Loading...
HomeMy WebLinkAbout20150356 Ver 3_Buffer impact sketch EMO AJohnson_20191205Strickland, Bev From: Jim <jim@carolinalandsolutions.net> Sent: Thursday, December 5, 2019 1:43 PM To: Johnson, Alan Cc: 'Steven Hinshaw' Subject: FW: [External] Re: Seven Oaks Marina Attachments: Seven Oaks - Buffer impact sketch EMO AJohnson 12-5-19.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to iflp'ort.spam@nc.gov Alan, I've attached a sketch detailing the breakout of the various impacts... highlighted for clarity. I also included the total area of the buffer impacts --delineated by the heavy dashed line. It should scale at 1"=40' when printed on 8-1/2x11 paper See the responses below for the various square footage breakouts you requested. If you find I missed something or have questions about any of the calculated areas please let me know. Also, before I file the mitigation request with Kelly please confirm that the number to report is 17,547 sq. ft.... the total impacted area. Thanks, Jim Heller Carolina Land Solutions, PLLC PO Box 49116 Charlotte, NC 28277 phone 704.724.2235 fax 704.544.3988 This email contains proprietary information and may be confidential. Any files transmitted with it are intended solely for the use of the individual and/or entity to whom it is addressed. Unless noted otherwise above, any distribution or copying of this email is strictly prohibited. If you have received this message in error, please immediately notify the sender and delete this message from your computer. From: Steven Hinshaw <steven@hinshawproperties.com> Sent: Thursday, December 5, 2019 9:40 AM To: Johnson, Alan <alan.johnson@ncdenr.gov>; Jim <jim@carolinalandsolutions.net> Subject: RE: [External] Re: Seven Oaks Marina 10-4, we will get on it so that you have what you need. Thanks. From: Johnson, Alan <alan.iohnson@ncdenr.gov> Sent: Thursday, December 5, 2019 9:23 AM To: Steven Hinshaw <steven@hinshawproperties.com> Subject: RE: [External] Re: Seven Oaks Marina I need the pertinent impact area and the acceptance from DMS for mitigation. Kelly normally, turns those around in a day or less. If I get the information. I might could get it out Monday, at the latest. We can email a signed copy, with the hardcopy via mail. Sq ft of access road located within the buffer[Jim] 1,820 sq.ft Sq ft of open water impact (bulkhead and ramp)[Jim] 1,789 sq. ft. Sq ft of other/remaining buffer impacts (zone 1, exclude the access road)). Length of impact shoreline time 30[Jim] 15,727 sq. ft. If you just multiply length of impact shoreline times 30 ft. it would double count the buffer area at the "point" next to the D-docks. To resolve that, 1 simply delineated the impacted area and noted that total on the sketch .... 17,547 sq. ft. Sq ft of "boardwalk" located in the buffer (access to the boat slips)[Jim] 1,487sq. ft. Those are the impacts I am approving. From: Steven Hinshaw [mailto:steven@hinshawproperties.com] Sent: Thursday, December 5, 2019 9:17 AM To: Johnson, Alan <alan.iohnson@ncdenr.gov>; Jim <jim@carolinalandsolutions.net> Subject: RE: [External] Re: Seven Oaks Marina External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Alan —thanks for taking the call earlier. Jim will send you a sketch breaking out the buffer areas and will send the mitigation request form to Kelly. I will get you a couple of current photos so that you can see the impacted areas. Are you good to go ahead and send us the water quality certification? We are trying to submit this to Duke tomorrow for our extension. Thank you. Steven From: Johnson, Alan <alan.iohnson@ncdenr.gov> Sent: Wednesday, December 4, 2019 4:32 PM To: Steven Hinshaw <steven@hinshawproperties.com> Subject: RE: [External] Re: Seven Oaks Marina need to be in the field. Leaving at 9:30 a.m. but available before From: Steven Hinshaw [mailto:steven@hinshawproperties.com] Sent: Wednesday, December 4, 2019 4:17 PM To: Johnson, Alan <alan.iohnson@ncdenr.gov> Cc: Jim <iim@carolinalandsolutions.net> Subject: RE: [External] Re: Seven Oaks Marina xternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Yes! A lot to digest. Can you do a call tomorrow morning? Thanks. From: Johnson, Alan <alan.iohnson@ncdenr.gov> Sent: Wednesday, December 4, 2019 4:08 PM To: Steven Hinshaw <steven@hinshawproperties.com> Subject: RE: [External] Re: Seven Oaks Marina You have 762 linear ft (If) of shoreline for this parcel. sq ft of zone 1 buffer. The fee for mitigation is 1.85/sq ft. of buffer impact. Which means you have a total of 22,860 X2 Buffer restoration is based on the area of impact (length of impact X buffer width). Restoration is at a rate of 260 trees/ac. Shown below is approx. length for the various segments of the parcel. I need photos from Shannon to confirm impact(s). He stated he could provide. Please read below. A phone call may be in order, once you've digested. Thanks, Alan Red - 180 ft (wooded) X 30 = 5,400 / 43,560 = 0.12 acre X 260 = 32 trees would be required to restore this section. I propose a minimum of 10 trees in a similar "row" through the buffer (1 tree every 10 ft of 30 ft of buffer) Orange — 75 ft (wooded), 14 trees for restoration Green — 176 ft (100 ft which was already free of trees), 14 trees for restoration Blue — 95 ft (which was clear of trees), no trees required A minimum of 60 trees would typically be required (3" diameter, 8 ft, native species) for restoration. If the blue is limited to just the 95 ft. The 28 trees (14 + 14) can be spread through the Orange, blue, and green areas in a similar manner as shown (no bunching). The aforementioned would be partial mitigation. Then For the wooded section(s), 255 X 30 = 7,560 sq ft., mitigation 3 would be paid into the program at a reduced rate (for partial mitigation on site), since they aren't technically fully restored. The 30 X 30 launch pad would be mitigated at full rate. Storm water from the access/launch pad should not flow into the lake Zr mot. ti 1 +-rK alb S 4 r7 Area w* Limits +ram From: Steven Hinshaw[mailto:steven@hinshawproperties.com] Sent: Wednesday, December 4, 2019 11:27 AM To: Jim<jim@carolinalandsolutions.net>; Johnson, Alan <alan.iohnson@ncdenr.gov> Subject: [External] Re: Seven Oaks Marina • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ��am@nc.gov Alan - as promised attached is a landscape plan for the buffer areas. Thanks. Steven 4 l WOOD DECK p ' (WITH STEPS) / 44 r8' BOARDWALK OFFM (WOOD OR COMPOSITE DECKING) / ' '� \ / / J. % ` I y } IN, C—DOCK' .: f 0-10'x24' s/ip4 3Z, 7 PWC s/ipti . End T Holding Dock B—DOCK 4-1O'x24' slips y l f w. 5Q �' boarding Pier D—DOCK - 14-10'x24' slips 2 End Tles Pump Out 1 T 35.1517 (NA 3 LONG-81.0565 (NAD 83 N ElevQte: Launch Pad (30'x4CJ') _ J Launc_h Ramp (I 5' x 65' - i` �77 3 l3 Z-73t fir: Staging A —DOCK Area 4-1 o'x2o' slips Limits 3 PWC SAPS V 7jP MERRICK ACAD-x7825-13-LAYOUT w CLS revs 10-22-19.dwg Model 12/5/2019 12:52:12 1 : 50