Pipe No. (003 ) Permit Application Received (802 ) Draft to Public Notice (805 ) Discharger Name (103 .) County (104 ) Type (401-0�) 7 Mu /�Id Equiv. Population Served (202 ) Latitude (115 ) Longitude (116 ) 201 Area (263 ) 208 Area (264 ) Subbasin(112 y Stream Classification (269 ) 83-09-3 Receiving Stream (109 ) Dr4in. Area(267) 7/10 Flow(270) Ratio Waste 7/10 (303 ) Zo07 �S Design Capacity (207 /) Design Temperature (NKP) Elevation (NKP) 4,1) v 2-7 400 Location Discharger (NKP) Principal Product (NKP) Sample No. BOD5(mg/Z) FecaZ CaZiform Temperature DO (mg/Z) 310 100mZ 31616 a F 11 300 41 _ I - Mo. Aver e Concentration 01 p l 0 0 6 /, a - Wk. Average Concentration 02 J - Minimwn Concentration 03 K - Maxim= Concentration 04 M - Monthly Avera e Loadi 05 - Weekty Average Loading 06 P - Minim= Loading 07 Q - Maximum Loading 08 T - Frequency of AnaZ sis 09 W - S Ze e 10 -T6ta-Z NFL.r NH3-N pY (units) ( /Z) 530 (m Z) 600 400 I - Mo. Avera e Concentration 21 3 D. b - - Wk. Average Concentration 22 J - Minimum Concentration 23 K - Maximum Concentration 24 M - MonthZy Average Loading 25 - Weekly Aver e Loading 26 P - Minimwn Loading 27 Q - Maximum Loading 28 T - Frequency of AnaZ sis 29 W - Sample Type 30 UOD (NKP) '� 6 / 7A ASSIMILATIVE CAPACITY EVALUATION LEVEL "B" ANALYSIS SOURCE OF POLLUTION: jpp/� o f yYIDw�' Att y #er,-,17j�v ST/q Areawide (208) Planning Area: fin. -Ad;f� Facilities (201) Planning Area: � �,l, ..�; A. RECEIVING STREAM C47k1,g# 0Z((JF2- Classification: A —17 7/10 Flow (cfs) 17s, B. ASSIMILATIVE CAPACITY DATA Water Surface Slope (ft/mi) I•D Stream Velocity (fps) p KG 2/ Stream Depth (ft) 12 -0 Elevation @ Discharge Pt. (ft 4 0 0 ` Z Drainage Area (sq. mi.) _ pa 4 LtV 7/10 Yield (cfsm) p, 0417 I Design Temperature (OC) z- ^ I Groundwater Runoff cfs/mi) 0.0 Deoxygenation Rate (Kl Base e) 0.2 Q ►) Reaeration Rate (K2 Base e) 0.3 0,* Min. Daily Avg. D.O. (mg/1) _ S-, 0 f Upstream Quality - BODu (mg/1) Z. D.O. (mg/1) 7.3 C. REQUIRED EFFLUENT LIMITS Design Flow (MGD) 40 BOD5 (mg/1) Ammonia Nitrogen (mg/1) Dissolved Oxygen (mg/1) Total Suspended Solids (mg/1) Fecal Coliform R/100 ml) loop PH (S.U.) O D. COMMENTS UD8at m��L MI/i 500 400 300 200 93 u 80 f ` Q 30 h 40 ,.jJ[C) v 30 S • 20 Coo r �s Design Flow [mad] c_ 9 STATE OF NORTH CAROLINA DEPARTMENT OF NATURAL AND ECONOMIC RESOURCES lLc7 . ORIGINAL FIRST UPDATE PAGE SECOND UPDATE THIRD UPDATE "�"�$ 401; C.-r833