Loading...
HomeMy WebLinkAboutSW3191201_O&M EZ 071414_1.1 (2)_12/5/2019QperatiQn..aintananca A Project Name: Project Location: Circle K Denver (Unity Church Rd) NE corner NC-16 Business and Unity Church Rd Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & co Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity. Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ding O&M tables 1 Location( Location( Location( Location( Location( Location( Location( Location( Location( Location( Location( Location( Location( Location( Location(: s): s): s): s): s}: s): s): aaaea a I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Signature: County of Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Haytham Kasem Construction Manager, Circle K Stores Inc. 2550 W. Tyvola Road, Suite 200 Charlotte, NC 28217 (704) 776-6444 hkaseml circiek.com Date: Jz U_tto a Notary Public for the State of hcLy do hearby certify that :HrkQih(J r'vt Os- a:3 personally appeared before me this IQ day of _Iv> \l f-e,(' I QO I � and acknowledge the due execution of the Op rations and Maintenance Agreement. Witness my hand and official seal, KARLA YQN NOTARY PUBLIC Meckleebwg Cwxigl North CarWA My Commission rxv�.s Version 1.4 My commission expires 0 -2)I _�, ,=aG 111412019 O&M Millual Page 1 of 5 STORM-EZ 11/412019 Version 1.4 O&M Manual Page 2 of 5 ,,, Important operation and maintenance procedures: immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. Wheeled or tracked equipment will NEVER be driven over the bioretention planting surface. Special care will be taken to prevent sediment from entering the bioretention cell. If standing water is present 2 days after rainfall, conduct an infiltration test of the soil media. After the bioretention cell is established, inspect it quarterly. Inspection activities shall be performed as follows and maintenance activites shall commence immediately to remediate any problems observed per the table below. iBMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil to remove the gully, and plant a ground cover and erosive gullies have formed. water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale to smooth it over and provide erosion control Swale. devices such as reinforced turf matting or riprap to avoid future problems. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The pretreatment area Flow is bypassing Regrade if necessary to route all flow to the pretreatment area. pretreatment area and/or Restabilize the area after grading. gullies have formed. Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than three possible. Remove the sediment and restabilize the pretreatment area. inches. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional practices. vegetation show that pruning is needed Ito maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present I Remove tree stake/wires (which can kill the tree if not removed), six months after planting. STORM-EZ 111412019 Version 1.4 O&M Manual Page 3 of 5 BMP element: Potential problem: How to remediate the problem: The bioretention cell: Mulch is breaking down or Spot mulch if there are only random void areas. Replace whole mulch soils and mulch has floated away. layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging - remove and replace either just clogged with sediment. the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as recommended per the soil test and pH has dropped or heavy toxic soils shall be removed, disposed of properly and replaced with metals have accumulated in new planting media. the soil media. The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-FZ 11 /4/2419 Version 1.4 O&M Manual Page 4 of 5 Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the sand filter. - The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. - Once a year, sand media will be skimmed. - The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: lPotential problem: Flow to remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as possible. applicable) pavement surface. Perimeter of sand filter Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at an appropriate height. long. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or IReplace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). Forebay or pretreatment Sediment has accumulated to Search for the source of the sediment and remedy the problem if area a depth of greater than six possible. Remove the sediment and stabilize or dispose of it in a inches. location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Filter bed and underdrain Water is ponding on the Check to see if the collector system is clogged and flush if necessary. collection system surface for more than 24 If water still ponds, remove the top few inches of filter bed media and hours after a storm. replace, If water still ponds, then consult an expert. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-EZ 11/4/2019 Version 1.4 O&M Manual Page 5 of 5