HomeMy WebLinkAboutNCC192861_ESC Approval Submitted_20191206 ROY COOPER _
Governor
MICHAEL S.REGAN
Secretary
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
October 11, 2019
LETTER OF APPROVAL
Duke Energy Carolinas, LLC
Attention: Scott Martin
400 South Tryon Street, Suite 30C
Charlotte, North Carolina 28202
RE: Project Name: Phase III Rogers CCP Landfill Construction (Express Review)
Acres Approved: 37.1
Project ID: CLEVE-2020-006
County: Cleveland
City: Cliffside
Address: McCraw Road
River Basin: Broad
Stream Classification: Other
Submitted By: Duke Energy Carolinas, LLC
Date Received by LQS: October 10, 2019
Plan Type: New
Dear Mr. Martin`
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at
the job site. This plan approval shall expire three(3)years following the date of approval, if no land-disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
Stormwater General Permit.This form MUST be submitted prior to the commencement of any land disturbing
activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct
questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
PauI.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, on or after May 1, 2019, a$100 fee will be charged annually.This fee is to be sent to the DEMLR
Stormwater Central Office in Raleigh.
�_��� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
`� Mooresville Regional Office 1 610 East Center Avenue,Suite 301 1 Mooresville,North Carolina 28115
NORTH OAHOUM
. I -a I.�r 704.663.1699
Letter of Approval
Duke Energy Carolinas, LLC
October 11, 2019
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan
and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this
land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
7"__'\ c-u_
ames Moore
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
em: Elizabeth.Glenn@Duke-Energy.com
cc: Inspection Department