Loading...
HomeMy WebLinkAboutSW3191201_Denver Unity Church Rd Circle K Drainage Report_12/5/2019Bowman C O N S U L T I N G Circle K Stores Inc. Denver (Unity Church Rd.) NE Corner of NC-16 Business and Unity Church Road Denver, NC COORDINATE: 35°28'45.5"N,-80°59'35.2"W Project No.: 120003-01-045 Storm Water Management Report Prepared By: Bowman C O N S U L T 1 N G 950 North Point Pkwy., Suite 200 Alpharetta, GA 30005 NC Business License No. C-3556 PREPARED FOR CIRCLE K NOVEMBER 2019 CIRCLE K— DENVER (UNITY CHURCH RD) 1 I P a g e Bowman C O N S U L T I N G PREPARED FOR CIRCLE K Circle K Stores Inc. Denver (Unity Church Rd.) NE Corner of NC-16 Business and Unity Church Road Denver, NC COORDINATE: 35°28'45.5"N,-80°59'35.2"W Project No.: 120003-01-045 Storm Water Management Report Prepared By: Bowman C O N S U L T I N G 950 North Point Pkwy., Suite 200 Alpharetta, GA 30005 NC Business License No. C-3556 NOVEMBER 2019 Kai Burk, P.E. NC License No. 043463 CIRCLE K— DENVER (UNITY CHURCH RD) 2 1 P a g e Bowman C O N S U L T I N G 6N1111to] u1Ti%11YDI:auKHR111"DIuIDI►Ir►Val all I .11YWa This report documents the hydraulic and hydrological analysis performed by Bowman Consulting for the Denver Circle K located on the northeast corner of NC-16 Business and Unity Church Road in Denver, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. SITE INFORMATION The proposed site is located on the northeast corner of NC-16 Business and Unity Church Road, Denver, North Carolina. The site is located on three undeveloped parcels. Circle K is proposing to develop a 2.35+ acre portion of the three existing parcels with a new Circle K Convenience Store and Gas Station with Car Wash, as well as supporting infrastructure. Table 1: Site Information Parcel ID Portion of 4603750889, 4603657556, 6603656377 Parcel Area 2.35 + acres Zone (no flood elevation) from FEMA FIRM Map No. Flood Zone 3710460300J, dated August 16, 2007. Soils within close proximity to the site as defined by NRCS (National Resources Conservation Service) are described in Table 2. Table 2: Hydrologic Soil Groups Group Description Ce132 Cecil sandy clay loam According to the Web Soil Survey, 100% of the subject site falls within the hydrologic soil group B. For the purposes of design, the same hydrologic group was utilized for both Pre and Post Development conditions. The FEMA Flood Map is included in Appendix A. DESIGN REQUIRMENTS Stormwater design was based on the standards presented in the Lincoln County Unified Development Ordinance, Section 3.8 Stormwater Drainage and Erosion Control, and the North Carolina Department of Environmental Quality Stormwater Design Manual. The following criteria were selected based on the guidelines: 1. Erosion and sedimentation control measures, structures, and devices shall be planned, designed, and constructed to provide protection from the calculated maximum peak of the ten-year storm. 2. Volume of stormwater runoff generated from all of the built upon areas of a project during a storm of the required storm depth (one inch for non -coastal areas) is treated in one or more primary SCMs (Stormwater Control Measures) or a combination of Primary and Secondary SCMs that provide equal or better treatment. RAINFALL DATA FOR CITY OF LINCOLN COUNTY NOAA rainfall amounts for Denver, NC storm events are listed below. CIRCLE K— DENVER (UNITY CHURCH RD) 3 1 P a g e Bowman C O N S U L T I N G Table 3: Denver, NC Rainfall Depth Data 1 yr 2 yr 5 yr 10 yr 25 yr 50 yr 100 yr 2.80" 3.39" 4.26" 4.95" 5.89" 6.64" 7.40" Table 4: Denver, NC Rainfall Intensity Data Storm Frequency (yrs) Tc = 5 min. Tc = 15 min. Tc = 30 min. Tc = 60 min. 1 4.66 3.10 2.12 1.32 2 5.50 3.68 2.54 1.60 5 6.42 4.34 3.08 1.97 10 7.09 4.78 3.47 2.26 25 7.87 5.30 3.93 2.61 50 8.41 5.66 4.26 2.89 100 8.92 5.97 4.57 3.15 HYDROLOGY ANALYSIS AND CALCULATIONS Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the Denver, NC Unified Development Ordinance and the NC DEQ Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. PRE -DEVELOPMENT CONDITIONS The existing site is currently an undeveloped, mostly wooded area that is part of three existing parcels. The drainage area is divided into two drainage basins, each with its own point of analysis. Pre Drainage Area A drains to an existing grate inlet and stormwater system at the southwest corner of the site at the intersection of NC -Business 16 and Unity Church Road (POA-1). Pre Drainage Area A slopes generally from the east to south and west, with average slopes in the range of 1-5% and consists entirely of pervious area. Approximately 90% of Pre Drainage Area A is wooded and the remaining 10% consists of open gravel, grass, and dirt areas. Pre Drainage Area B drains east of the site to an existing swale along Unity Church Road with slopes of 1- 3% and consists of wooded areas. A breakdown of the drainage basins, areas, curve numbers, and times of concentration are shown in Table 5 below. Calculations associated with this data can be found in Appendix B. A drainage map showing the Pre -Development Basins can be found in Appendix A. Table 5: Pre Development Basin Summaries Composite Time of Basin ID Area [acres] Curve Number Concentration (CN) (Tc) [min.] Pre Drainage Area A 3.26 60 69.1 Pre Drainage Area B 0.34 58 70.5 CIRCLE K- DENVER (UNITY CHURCH RD) 4 1 P a g e Bowman C O N S U L T I N G Two points of analyses (POAs) were set up for the model and analysis purposes. Pre -Drainage Area A discharges southwest of the site to an existing storm water system at POA-1 Pre -Drainage Area B discharges east of the site to an existing swale along Unity Church Road at POA-2. [111110]0USI5911111V1 00101mOFWARIa11:11163 N]►[K@]►INal lI A temporary sediment trap is proposed to provide protection from the 10-year 24-hour storm during construction. An area of 4.35 acres will be directed to the sediment trap via two diversion swales running along the south and west sides of the site. Site characteristics and calculations may be found in Appendix B. Sediment Trap Volume: 15,815 cu. ft. Bottom elev.: 846.50' Berm elev.: 850.00' Spillway elev.: 849.50' 10-year elev.: 849.53' Table 6: Sediment Trap Stage Storage Incremental Total Height Elevation Storage Storage (FT) (FT) (CF) (CF) 0.00 846.50 0 0 0.50 847.00 1746 1746 1.50 848.00 3988 5734 2.50 849.00 4680 10414 3.50 850.00 5402 15815 Table 7: Model Results Storm Event Spillway Pre-Dev. Post-Dev. (cfs) (cfs) 2-yr 24-hr 10-yr 24-hr 0.68 2.36 0.00 0.34 POST -DEVELOPMENT CONDITIONS Overview Development of the project site consists of construction of a 5,471+/- sf building, gasoline fueling area canopies, an 851+/- car wash, and associated pavement including parking areas, drives and curb. The post - development condition contains four basins. Post Drainage Area A captures runoff from most of the new impervious areas including the new building, fuel canopy, car wash, the southern half of the parking and driveways, and all of the new access drive CIRCLE K— DENVER (UNITY CHURCH RD) 5 1 P a g e Bowman C O N S U L T I N G along Unity Church Road. Post Drainage Area A routes runoff to an open sand filter and detention system at the southwest corner of the site. Post Drainage Area C Bypass captures runoff from the undeveloped wooded area east of the site as well as part of the remaining developed pervious, landscaped areas east and north of the site. The runoff from Post Drainage Area C Bypass discharges to a swale running along NC-16 Business to point of analysis, POA- 1. Post Drainage Area C Bypass is entirely pervious with the exception of 278 square feet of sidewalk. Post Drainage Area D captures runoff from the northern half of the parking and driveway areas, as well as a portion of the developed, pervious area at the northern side of the site. The runoff from Post Drainage Area D is routed through a bioretention area and discharged to a swale running along NC-16 Business to point of analysis, POA-1. Runoff from Post Drainage Area A, Post Drainage Area C Bypass, and Post Drainage Area D are combined and discharged at the existing grate inlet at the intersection of NC-16 Business and Unity Church Road at point of analysis POA-1. Post Drainage Area B consists of the wooded area in Pre -Drainage Area B minus the impervious portion of the new driveway and access to Unity Church Road. Post Drainage Area B is entirely pervious. Post Drainage Area B discharges east of the site to an existing swale along Unity Church Road at point of analysis, POA-2. Both points of analyses, POA-1 and POA-2, remain the same for the pre- and post -development drainage basins. The characteristics for the post -development basins are shown below and calculations can be found in Appendix B. A drainage map identifying the basins can be found in Appendix A. Table 8: Post Development Basin Summaries Composite Time of Area Basin ID Curve Number Concentration [acres] (CN) (Tc) [min.] Post Drainage Area A 1.98 87 5.0 Post Drainage Area B 0.20 59 39.7 Post Drainage Area C Bypass 0.93 60 60.9 Post Drainage Area D 0.55 85 27.5 Water Quantity Hydraflow was utilized to model the site's peak discharges and hydrographs for the Circle K site and associated drainage basins. The pre and post -development peak discharges for the site are presented below in Table 9. Post Drainage Area A is routed through an open sand filter and detention system and Post drainage Area D is routed through a bioretention area. Both are combined with Post Drainage Area C Bypass to continue to the point of analysis (POA-1) at the northeast corner of the intersection of NC-16 Business and Unity Church Road. Post Drainage Area B discharges to the point of analysis (POA-2) in the swale along Unity Church Road. The points of analyses are the same in pre- and post- development studies. A comparison of the discharges is summarized in the table below. Please see Appendix C for full Hydraflow results. CIRCLE K— DENVER (UNITY CHURCH RD) 6 1 P a g e Bowman C O N S U L T I N G Table 9: Model Results Storm Event POA-1 POA-2 Pre-Dev. Post-Dev. Pre-Dev. Post-Dev. (cfs) (cfs) (cfs) (cfs) 2-yr 24-hr 10-yr 24-hr 0.51 0.45 1.77 1.74 0.04 0.04 0.16 0.15 Bioretention Area Design Specifics A bioretention area is designed to provide water quantity control as described in the previous section. The system consists of a shallow open pond area over bioretention media. The detention system outfall is controlled by an outlet control structure. Table 10 below describes the combined detention stage - storage details. Bioretention Volume (above internal water storage): 4,926 cu. ft. Top elev. of bioretention: 847.00' Bottom elev. of bioretention: 845.00' Bottom elev. of planting media: 843.50' Bottom elev. of 6" underdrain: 843.00' Table 10: Bioretention Stage Storage Incremental Total Height Elevation Storage Storage (FT) (FT) (CF) (CF) 0.00 845.00 0 0 1.00 846.00 2096 2096 2.00 847.00 2830 4926 Table 11: Bioretention Maximum Water Surface Elevations Maximum Water Storm Event Surface Elevation (FT) 2-yr 24-hr 845.91 10-yr 24-hr 846.22 Bioretention Outlet Control Structure The system will be controlled by an outlet control structure having two weirs to meet water quantity discharge requirements: Weir 1: 6" at Elevation 845.60' Weir 2: 16' at Elevation 846.25' CIRCLE K— DENVER (UNITY CHURCH RD) 7 1 P a g e Bowman C O N S U L T I N G Sand Filter Detention Design Specifics An open sand filter detention system is designed to provide water quantity control as described in the previous section. The system consists of two pond areas connected by an 18" pipe: a sediment chamber and a sand filter pond. The detention system outfall is controlled by an outlet control structure. Table 12 below describes the combined detention stage -storage details. Sediment Chamber Volume: 6,721 cu. ft. Bottom elev. of pond: 844.00' Top elev. of pond: 849.00' Sand Filter Chamber Volume of pond above sand filter 13,102 cu. ft. Bottom elev. of 6" underdrain: 841.50' Bottom elev. of sand: 842.00' Bottom elev. of 6" gravel layer: 843.50' Bottom elev. of pond: 844.00' Top elev. of pond: 848.00' Table 12: Sand Filter Detention System Storage Incremental Total Height Elevation Storage Storage (FT) (FT) (CF) (CF) 0.00 844.00 0 0 1.00 845.00 2413 2413 2.00 846.00 3280 5693 3.00 847.00 5175 10868 4.00 848.00 6430 17298 5.00 849.00 1985 19283 Table 13: Sand Filter Detention System Maximum Water Surface Elevations Maximum Water Storm Event Surface Elevation (FT) 2-yr 24-hr 847.42 10-yr 24-hr 847.79 Sand Filter Outlet Control Structure The system will be controlled by an outlet control structure having two weirs to meet water quantity discharge requirements: Weir 1: 16' at Elevation 848.00' Weir 2: 4" at Elevation 847.30' CIRCLE K— DENVER (UNITY CHURCH RD) 8 1 P a g e Bowman C O N S U L T I N G Water Quality (Post Construction) Runoff treatment will be provided by routing all new built upon surfaces through either an open sand filter or bioretention area, both which are designed according to North Carolina Department of Environmental Quality Primary Stormwater Control Measure (SCM) design criteria. Sand Filter — Post Drainage Area A Runoff Volume Rv=0.05+0.9IA IA (Impervious fraction) = 55,918 SF / 85,022 SF = 0.66 = 0.05 + 0.9 (0.66) = 0.64 inches Design Volume DV = 3630 x RD x Rv x A Ro (Design storm depth) = 1.0" (for non -coastal North Carolina areas) A (Drainage area) = 1.96 acres =3630x1.0x0.64x1.96 = 4,553 cubic feet Discounted Sand Filter Design Volume DVSF = 0.75 (4533 cubic feet) = 3,415 cubic feet Stage Storage Elevation at Discounted Sand Filter Design Volume WQELEv = 845.3V Minimum Sand Filter Surface Area AreaSF = DVSF/Ponding Depth = 3,415 cubic feet/4.0 feet = 854 square feet Provided sand filter surface area = 904 SF Bioretention Area — Post Drainage Area D Runoff Volume Rv=0.05+0.9IA IA (Impervious fraction) = 15,142 SF / 24,206 SF = 0.63 =0.05+0.9(0.63) = 0.61 inches Design Volume DV = 3630 x RD x Rv x A Ro (Design storm depth) = 1.0" (for non -coastal North Carolina areas) A (Drainage area) = 0.56 acres CIRCLE K— DENVER (UNITY CHURCH RD) 9 1 P a g e Bowman C O N S U L T I N G = 3630 x 1.0 x 0.61 x 0.56 = 1,240 cubic feet Design Surface Area DSA = DV / Ponding Depth = 1,240 cubic feet / 1 foot = 1,240 square feet Provided bioretention surface area = 1,755 SF CIRCLE K— DENVER (UNITY CHURCH RD) 10 1 Page Bowman C O N S U L T I N G R19011,1111106] Appendix A: Maps • Soil Report • FEMA Flood Map No. FM3710460300J • Pre -Development Drainage Basin Map • Post -Development Drainage Basin Map Appendix B: Calculations • Pre -Development Basin Calculations • Construction Phase Basin Calculations • Post -Development Basin Calculations Appendix C: Hydraflow Hydrograph Model • Model Schematic • Hydraflow Hydrograph Results • Sediment Trap Hydrograph Results CIRCLE K— DENVER (UNITY CHURCH RD) 111 Page Bowman C O N S U L T I N G APPENDIX A Maps CIRCLE K— DENVER (UNITY CHURCH RD) 12 1 Page a 500II470 500530 35° 28' 55" N rra+F � it: :r c t, 1 �i 1 i l rS ► � 35° 28'42"N Custom Soil Resource Report Map —Hydrologic Soil Group 500710 500770 500830 500890 500950 501010 500470 500530 5CD590 500650 500710 500770 500830 500890 500950 501010 Map Scale: 1:2,900 if printed on A landscape (11" x 8.5") sheet. Milers $ N 0 40 80 160 240 Feet 0 100 200 400 600 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 18 501070 11 35° 28' 55" N 35° 28' 42" N 501070 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D 0 C 0 C/o 0 D 0 Not rated or not available Soil Rating Lines . . A . A/D r r B r 0 B/D . C . C/o . D . Not rated or not available Soil Rating Points ❑ A ❑ A/D 0 B 0 B/D Custom Soil Resource Report ❑ C ❑ C/o 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation i-" Rails , 0 Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Lincoln County, North Carolina Survey Area Data: Version 22, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 8, 2015—Nov 28, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. 19 Custom Soil Resource Report Table —Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded B 9.9 99.9% PeC2 Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded B 0.0 0.1 % Totals for Area of Interest 9.9 100.0% Rating Options —Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher 20 Custom Soil Resource Report Lincoln County, North Carolina CeB2—Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol. 2mw6d Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Cecil, moderately eroded, and similar soils: 88 percent Minor components: 12 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cecil, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap - 0 to 6 inches: sandy clay loam Bt - 6 to 40 inches: clay BC - 40 to 48 inches: clay loam C - 48 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 7.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Hydric soil rating: No Minor Components Madison, moderately eroded Percent of map unit. 8 percent Landform: Interfluves 13 Custom Soil Resource Report Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Convex Hydric soil rating: No Vance, moderately eroded Percent of map unit: 4 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Convex Hydric soil rating: No PeC2—Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mw6n Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Pacolet, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pacolet, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap - 0 to 7 inches: sandy clay loam Bt - 7 to 24 inches: clay B - 24 to 33 inches: sandy clay loam C - 33 to 80 inches: loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium 14 Custom Soil Resource Report Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 7.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Hydric soil rating: No 15 ❑ Q Q (i = N 0 1 N C ❑ m S N (i6 N > _ o N N U x Q Q Q E (6 E tlllCL N J ¢ r�i i L (6 Y J C (6 x (6 LL= O 0 i 0 0 i 0 _ tlll Z = x 3 = o Vo OO -0 E y(=036 0 LL❑w�(❑6 x ve '0 '0 N '6 000¢ 0aww W ' N N U=0 = ( N n 0 CLL0 0I' O E 'O W 0 6 o 0 ((0= = _w dU LLwc) E o > i > 0 4=E oN0 E Eo=a dOvC m¢> Ui a0 C N Z ° w. M 0.a (0 >N U EC mN(6 T N = N C N O E(0O �C .0oy _- >0 (60 3 E 0 E N (,0, LL o =N ¢ ULLU )�+ a) 0 o c m a ((0 Q (0 z� a m w o C E Qw w.0nn ¢ o> d v _ E c.T3 0�0 .0 ❑ LC a > > oa m ON Z J= �❑(6 '(doT6> E dN N 00N6 (6 U U LL= Q000 `6 Nc¢O E]E]®=C ° 6 O E ' UE m00 C vi I^ N C O O C (6 -� � , Q (6 •O (6 Z O- J 0 O_ '6 Q o° O LL O ¢ ¢ W W W W E EQ= :+6 U °x ? d Z CL o==� '0 (6 — 0" F w O < N W W M x Z E Q O N T (0 w M, ❑ '0 y6 O L N 0 C U N Q w= N i (6 C C a LL¢ W¢ ¢ Z H O H ¢ (6 0 '— F w����a Q —i ¢ ¢ p w cs� w LL a ¢ ���� �.'°a� u (6'6 E d Ea=�`�� d nnm = nn �1� W N W N W Q H F '6 F (6 F (6 3 ._ F N li 3 J N O vai= �LL 80o59'29.75"W �CD CD CD N 0 0 0 O Lo N w oGo y � a U ,p41' �- Q -0 ' oin oU � m ZQ W \ oLU wwQ \ pz��� N (p CM a o cv m �. 1 U zm w 2wU) � 0 < LO \ / w w Q n w Q U o c� ❑ZMo O u U a- d ❑ ~ �a � Z� L� >,U o o gT oa o z oN ,C:) J o a M Z co a L M L N z a) c� Uw � � m WZ LU �O OZ � a� U z Z C U C o u o ca wo J J m a� ~ U Q 0 Q c C J 0.5 U U N m U y / /XA =�,•``•II I 1 II 7 � 1 W } W / CO / d U W W O' Woz J Q 11 — / W Cl) z \ W W Q II Qa�LZ W QCir U0 W W U a ❑ W o / i (D Q Z H( 11 / N W O O) (n Q U ❑zoUr� Oz a-Q I 0-Q O p ❑ d �- a w �z a _ ,, -j o�zoo W >W 1 11 W co a w FLZ > O o a� a z _ LOD H L 0 O o T Cl) It Q J O 0 N Cl) (� d Q) M L lA VJ Z CU Q) (7 O LO Q O Q� C �N o O 0 V E o m Bowman C O N S U L T I N G APPENDIX B Calculations CIRCLE K— DENVER (UNITY CHURCH RD) 13 1 Page Bowman C O N S U L T I N G Stormwater Calculations Pre -Developed Project: Circle K Denver (NC Hwy 16), SC Date: 11/25/19 Project No.: 120003-01-045 Designed: PNL Municipality: Lincolnton County Checked: KB Ch Ch; Pre Drainage Area A Curve Number Calculation Cover Type Group (SF) (Ac.) CN Woods and Grass (Good) B 126198 2.90 Open Space (Poor) B 13591 0.31 Gravel B 2051 0.05 Time of Concentration Calculations 0.007UtL. ' _ Tt (p )°-6sLL9 a Area: Composite CN: Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Woods - dense 1 3.39 0.0330 273 66.4 Open Channel Flow Description Wp (ft) a (sq ft) Rh n S (ft/ft) V (ft/s) L (ft) t (min) innel w/ light br 7.41 3.25 0.44 0.05 0.023 2.6 400 2.6 Concrete 1.96 0.61 0.31 0.013 0.0103 5.3 40 0.1 V _ �I`vzeft Pre Drainage Area B Curve Number Calculation Time of Concentration: Cover Type Hydrologic Soil Group Area (SF) Area (Ac.) CN Woods and Grass (Good) B 14752 0.34 58 Time of Concentration Calculations T, 2JJ1F o,6et 1 Area: Composite CN: Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Woods - dense 1 0.8 3.39 0.0096 156 69.5 V _ L ldSIP., Time of Concentration:®i Bowman C 0 N 5 U L T I N G Project: Circle K Denver (NC Hwy 16), SC Project No.: 120003-01-045 Municipality: Lincolnton County Post Drainage Basin A Curve Number Calculation Stormwater Calculations Post -Developed Date: 11/25/19 Designed: PNL Checked: KB Cover Type Group (SF) (Ac.) CN Impervious B 59726 1.37 98 Open Space (Good) B 26518 0.61 61 Time of Concentration Calculations O.0O7(nLY z Area: Composite CN: Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Smooth 0 3.84 0.005 216 3.6 Open Channel Flow Description Wp (ft) a (sq ft) Rh n S (ft/ft) V (ft/s) L (ft) t (min) Concrete 3.14 1.57 0.50 0.016 0.001 1.9 68 0.6 Concrete 2.36 0.88 0.37 0.02 0.0146 4.7 164 0.6 Time of Concentration: e & 42V,3�2 *Use minimum 5 minutes 76 Bowman C 0 N 5 U L T I N G Project: Circle K Denver (NC Hwy 16), SC Project No.: 120003-01-045 Municipality: Lincolnton County Post Drainage Basin B Curve Number Calculation Stormwater Calculations Post -Developed Date: 11/25/19 Designed: PNL Checked: KB Cover Type Hydrologic Soil Group Area (SF) Area (Ac.) CN Woods and Grass (Good) B 6656 0.15 58 Open Space (Good) B 2242 0.05 61 Time of Concentration Calculations _ 0.0076L Ti fF 10.Gg0.a l zl Area: Composite CN: Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Woods - dense 1 3.75 0.0536 192 39.2 U11paved V _ J6.JM.5 (a)o_t Paved V = 20.3282 (9)0-5 Shallow Concentrated Flow Surface Type S (ft/ft) V (ft/s) L (ft) t (min) Unpaved 0.0201 2.29 58 0.4 Time of Concentration: *Use minimum 5 minutes Bowman C 0 N 5 U L T I N G Stormwater Calculations Post -Developed Project: Circle K Denver (NC Hwy 16), SC Date: 11/25/19 Project No.: 120003-01-045 Designed: PNL Municipality: Lincolnton County Checked: KB Ch; Ch; Ch; Post Drainage Basin C BYPASS Curve Number Calculation Cover Type Hydrologic Soil Group Area (SF) Area (Ac.) CN Woods and Grass (Good) B 24195 0.56 58 Open Space (Good) B 15440 0.35 61 Impervious B 1 806 1 0.02 1 98 Time of Concentration Calculations T, _ 0.00760" fp Y0.6S0.9 4 a+ Area: Composite CN: Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Woods - dense 0.8 3.75 0.0339 113 30.8 Bermudagrass 0.41 3.75 0.0115 0 0.0 unpaved V _ 18.184.5 (a)D_t Paged V = 20.5282 (S)ID-5 Shallow Concentrated Flow Surface Type S (ft/ft) V (ft/s) L (ft) t (min) Unpaved 0.0106 1.66 288 2.9 Open Channel Flow Description Wp (ft) a (sq ft) Rh n S (ft/ft) V (ft/s) L (ft) t (min) annel w/ light br 6.47 6 0.93 0.05 0.0248 4.5 221 0.8 Concrete 2.36 0.88 0.37 0.013 0.005 4.2 139 0.6 annel w/ light br 15 4 0.27 0.05 0.0022 0.6 32 0.9 Concrete 2.36 0.88 0.37 0.013 0.0174 7.8 84 0.2 annel w/ light brI 8.11 1 7.88 1 0.97 1 0.05 1 0.0001 0.3 1 448 1 25.5 V _ k ga_ 2J,3 �r1�°2 Time of Concentration: � �dL iT Bowman C 0 N 5 U L T I N G Project: Circle K Denver (NC Hwy 16), SC Project No.: 120003-01-045 Municipality: Lincolnton County Ch; Post Drainage Basin D Curve Number Calculation Stormwater Calculations Post -Developed Date: 11/25/19 Designed: PNL Checked: KB Cover Type Hydrologic Soil Group Area (SF) Area (Ac.) CN Impervious B 15408 0.35 98 Open Space (Good) B 8806 0.20 61 Time of Concentration Calculations _ 0.0076L Ti fF 10.Gg0.a l zl Area: Composite CN: Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Smooth 10. 3.75 0.0136 148 3 8 Open Channel Flow Description Wp (ft) a (sq ft) Rh n S (ft/ft) V (ft/s) L (ft) t (min) Concrete 1.96 0.61 0.31 0.013 0.1 16.6 29 0.0 Concrete 2.36 0.88 0.37 0.013 0.0174 7.8 84 0.2 innel w/ light br 8.11 7.88 0.97 0.05 0.0001 L 0.3 448 25.5 V _ k g� �� � Time of Concentration: Bowman C O N S U L T I N G Project: Circle K Denver (NC Hwy 16), SC Project No.: 120003-01-045 Municipality: Lincolnton County Chai Curve Number Calculation Cover Type Woods and Grass (Good) Open Space (Poor) Gravel Time of Concentration Calculations ri r 0.0076L}. . TL = (g )Q68u.4 z Stormwater Calculations Sediment Trap Date: 11/25/19 Designed: PNL Checked: KB Hydrologic Soil Group Area (SF) Area (Ac.) CN B 173808 3.99 58 B 1 13591 1 0.31 1 79 B 1 2051 1 0.05 1 85 Area: Composite CN: 60 Sheet Flow Calculations Surface Type n P2 (in) S (ft/ft) L (ft.) t (min.) Woods - dense 0.8 3.39 0.0330 273 66.4 Open Channel Flow Description Wp (ft) a (sq ft) Rh n S (ft/ft) V (ft/s) L (ft) t (min) nel w/ light 1 7.41 3.25 0.44 0.05 0.023 2.6 400 2.6 Concrete 1.96 0.61 0.31 0.013 0.0103 5.3 40 0.1 Time of Concentration: Bowman C O N S U L T I N G APPENDIX C Hydraflow Hydrograph Model CIRCLE K— DENVER (UNITY CHURCH RD) 14 1 Page Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.512 2 764 5,737 ------ ------ ------ Pre Drainage Area A 2 SCS Runoff 0.041 2 768 507 ------ ------ ------ Pre Drainage Area B 4 SCS Runoff 6.862 2 716 14,041 ------ ------ ------ Post Drainage Area A 5 SCS Runoff 0.041 2 742 324 ------ ------ ------ Post Drainage Area B 6 SCS Runoff 0.163 2 756 1,637 ------ ------ ------ Post Drainage Area C Bypass 7 SCS Runoff 0.959 2 730 3,835 ------ ------ ------ Post Drainage Area D 9 Reservoir 0.287 2 756 2,573 7 845.91 1,906 Bioretention Pond 10 Reservoir 0.047 2 1442 1,226 4 847.42 13,563 Sand Filter Pond 11 Combine 0.449 2 756 5,436 6, 9, 10 ------ ------ POA Circle K Denver.gpw Return Period: 2 Year Tuesday, 11 / 26 / 2019 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 1 Pre Drainage Area A Hydrograph type = SCS Runoff Peak discharge = 0.512 cfs Storm frequency = 2 yrs Time to peak = 764 min Time interval = 2 min Hyd. volume = 5,737 cuft Drainage area = 3.260 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 69.10 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 in We 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Pre Drainage Area A Hyd. No. 1 -- 2 Year Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 2 Pre Drainage Area B Hydrograph type = SCS Runoff Peak discharge = 0.041 cfs Storm frequency = 2 yrs Time to peak = 768 min Time interval = 2 min Hyd. volume = 507 cuft Drainage area = 0.340 ac Curve number = 58 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 70.50 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 in e: 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Pre Drainage Area B Hyd. No. 2 -- 2 Year Q (cfs) 0.10 0.09 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 4 Post Drainage Area A Hydrograph type = SCS Runoff Peak discharge = 6.862 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 14,041 cuft Drainage area = 1.980 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 M. 11 5.00 4.00 3.00 2.00 1.00 Post Drainage Area A Hyd. No. 4 -- 2 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 4 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 5 Post Drainage Area B Hydrograph type = SCS Runoff Peak discharge = 0.041 cfs Storm frequency = 2 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 324 cuft Drainage area = 0.200 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 39.70 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 in e: 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Post Drainage Area B Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.09 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 6 Post Drainage Area C Bypass Hydrograph type = SCS Runoff Peak discharge = 0.163 cfs Storm frequency = 2 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 1,637 cuft Drainage area = 0.930 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 60.90 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post Drainage Area C Bypass Hyd. No. 6 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 7 Post Drainage Area D Hydrograph type = SCS Runoff Peak discharge = 0.959 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 3,835 cuft Drainage area = 0.550 ac Curve number = 85 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.50 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 in We 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Post Drainage Area D Hyd. No. 7 -- 2 Year Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 9 Bioretention Pond Hydrograph type = Reservoir Peak discharge = 0.287 cfs Storm frequency = 2 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 2,573 cuft Inflow hyd. No. = 7 - Post Drainage Area D Max. Elevation = 845.91 ft Reservoir name = Bioretention Pond Max. Storage = 1,906 cuft Storage Indication method used. Q (cfs) 1.00 0.90 F :It 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 Bioretention Pond Hyd. No. 9 -- 2 Year Q (cfs) 1.00 0.90 EMU 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 9 — Hyd No. 7 Total storage used = 1,906 cuff Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Pond No. 3 - Bioretention Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 845.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 845.00 1,755 0 0 1.00 846.00 2,458 2,096 2,096 2.00 847.00 3,219 2,830 4,926 Culvert / Orifice Structures [A] [B] [C] [PrFRsr] Rise (in) = 15.00 Inactive 0.00 0.00 Span (in) = 15.00 2.30 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 843.00 845.60 0.00 0.00 Length (ft) = 0.50 0.50 0.00 0.00 Slope (%) = 0.50 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No No No Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 0.50 0.00 16.00 0.00 Crest El. (ft) = 845.60 0.00 846.25 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = Rect --- Rect --- Multi-Stage = Yes No Yes No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 847.00 846.80 846.60 846.40 846.20 846.00 845.80 845.60 845.40 845.20 845 00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Q Discharge (cfs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 10 Sand Filter Pond Hydrograph type = Reservoir Peak discharge = 0.047 cfs Storm frequency = 2 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 1,226 cuft Inflow hyd. No. = 4 - Post Drainage Area A Max. Elevation = 847.42 ft Reservoir name = Sand Filter Max. Storage = 13,563 cuft Storage Indication method used. Sand Filter Pond Q (cfs) Hyd. No. 10 -- 2 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) — Hyd No. 10 — Hyd No. 4 Total storage used = 13,563 cult Pond Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Pond No. 1 - Sand Filter Pond Data Pond storage is based on user -defined values. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 841.50 n/a 0 0 2.50 844.00 n/a 1 1 3.50 845.00 n/a 2,412 2,413 4.50 846.00 n/a 3,280 5,693 5.50 847.00 n/a 5,175 10,868 6.50 848.00 n/a 6,430 17,298 7.50 849.00 n/a 1,985 19,283 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 18.00 Inactive Inactive 0.00 Crest Len (ft) = 0.33 0.00 16.00 0.00 Span (in) = 18.00 2.75 0.00 0.00 Crest El. (ft) = 847.30 0.00 848.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 841.50 845.50 0.00 0.00 Weir Type = Rect --- Rect --- Length (ft) = 0.50 0.50 0.00 0.00 Multi -Stage = Yes No Yes No Slope (%) = 0.50 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 8.00 Am 4.00 2.00 0.00 0.00 2.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Elev (ft) 849.50 847.50 845.50 843.50 841.50 18.00 20.00 22.00 Discharge (cfs) Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 11 POA Hydrograph type = Combine Peak discharge = 0.449 cfs Storm frequency = 2 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 5,436 cuft Inflow hyds. = 6, 9, 10 Contrib. drain. area = 0.930 ac Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 POA Hyd. No. 11 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 11 Hyd No. 6 Hyd No. 9 Hyd No. 10 13 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.766 2 758 15,052 ------ ------ ------ Pre Drainage Area A 2 SCS Runoff 0.158 2 758 1,409 ------ ------ ------ Pre Drainage Area B 4 SCS Runoff 11.32 2 716 23,720 ------ ------ ------ Post Drainage Area A 5 SCS Runoff 0.153 2 740 876 ------ ------ ------ Post Drainage Area B 6 SCS Runoff 0.566 2 752 4,294 ------ ------ ------ Post Drainage Area C Bypass 7 SCS Runoff 1.653 2 730 6,632 ------ ------ ------ Post Drainage Area D 9 Reservoir 0.965 2 746 5,370 7 846.22 2,730 Bioretention Pond 10 Reservoir 0.382 2 820 10,904 4 847.79 15,973 Sand Filter Pond 11 Combine 1.738 2 748 20,569 6, 9, 10 ------ ------ POA Circle K Denver.gpw Return Period: 10 Year Tuesday, 11 / 26 / 2019 Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Pre Drainage Area A Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 3.260 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.95 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M Pre Drainage Area A Hyd. No. 1 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Tuesday, 11 / 26 / 2019 = 1.766 cfs = 758 min = 15,052 cuft = 60 = 0 ft = 69.10 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 2 Pre Drainage Area B Hydrograph type = SCS Runoff Peak discharge = 0.158 cfs Storm frequency = 10 yrs Time to peak = 758 min Time interval = 2 min Hyd. volume = 1,409 cuft Drainage area = 0.340 ac Curve number = 58 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 70.50 min Total precip. = 4.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre Drainage Area B Hyd. No. 2 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 4 Post Drainage Area A Hydrograph type = SCS Runoff Peak discharge = 11.32 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 23,720 cuft Drainage area = 1.980 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 12.00 10.00 : M .M 4.00 2.00 e Post Drainage Area A Hyd. No. 4 -- 10 Year Q (cfs) 12.00 10.00 M M 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 4 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 5 Post Drainage Area B Hydrograph type = SCS Runoff Peak discharge = 0.153 cfs Storm frequency = 10 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 876 cuft Drainage area = 0.200 ac Curve number = 59 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 39.70 min Total precip. = 4.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post Drainage Area B Hyd. No. 5 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 6 Post Drainage Area C Bypass Hydrograph type = SCS Runoff Peak discharge = 0.566 cfs Storm frequency = 10 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 4,294 cuft Drainage area = 0.930 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 60.90 min Total precip. = 4.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 in We 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Post Drainage Area C Bypass Hyd. No. 6 -- 10 Year Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 7 Post Drainage Area D Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.550 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.95 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 M Post Drainage Area D Hyd. No. 7 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 7 Tuesday, 11 / 26 / 2019 = 1.653 cfs = 730 min = 6,632 cuft = 85 = 0 ft = 27.50 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 9 Bioretention Pond Hydrograph type = Reservoir Peak discharge = 0.965 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 5,370 cuft Inflow hyd. No. = 7 - Post Drainage Area D Max. Elevation = 846.22 ft Reservoir name = Bioretention Pond Max. Storage = 2,730 cuft Storage Indication method used Q (cfs) 2.00 1.00 Bioretention Pond Hyd. No. 9 -- 10 Year 120 240 360 480 600 720 Hyd No. 9 Hyd No. 7 Q (cfs) 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Total storage used = 2,730 cuff 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 10 Sand Filter Pond Hydrograph type = Reservoir Peak discharge = 0.382 cfs Storm frequency = 10 yrs Time to peak = 820 min Time interval = 2 min Hyd. volume = 10,904 cuft Inflow hyd. No. = 4 - Post Drainage Area A Max. Elevation = 847.79 ft Reservoir name = Sand Filter Max. Storage = 15,973 cuft Storage Indication method used. Q (cfs) 12.00 10.00 M M 4.00 2.00 240 480 Hyd No. 10 Sand Filter Pond Hyd. No. 10 -- 10 Year Q (cfs) 12.00 10.00 M. . �� 4.00 2.00 0.00 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 4 Total storage used = 15,973 cult Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Hyd. No. 11 POA Hydrograph type = Combine Peak discharge = 1.738 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 20,569 cuft Inflow hyds. = 6, 9, 10 Contrib. drain. area = 0.930 ac Q (cfs) 2.00 1.00 M POA Hyd. No. 11 -- 10 Year 240 480 720 960 1200 1440 1680 Hyd No. 11 Hyd No. 6 Hyd No. 9 Hyd No. 10 Q (cfs) 2.00 1.00 0.00 1920 Time (min) 23 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 11 / 26 / 2019 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 59.0036 12.5000 0.8871 -------- 2 63.6181 12.2000 0.8606 -------- 3 0.0000 0.0000 0.0000 -------- 5 74.3298 13.1000 0.8459 -------- 10 69.9009 12.4000 0.8014 -------- 25 64.8268 11.5000 0.7524 -------- 50 54.9803 10.0000 0.6934 -------- 100 49.8439 9.0000 0.6522 -------- File name: Denver.IDF Intensity = B / (Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 4.66 3.73 3.12 2.69 2.37 2.12 1.92 1.76 1.62 1.51 1.41 1.32 2 5.50 4.41 3.71 3.21 2.83 2.54 2.31 2.12 1.96 1.82 1.70 1.60 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.42 5.22 4.42 3.85 3.42 3.08 2.81 2.58 2.39 2.23 2.09 1.97 10 7.08 5.79 4.92 4.30 3.84 3.47 3.17 2.93 2.72 2.55 2.39 2.26 25 7.87 6.45 5.51 4.84 4.33 3.93 3.61 3.34 3.12 2.92 2.76 2.61 50 8.41 6.89 5.90 5.20 4.67 4.26 3.93 3.65 3.42 3.22 3.04 2.89 100 8.91 7.30 6.27 5.54 5.00 4.57 4.22 3.94 3.70 3.49 3.31 3.15 Tc = time in minutes. Values may exceed 60. k\_Concepts\TEMP - Circle K Denver (Hwy 16), NC\En ineerin \Desi n Documents\Stormwater\H draflow\Denver. c Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 2.80 3.39 0.00 4.26 4.95 5.89 6.64 7.40 SCS 6-Hr 2.01 2.42 0.00 3.03 3.50 4.16 4.68 5.21 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.684 2 764 7,656 ------ ------ ------ Pre Drainage Area A 3 Reservoir 0.000 2 n/a 0 1 848.41 7,656 Sediment Trap Circle K Denver - Sediment Trap.gpw Return Period: 2 Year Monday, 11 / 25 / 2019 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 11 / 25 / 2019 Hyd. No. 1 Pre Drainage Area A Hydrograph type = SCS Runoff Peak discharge = 0.684 cfs Storm frequency = 2 yrs Time to peak = 764 min Time interval = 2 min Hyd. volume = 7,656 cuft Drainage area = 4.350 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 69.10 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 in We 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Pre Drainage Area A Hyd. No. 1 -- 2 Year Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 11 / 25 / 2019 Hyd. No. 3 Sediment Trap Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 1 - Pre Drainage Area A Max. Elevation = 848.41 ft Reservoir name = Sediment Trap Max. Storage = 7,656 cuft Storage Indication method used. Q (cfs) 1.00 0.90 in We 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 Sediment Trap Hyd. No. 3 -- 2 Year Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 — Hyd No. 1 Total storage used = 7,656 cuff Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 11 / 25 / 2019 Pond No. 1 - Sediment Trap Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 846.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 846.50 3,331 0 0 0.50 847.00 3,656 1,746 1,746 1.50 848.00 4,330 3,988 5,734 2.50 849.00 5,038 4,679 10,413 3.50 850.00 5,773 5,401 15,814 Culvert / Orifice Structures [A] [B] [C] [PrFRsr] Rise (in) Inactive Inactive Inactive 0.00 Span (in) = 18.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 841.50 845.31 0.00 0.00 Length (ft) = 0.50 0.50 0.00 0.00 Slope (%) = 0.50 0.50 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No Yes No Stage (ft) 4.00 01111 2.00 M Weir Structures [A] [B] [C] [D] Crest Len (ft) Inactive 0.00 10.00 0.00 Crest El. (ft) = 847.70 0.00 849.50 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = Rect --- Rect --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 850.50 WEM: 'Si] 848.50 847.50 0.00 ' 1 1 1 1 1 1 1 1 1 1 1' 846.50 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Total Q Discharge (cfs) Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.356 2 758 20,085 ------ ------ ------ Pre Drainage Area A 3 Reservoir 0.335 2 950 6,971 1 849.53 13,285 Sediment Trap Circle K Denver - Sediment Trap.gpw Return Period: 10 Year Monday, 11 / 25 / 2019 Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 11 / 25 / 2019 Hyd. No. 1 Pre Drainage Area A Hydrograph type = SCS Runoff Peak discharge = 2.356 cfs Storm frequency = 10 yrs Time to peak = 758 min Time interval = 2 min Hyd. volume = 20,085 cuft Drainage area = 4.350 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 69.10 min Total precip. = 4.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Drainage Area A Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 11 / 25 / 2019 Hyd. No. 3 Sediment Trap Hydrograph type = Reservoir Peak discharge = 0.335 cfs Storm frequency = 10 yrs Time to peak = 950 min Time interval = 2 min Hyd. volume = 6,971 cuft Inflow hyd. No. = 1 - Pre Drainage Area A Max. Elevation = 849.53 ft Reservoir name = Sediment Trap Max. Storage = 13,285 cuft Storage Indication method used Sediment Trap Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 Hyd No. 1 Total storage used = 13,285 cult