Project Name:
Project Location:
Circle K Denver (Unity Church Rd)
NE corner NC-16 Business and Unity Church Rd
Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set
location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These
deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s).
The BMP(s) on this project include (check all that apply & co
Bioretention Cell
Quantity:
Dry Detention Basin
Quantity:
Grassed Swale
Quantity:
Green Roof
Quantity:
Infiltration Basin
Quantity:
Infiltration Trench
Quantity:
Level SpreaderNFS
Quantity:
Permeable Pavement
Quantity.
Proprietary System
Quantity:
Rainwater Harvesting
Quantity:
Sand Filter
Quantity:
Stormwater Wetland
Quantity:
Wet Detention Basin
Quantity:
Disconnected Impervious Area
Present:
User Defined BMP
Present:
ding O&M tables
1 Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(:
s):
s):
s):
s):
s}:
s):
s):
aaaea a
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed
for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any
changes to the system or responsible party.
Signature:
County of
Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
Haytham Kasem
Construction Manager, Circle K Stores Inc.
2550 W. Tyvola Road, Suite 200
Charlotte, NC 28217
(704) 776-6444
hkaseml circiek.com
Date: Jz
U_tto a Notary Public for the State of hcLy
do hearby certify that :HrkQih(J r'vt Os- a:3
personally appeared before me this IQ day of _Iv> \l f-e,(' I QO I � and
acknowledge the due execution of the Op rations and Maintenance Agreement.
Witness my hand and official seal,
KARLA YQN
NOTARY PUBLIC
Meckleebwg Cwxigl
North CarWA
My Commission rxv�.s
Version 1.4
My commission expires 0 -2)I _�, ,=aG 111412019
O&M Millual Page 1 of 5
STORM-EZ
11/412019
Version 1.4 O&M Manual Page 2 of 5
,,,
Important operation and maintenance procedures:
immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants
become established (commonly six weeks).
Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell.
Wheeled or tracked equipment will NEVER be driven over the bioretention planting surface.
Special care will be taken to prevent sediment from entering the bioretention cell.
If standing water is present 2 days after rainfall, conduct an infiltration test of the soil media.
After the bioretention cell is established, inspect it quarterly. Inspection activities shall be performed as follows and maintenance
activites shall commence immediately to remediate any problems observed per the table below.
iBMP element: Potential problem:
How to remediate the problem:
The entire BMP Trash/debris is present.
Remove the trash/debris.
The perimeter of the BMP Areas of bare soil and/or
Regrade the soil to remove the gully, and plant a ground cover and
erosive gullies have formed.
water until it is established. Provide lime and a one-time fertilizer
application.
Vegetation is too short or too
Maintain vegetation at a height of approximately six inches.
long.
The inlet device The pipe is clogged.
Unclog the pipe. Dispose of the sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale to smooth it over and provide erosion control
Swale.
devices such as reinforced turf matting or riprap to avoid future
problems.
Stone verge is clogged or
Remove sediment and replace with clean stone.
covered in sediment (if
applicable).
The pretreatment area Flow is bypassing
Regrade if necessary to route all flow to the pretreatment area.
pretreatment area and/or
Restabilize the area after grading.
gullies have formed.
Sediment has accumulated to Search for the source of the sediment and remedy the problem if
a depth greater than three
possible. Remove the sediment and restabilize the pretreatment area.
inches.
Erosion has occurred.
Provide additional erosion protection such as reinforced turf matting or
riprap if needed to prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by hand.
The bioretention cell: Best professional practices
Prune according to best professional practices.
vegetation show that pruning is needed
Ito maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the problem: soils, hydrology, disease, etc.
dying.
Remedy the problem and replace plants. Provide a one-time fertilizer
application to establish the ground cover if a soil test indicates it is
necessary.
Tree stakes/wires are present I Remove tree stake/wires (which can kill the tree if not removed),
six months after planting.
STORM-EZ 111412019
Version 1.4 O&M Manual Page 3 of 5
BMP element:
Potential problem:
How to remediate the problem:
The bioretention cell:
Mulch is breaking down or
Spot mulch if there are only random void areas. Replace whole mulch
soils and mulch
has floated away.
layer if necessary. Remove the remaining much and replace with
triple shredded hard wood mulch at a maximum depth of three inches.
Soils and/or mulch are
Determine the extent of the clogging - remove and replace either just
clogged with sediment.
the top layers or the entire media as needed. Dispose of the spoil in
an appropriate off -site location. Use triple shredded hard wood mulch
at a maximum depth of three inches. Search for the source of the
sediment and remedy the problem if possible.
An annual soil test shows that
Dolomitic lime shall be applied as recommended per the soil test and
pH has dropped or heavy
toxic soils shall be removed, disposed of properly and replaced with
metals have accumulated in
new planting media.
the soil media.
The underdrain system
Clogging has occurred.
Wash out the underdrain system.
(if applicable)
The drop inlet
Clogging has occurred.
Clean out the drop inlet. Dispose of the sediment off -site.
The drop inlet is damaged
Repair or replace the drop inlet.
The receiving water
Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.
STORM-FZ
11 /4/2419
Version 1.4 O&M Manual Page 4 of 5
Important maintenance procedures:
- The drainage area will be carefully managed to reduce the sediment load to the sand filter.
- The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches.
- Once a year, sand media will be skimmed.
- The sand filter media will be replaced whenever it fails to function properly after maintenance.
The sand filter shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5
inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available
upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element: lPotential problem: Flow to remediate the problem:
Entire BMP Trash/debris is present.
Remove the trash/debris.
Adjacent pavement (if Sediment is present on the
Sweep or vacuum the sediment as soon as possible.
applicable) pavement surface.
Perimeter of sand filter Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then plant a
erosive gullies have formed.
ground cover and water until it is established. Provide lime and a one-
time fertilizer application.
Vegetation is too short or too
Maintain vegetation at an appropriate height.
long.
Flow diversion structure The structure is clogged.
Unclog the conveyance and dispose of any sediment offsite.
The structure is damaged.
Make any necessary repairs or replace if damage is too large for
repair.
The inlet device The pipe is clogged.
Unclog the pipe. Dispose of the sediment off -site.
The pipe is cracked or
IReplace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to smooth it over and provide erosion
swale.
control devices such as reinforced turf matting or riprap to avoid future
problems with erosion.
Stone verge is clogged or
Remove sediment and replace with clean stone.
covered in sediment (if
applicable).
Forebay or pretreatment Sediment has accumulated to
Search for the source of the sediment and remedy the problem if
area a depth of greater than six
possible. Remove the sediment and stabilize or dispose of it in a
inches.
location where it will not cause impacts to streams or the BMP.
Erosion has occurred.
Provide additional erosion protection such as reinforced turf matting or
riprap if needed to prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by hand. If a pesticide is used, wipe it
on the plants rather than spraying.
Filter bed and underdrain Water is ponding on the
Check to see if the collector system is clogged and flush if necessary.
collection system surface for more than 24
If water still ponds, remove the top few inches of filter bed media and
hours after a storm.
replace, If water still ponds, then consult an expert.
The outlet device Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.