Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3191201_Circle K Denver (Unity Church Rd) Civil Plans_11-27-19_12/5/2019
c� z_ J Z 0 U Z Q C) O m O r m Q J O W m J J Q _ Cn z f- J V) En Z U z Q 0 m M m z O Q 0 a 0 z Q z 0 N 0 0 Q z R- 0 0 x z w U O 0 z 0 w U z w of LLJ z 0 w C0 LLJ w LLJ x V) LLJ U 0 Li z U 0 Z Q 0 rz LLJ rr _ U U 0- N LLJ Li J Z 0 0 LiJ 0 z z U LiJ 0 0 z LLJ Of z z Q Cn Q z w 0 z V) LiJ _ z Ln 0 LLJ z Q U z U U LiJ LiJ C) 0 z U O 0 En _ PROPOSED SITE DEVELOPMENT FOR: CIRCLE K STORE NE CORNER NC-16 BUSINESS AND UNITY CHURCH RD SITE AREA: DISTURBED AREA: +/-2.35 AC +/-4.35 AC PROJECT DESCRIPTION THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A NEW CONVENIENCE STORE/GAS STATION WITH ALL ASSOCIATED UTILITIES, DRAINAGE, AND INFRASTRUCTURE. THE ENTIRE PROJECT SITE AREA IS +/-6.18 ACRES. THE PROPOSED SITE AREA IS +/-2.35 ACRES WITH FRONTAGES OF +/- 445 FEET ON NC HWY 16 AND +/- 412 FEET ON UNITY CHURCH RD. THIS PROJECT COMBINES THREE PARCELS AND WILL BE SUBDIVIDED. CATAWBA RIVER BASIN LINCOLN COUNTY -LAKE NORMAN WATER SUPPLY WATERSHED UTILITY PROVIDERS: WATER LINCOLN COUNTY PUBLIC WORKS 115 W. MAIN ST. LINCOLNTON, NC 28092 (704) 736-8497 SEWER LINCOLN COUNTY PUBLIC WORKS 115 N. MAIN ST. LINCOLNTON, NC 28092 (704) 736-8497 STORM WATER LINCOLN COUNTY NATURAL RESOURCES 115 N. MAIN ST. LINCOLNTON, NC 28092 (704) 736-8501 BENCHMARK: ELECTRIC DUKE POWER 6769 OLD PLANK RD. STANLEY, NC 28164 (704)735-8215 GAS PIEDMONT NATURAL GAS 4720 PIEDMONT ROW DR. CHARLOTTE, NC 28233 (800) 752-7504 COMMUNICATION AT&T (800) 288-2020 TEMPORARY BENCHMARK AT RIM OF SANITARY SEWER MANHOLE LOCATED AT NORTHWEST CORNER OF SITE, ±18 FEET FROM INC HWY 16. RIM ELEVATION OF MANHOLE IS 845.43'. TEMPORARY BENCHMARK AT RIM OF SANITARY SEWER MANHOLE LOCATED AT SOUTHWEST CORNER OF SITE, ±87 FEET FROM INC HWY 16 AND ±16 FEET FROM UNITY CHURCH RD. RIM ELEVATION OF MANHOLE IS 844.31'. VERTICAL DATUM FOR SITE BASED ON GPS OBSERVATION USING CORS STATIONS "MOORESVILLE CORS", "177 WELCOME CNTR CORS" AND "HICKORY CORS" (NGVD 88) FLOOD NOTE: THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA BASED ON THE FLOOD INSURANCE RATE MAP FOR THIS AREA. THE MAP NUMBER FOR THIS AREA IS 3710460300J, AND THE DATE OF SAID MAP IS AUGUST 16, 2007. THIS DETERMINATION WAS MADE BY GRAPHICALLY DETERMINING THE POSITION OF THIS SITE ON SAID FIRM MAPS UNLESS OTHERWISE NOTED. DENVER, NC PARCEL I D# 57407 7 02475) 02472 SITE LOCATION MAP NOT TO SCALE DIRECTIONS TO PROJECT SITE- NC-16 NORTH TO OPTIMIST CLUB ROAD. EAST ON OPTIMIST CLUB ROAD TO TRIANGLE CIRCLE. NORTH ON TRIANGLE CIRCLE TO NC-16 BUSINESS. SITE IS LOCATED ON THE NE CORNER OF NC-16 BUSINESS AND UNITY CHURCH ROAD. SURVEYOR: MSP & ASSOCIATES LAND SURVEYING, INC. LAND SURVEYOR: MICHAEL S. PERDUE 301 HILLCREST DR. GREENVILLE, SC 29609 PHONE: (864) 370-2232 MPERDUE@MSPSURVEYING.COM OWNER / DEVELOPER OWNER/DEVELOPER: CIRCLE K STORES INC TAYLOR SEELOFF 2550 W. TYVOLA ROAD SUITE 200 CHARLOTTE, NC 28217 PHONE: (478) 494-1828 EMAIL: TSEELOFF@CIRCLEK.COM CIVIL ENGINEER: BOWMAN CONSULTING ENGINEER OF RECORD: KAI BURK 950 NORTH POINT PARKWAY SUITE 200 ALPHARETTA, GA 30005 PHONE: (678) 374-6687 KBURK@BOWMANCONSULTING.COM 19 TM LANDSCAPE ARCHITECT: MANLEY LAND DESIGN, INC. PROFESSIONAL LANDSCAPE ARCHITECT: STEVE MANLEY 51 OLD CANTON STREET ALPHARETTA, GA 30009 PHONE: (770) 442-8171 SMANLEY@MANLEYLANDDESIGN.COM Bowman C O N S U L T I N G Sheet List Table Sheet Number Sheet Title C0.0 COVER SHEET S1.0 SURVEY D1.0 DEMOLITION PLAN D1.1 DEMOLITION PLAN C1.0 EROSION CONTROL - INITIAL PHASE C1.1 EROSION CONTROL - FINAL PHASE C1.2 EROSION CONTROL DETAILS C1.3 EROSION CONTROL DETAILS C1.4 EROSION CONTROL DETAILS C1.5 EROSION CONTROL DETAILS C2.0 SITE PLAN C2.1 SITE PLAN C2.2 SITE DETAILS C2.3 SITE DETAILS C2.5 SIGHT DISTANCE C2.6 SIGHT DISTANCE C3.0 GRADING AND DRAINAGE PLAN C3.1 GRADING AND DRAINAGE PLAN C3.2 GRADING AND DRAINAGE PROFILES C3.3 GRADING AND DRAINAGE DETAILS C4.0 UTILITY PLAN C4.2 UTILITY DETAILS L1.0 LANDSCAPE PLAN L1.1 LANDSCAPE DETAILS North Carolina One -Gall Center nog IF. wd u.& Mft W GN N. AR R � OW 2 Dos '" O w N NORIN GVmIIN GALL I-WO-632-4949 UNDERGROUND LOCATORS. CONTRACTOR SMALL CONTACT THE UNDERGROUND LOCATORS EVERY TO DAYS FOR AN UPDATE TO URGO lTY LAONS. Call BEFORE you 0161 "It's The Law" W W U) W O U O CV O N d L U)/�� L O z O LO LOrl- C) co C) C) M 4 Q � M M N Cc6 N � c O Q � Q O U ry LU I� U 0 U ~ Z w� C-0 0 � Z Una �LU w z LU > w m C) I U Z U LU 'z 0. O U z E ci 0 0 C 0) C O c U O c U CU C: E m �: E O O 03 KAI BURK LICENSE NO. 043463 z z 0 z J 0 z_ J 1 PLAN STATUS 1 1 DATE I DESCRIPTION 1 PL BG I KB DESIGN DRAWN CHKD SCALE 1 " = 20' JOB No. 120003-01-045 DATE 1 FILE C0.0 -COVER SHEET 1 SHEET CO.0 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C0.0 COVER SHEET.DWG 11 /27/2019 VICINITY MAP N/F PHILLIP & TSOULOS PROP LLC PIN# 4603669032 (DB. 1146, PG. 349) Know what's below Call before you dig. Dial 811 Or Call 800-282-7411 PAGE 2OF2 1 N/F MARINERS POINTE AT ' SMITHSTONE TOWNHOMES OWNERS ASSOC. INC. I PIN# 46 3677063 (DB. 1275, PG. 608) I \ SURVEYORS CERTIFICATE " To: Circle K Stores, Inc. and Chicago Title Insurance Company This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes items 1-4, 7o,b, 8, 9, 11, 13, 14, 16, 17, 19 and 20 of Table A thereof The field work was completed on 7131119. Micha erdue PLS #L-4322 Date CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE TANGENT C1 1116.08' 51.51' 51.51' S 73°22'01" W 2°38'41" 25.76' C2 1109.97' 468.72' 465.24' S 59°56'07" W 24'11'41" 237.90' C3 955.68' 289.07' 287.97' S 62°50'41" W 17'19'50" 145.65' C4 723.25' 41.31' 41.31' S 53' 14'42" W 3' 16'21 " 20.66' C5 2906.06' 164.95' 164.93' S 50'10'55" W 3'1608" 82.50' C6 4156.65' 210.18' 210.16' S 47°06'26" W 2°53'50" 105.1 V C7 2906.59' 166.89' 166.86' N 04°12'18" E 3°17'23" 83.47' C8 2958.59' 315.67' 315.52' N 00'26'18" W 6°06'48" 157.98' C9 709.72' 152.58' 152.29' S 54°45'23" W 12°19'04" 76.59' LEGAL DESCRIPTION GRAPHIC SCALE 11 V-30' TITLE EXCEPTIONS Schedule B Section II Title Exceptions Chicago Title Insurance Company Commitment 1119-02172RA ; Effective Date: Feb. 6, 2019 3. Any right, easement, setback, interest, claim, encroachment, encumbrance, violation, variations or other adverse circumstance affecting the Title disclosed by plat(s) recorded in Plat Book D , Page 94 (NO MATTERS SHOWN AAFECTS SITE) MSP C & ASSOCIATES LAND SURVEYING, INC. 301 E HILLCREST DR. GREENVILLE SC, 29609 864-370-2232 WWW.MSPSURVEYING. COM MICHAEL S. PERDUE ,PLS # L-4322 LEGEND CB CATCH BASIN CPP CORRUGATED PLASTIC PIPE GUY WIRE CT CRIMPED TOP PIPE - G - GAS LINE DI DROP INLET -W- WATER LINE IE INVERT ELEVATION JB JUNCTION BOX -POWER LINE MH MANHOLE - E - UNDERGROUND POWER LINE OT OPEN TOP PIPE POB POINT OF BEGINNING - T - UNDERGROUND PHONE LINE POC POINT OF COMMENCEMENT - FO - FIBER OPTIC TBM TEMPORARY BENCHMARK RCP REINFORCED CONCRETE PIPE POWER POLE SS SANITARY SEWER ® SANITARY SEWER MANHOLE OHP OVERHEAD POWER EIP IRON PIN FOUND STORM SEWER MANHOLE NIP IRON PIN SET CATCH BASIN OW WATER VALVE LP FH LIGHT POLE O WATER METER 0 GAS VALVE FIRE HYDRANT A �D GAS METER ❑T TRANSFORMER 0 TELEPHONE PEDESTAL SIG SIGNAL BOX E ELECTRICAL BOX TEL TELEPHONE VAULT GENERAL NOTES This property is in Zone X based on Flood Insurance Rate Map 3710460JOOJ dated Aug. 16, 2007. This determination was made by graphically determining the position of said site on said FIRM Mop. Vertical datum for site based on GPS observation using CORs Stations "MOORESVILLE CORS", '777 WELCOME CNTR CORS" and "HICKORY CORS" (NGVD 88) Contact proper Authorities Before building near utility lines, for easement width and restrictions. Underground Utilities are approximate and should be verified prior to any construction. Locations shown are approximate. This survey has been prepared for the exclusive use of the person or entities named hereon. No express or implies warranties with respect to the information shown hereon is to be extended to any persons or entities other than those shown hereon. DP Property Zoned B-N and ELDD Setbacks to be verified by Site Engineer I, Michael S. Perdue certify that this plat was drawn under my supervision from on actual survey made under my supervision and is a portion of DB. 2630 pg. 357; that the ratio of precision as calculated 1: 20,000 + and was not adjusted, that this plat was prepared in accordance with G.S. 47-30 as amended. Witness my original signature, registration # and seal phis 3.1 st dayof July 2019. That this survey does not create 'parcels of land, existing structures and buildings and change existing streets. The property shown hereon Parcel # 4603765181, 4603750889, 4603657556, 4603656377 Survey references: PB. D, PG. 94 DB. 2630, PG. 357 ALTA/NSPS LAND TITLE SURVEY FOR CIRCLE K STORES , INC. CITY. DENVER COUNTY: LINCOLN STATE. NORTH CAROLINA CATAWBA TOWNSHIP DATE OF SURVEY: 7131119 SCALE. 1:30 FIELD WORK: MSP DRAWN BY. MSP REVIEWED BY. MSP MSP FILE: CKDENVER MSP JOB# : 191341 c� z J z 0 U z Q C) 0 m O r m Q J 0 _ W m J Q cn c� z J cn z 0 U z Q 0 m r m z 0 Q _ Q 0 0 z Q z 0 Q N O _ Q z W o= 0 0 z W U 0 0 z 0 w U Z Q J W of W _ 0 _ 0 z _ 0 W 0 W of _ LLJ V) Q U _ 0 z W J U 0 z W 0 _ m _ U U W _ N W _ H O J Z O w 0 z w z w U m W 0 z W Of z Q V) Q z w _ W 0 z W W _ z U) LLJ 0 0 z Q _ U Z U U _ W w 0 z W U 0 0 i L GEND - EXISTIN I TBM TEMPORARY BENCHMARK RCP RE 0 IPS IRON PIN SET (5/8" REBAR) QS SSMH SF 0 IPF IRON PIN FOUND © GMH Gf R/W RIGHT-OF-WAY 0 CO CL PP POWER POLE 0 T-PED TE Efuv1 ELECTRIC METER —C— SI �i 1 HEADLIGHT STANDARD OHE O\ MI■ 2 HEAD LIGHT STANDARD SS — SF cv IXI GAS VALVE WwV — W/ WATER VALVE 0 wM — WATER METER G — GE / W1 FIRE HYDRANT — — D/ 0 MW MONITORING WELL D( icv IRRIGATION CONTROL VALVE --------- 5' OD SDMH STORM DRAIN MANHOLE --------- 1' ❑ CBDI CATCH BASIN DROP INLET Sl I \ 1-1 f� NN \ \\ \ \ \\ DEMOLITION NOTES l� \ I MATCH LINE (SEE SHEET D1.1) O / `\ \dCs, 1. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) OF ALL MATERIALS, SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE I CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. Z 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING OF THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. ( \ 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICES TO ANY NECESSARY UTILITIES DURING CONSTRUCTION. � J I 4. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF M UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE U \ \ PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR p SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. zo / `OQ \\ \� ,f \ 5. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE AND / \ \ I \ ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. N RCED CONCRETE PIPE RY SEWER MANHOLE \ PRIOR TO THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE p � / ,� \\ \ \ 852 L LOCATIONS OF EXISTING UTILITIES. MANHOLE )UT \ 6. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY o / \ 1) \\ OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY p IONE PEDESTAL \ \ \ \ \\ \ ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE N —858 \ OOP ' \\ �• \ / \ LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. =AD ELECTRIC LINE X \/\`J \ 7. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATEDRY SEWER LINE \ SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND \ CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE.LINE \ �' ��I (b \\ \ \\\ -y \ CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD RIGHT OF WAY DURING CONSTRUCTION. IE & 1 2 \ L� 8. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER _INE / -�/ APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. O \ O- co. ,y \ \ \ \ WHITE LINE \ �� / \, ` �\ `� \ 9. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE YELLOW LINE \ \ \ \ EXISTING FACILITIES. "OUR OOP \ / \\ \ 1 \ \\ \\ 10. PRIOR TO DEMOLITION OCCURRING, THE INITIAL PHASE EROSION CONTROL DEVICES ARE TO BE INSTALLED. (SEE SWPPP SHT C1.0) 'OUR \ ) \\\ \ \� \ 11. CONTRACTOR MUST LIMIT SAW -CUT &PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE DRAIN E I / \ / \ V \ \ y \\ \ °b \ CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC,. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. � J `b \ \ \ \ \ \\� 20 \ 12. THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE TOWN/COUNTY UTILITY DEPARTMENT LEGEND - D E M O L I T �N / I y \\ TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION IS CONSTANTLY AVAILABLE TO THE STORE 0 Y O v o / \ \ \ \ \ \ \ \ AND SITE THROUGHOUT THIS SPECIFIC WORK AND THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE L L o co / \\ \ RESPONSIBLE FOR ARRANGI NG/PROVI DING ANY REQUIRED WATER MAIN SHUT OFFS WITH THE CITY/COUNTY DURING U o cY) � C 0) CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND o Q cy S a= 04 \J� NO EXTRA COMPENSATION WILL BE PROVIDED. p U 0 \ REMOVE ALL BUIL91XNGS, ASPHALT \\ \ \ \ \�� I °� \\ v) O o PAVEMENT,CRETE PAVEMENT, , OO I \\ \6 13. DAMAGE TO ALL EXISTING FACILITIES AND IMPROVEMENTS TO REMAIN WILL BE N U CONCRETE S, CONCRETE SIDEWALKS, '� \\ \ \ \�Q \ \ REPLACED AT CONTRACTOR'S EXPENSE. U o CU \ AND VE ATION ��� � J \`�� / , \ \ � �' \ / . , z _Q p 3 E \�_n °i \ 14. FOR ALL ITEMS NOTED TO BE REMOVED, REMOVE NOT ONLY THE ABOVE GROUND ELEMENTS, BUT ALSO REMOVE ALL E � Q o H H -H H H -H U ITY REMOVAL \\/� UNDERGROUND ELEMENTS AS WELL INCLUDING, BUT NOT LIMITED TO; FOUNDATIONS, GRAVEL FILLS, TREE ROOTS, PIPES, TANKS, 3 °� m 'I ,`\\ �O / / Q� / \\ ♦` GG�\ J \ y ETC. ppp O 0^ \5 0J G \ \\ �. o� 15. BACKFILL FOR ALL EXCAVATIONS RESULTING FROM THE DEMOLITION WORK MUST MEET THE REQUIREMENTS FOR FILL OUTLINED / \ $' \ \\\ \\ �01 \\ IN THE GEOTECHNICAL INVESTIGATION REPORT FOR THIS SITE. /QS G ?\ 16. ASBESTOS AND ANY OTHER HAZARDOUS MATERIAL SHALL BE PROPERLY PERMITTED AND REMOVED BY THE CONTRACTOR. 0 �\ O /`` �\ \ . \ / \ CONTRACTOR SHALL SECURE ALL PERMITS FOR DEMOLITION AND REMOVAL OF MATERIALS FROM THE SITE. Q O.\ 17. \SEPTIC TANKS MAY EXIST ON THE EXISTING PARCELS. CONTRACTOR TO REMOVE AND DISPOSE SEPTIC TANK AND ASSOCIATED O �'[� \y MATERIAL IN A LAWFUL MANNER. \�� ,\� NOTES / / / 2%N�I/� \ \ O 3 \ 1. EXISTING TO BE REMOVED gyp,\� \ \ \ \ 2. EXISTING TO REMAIN U 0\ \ \ \ 3. PROTECT EXISTING UTILITIES DURING CONSTRUCTION U 4 PROTECT EXISTING TIIAL EQUIPMENT AND POLES DURING CONSTRUCTION \\ 5. SAWCUT LINE O O / / y \ 3 6. EXISTING ROADWAY SIGNAGE TO REMAIN U 3 \ \ 7. EXISTING TO BE ABANDONED z z Z U \ z Q \ n z ?\ /� _ —853 ( / / / / \ ` 3 \ \ \, \\ GRAPHIC SCALE �_ w J v 0 10' 20' 40' J w z OU J) \ � p \ \ \ \ cti \ \ O _ p w ? z � z J vo / / $52 / / \\ `TCOG�'s� \ \ \ \ \\\ o��o -r \ ( IN FEET ) W Lu r J / / / / — _ / / / \\ ��� �\ \ 0\ \\ \\ SCALE: 1" = 20' 0 Q 41. 3' \ �r 4 (VARIABUff PUB - 1 I CAD file name: V:\120003 — Circle K\120003-01-045 (ENG) — Denver (Unity Church Rd), NC\Engineering\Engineering Plans\D1.0 DEMOLITION PLAN.DWG 11 /27/2019 = 3 = � '•., GINS .••' KAI BURK LICENSE NO. 043463 PLAN STATUS \ DATE DESCRIPTION PL BG KB '•` DESIGN DRAWN CHKD •. SCALE 1" = 20' JOB No. 120003-01-045 �of DATE FILE D1.0 - DEMOLITION PLAN SHEET D1.0 c� z J U) z 0 U z Q C) 0 m 0 r m Q J 0 x m J J Q _ cn c� z J Lo En z 0 U Z Q 0 m r m z 0 Q m Q 0 0 z Q z 0 Q 0 x Q z w o= 0 0 x z w U 0 0 z 0 w U Z J w of w a 0 Uj of LLJ 0 z _ 0 w 0 w Q _ Lo Q U x 0 w z w J U 0 Z Q 0 m rr _ U L� U w m w x 0 J Z 0 0 w 0 z w z U w L` 0 z w m F- z z Q z w w w z w En Uj Cn w 0 0 z Q Cn F- Fz w U Z 0 U LLJ of w x w 0 F- z U 0 0 Ln ss \ d i � � 3 \ \ 4tb \ O \ \ \ \\ \ \may 16 `00 �0 \ \ \ \ \ \ \ O \ \ \\ \\\\ \ \ 0� q \ \ \ 1 00 / \\ \ \ \ MATCH LINE (SEE SHEET D1.0) 41 I J - - - - - - - - - 8 5 9 - / `---858 / o0 / / OO^ \ / CO\ LEGEND - EXISTING TEMPORARY BENCHMARK RCP REINFORCED CONCRETE PIPE IRON PIN SET (5/8" REBAR) QS SSMH SANITARY SEWER MANHOLE IRON PIN FOUND © GMH GREASE MANHOLE RIGHT-OF-WAY 0 CO CLEANOUT POWER POLE 0 T-PED TELEPHONE PEDESTAL ELECTRIC METER -a- SIGN 1 HEADLIGHT STANDARD - OHE- OVERHEAD ELECTRIC LINE 2 HEAD LIGHT STANDARD - SS - SANITARY SEWER LINE GAS VALVE - W - WATER LINE WATER VALVE G GAS LINE WATER METER WHITE LINE FIRE HYDRANT - - DASHED WHITE LINE MONITORING WELL DOUBLE YELLOW LINE IRRIGATION CONTROL VALVE -- 5' CONTOUR STORM DRAIN MANHOLE --------- 1' CONTOUR CATCH BASIN DROP INLET STORM DRAIN PIPE LEGEND - DEMOLITION REMOVE ALL BUILDINGS, ASPHALT PAVEMENT, CONCRETE PAVEMENT, CONCRETE PADS, CONCRETE SIDEWALKS, AND VEGETATION H H H H H H UTILITY REMOVAL 41 I I I \ \ \ \ \ - 852 \ y `\ \\ 0 r7. , \ \\ \ \ 1 ` \ DEMOLITION NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) OF ALL MATERIALS, SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING OF THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICES TO ANY NECESSARY UTILITIES DURING CONSTRUCTION. (p LO 4. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF Lo M UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE U PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR 6 SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. z 0 5. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE AND mi 0 ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. N PRIOR TO THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE `p LOCATIONS OF EXISTING UTILITIES. E 6. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY o OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY a) ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE ca LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. .2 7. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED a) U SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD RIGHT OF WAY DURING CONSTRUCTION. 0 8. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. 9. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE In EXISTING FACILITIES. 10. PRIOR TO DEMOLITION OCCURRING, THE INITIAL PHASE EROSION CONTROL DEVICES ARE TO BE INSTALLED. (SEE SWPPP SHT C1.0) 11. CONTRACTOR MUST LIMIT SAW -CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC,. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. 12. THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE TOWN/COUNTY UTILITY DEPARTMENT J J >1 TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION IS CONSTANTLY AVAILABLE TO THE STORE Q o co 0 AND SITE THROUGHOUT THIS SPECIFIC WORK AND THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE o Y o oM RESPONSIBLE FOR ARRANGI NG/PROVI DING ANY REQUIRED WATER MAIN SHUT OFFS WITH THE CITY/COUNTY DURING - U CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND o Q M NO EXTRA COMPENSATION WILL BE PROVIDED. U C w 04 o 13. DAMAGE TO ALL EXISTING FACILITIES AND IMPROVEMENTS TO REMAIN WILL BE p � U REPLACED AT CONTRACTOR'S EXPENSE. Z 5 6 E m o 14. FOR ALL ITEMS NOTED TO BE REMOVED, REMOVE NOT ONLY THE ABOVE GROUND ELEMENTS, BUT ALSO REMOVE ALL CU _Q E Lo Q 0 � UNDERGROUND ELEMENTS AS WELL INCLUDING, BUT NOT LIMITED TO; FOUNDATIONS, GRAVEL FILLS, TREE ROOTS, PIPES, TANKS, O m ETC. pip O 15. BACKFILL FOR ALL EXCAVATIONS RESULTING FROM THE DEMOLITION WORK MUST MEET THE REQUIREMENTS FOR FILL OUTLINED IN THE GEOTECHNICAL INVESTIGATION REPORT FOR THIS SITE. 16. ASBESTOS AND ANY OTHER HAZARDOUS MATERIAL SHALL BE PROPERLY PERMITTED AND REMOVED BY THE CONTRACTOR. 0 CONTRACTOR SHALL SECURE ALL PERMITS FOR DEMOLITION AND REMOVAL OF MATERIALS FROM THE SITE. Q O�/ 17. SEPTIC TANKS MAY EXIST ON THE EXISTING PARCELS. CONTRACTOR TO REMOVE AND DISPOSE SEPTIC TANK AND ASSOCIATED MATERIAL IN A LAWFUL MANNER. LJ_ NOTES 1. EXISTING TO BE REMOVED 2. EXISTING TO REMAIN 3. PROTECT EXISTING UTILITIES DURING CONSTRUCTION 4. PROTECT EXISTING SIGNAL EQUIPMENT AND POLES DURING CONSTRUCTION 5. SAWCUT LINE 6. EXISTING ROADWAY SIGNAGE TO REMAIN 7. EXISTING TO BE ABANDONED GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center M..TwLMftW GN N � 0W NORIN GVmIIN GALL I-WO-632-4949 UNDERGROUND LOCATORS CONTRACTOR SMALL CONTACT THE UNDERGROUND LOCATORS EVERY TG DAYS FOR AN UPDATE TO UTLITY LOCATONS Call BEFORE you 0161 'Ws The Law" NONE W LL U 0 Lam_ z �-zz 1 0 Q w .-: Z)(-0 0 z z o zU�a O = U)0 J W W W Z (n z O z O > J Lu=wm C) � U z ULU z 0. O U LU O�'FEssi' % SEAL - 3 •., GINS .• ' "rAI KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FILE D1.1 - DEMOLITION PLAN SHEET D1.1 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\D1.0 DEMOLITION PLAN.DWG 11 /27/2019 (DB. 2630, PG. 357) N _0 \ \ c� z J z O U z Q C) O m O r m Q J 0 w m J J Q Cn c� z J En z 0 U Z Q O m r m z 0 Q w Q 0 a 0 z Q z 0 Q 0 Q z w 0= 0 z w U 0 0 _ z 0 W U Z J w Z of w w 0 of 0 z W 0 w W 0 w w V) Q U x 0 w z w J U 0 z Q w 0 m U U W w x 0 w J z 0 0 w 0 z w z In ILJ U w w 0 z w Of Of z z a V) Q z w w x 0 W z W w z U) w 0 0 z w U Z O U w x w w 0 z U 0 0 SEQUENCE OF CONSTRUCTION - INITIAL PHASE \\ DISTURBED AREA. (SCHEDULE PROVIDED AS PART OF CONSTRUCTION SEQUENCE IS FOR INFORMATION ONLY.) ys 4.35 ACRES + 1. RECEIVE NPDES COVERAGE FROM NCDEQ. DISTRICT LINE - __--- \ 2. AT LEAST ONE WEEK PRIOR TO ANY LAND DISTURBANCE ACTIVITY, CONDUCT A SWPPP PRE -CONSTRUCTION CONFERENCE. SITE CONTRACTOR SHALL SCHEDULE AND CONDUCT SWPPP \ a \ CI__AL_H `� SPEPRE-CONSTRUCTION MEETING WITH SWPPP PREPARING ENGINEER, LINCOLN COUNTY, NCDEQ, OWNER AND ALL LAND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. � pESIGNATED _--- � � \ \ ---- -- APPROXIMATE LOCH¶ON y \ \ 24 H R CONTACT: 3. CONDUCT LIMITED CLEARING AND GRUBBING AS REQUIRED TO INSTALL CONSTRUCTION ENTRANCE AND PERIMETER BMPS. HAYTHAM KASEM 4 SHEET C1.°2 STRUC ION ENTRINSTALL ANCE, SILT FENCE, AND CONCRETE WASHOUT, TEMPORARY DIVERSION CHANNELS, AND SEDIMENT TRAP AS SHOWN ON PLAN AND IN ACCORDANCE WITH DETAILS ON F------- SILT FEN SHOWN 2' \D / \ ` 704-776-6444 \ 5. INSTALL TEMPORARY SEED IN DISTURBED AREAS AND IN ACCORDANCE WITH DETAILS ON SHEET C1.3. °O FOR VISUAL PURPOSES. T F`fNCE TO BE INSTALLLOD L E. \ s \ \ vgc 6. MAINTAIN ALL BMPS THROUGHOUT CONSTRUCTION. 7. COMPLETE INSPECTION REPORTS EVERY 7 DAYS IN ACCORDANCE WITH THE GENERAL PERMIT. EROSION CONTROL MAINTENANCE - INITAL PHASE `,O dd\ \ \ \ SILT FENCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE CATAWBA RIVER BASIN PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. o \ \ Zo c \` B \ N \ \\1\\\ O 61 / AD / STATESVILLE ROAD \\ LAND COMPANY LLC F DRAINAGE AREA TO / PIN#4603657556 SEDIMENT TRAP (DB. 2630, PG. 357) / 4.35 AC \ i / /ram D a52/ 1 � - q ---/--------------------------------- I� TYPE\ �` O PROPOSED CANOPY FOOTPRINT \ / / A - - - - - - - - - - - - - - - - - - - - - - - - - - - - -_ \ I i I PROPOSED � '' , — — — D \` — UNDERGROUND \ ys FUEL TANK STORAGE \ ---------/-- /--------------------------- ROPOSEDUTIL\ITYEASEM------CP kNUMENT --- N/F \ \ \ \ y � ° s a\ STATESVILLE ROAD SF / --�__ _-fir ��i/,8V°gv N O� N LAP N#4603656377D COMPANY LC I q ¢--��-- --- — — — — — — — — aF SF —_ — ' ^--____-- _ 847 EQ11��� sF 2 y (DB. 2630, PG. 357) I / v --- _o f ; N ;�Y_MENT _ _ _ _ _ _ _ sF sF - - -�,_sF-_�--NCR/W� —4 _ ------------------------ --- �_ - - - - - - - - - 845 - - - - - - - _------------- _ _ s ✓ / / -844— F sF_ --- �OO� — — — — — — — — — r — — — — — — 0, of ------- ao- ao� — — — — — — — _ •----- --- �ao� ------------------- --_—!_—_------------ — ------------- p I -� --- �OO�-------- -844- - CV I '� - - - - - - ----- o� sF � � � --- -�----------- — — — — - ---------- — — - ------------- — — — — — -------= LOD LODE-�6�--- LOD LOD 'LOD LOD LOD JC_ —ORI NA LODE LODE GI --------- ---------------- LINE- - b8' Z =EFTA =----3 ---- LODE ------ - ----- = - _ - - - - - - - - -844- B=841.93' n i A r1l-ice_ n. -�- — 1 i E=;839.00' CONSTRUCTION ENTRANCE MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY DIVERSION CHANNEL OQ \ \ \ \ \ INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. SEDIMENT TRAP INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE �o \\ O \ \,\ \ \ \ TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL N\ \ \ \ \ AREA, AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE B ` ` \\ SPILLWAY TO ENSURE IT IS A MINIMUM OR 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL \ � \\ UNSTABLE SEDIMENT. s�' \ POROUS BAFFLES r \ \ \ INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. MAINTAIN ACCESS TO BAFFLES. SHOULD BAFFLE FABRIC COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT IMMEDIATELY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND \ \ \ \ \ TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND REPLACE IF DAMAGED DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNATED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT \ \ ` DEPOSITS. I I 1 o / ��/ \` \ \ \ \ I / / \ \ \ / \ TEMPORARY SEEDING 'x aN \ \ \\ \\\ \ \ \ RESEED AND MULCH AREA WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT AS MUCH AS POSSIBLE. o I \ I ram/' I o\\�'09 N/F \\ \ EROSION CONTROL STANDARD NOTES I I I / I / \ \ PHILLIP $ TSOULOS SEE SHEET C1.2 PROP LLC PIN# 4603669032 (DB. 1146, PG. 349) CONSTRUCTION ENTRANCE 35° 28' 48" N \ 80° 59' 32" W \ \ \ �\ o PROPOSED I ��� CARWASH OQ / FOOTPRINT Q� gam/ / ----------------- /Z I �s,o E \s �\ 0 \ \'9 `\ \ \ \ \ PROPOSED BUILDING FOOTPRINT 1 / / — — — — — — — — — — — — — — — — — — — — SIL FENCE SHOWN 2' OFF LOD R VISUAL PURPOSES. SILT FENCE/ (je, B2 TO BE INSTALLED ON LOD LINE ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCE RULES AND REGULATIONS [15A NCAC 4B .0110] GRAPHIC SCALE 15 30 60 ( IN FEET ) SCALE: I" = 30' North Carolina One -Gall Center MIEN..*, �Eftw GN N � OW AOL I-- '" w NORIN GVmIIN GALL I-wo-632-4949 UNDERGROUND LDCATORS. CONTRACTOR SNAIL CONTACT THE UNDERGRMND LOCATORS EVERY 10 DAYS FOR AN UPDATE M UTKM LOGLONS Call BEFORE you 0161 "It's The Law" EROSION CONTROL NOTES A. CONSTRUCTION ENTRANCE 6.06, SEE DETAIL ON SHEET C1.2 B. SILT FENCE 6.62, SEE DETAIL ON SHEET C1.3 C. CONCRETE WASHOUT 6.06, SEE DETAIL ON SHEET C1.2 D. TEMPORARY SEEDING 6.10, SEE DETAIL ON SHEET C1.2 E. DIVERSION DIVERSION CHANNEL 6.20, SEE DETAIL ON SHEET C1.3 F. SEDIMENT TRAP 6.60, SEE DETAIL ON SHEET C1.4 G. POROUS BAFFLE 6.65, SEE DETAIL ON SHEET C1.4 H. SPILLWAY, ELEV. 849.50' I. SILT FENCE J-HOOK EROSION CONTROL LEGEND PROPERTY LINE - - - - SOIL BOUNDARY LOD LIMITS OF DISTURBANCE SILT FENCE (DETAIL SHEET C1.3) SF DIVERSION CHANNEL (DETAIL SHEET C1.3) STABILIZED CONSTRUCTION ENTRANCE (DETAIL SHEET C1.2) \ RIP RAP CHANNEL PROTECTION LD -6 J rz o O U C (6 orn N CU U O z N U) L C)co 0 C)(D M C � .2-O Q M CO CO E 0 O U C= E 3 J c O U m E m m 0 O 2 U W LU z) ^^ '' VJ 2 LL U a_ O � zz Q I— (1) 1-: z z (.0 C) z H U �Q o J � U) U 0 W LU z O I Z w � (n z Jwm C) z ' U O W z 0U 0� Ili W W � O U LU KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FI LE C1.0 - EROSION CONTROL - INITIAL PHASE SHEET C 1 .0 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C1.0 EROSION CONTROL - INITIAL PHASE.dwg 11/27/2019 c� z J z C) U z Q C) 0 07 O r m Q J 0 _ H w m J J Q cn c� z J En z 0 U Z Q O m M m z 0 H Q w Q a 0 Z Q z 0 Q O _ Q Z w o= 0 O _ z W U O 0 _ Z 0 W U z Q J w Z of LLJ W 0 of z Q W O w W G' 0 W W V) Q U O w z w J U 0 z Q w 0 U L� U W N W _ 0 w J Z 0 0 w 0 z w z LLJ U w W O Z w Of H N z Z Q V) Q z w w _ W H Z W w Z z C) Ln W 0 0 Z w U Z O U w _ _ H W _ H w O Z U O 0 En EROSION CONTROL MAINTENANCE - FINAL PHASE SILT FENCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE H DIS1R ^ \ a `\ CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND \ \ SPECIAL ---- \y\ \' O �p� \ # \ \ \ oo \ (DB. 2630, PG. 357) \ y0 1CT LINE BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CONSTRUCTION ENTRANCE MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. \ oo \ y \\ y y y \ \ TEMPORARY SEEDING y \ y y \ \ `O° 1. y y y \ 2. 3. y \y 5. V. \ 4. \ y y \ y \ 7. 8. i \ QJ � y \ RESEED AND MULCH AREA WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MO W. PROTECT AS MUCH AS POSSIBLE. PERMANENT SEEDING FERTILIZE, MOW, WATER, CONTINUE SOIL TESTING, REPAIR, AND MULCH AS NEEDED. CATAWBA RIVER BASIN SEQUENCE OF CONSTRUCTION - FINAL PHASE (S \ \ \ y y\ y y \ \ y y y \ \ v \ y \ CHEDULE PROVIDED AS PART OF CONSTRUCTION SEQUENCE IS FOR INFORMATION ONLY.) CONTINUE TO MAINTAIN ALL BMPS THROUGHOUT CONSTRUCTION (SEE EROSION CONTROL MAINTENANCE BELOW). START STORM DRAIN SYSTEM INSTALLATION AS SHOWN ON PLAN AND ON C3.0. COMPLETE GRADING TO EXTENT POSSIBLE. COMPLETE FINAL GRADING AND PAVING FOR THE SITE. REMOVE CONCRETE WASHOUT AND CONSTRUCTION EXIT AS NECESSARY AS PAVING IS INSTALLED. PERMANENTLY STABILIZE DISTURBED AREAS AS SHOWN ON PLAN AND IN ACCORDANCE WITH DETAILS ON SHEET C1.3. REMOVE TEMPORARY DIVERSION CHANNEL, SEDIMENT TRAP, AND SILT FENCE AFTER ENTIRE AREA IS STABILIZED. PREPARE THE STORMWATER AS-BUILTS. SCHEDULE AN ONSITE INSPECTION WITH LINCOLN COUNTY AND THE ENGINEER AFTER THE SITE IS FULLY STABILIZED. CONTINUE WEEKLY INSPECTION REPORTS UNTIL THE SITE IS FULLY STABILIZED AND THE PERMIT MAY BE TERMINATED. s EROSION CONTROL STANDARD NOTES \ y\ \ \ I r \ / / /y y y ��h y\y y \% y y \ ��\`v\� `� \ \\ / \\\ SEE SHEET C1.2 \ \ \ O I I I y �� \ y \ \ �� N/F o V y PHIL00 PROPLOULOS\\ /// y yy \ y\ y \ ?c��'\,\\ \ / 2 \ \ I I // I y / y y y y C" LC (DB. 1146, PG. 349) PIN# 4603669032 \/ y y p/ y \ \ / co CD Wo \ \ _ _ _ _ _ _ ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN \ I i y yy y yyy APPROVED EROSION CONTROL PLAN A SITE REGULATED UNDER THE MINING ACT OF 1971 OR A LANDFILL I I / �O y y y, \ y y \ \ \ \ �\ \ \ f f 1 \ \ / / \ REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION \yy ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR \ I \ I �hh�'/ — J \ oo� DIVISION OF WATER RESOURCE RULES AND REGULATIONS [15A NCAC 4B .0110] I 0` y / NN Z �� \ V\ y y �\ o 850 I \ \ \ &I Lo \ // OO.\ \ \ y y \L I I! 1 \ \ \ \ j /'" / y -v yLOb \ \ � y CAR WASH \ y y \ 5y y FFE851.25' y y 10 p^ I\ / ✓ / y y yy /� y / y yy` y yy °y y =YY/ I \ y y y y y / / yAZ y — y / v \ \ y y\ y y� y \• \ / °' y 5 'Q� y y\ �,/! °' \v y y\\ ��&� \ y y\ii \ --PROPOSED N STORE / \ y sy y / \ y y' \ •X O \ 7.5�.i0 / / y C9� F 8 'd CO /101 y 3� yyy y y �yy yyyy _vim \ y 11 -.. \ ' y y y y y 8,49 \\rOy\ \ ¢\ y y \ �O \y \ v/ �cI \ \ y y SD /F y f� \ y \ y y\ o0 9l STATE ILLE ROAD 1 y \S''Q LAN OMPANY LLC # 4603657556 (DB. 2630, PG. 357) - J y y / y / / y / y y v y y/ y y y/ y y y / y y y y v 850 011 1=" :; 4 3�' ..' (30-1- - .. .. LOD LOD• _ ____ • •--- °I day / V / I—_844—�--- CAD file name: V:\120003 — Circle K\120003-01-045 (ENG) — Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C1.1 EROSION CONTROL — FINAL PHASE.DWG 11 / •yy y / / y T \\ \yy/yy/ SD / Lul /y ea � a""°-� — _ ..�• � ° �+� ° � vi °. ° / _ �"a"� � s•. _ p� y y y ` y q i(\\y\ \ .. Q • �. Q . $ ` < �"� a .�,— a ° D.a • Q ... ° y y w y / y y \Fv \ y y \ °. a—Aa•►�. — :_9.a a _ ° v \ J y ..• ••••• y y/ \ y y y y\ y �\ y 'i'` y \ \\. a _ _ _ .: •ar:. .. .'v y I.. y / �e. v ' �• y a ?{;5::•. \ °' y\ y Cv\ y I'" \ „ ��c9 // S .. ° •,v> � � '_ }•:_ -m- y y y y y y y y\\ ... • e /e \ 'v : •:ir � ::tiff•: � . •••• �}:{• '� y y y y y '" \ y y y \ _ \ \ y y • :•}:: • :': ••: {:�•:: }: • � ••• \y � y 'v y y y \ y .v y 1 y � y y y � \ ° y ::•:e;:titi };y .•.•• .. a' y \ y U� y' y w I a' y a' `� y $d / / � � � � \ E $45• y i i \y � y y -" y� y ytl y y :••• y / y y y y y y y y y y••. y y IT y y � y y y _ y - _- --v_ —y -- •v y y y - � i y -- +•— y— y8 �'OO .titi�Z� � „y I \ y-v y 343— _�LINAL EED L '" ' 1 $+44 y y y y y y Iy y y y O 843 y LE Dy $ y 42 NYPg y y yy y y yy y y �—� yyy Z y y y I y O y y _ - - — /\ / A r1—ice y y y +.4-�_ � y y y 'v y y y �•'� y _-_.'�-_-'�'•-_-�`-_y -�r-_ y / GRAPHIC SCALE 15 30 60 ( IN FEET ) SCALE: 1" = 30' North Carolina One -Gall Center M IF. NeAwd R B.& MftW aaMe[e, -6�09W x ors EErac axxG x AOL NORIN Woo GALL I-WO-632-4949 UNDERGROUND LDCATORA CONTRACTOR SMALL CONTACT THE UNDERGROUND LOCATORS EVERY 70 CAYs FOR AN UPDATE TD ururr wrwnDNs. Call BEFORE you 0161 'Ws The Law" EROSION CONTROL LEGEND fW k PROPERTY LINE SOIL BOUNDARY LIMITS OF DISTURBANCE SILT FENCE (DETAIL SHEET C1.3) DIVERSION CHANNEL (DETAIL SHEET C1.3) STABILIZED CONSTRUCTION ENTRANCE (DETAIL SHEET C1.2) PERMANENT SEEDING (DETAIL SHEET C1.5) GRAVEL PRETREATMENT AREA QD L0 M U 0 z C O J zi 7 � o U c CB E � co C d O z Lo 0-)m CV t 7 U LO O C)0 Cl)cu = _2- Q co M � CO O E OU o U E � -0 J C-. c O U m E o O 00 0 0 Q O 2 U Lu LLJ 0� D U) _ U O ` L Z �r^� D z LL I � C) z U Q � J O � =� 0 U LU Z o z w>� W O U J w m Z C.0 O U z Oxxxxxx� LU �U LU Wz' 0. O U LU KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FI LE CIA - EROSION CONTROL - FINAL PHASE SHEET C 1 x 1 !019 0 w ¢ w w d Lo LLJ _ 0 z U z w rn U _ 0- d U U w m w _ 0 w r J z 0 0 w 0 z w Of U w 0 z w Of z z ¢ z it w _ 0 w Ui - z Lo it m z c� Cn 0 0 z Q rn w w U Z U U w of w LLJ z w U O 0 Ln H EROSION CONTROL STANDARD NOTES 1. ALL CLEARING OR LAND DISTURBANCE OUTSIDE OF THE LIMITS DEFINED BY THE PLANS IS PROHIBITED. 11. WATER THAT IS BEING PUMPED FROM TRENCHES OR EXCAVATIONS SHALL BE FILTERED TO REMOVE SEDIMENT PRIOR TO BEING DISCHARGED OFFSITE OR INTO ANY WoS. IN ADDITION, THE INTAKE OF SEDIMENT SHALL BE MINIMIZED BY EQUIPPING THE INTAKE WITH A FLOAT 2. THE SSC'S SHOWN ON THESE PLANS REPRESENT THE ENGINEER'S OPINION OF REASONABLE MEASURES TO CONTROL STORMWATER AND TO PREVENT SEDIMENT FROM LEAVING THE SITE; HOWEVER, STORMWATER AND SEDIMENTATION CONTROL IS A DYNAMIC PROCESS OR BY EMBEDDING IT IN FILTER ROCK. EROSION AT THE PUMP OUTLET SHALL BE MINIMIZED THROUGH THE USE OF AN ENERGY DISSIPATER, SEDIMENT BASIN OR OTHER APPROPRIATE SSC'S. THAT REQUIRES MONITORING, MAINTENANCE AND ADAPTATION TO CHANGING CONDITIONS. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN ANY AND ALL MEASURES NECESSARY TO CONTROL STORMWATER AND TO PREVENT SEDIMENT FROM LEAVING THE SITE, WHETHER SHOWN ON THESE PLANS OR NOT, UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE ENGINEER. 12. A COPY OF THE SWPPP, INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OR CONSTRUCTION ACTIVITIES TO Z THE DATE THAT FINAL STABILIZATION IS REACHED. SEE SELF -INSPECTION, RECORDKEEPING, AND REPORTING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 3. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 13. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF SEVEN (7) CALENDAR DAYS. SEE GROUND STABILZATION M AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. � 4. SOIL STABILZATION SHALL BE ACHIEVED ON ANY AREAS OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE AND SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON tp SHEET C1.2 EROSION CONTROL DETAILS: 14. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. LO • ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT M WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTRUBING ACTIVITY. 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATER. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT U • ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. PRIOR TO DISCHARGE. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. p Z 5. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE 16. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMP'S (SEDIMENT BASIN, FILTER BAG, ETC.). NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. SEE SELF -INSPECTION, RECORDKEEPING, AND REPORTING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. 17. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED (SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. N 6. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY • WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; `p INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE • WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; (WoS). 0FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND Q • SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 7. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED 0 2 DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 20. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. U t� 8. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 21. IF EXISTING BMPs NEED TO BE MODIFIED OR IF ADDITIONAL BMPs ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR STATE's WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER L SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPs MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. N " 9. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UP -SLOPE RUNOFF AND/OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 22. APRE-CONSTRUCTION CONFERENCE MUST BEHELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON -SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON -LINEAR PROJECTS THAT DISTURB TEN (10) ACRES OR MORE THIS Z CONFERENCE MUST BE HELD ON -SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. 0 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. SEE GROUND STABILZATION AND MATERIALS HANDLING NOTES ON SHEET C1.2 EROSION CONTROL DETAILS. IM0 V Practice Standards and Specifications Practice Standards and Specifications Practice Standards and Specifications 6.10 rate of 1 to 1 1/2 tons/acre on coarse -textured soils and 2-3 tons/acre on fine- Maintenance Reseed and mulch areas where seedling emergence is poor, or where erosion TEMPORARY SEEDItextured soils is usually sufficient. Apply limestone uniformly and incorporate occurs, as soon as possible. Do not mow. Protect from traffic as much as into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be possible. Table 6.10b Seeding mixture Table 6.10E Seeding mixture J J TS limed. Temporary Seeding Species Rate (lb/acre) Temporary Seeding Species Rate (lb/acre) Q ca Q Definition Planting rapid -growing annual grasses, small grains, or legumes to provide Fertilizer -Base application rates on soil tests. When these are not possible, References Site Preparation Recommendations for German millet 40 Summer Recommendations for Fall Rye (grain) 120 = � o 00 O CO U L � CO o initial, temporary cover for erosion control on disturbed areas. apply a 10-10-10 grade fertilizer at 700-1,000 lb/acre. Both fertilizer and lime FF y Roughening 6.03, Surface Rou henin In the Piedmont and Mountains, a small -stemmed Sudangrass may be Seeding dates U cis O M � C should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is 6.04, Topsoiling substituted at a rate of 50 lb/acre. Mountains -Aug. 15 - Dec. 15 O Q M 0) Purpose To temporarily stabilize denuded areas that will not be brought to final grade used, do not mix seed and fertilizer more than 30 minutes before application. Surface Stabilization Coastal Plain and Piedmont -Aug. 15 - Dec. 30 N (� to 0 w for a period of more than 21 calendar days. Surface roughening -If recent tillage operations have resulted in a loose 6.11, Permanent Seeding Seeding dates Mountains -May 15 -Aug. 15 Soil amendments tq C 0 � co U to i= o Temporary seeding controls runoff and erosion until permanent vegetation or surface, additional roughening may not be required, except to break up large 6.14, Mulching Piedmont -May 1 -Aug. 15 Follow soil tests or apply 2,000 lb/acre ground agricultural limestone � O t 0 U other erosion control measures can be established. In addition, it provides clods. If rainfall causes the surface to become sealed or crusted, loosen it Appendix Coastal Plain -Apr. 15 -Aug. 15 and 1,000 lb/acre 10-10-10 fertilizer. U 0 CU N Z = E c cu residue for soil protection and seedbed preparation, and reduces problems of p F F just prior to seeding by disking, raking, harrowing, or other suitable methods. 8.02, Vegetation Tables � _Q O E mud and dust production from bare soil surfaces during construction. F g Groove or furrow slopes steeper than 3:1 on the contour before seeding Soil amendments Mulch C) Q 0 o (Practice 6.03, Surface Roughening). Follow recommendations of soil tests or apply 2,000 lb/acre ground Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, �p agricultural limestone and 750 lb/acre 10-10-10 fertilizer. or a mulch anchoring tool. A disk with blades set nearly straight can be 0 m Oo Conditions Where On any cleared, unvegetated, or sparsely vegetated soil surface where PLANT SELECTION used as a mulch anchoring tool. vegetative cover is needed for less than I year. Applications of this practice Practice Applies Select an appropriate species or species mixture from Table 6.1Oa for seeding in late winter and early spring, Table 6.1Ob for summer, and Table 6.1Oc for Mulch Apply 4,000lb/acre Anchor by tacking Maintenance include diversions, darns, temporary sediment basins, temporary road banks, straw. straw with asphalt, netting, and topsoil stockpiles. fall. or a mulch anchoring tool. Adisk with blades set nearly straight can be Repair and refertilize damaged areas immediately. Topdress with 50 In the Mountains, December and January seedings have poor chances of used as a mulch anchoring tool. lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Planning Annual plants, which sprout and grow rapidly and survive for only one season, success. When it is necessary to plant at these times, use recommendations Maintenance Coastal Plain) or Korean (Mountains) lespedeza in late February or Q are suitable for establishing initial or temporary vegetative cover. Temporary Considerations for fall and a securely tacked mulch. Refertilize if growth is not fully adequate. Reseed, refertilize and mulch early March. O seeding preserves the integrity of earthen sediment control structures such SEEDING immediately following erosion or other damage. as dikes, diversions, and the banks of dams and sediment basins. It can also Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, reduce the amount of maintenance associated with these devices. For example, the frequency of sediment basin cleanouts will be reduced if watershed areas, or hydroseeder. Use seeding rates given in Tables 6.1 Oa-6.1 Oc. Broadcast 2 seeding and hydroseeding are appropriate for steep slopes where equipment outside the active construction zone, are stabilized. cannot be driven. Hand broadcasting is not recommended because of the U Proper seedbed preparation, selection ofappropriate species, and use ofquality difficulty in achieving a uniform distribution. �y seed are as important in this Practice as in Practice 6.11, Permanent Seeding. Small grains should be planted no more than I inch deep, and grasses and Failure to follow established guidelines and recommendations carefully may legumes no more than 1/2 inch. Broadcast seed must be covered by raking result in an inadequate or short-lived stand of vegetation that will not control erosion. or chain dragging, and then lightly firmed with a roller or cultipacker. ' ^ Hydroseeded mixtures should include a wood fiber (cellulose) mulch. v J U J Temporary seeding provides protection for no more than I year, during which time be initiated. MULCHING permanent stabilization should The use of an appropriate mulch will help ensure establishment under normal O conditions, and is essential to seeding success under harsh site conditions CatlOnS Complete grading before preparing seedbeds, and install all necessary erosion Specifications p (Practice 6.14, Mulching). Harsh site conditions include: •seeding in fall for fiber 7 Z z control practices such as, dikes, waterways, and basins. Minimize steep slopes winter cover (wood mulches are not considered w U because they make seedbed preparation difficult and increase the erosion adequate for this use), Q z hazard. If soils become compacted during grading, loosen them to a depth of • slopes steeper than 3:1, Z 6-8 inches using a ripper, harrow, or chisel plow. • excessively hot or dry weather, J ' SEEDBED PREPARATION Good seedbed is essential to establishment. A • adverse soils (shallow, rocky, or high in clay or sand), and O Z < z preparation successful plant good seedbed is well pulverized, loose, and uniform. Where hydroseeding • areas receiving concentrated flow. L.L ::) O are the may be left a more irregular surface of If the area to be mulched is subject to concentrated waterflow, as in channels, methods used, surface with C)large clods and stones. anchor mulch with netting (Practice 6.14, Mulching). = r ) v W Liming -Apply lime according to soil test recommendations. IfthepH (acidity) O _J of the soil is not known, an application of ground agricultural limestone at the U w w cn z Rev.6/06 6.10.1 6.10.2 6.10.3 6.10.5 6.10.6 Z z D J O J wm E5U0T_ North Carolina One -Gall Csn Oter ' U � T.�� rrr. � � a 2a MO) am -an Z Practice Standards and Specifications �d�xD x AOL1 t w Washing -If conditions at the site are such that most of the mud and sediment GALL I-WO-632-4949 UNDERGROUND R 00 TW W 6.06 TEMPORARY GRAVEL are not removed by vehicles traveling over the gravel, the tires should be TME UNDERGROUND LOCAMRS EVERY 10 DAYS FOR AN UPDOE m ururr`OCKRONS. washed. Washing should be done on an area stabilized with crushed stone Coll BEFORE you 0161 Fol that drains into a sediment trap or other suitable disposal area. A wash rack Definition A graveled area or pad located at points where vehicles enter and leave a may also be used to make washing more convenient and effective. It's The Law" O construction site. � 1 Construction I. Clear the entrance and exit area of all vegetation, roots, and other �J Purpose To provide a buffer area where vehicles can drop their mud and sediment to Specifications objectionable material and properly grade it. w avoid transporting it onto public roads, to control erosion from surface runoff, 2. Place the gravel to the specific grade and dimensions shown on the plans, Z and to help control dust. and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable Conditions Where Wherever traffic will be leaving a construction site and moving directly onto a outlet. public road or other paved off -site area. Construction plans should limit traffic Practice Applies to properly constructed entrances. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. ` CARp� Design Criteria Aggregate Size -Use 2-3 inch washed stone. 9 Maintain in from 0 *-SSIQ••.�ti 'Rt.: Maintenance the gravel pad a condition to prevent mud or sediment •, 9 Dimensions of gravel pad Thickness: 6 inches leaving the construction site. This may require periodic topdressing with 2- �O %C 711 9<•. minimum Width: 12-feet full inch stone. After each rainfall, inspect any structure used to trap sediment ,7�/�1 11 minimum or width at all points of the vehicular entrance and exit area, whichever is greater and clean it out as necessary. Immediately remove all objectionable materials - _- spilled, washed, or tracked onto public roadways. 3 Length: 50-feet minimum Location -Locate construction entrances and exits to limit sediment from Runo Conv Once Measures References -1 ..� GINE,.• leavingthe site and to provide b all construction vehicles F utility Y 6.30, Grass -lined Channels , ``� (Figure 6.06a). Avoid steep grades, and entrances at curves in public roads. `CNN Sediment Traps and Barriers �t t t l l l l l l t\\\\ 6.60, Temporary Sediment Trap KAI BURK LICENSE NO. 043463 ad �o G PLAN STATUS QJ�\/ SD ryl /n PQJ�ea / 1m 6"' in JIB 2-3 tit coarse aggregate Figure 6.06a Gravel entrance/exit keeps sediment from leaving the construction site (modified From Va SWCC). DATE DESCRIPTION PL BG KB 6.06.1 6.06.2 DESIGN DRAWN CHKD SCALE 1" = 20' o. 120003-01-045 JOB No . DATE FI LE C1.2 - EROSION CONTROL DETAILS C1.2 SHEET CAD file name: V: \120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C1.2 EROSION CONTROL DETAILS.DWG 11/27/2019 c� Z J (n z O U z Q C) O m O r m Q H O M m J Q O Z J L0 rn Z O U Z Q O m M m z 0 Q 0 a 0 Z Q Z O Q N O H Q Z w H 0 O Z w U O 0 _ Z O w U LLJ Q J w tr a- O 0 z 0 C0 LLJ LLJ Q d fn Q U S 0 z U LLJ Z Q 0 m m U U w r1 (n ILLJ S H O w J Z 0 w LLJ Z Z In LLJ U w 0 Z m I- N LLJ z Q z w z w rn LLJ to Z U C/) ILLJ LLJ Z Q H w U Z O U w m w H 0 z w U O 0 cn H Practice Standards and Specifications 6.62 SEDIMENT FENCE Definition A temporary sediment control measure consisting of fabric buried at the bottom, stretched, and supported by posts. Purpose To retain sediment from small disturbed areas by reducing the velocity of sheet flows to allow sediment deposition. Conditions Where Below small -disturbed areas that are less then '/. acre per 100 feet offence. Practice Applies Where runoff can be stored behind the sediment fence without damaging the fence or the submerged area behind the fence. Do not install sediment fences across streams, ditches, or waterways, or other areas of concentrated flow. Sediment fence should be placed along topographic elevation contours, where it can intercept stormwater runoff that is in dispersed sheet flow. Sediment fence should not be used alone below graded slopes greater than 10 feet in height. Planning A sediment fence is a system to retain sediment on the construction site. The Considerations fence retains sediment primarily by retarding flow and promoting deposition. In operation, generally the fence becomes clogged with fine particles, which reduce the flow rate. This causes a pond to develop behind the fence. The designer should anticipate pending and provide sufficient storage areas and overflow outlets to prevent flows from overtopping the fence. Since sediment fences are not designed to withstand high water levels, locate them so that only shallow pools can form. Tie the ends of a sediment fence into higher ground to prevent flow around the end of the fence before the pool reaches designlevel. Curling each end of the fence uphill in a "P' pattern may be 8 P P Y appropriate to prevent end flow. Provide stabilized outlets to protect the fence system and release storm flows that exceed the design storm. Deposition occurs as the storage pool forms behind the fence. The designer can direct flows to specified deposition areas through appropriate positioning of the fence orb providing an excavated area behind the fence. Plan deposition Y P g cos areas at accessible points to promote routine cleanout and maintenance. Show deposition areas in the erosion and sedimentation control plan. A sediment fence acts as a diversion if placed slightly off the contour. A maximum slope of 2 ercent is recommended. This technique may be used to control shallow, P 9 Y uniform flows from small disturbed areas and to deliver sediment -laden water to deposition areas. The anchoring ofthe toe ofthe fence should be reinforced with 12 inches of NC DOT #5 or #57 washed stone when flow will run parallel to the toe of the fence. Sediment fences serve no function along ridges or near drainage divides where there is little movement of water. Confining or diverting runoffunnecessarily with a sediment fence may create erosion and sedimentation problems that would not otherwise occur. Rev. 5113 6.62.1 Straw barriers have only a 0-20% trapping efficiency and are inadequate. Straw bales may not be used in place of sediment fence. Prefabricated sediment fence with the fabric already stapled to thin wooden posts does not meet minimum standards specified later in this section. Anchoring of sediment fence is critical. The toe of the fabric must be anchored in a trench backfilled with compacted earth. Mechanical compaction must be provided in order for the fence to effectively pond runoff. Design Criteria Ensure that drainage area is no greater than V/ acre per 100 feet offence. This is the maximum drainage area when the slope is less than 2 percent. Where all runoff is to be stored behind the fence, ensure that the maximum slope length behind a sediment fence does not exceed the specifications shown in Table 6.62a. The shorter slope length allowed for steeper slopes will greatly reduce the maximum drainage area. For example, a 10-20 % slope may have a maximum slope length of 25 feet. For a 100-foot length of sediment fence, the drainage area would be 25ft X 100111 = 2500sq.ft., or 0.06 acres. Table 6.62a Maximum Slope Slope Length (ft) Maximum Area (ft') Slope Length and Slope for <2% 100 10,000 which Sediment Fence is 2 to 5% 75 7,500 Applicable 5 to 10% 50 5,000 10 to 20 % 25 2,500 >20% 15 1,500 Make the fence stable for the 10-year peak storm runoff. Ensure that the depth of impounded water does not exceed 1.5 feet at any point along the fence. If non -erosive outlets are provided, slope length may be increased beyond that shown in Table 6.62a, but runoff from the area should be determined and bypass capacity and erosion potential along the fence must be checked. The velocity of the flow at the outlet or along the fence should be in keeping with Table 8.05d, Appendix 8.05. Provide a rira splash ad or other outlet protection device for an point riprap P P P Y where flow may overtop the sediment fence, such as natural depressions or swales. Ensure that the maximum height of the fence at a protected, reinforced outlet does not exceed 2 feet and that support post spacing does not exceed 4 feet. The design life of a synthetic sediment fence should be 6 months. Construction MATERIALS Specifications I. Use a synthetic filter fabric of at least 95 % by weight of polyolefins or polyester, which is certified by the manufacturer or supplier as conforming to the requirements in ASTM D 6461, which is shown in part in Table 6.62b. Synthetic filter fabric should contain ultraviolet my inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120- F. 6.62.2 Rev. 5113 I CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C1.2 EROSION CONTROL DETAILS.DWG 11 /27/2019 Practice Standards and Specifications 2. Ensure that posts for sediment fences are 1.25 I1,11hr ar ft minimum steel with a minimum length of 5 feet. Make sure that steel posts have projections to facilitate fastening the fabric. 3. For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62b Specifications For Sediment Fence Fabric Temporary Silt Fence Material Property Requirements Supported' Unsupported' Type of Test Material Units Sift Fence Sill Fence Value Grab Strength ASTM D 4632 N (Ibis) Machine Direction 400 550 MARV (90) (90) X-Machine Direction 400 450 MARV (90) (90) Permittivity' ASTM D 4491 sec-1 0.05 0.05 MARV Apparent Opening Size ASTM D 4751 ram 0.60 0.60 Max. ARVs (US Sieve#) (30) (30) Ultraviolet StabilityASTM % 70%after D 4355 Retained 70%after Typical YP 500h of exposure Strength P 500h of ex sure f" ' SIR Fence support shall consist of 14 gage steel wire with a mesh sparing of 150 mid (6 Inches), or prefabricated poylmer mesh of equivalent strength. z These default values are based on empirical evidence with a variety of sediment. For environmentally sensitive areas, a review of previous experience and/or site or regionally specific gent nctile tests in accordance with Test Method D 5141 should be performed by the agency to confirm suitability of these requirements. s As measured in accordance with Test Method D 4632. Rev. 5113 CONSTRUCTION 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement then fabric on the Pe o u slside of P the fence post. Wire or plastic zip ties should have minimum 50 pound tensile Po P P strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches. 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have minimum 50 pound tensile strength. 6.62.3 6.62.4 I 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (Figure 6.62a). 8. Place 12 inches of the fabric along the bottom and side of the trench. 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavating a trench, placing fabric and then backfilling trench, sediment fence may be installed using specially designed equipment that inserts the fabric into a cut sliced in the ground with a disc (Figure 6.62b). Installation I. The base of both end posts should be at least one foot higher than the Specifications middle of the fence. Check with a level if necessary. 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard applications. 3. Install posts 2 feet deep on the downstream side of the silt fence, and as close as possible to the fabric, enabling posts to support the fabric from upstream water pressure. 4. Install posts with the nipples facing away from the silt fabric. P PP g Y 5. Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric. Attach each tie diagonally 45 degrees through the fabric, with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a post nipple when tightened to prevent sagging. 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level. 8. The installation should be checked and corrected forany deviations before compaction. 9. Compaction is vitally important for effective results. Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. Re, 5113 Rev. 5113 Practice Standards and Specifications rmax 'd strength fabric with wire fence rength fabric without wire fence Steel post plastic or .. wire tieWire8-24" WirI 8" down &long 4" forward al 24- the trench Filter I fabric Cross -Section View Filter Steel fabric BackfIl trench Natural post and compact ground thoroughly •••m••• upslopis in 8" 24" min Figure 6.62a Installation detail of a sediment fence. Natural gro ground 6.62.5 I The Slicing Method Pori height POST SPACING: men. 24• 6,' max. on open run6 4' max . on coding crew Ana�h node to u,, o- cede of Poi FLOW - Dr w raw esi rde or sla PnCT r1FPTH fence 2 to 4 times with Z Peet deice -ring 60 P.s.l. or greater compadei son compacred son No more than 24" ofa 36" fabric is allowed above ground. ------------ ......--------------- Top of Fabric Bell op 8" wagonal afracnmenr tloublesslrergih.. ATIACHMENT DETAILS: • Sather Wtide or Pools, ft nestled. • 0111ae three Iles per post, all wlihin top 9' of fabric. • Posfilen each Ile diagonally, puncturing holes vedlcally a minimum of Veered. • Hang each Ye ens pawl ripple and lighten securely. Use cable 11. (501bs1 or soft wire. Roll of silt fence Post Installed after compadlon Fabric above Silt Fence ground G \\ r ri r GpG • ,� � , AAVAp;� p��pV Gl'l Horizontal chisel point Sllcina blade 3' width 0.7^ Completed Installation Vibratory plow is not acceptable because of horizontal compaction Figure 6.62b Schematics for using the slicing method to install a sediment fence. Adapted from Silt Fence that Works 6.62.6 Rev. 5113 Practice Standards and Specifications Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next min and to reduce pressure on the fence. Take care to avoid undermining the fence during element. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. References ASTMD 6461 - 99. "Standard Specification for Silt Fence Materials" ASTM International. For referenced ASTM standards, visit the ASTM website, www.astin.org, or comactASTM Customer Service at we ice@astm.org. For Annual Book ofASTM Standards volume information, refer to the standard's Document Summary page on the ASTM website. ASTM D 6462 - 03. "Standard Practice for Silt Fence Installation" ASTM International. For referenced ASTM standards, visit the ASTM website, www.aslm.org, or contact ASTM Customer Service at service@wbn.org. For Annual Book of ASTM Standards volume information, refer to the standard's Document Summary page on the ASTM website. C. Joel Sprague, PE, Silt Fence Performance Limits and Installation Requirements. Sprague and Sprague Consulting Engineers and TRI/ Environmental, Inc. Carpenter Erosion Control. http://wwwtommy-sfm.com/ Kentucky Erosion Prevention and Sediment Control Field Manual, 2004. Runcf'Canmol Measures 6.20, Temporary Diversions Outlet Protection 6.41, Outlet Stabilization Structure Appendix 8.03, Estimating Runoff Re, 5113 6.62.7 North Carolina One -Gall Center M IF. NesAir n• B.& Illift W 2 N GALL I-800-632-4949 UNDERGROUND LOCATORS CONTRACTOR SMALL COWACr TIME UNDEROROIIND LD cl EVERY 10 DAYS FOR AN LiiiA E To uTlllY ltX.h` noN4. Gall BEFORE you 0161 "It's The Law" Practice Standards and Specifications 6.20 Practice Standards and Specifications downhill side with the spoil than to build diversions by other methods. Whem Channel design- shape: parabolic, trapezoidal, or V-shaped ' ' ■ space is limited, it may be necessary to build the ridge by hauling in diking side slope: 2:1 orflatter T D material, or using a silt fence to divert the flow. Use gravel to form the 3:1 or flatter where vehicles cross diversion dike when vehicles must cross frequently (Figure 6.20b). Grades- Either a uniform or a gradually increasing grade is preferred. Definition A temporary ridge or excavated channel or combination ridge and channel Sudden decreases in grade accumulate sediment and should be expected to constructed across sloping land on a predetermined grade. cause overtopping. A large increase in grade may erode. Coarse aggregate \ Purpose To protect work areas from upslope runoff, and to divert sediment -laden water y 3: t max Outlet Design the outlet to accept flow from the diversion plus any other contributing areas. Divert sediment -laden nmoff and release through a to appropriate traps or stable outlets. 18" min ctaW sediment -trapping device (Practice 6.60, Temporary Sediment Trap and Practice 6.61, Sediment Basin). Flow from undisturbed areas can be dispersed Conditions Where This practice applies to construction areas where runoff can be diverted and disposed flood damage. _ m I _ - I I = I - by a level spreader (Practice 6.40, Level Spreader). of properly to control erosion, sedimentation, or Practice Applies PP Specific locations and conditions include: - I - II 1- I IIII II -"" II = I -�- -_u=fi j� jjTL�''j. Small diversions Where the diversion channel grade is between 0.2 and 3%, a vegetative cover is required. A channel and ridge 1ILf= < 9' typical -0 ,r t"" (y(( permanent parabolic • above disturbed existing slopes, and above cut or fill slopes to prevent IIII�I� "" I I - E 1.5 feet deep and 12 feet wide may be used for diversions with flows up to 5 runoff over the slope; cfs. This depth does not include freeboard or settlement. Side slopes should • across unprotected slopes, as slope breaks, to reduce sloe length; P P P P gt Figure 6.20b Temporary ravel diversion dike for vehicle crossing modified from Va SWCC . g Po �'9 g( ) be 3:1 or flatter, and the top of the dike must be at least 2 feet wide. • below slopes to divert excess runoff to stabilized outlets; • where needed to divert sediment -laden water to sediment traps; Plan temporary diversions to function I year or more, or they may be Construction I• Remove and properly dispose of all trees, brush, stamps, and other • near the perimeter of the construction area to keep sediment from constructed anew at the end of each day's grading operation to protect new fill. Specifications objectionable material. le2. leaving the site; and Diversions that are to serve longer than 30 working days should be seeded and Ensure that the minimum constructed cross section meets all design mulched as soon as they are constructed to preserve dike height and reduce requirements. • above disturbed areas before stabilization to prevent erosion, and maintain maintenance, acceptable working conditions. 3. Ensure that the top of the dike is not lower at any point than the design • Temporary diversions may also serve as sediment traps when the site has Where design velocities exceed 2 ft/sec, a channel liner is usually necessary to elevation plus the specified settlement. been overexcavated on a flat grade; they may also be used in conjunction prevent erosion (Table 8.05a, Appendix 8.05). with a sediment fence. Temporary diversions may serve as in -place sediment traps if overexcavated ! 4. Provide sufficient room around diversions to permit machine regrading and to 2 feet and placed on a nearly flat grade. The dike serves to divert water as cleanout. It is important that diversions aredesigned, constructed and Planning Po properly gn the stage increases. A combination silt fence and channel in which fill from 5. Vegetate the ride immediate) after construction, unless it will remain in B g Y maintained since they concentrate water flow and increase erosion potential the channel is used to stabilize the fence can trap sediment and divert runoff place less than 30 working days. Considerations (Figure 6.20a). Particular care must be taken in planning diversion grades. simultaneously. Too much slope can result in erosive velocity in the diversion channel or at the Wherever feasible, build and stabilize diversions and outlets before initiating Maintenance Inspecttemporaryromtheflversions o aweek andafther everyminridI.Carefully outlet.A change of slope from steeper grade to flatter may cause deposition to other land -disturbing activities. areaade remove sediment from the flow area and repair the diversion ridge. Carefully occur. The deposition reduces carrying capacity, and may cause overtopping check outlets and make timely repairs as needed. When the area protected is and failure. Frequent inspection and timely maintenance are essential to the penna¢endy stabilized, remove the ridge and the channel to blend with the proper functioning of diversions. Design Criteria Drainage area-5 acres or less. g natural ground level and appropriately stabilize it. Sufficient area must be available to construct and properly maintain diversions. Capacity -peak runoff from I0-year storm. It is usually less costly to excavate a channel and form a ridge or dike on the References Surface Stabilization Velocity -See Table 8.05a, Permissible Velocities for Erosion Protection, Appendix 8.05. 6. 10, Temporary Seeding Compacted soil 2' 6.11, Permanent Seeding Ridge design- side slope: 2:1 or flatter 6.14, Mulching � min ► I 3:1 or flatter at points where cross '� top width: 2 ft minimum Outlet Protection ;'•: •'j'i'r"- . `�•1•t4 Flow ••' '''`"'•_ 18" freeboard: 0.3 ft minimum 6.40,LevelSpreader '. min •� •''' ' �� - I =11111•II•.I�I�III •III��III + I settlement: top/ of total fill height minimum 6.41, Outlet Stabilization Structure =II I IIIIII_ II- IIF- I-! - III=1111- E 6' typical -► Figure 6.20a Temporary earthen diversion dike. 6.20.1 6.20.2 6.20.3 C%2 L0 to M U O Z mi 0 O LD -6 J CL L O U CU CU E O� A (>3 Y CU O z Lo N (n L C:)(DU C:) O M < � Q Q CID T M CO O Il E O 0 O U C= E 3 J Q = O ;� c O U E 0 co m 0 00 I..L 2 U W z) J LL U O /r 1 W � Z Issis- Z ^� v J I � C) Z > DU co 0 Z W 0 wZ Z 0 U w � co z z0 Jz� W m U5co o1 U 10� _ Z W U W Z 0rr'' 0 U W Z CAil?O 'oi O�'FEssi' i ?.QQ,o SEAL = 3 = '•.• GINS .••' 111111111110% KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FI LE C1.3 - EROSION CONTROL DETAILS SHEET C1.3 Practice Standards and Specifications 6.65 ... g 11111 Definition Porous barriers installed inside a temporary sediment trap, skimmer basin, or sediment basin to reduce the velocity and turbulence of the water flowing through the measure, and to facilitate the settling of sediment from the water before discharge. Purpose Sediment traps and basins are designed to temporarily pool runoff water to allow sediment to settle before the water is discharged. Unfortunately, they are usually not very efficient due to high turbulence and "short-circuiting" flows which take runoff quickly to the outlet with little interaction with most of the basin. Porous baffles improve the rate of sediment retention by distributing the flow and reducing turbulence. This process can improve sediment retention. Conditions Where This practice should be used in any temporary sediment trap, skimmer basin, Practice Applies or temporary sediment basin. Planning Porous baffles effectively spread the flow across the entire width of a sediment Considerations basin or trap. Water flows through the baffle material, but is slowed sufficiently to back up the flow, causing it to spread across the entire width of the baffle (Figure 6.65a). Spreading the flow in this manner utilizes the full cross section of the basin, which in turn reduces flow rates or velocity as much as possible. In addition, the turbulence is also greatly reduced. This combination increases sediment deposition and retention and also decreases the particle size of sediment captured. The installation should be similar to a sediment fence (Figure 6.65b). The fabric should be 700 g/mz coir erosion blanket (Figure 6.65c) or equal. A support wire across the top will help prevent excessive sagging if the material is attached to it with appropriate ties. a, no C: a, 0 V P4 w w � O o ry a ZFd v ra E a, na V v -� 0 -5 0 n N nc v a, ra �� -0 a, E �m ra ` = v 12 0 ip LZ S ry to 5L,, c V I!qm/ 0 12 OU VI c O a' sn 72 ry a, 3 a o v = n E to Practice Standards and Specifications rC rV a 3 °''c - - Cf ,n .S c 8 't v a ,, a = H di Cl. Cl- ,a O L Y -0 O a `^ " to C 2¢ O w E y -0 a ; 0 0 TO UU)) V cc >. 0) m ate) c o .2 c a) N N C 3 m E 0 d d L N F- `m in C N (a0) c C to E ,_. v a, aito TO O N C A a) tl= 0 To -2 a m .0 Z' c o to a° w to m rn 3 to 0 LO to a) N Practice Standards and Specifications Baffles need to be installed correctly in order to fully provide their benefits. Refer to Figure 6.65b and the following key points: - The baffle material needs to be secured at the bottom and sides using staples. • Most of the sediment will accumulate in the first bay, so this should be readily accessible for maintenance. Drape baffle material over wire strand and secure with plastic ties at posts and on wire every 12' 9Gauge MirtHigh ____±3' Tension Wire StrandShallBeSecured To PostTo SuPPSBaffle Material BafFle Material Extend 9 gauge wire to basin side a installT-post to anchor baffle to side of basin and secure to vertical post -1 / ". \ Variable Depth V..I bottom of baffle to ground with staples at 12' maximum spacing. \ X Baffle: Material .-,it,""""" - If the temporary sediment basin will be 11 Gauge converted to a permanent stormwater basin Landscaping Staple of greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. 11 , Note: Install three (3) coir fiber baffles in basins `Steel Post at drainage outlets with a spacing oft/4the i 2'-ODepth basin length. Two (2) coir fiber baffles can be ' 1 installed in the basins less than 20 ft in length Baffle Material should be secured to the bottom basin 12' landscape with a spacing of 1 /3 the basin length. and sides of using staples 11 Figure 6.65b Coir Fiber Baffle Detail Cross section of a porous baffle in a sediment basin. Re.. sn3 6.65.1 1 6.65.2 Re, 5/13 I Rev. 5/13 6.65.3 Practice Standards and Specifications 6.60 ,o., I 14 ":M. Definition A small, temporary ponding basin formed by an embankment or excavation to capture sediment. Purpose To detain sediment -laden runoff and trap the sediment to protect receiving streams, lakes, drainage systems, and protect adjacent property. Conditions Where Specific criteria for installation of a temporary sediment trap are as follows: Practice Applies - At the outlets of diversions, channels, slope drains, or other runoff conveyances that discharge sediment -laden water. - Below areas that are draining 5 acres or less. • Where access can be maintained for sediment removal and proper disposal. - In the approach to a stormwater inlet located below a disturbed area as par of an inlet protection system. - Structure life limited to 2 years. A temporary sediment trap should not be located in an intermittent or Perennial stream. Select locations for sediment traps during site evaluation. Note natural Planning drainage divides and select trap sites so that ru noff frompo tential sediment - Considerations producing areas can easily be diverted into the [saps. Ensure the drainage areas for each trapdoes not exceed 5 acres. Install temporary sediment traps P ry before land disturbing takes place within the drainage area. Make traps readily accessible for periodic sediment removal and other necessary maintenance. Plan locations for sediment disposal as part of trap site selection. Clearly designate all disposal areas on the plans. In preparing plans for sediment traps, it is important to consider provisions to protect the embankment from failure from storm mnoffthat exceeds the design capacity. Locate bypass outlets so that flow will not damage the embankment. YP g Direct emergency bypasses to undisturbed natural, stable areas. If a bypass is not possible and failure would have severe consequences, consider alternative sites. Sediment trapping is achieved primarily by settling within a pool formed by an embankment. The sediment pool may also be forted by excavation, or by a combination of excavation and embankment. Sediment -trapping efficiency is a function of surface area and inflow rate Practice 6.61 Sediment Basin). . ) Therefore, maximize the surface area in the design. Because porous baffles improve flow distribution across the basin, high length to width ratios are not necessary to reduce short-circuiting and to optimize efficiency. Because well planned sediment traps are key measures to preventing off - site sedimentation, they should be installed in the first stages of project development. R- 6/06 6.60.1 0 Design Criteria Summary: Temporary Sediment Trap Primary Spillway: Stone Spillway Maximum Drainage Area: 5 acres Minimum Volume: 3600 cubic feet per acre of disturbed area Minimum Surface Area: 435 square feet per cfs of Q1, peak inflow Minimum L/W Ratio: 2:1 Minimum Depth: 3.5 feet, 1.5 feet excavated below grade Maximum Height: Weir elevation 3.5 feet above grade Dewatering Mechanism: Stone Spillway Minimum Dewatering Time: N/A Baffles Required: 3 Storage capacity -Provide a minimum volume of 3600 fts/acre of disturbed area draining into the basin. Required storage volume may also be determined by modeling the soil loss with the Revised Universal Soil Loss Equation or other acceptable methods. Measure volume to the crest elevation of the stone spillway outlet. Trap cleanout-Remove sediment from the trap, and restore the capacity to original trap dimensions when sediment has accumulated to one-half the design depth. Trap efficiency The following design elements must be provided for adequate trapping efficiency: - Provide a surface area of 0.01 acres (435 square feet) per cfs based on the 10- ear storm; Y , - Convey runoff into the basin through stable diversions or temporary slope drains; • Locate sediment inflow to the basin away from the dam to prevent short circuits from inlets to the outlet; - Provide porous baffles (Practice 6.65, Porous Baffles); - Excavate 1.5 feet of the depth of the basin below grade, and provide minimum storage depth of 2 feet above grade. Embankment -Ensure that embankments for temporary sediment traps do not exceed 5 feet in height. Measure from the center line of the original ground surface to the top of the embankment. Keep the crest of the spillway outlet a minimum of 1.5 feet below the settled top of the embankment. Freeboard may be added to the embankment height to allow flow through a designated bypass location. Construct embankments with a minimum top width of 5 feet and side slopes of 2:1 or flatter. Machine compact embankments. ExcavationWheresediment pools are formed or enlarged by excavation, keep side slopes at 2:1 or flatter for safety. Outlet section -Construct the sediment trap outlet using a stone section of the embankment located at the low point in the basin. The stone section serves two purposes: (1) the top section serves as a non -erosive spillway outlet for flood flows; and (2) the bottom section provides a means of dewatering the basin between runoff events. Stone size -Construct the outlet using well -graded stones with a dso size of 9 inches (Class B erosion control stone is recommended,) and a maximum stone 6.60.2 Rev. 6/06 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this Ian sheet will result in the construction P g P P activitybeing considered compliant with the Ground Stabilization and Materials Handling g P g sections of the NCG01 Construction General Permit Sections E and F respectively). ( P Y). The Permittee shall comply with the Erosion and Sediment Control plan approved b the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HOW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slo es 3:1 to 4:1 14 ditches perimeter slopes and HOW W p Q Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes swales (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary round stabilization shall be converted to permanent round stabilization as soon as g P g practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the round sufficient) so that rain will not dislodge the soil. Use one of the g Y g techniques in the table below: Tinarstmorystimiludicin I per awastwamo n. - Temporary grass seed covered with straw or - Permanent grass seed covered with straw or other mulches and tacki iers other mulches and tackifien - Hydroseedl ng. - Geotextlle fabrics such as pefma rent soil a ROIMd erosion control products with or reinforcement matting without temporary gran seed - Hydroseeding - Appr.pn.t[ lyapplied straw or other mulch - shrubs or other permanent plantings coveted - Plastic sheeting with mulch - tl oitnrm and evenly distributed ground carer suBNierit to restrain erosion - structural methods web as concrete, asphalt or retaining walls - • Rolled elision contrul products with grass seed POLYACRYLAMIDES (PAMSI AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction selectingfrom the NC DWR List o A roved PAMSFlocculants. / PP 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans an ans under stored equipment. V 3. Identifyleaks and repair as soon as feasible or remove leaking equipment from the p 8 project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leakingvehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. S. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean u and dispose of waste in designated waste containers. Y, P P g PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled sized and laced appropriately for the needs of site. P 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level round at least 50 feet awe from storm drains P g Y streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a s. ravel ad and surround with sand bags. g P g 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. Practice Standards and Specifications size of 14 inches. The entire upstream face of the rock structure should be covered with fine gravel (NCDOT #57 or 45 wash stone) a minimum of 1 foot thick to reduce the drainage rate. Side slopes Keep the side slopes of the spillway section at 2:1 or flatter. To protect the embankment, keep the sides of the spillway at least 21 inches thick. DepthThebasin should be excavated 1.5 feet below grade. Stone spillway height -The sediment storage depth should be a minimum of 2 feet and a maximum of 3.5 feet above grade. Protection from -Place filter cloth on the foundation below the ri ra piping P P to prevent piping. An alternative would be to excavate a keyway trench across the riprap foundation and up the sides to the height of the dam. Weir length and depth Keep the spillway weir at least 4 feet long and sized to pass the peak discharge of the 10-year storm (Figure 6.60a). A maximum flow depth of six inches, a minimum freeboard of 1 foot, and maximum side slopes of 2A are recommended. Weir length may be selected from Table 6.60a shown for most site locations in North Carolina. Cross -Section 12" min, of NCDOT#5 �m,n� or #57 washed stone --- -- -- ------- I ------ ",-A- 3600 ---- ` 1-�' t 1.5' min. - � --I ------ 3600 cu ft/acre tit ! v - 5, I m ax -t�f ti� m5 filter fabric Design settled 2� Overfill 6" for top � Mot^' , pion View r settlement "_ Emergency by- 4' 'o ass beta ----- 5 -- ;1� min. tilt' ti y\ o+ P 6 w ---- - max r T: F settled top of ----T--- fill .'t•Ft i' a� dam 2' to 3.5' s a, ___-�---------- • 's-g000+ - Natural 3, Ground filter fabric min. Figure 6.60a Plan view and cross-section view of a temporary sediment trap. Rev. 6/06 6.60.3 ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER �� T _ s /� i4.: a - o u r .I1.P iccum_ci4 e �_-w.-w�.a.rW_ ucrmae-a a .,,. �.,-, .,..w. 17P :fit,.-. l��T.,m eliWjW_ TTT err , a L n..,� 7Y .� ,.E. flat nee an OW GRAI& 40MUT STRUCTURE GRAD& 4 _anUT sTRUCTI CONCRETE WASHOUTS 1. Do not discharge concrete or cement slur from the site. g slurry 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition lace the mixer and associated materials on impervious barrier and within P P lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an P ry P 9 PP alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75%capacity to limit overflow events. Replace the tar sand bags or other temporary structural p p, H P ry components when no longer functional. When utilizing alternative or proprietary P g g P P Y products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. 11. ZARDOUSANDTOXICWASTE . Create designated hazardous waste collection areas on -site. . Place hazardous waste containers under cover or in seconds containment. ;; ,n Do not store hazardous chemicals drums or ba ed materials direct) on the round. 6 t t.NORTH CAROLINAbagged v g Environmental Qualify NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING IEFFECTIVE: 04/01/19 EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. Practice Standards and Specifications Figure 6.65d Close-up of porous baffle. 9 P a Figure 6.65c Example of porous baffles made of 700 g/m2 coir erosion blanket as viewed from the outlet. Design Criteria Tbetemporarysedimenttraportemporarysedimentbasin should be sized using the appropriate design criteria. The percent of surface area for each section of the baffle is as follows: -inlet zone: 25% - first cell: 25% - second cell: 25% -outlet zone: 25% Baffle spacing in future permanent stormwater basins is beyond forebay. Be sure to construct baffles up the sides of the trap or basin banks so water does not flow around the structures. Most of the sediment will be captured in the inlet zone. Smaller particle size sediments are captured in the latter cells. Be sure to maintain access to the trap for maintenance and sediment removal. The design life of the fabric is 6-12 months, but may need to be replaced more often if damaged or clogged. 6.65.4 Rev. 5113 a Table 6.60a Drainage Area Weir Length' Design of Spillways (acres) (ft) 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 ' Dimensions shown are minimum. Construction 1. Clear, grub, and strip the area under the embankment of all vegetation and Specifications root mat. Remove all surface soil containing high amounts of organic matter, Slid stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutofftrench between the riprap structure and soil. • Place the filter fabric between the rira and the soil. Extend the fabric P P across the spillway foundation and sides to the to of the dam; or P y p , • Excavate a keyway trench along the center line of the spillway foundation extending up the sides to the height of the data. The trench should be at least 2 feet deep and 2 feet wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. S. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 feet and maximum side slopes of L 1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown on the land with 2:1 side slopes extending to the to of the over filled P P g P embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. 8. Material used in the stone section should be a well -graded mixture of stone with a Lisa size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Discharge inlet water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment - laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 6.60.4 Rey. 6/06 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION are Self -inspections required during normal business hours in accordance with thetable A q 8 below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or ,eater than 1.0 inch occurs outside of normal business hours the self -inspection ection shall be P performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. ll,aqln-" �n,.acl (daring -.at rnspecuw r.cwo wMdute: WNnes. horn) Oailr mieullamoute,. Ill Ran ksup Gaily reaMurnea n If no dolly min gavae cose,,mrmls are made dudna ,wetend m goodwOrkFq holiday p.n.d, Ord no indmdutil loy aloud isMrmubn is cad.. Oy lbw", d flr umulatlw- in ntra ,room f _ thaso sal attended ns this will determine d a we a n Is days fa spa€ti needed). Wvs on which n. rainfall .ecavrred shalir be rectmed as • The rn mee may use another rain-momtarai deWe ' Pe y e .oproued by the civiti n. (2) E&se At, -,I wrco par 1, ad.ntifkadan of the measure inspected, Wast.r.s 7calendar days 2. Oatt, and dime of the lnslrc€tl.n, and warhio 24 1. llama of the person wrmrmina ,be infpeeeion, ho," at a min A. IndKa1-en of whether the mea.res were epenauna r a 1.0 torn In pops)),, 24 here S. OeuriP tion atmimenanne needs ror the measam b Orari afore, natli and d.teM mH€Yehe a[ewm uhtn (3)storrnwaer At Man once per 1. identdfcation of the drscharae ouefaei lmoeoed. d.d,arg. 7ellend.r they. 2. oete and time of the impection, modallTlSDCs) am within 24 3. ftame at The person pHtorinng it-speaian, his,,el.mat C E,Adenee olindiumnetimren a polloom 1.0 aseil event s 1 o t nil, rn _ sheen. war art sa k1s dr deraoraswn Floating ddtl 29 haws 5. IndKaUdd MsAdbli getlllmenLlNWng iht tile, a wit E OescH dart .,Ad- and dam n: as tiye „cti.anueer, (4)polmetn.t At flan ore.por N.hiN.udlmerl.do,Isrmml.rrmideshnlsRtis,ti,en.- she 7 calendar day. of The ,nil wIng dull he nude: and wahin 24 1. Aal.rs nRm 1adean.0 ar notidue enc Tedlmam Thu hag Me houriaf-lif. th-1.11 im event. l,0 inch In 2. Dev,ipfian,e Ida , and damof conttpveactianstAen.and 3. An expbnetl.n as to meaHlens mken ea ronirolhdurc releases.. [S) strea.ns m At lean otcaper lithe steam w w-sh.d has Inneasrd visible sedhnenLaaon.• a wettantlsamRe 7 calendar drys stream hisvvsbk Ilemased WebwaYfram the co nirsrtwn v 11i and wahln 2t =WILY. then a -.in of Ine fdlowlie shag m be ade: tuner haersoraml. Teso 0mw dan,wene..nod.trrsWow,e ep/te.af„Lml,am .€.....tio) r -.,a la erh in 1. tto 1snt,h-N,wred enmadsr. rM.W.,s,il. Na . 24 na M atiemna Offide Off PM 11 I. seamen LItem JJ!RJd NthiL Pettim. b Ground i) pica After each ie 1. The hase of tan Imfalhtion of wlemoor 665C v art e f a unhiliarms of rad t a'R #earl and bbin mna16,kn.F.Llms B grit g measwes aralmr MtNllki€ kdan Mall Mnd-dlnu Se �Pnr a<avnY. vuedon or reacvewpmen4 Permantnt around ewer). ]. DocummW*m that the re.q.1red armed studitanan meawrer have been peos,aM Wphinihe rdgohed 11-seame art an -....Thai [trey will be in-iaeo as ossble. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. Practice Standards and Specifications Construction MATERIALS Specifications 1. Use matting made of 100% coconut fiber (coir) twine woven into high strength matrix with the properties shown in Table 6.65a. 2. Staples should be made of 0.125 inch diameter new steel wire formed into a `U' shape not less than 12 inches in length with a throat of 1 inch in width. The staples anchor the porous baffles into the sides and bottom of the basin. 3. Ensure that steel posts for porous baffles are of a sufficient height to support baffles at desired height. Posts should be approximately 1-3/8" wide measured parallel to the fence, and have a minimum weight of 1.25 IbAinear ft. The posts must be equipped with an anchor plate having a minimum area of 14.0 square inches and be of the self -fastener angle steel type to have a means of retaining wire and coir fiber mat in the desired position without displacement. 4. Use 9-gauge high tension wire for support wire. Table 6.65a Specifications for Porous Baffle Material Rev. 5/13 Coir Fiber Baffle Material Property Requirements Thickness 0.30 in. minimum Tensile Strength (Wet) 900 x 680 lb/ft minimum Elongation Wet 69% x 34% maximum Flow Velocity 10-12 ft/sec Weight 20 oz/SY 680 /m minimum Minimum Width 6.5feet Open Area 50% maximum CONSTRUCTION 1. Grade the basin so that the bottom is level front to back and side to side. 2. Install the coir fiber baffles immediately upon excavation of the basins. 3. Install posts across the width of the sediment trap (Practice 6.62, Sediment Fence). 4. Steel posts should be driven to a depth of 24 inches and spaced a maximum of 4 feet apart. The top of the fabric should be a minimum of 6 inches higher than the invert of the spillway. Tops of baffles should be a minimum of 2 inches lower than the top of the earthen embankment. 5. Install at least three rows of baffles between the inlet and outlet discharge point. Basins less than 20 feet in length may use 2 baffles. 6. Attach a 9 gauge high tension wire strand to the steel posts at a height of 6 inches above the spillway elevation with plastic ties or wire fasteners to prevent sagging. If the temporary sediment basin will be converted to a permanent stormwater basin of a greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. 6.65.5 Practice Standards and Specifications 10. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground, and shape the center to confine the outflow stream (References: Outlet Protection). 11. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 12. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References: Surface Stabilization). 13. Show the distance from the top of the spillway to the sediment cleanout level (1/2 the design depth) on the plans and mark it in the field. 14. Install porous baffles as specified in Practice 6.65, Porous Baffles. Maintenance Inspect temporary sediment traps at least weekly and after each significant(V inch or greater) rainfall event and repair immediately. Remove sediment, and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area, and replace the part of the gravel facing that is impaired by sediment. Check the structure for damage from erosion orpiping. Periodical) check the g Y depth of the spillway to ensure it is a minimum of 1.5 feet below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment -producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas, and stabilize properly (References: Surface Stabilization). References Outlet Protection 6.41, Outlet Stabilization Structure Runoff Control Measures 6.20, Temporary Diversions 6.21 Permanent Diversions 6.22, Diversion Dike (Perimeter Protection) 6.23 Right-of-way, Diversion Water Bars , gh Y ( ) Surface Stabilization 6.10, Temporary Seeding 6. 11, Permanent Seeding 6.15, Riprap Sediment Traps and Barriers 6.61, Sediment Basins 6.64, Skimmer Basins 6.65, Porous Baffles North Carolina Department of Transportation Standard Specifications for Roads and Structures Rev. 6/06 6.60.5 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC Ian as well as an approved deviation shall be kept on the site. The PP P V PP P approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. he*Td to Cvaenm erR bet-entatlpn Reapdremenes [a) Each E&SC measure has been installed Initial and date each E&SC measure an a copy and does not signi0ca ally deviate from the of the approved E&SC plan or weer Plete, date locations, dime nstom and Telmive elevations and sign an Inspection report t hat lists each shown on the approved E&SC plan. E&SC measure shown on the a oproved E&SC plan. This documentation is required upon the inn i m ullaton M the Ells nersinares or if the E&SC measures are modified after initial installation. (b) A phase of grading his been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an Inspection report to indicate wmplaWn of the cordtruction phase. (c) Ground cover Is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&sc plan or complete, date and sign an inspection plan. repartta indicate wmpllance with approved ground cover specdkaliuns. (d) The maintenance and repair Complete,, date and sign a n inspection report.. requirements for all E&SC measures have been performed le) Cotecisve actions have been taken Initial and date a copy of the approved E&SC to E&Sc measures. plan or complete, date and sign an inspection report to Indicate the completion of the corrective xtion. 2. Additional Documentation to be Kept on Site In addition to [he E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours unless the P g Division provides a site -specific exemption based on unique site conditions that make P P P Q this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. b Records of inspections made during the previous twelve months. The ermittee shall O P 8 P P record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of p Q electronicall -available records in lieu of the required paper copies will be allowed if Y q Pp P shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-N01 and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.411 PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC Ian authority has approved these items P ty PP (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, e Velocity dissipation devices such as check dams sediment traps, and riprap are provided at the discharge points of all dewaterin devices and () Y P P, P P P 8 p g (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: - They are 25 gallons or more, - They are less than 25 gallons but cannot be cleaned up within 24 hours, - They cause sheen on surface waters (regardless of volume), or - They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a ermittee becomes aware of an occurrence that must be reported, he shall contact P P the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at 900 858-0368. occurrence ! Reporting Timeffanfes lAfter Oimovery) and Other Requirements (ai Visi hie sediment ' • wi[hIn 24 hours, an v.al or e', ecaronlc nntihcntion. aepgs itior, in a - vwrhln 7 calendar days, a report that conains a description of the stream or wetland sediment and actions taken to address the cause of the deposition, oivlslon staff may waive the requhemeen lot a wnrters report an a case -by -case basis- - If the stream Is named on the NC 30ANI list as impaired for sediment• related causes, the permittee nay be required to perform additional monitoring,h [Ions 1 more stringent ra Ices f Pe PP Y ng p M Ifstaff determine That addilis,e t needed in assure compliance q item re n p with the federal or state impaived-waters conditions. ib) Oil spills and . WU,WO24houn. an ],af M e,reuramc nntdicatian Thenottlicarion release of shall im lude information about the date, time, nature, volume and hazardous Iola lion of the spill or release, substances per item 1[b)-(cl strove IclAnti ciputed . Areppr[wtfensttendaysbeforeMrdaleo}dit,h"pra,ijplasslbfe. bypasses 140 eFR The report shall include an evaluation ofthe anticipated qualtyand 122AII. .1)] effe ,I of the bypass Id) Unanticipated - within 24 hours, an ]cal or erectronic ratification. bypasses 140 Cf R - Wif era 7 €Mend., dogs, -port that includes an evaluation of the 122.411m1(3)] quality and effect afthe bypass. to) Norl[ompliance - wit6en24neun, an Seal of esenranit notification. with the mndltlnns . Wfaryer 7 urfendu, days, a report that contains a description of the of this permit that amplonce,and ids causes; the period of nonwmplMnce, may endanger including exact dates and times, and if the noncomplsance has not health or the been corrected, the anticipated time noncompliance is expected to C-Oranmen0o continue; and steps taken at planned to reduce, eliminate, and CFR 122.411111711 prevent reoccurrence of the noncompliance- 140 CFR 12I.41(11(6). - Division staff may waive the requirement for a written report an a case -by -case basis. NCG01 SELF -INSPECTION, RECORDKEEPING AND REPORTING sr i IJl- I' ''I I C1R' H CI4;U[ {+ h' � ' 0 7 �I inlin3nml3d.il ;r Y EFFECTIVE: 04/01/19 Practice Standards and Specifications 7. Extend 9 gauge minimum high tension wire strand to side of basin or install steel T-posts to anchor baffle to side of basin and secure to vertical end posts as shown in Figure 6.65b. 8. Drape the coir fiber mat over the wire strand mounted at a height of 6 inches above the spillway elevation. Secure the coir fiber mat to the wire strand with plastic ties or wire fasteners. Anchor the matting to the sides and floor of the basin with 12 inch wire staples, approximately 1 ft apart, along the bottom and side slopes of the basin. 9. Do not splice the fabric, but use a continuous piece across the basin 10. Adjustments may be required in the stapling requirements to fit individual site conditions. Maintenance Inspect baffles at least once a week and after each rainfall. Make any required repairs immediately. Be sure to maintain access to the baffles. Should the fabric of a baffle collapse, P , tear, decompose, or become ineffective, replace it promptly. Remove sediment deposits when it reaches half full, to provide adequate storage volume for the next rain and to reduce pressure on the baffles. Take care to avoid damaging the baffles during cleanout, and replace if damaged during cleanout operations. Sediment depth should never exceed half the designed storage depth. After the contributing drainage area has been properly stabilized, remove all baffle materials and unstable sediment deposits, bring the area to grade, and stabilize it. References Sediment Traps and Barriers 6.60, Temporary Sediment Trap 6.61, Sediment Basins 6.62, Sediment Fence 6.64, Skimmer Sediment Basin McLaughlin, Richard, "Soil Facts: Baffles to Improve Sediment Basins" N.C. State University Cooperative Extension Service Fact Sheet AGW- 439-59,2005. North Carolina Department of Transportation Erosion and Sedimentation Control Special Provisions Sullivan, Brian. City of High Point Erosion Control Specifications. Thaxton, C. S., J. Calantoni, and R. A. McLaughlin. 2004. Hydrodynamic assessment of various types of baffles in a sediment detention pond. Transactions of the ASAE. Vol. 47(3): 741-749. 6.65.6 Rev. 5113 � North Carolina One -Gall Gantor 2M T. NWA.1 N urea, aura oat t IQGNt Dtts '" c D"A x NOON aem GALL I-800-632-4g4q UNDERGROUND LOCATORS CONTRACTOR SHALL CONTACT THE UNDERGROUND LOCATORS TW EVERY to DAYS roR AN UPDATE TO Unto lAGn._ Gall BEFORE you D161 "It's The Law" Co N O 3 7 Q O La 0) Co L 0) Z" O :0 0 7C3 -6 J CL - C - 7 to o U C CO E >1 CO Y C-6 a-� o z o t C)(D N 7 U Ln C:) O M = a) = CL � (.0 T 'IT � M (O c O D_ E O U i) C _ 7 O U c: E �: -0 J 1? Z) O (D 0) , a.., - c O C) m E m O 00 0 0 00 0. 2 U W V J 0� _D U rJ O � W U z ~ Z o0^D v z J 0 I T Z � z 0 U>>-< D O Z 2 �-- U) (n z W Z J O U w � (n z Z .J Z D J 0 win U)U07- 0 [)� U 0 _ Z wv w 'Zr' 0. 0 U W Z °°%`Illlllllll/// a° N CAR // \ O // \\�. .Se. •V/AAII i a . *`0 Sal • . 'r o � ,lip o` Y'I �'. 7 i 4 {l/-2 T 9 . _ : Q /i1 S 3 = i i -Zi A., 1 fc N / , N. / \ / AIt i BU� °° s/Otil 11��`` lll11 KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1 " = 20' JOB No. 120003-01-045 DATE FI LE C1.4 - EROSION CONTROL DETAILS SHEET C1.4 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C1.2 EROSION CONTROL DETAILS.DWG 11 /27/2017 Practice Standards and Specifications 6.11 PERMANENT SEEDING PS controlling runofff and erosion on disturbed areas b establishing perennial O S Y SDefinition vegetative cover with seed. Purpose To reduce erosion and decrease sediment yield from disturbed areas, to permanently stabilize such areas in a manner that is economical, adapts to site conditions, and allows selection of the most appropriate plant materials. Conditions Where Fine -graded areas on which permanent, long-lived vegetative cover is the Practice Applies most practical or most effective method of stabilizing the soil. Permanent pp seeding may also be used on rough -graded areas that will not be brought to final grade for a year or more. Areas to be stabilized with permanent vegetation must be seeded or planted within 15 working days or 90 calendar days after final grade is reached, unless temporary stabilization is applied. Introduction During the initial phaseofall landdisturbing projects, theprotective layer, either natural or man-made, is removed from the earth's surface. As the protective layer is removed, the resulting bare areas are exposed to the natural forces of rainfall, freezing, thawing, and wind. The result is soil erosion that leads to sediment pollution of North Carolina streams, rivers, lakes, and estuaries. This design manual presents many alternative strategies for preventing erosion and reducing sediment loss during the construction process. Establishment of protective vegetative cover during the construction project, however, is the crucial step in achieving soil stabilization, controlling soil erosion, and preventing sedimentation ofwaterways. Without a sufficient amount ofroot mat and leafcover to protect and hold the soil in lace large volumes ofsoil will be p place, arg lost and waterways will be degraded long after projects are considered complete. Sections of this practice standard address many of these various situations and set forth selection criteria for the appropriate cover based on purpose and adaptability. Some sediment and erosion control practices recommended in earlier editions ofthe manual may no longer be applicable. Forexample,many popular and commonly used seed and plant varieties have been identified as invasive. Invasive plants are defined as species that aggressively compete with, and displace, locally adapted native plant communities. In select cases where no practical alternative is available, these plants may be considered on a limited basis for soil stabilization, understanding that the goal is to eliminate the use of all invasive plants in favor of non-invasive native and/or introduced species that will provide an equally acceptable vegetative cover. Wherethereis no alternative to the use of invasive species, measures need to be incorporated in the installation and maintenance of these plants to limit their impacts. Rev. 5/08 6.11.1 Itis imperativethatdisturbedsoilsbetotallyprotectedfrom emsionandsedimmt loss duringconstruction and before a project is considered complete and P J P acceptable. Imtallingappropriatevegetationinmi=ediatemdtimelyfmhion is the optimal means of achieving this stabilization. Vegetative specifications P g g P for most exposed soil conditions across North Carolina are provided in this section of the manual. It should be noted however, that no two sites in the State are exactly alike; therefore the protective vegetative cover for individual sites should be carefully selected. Each requires its own investigation, analysis, design and vegetative prescription as set forth in this section of the manual. This practice standard describes three stages of vegetative cover; immediate, primary and long term. Effective and acceptable stabilization can be provided only when the optimum combination of immediate, primary, and long term vegetative practices are applied. The vegetative measures presented in this chapter include application of seed, sod and sprigs. Use of field and container grown plants are not addressed in this manual. Planting of these types of vegetation is typically at spacing and intervals that will not provide the required protective cover. However, the design professional is encouraged to utilize these larger plants to compliment the required protective cover, particularly where these types of plants will provide seed for continued long term cover and wildlife habitat. PLANNING CONSIDERATIONS SOILS Test and analyze the type(s) and quality of the existing soils on a site, their pH ranges, and their nutrient levels. Taking soil samples from the different are as of the project site and having them tested at a state or independent lab will provide a baseline for determining the pH modifiers and additional nutrients required for the selected plant varieties. Disturbed conditions on a site may produce a variety of soil communities. Nutrient and H levels in deeply cut soils will be quite different from those P eP Y soils found on the original surface. When sites are highly disturbed through mechanical means such as grading, the soils become mixed together in many different ratios. These areas should be identified and tested. Results from soil tests will usually include recommended application rates of soil modifiers such as lime and fertilizer for the selected plant species in the articular soils. Application rates will be itemized in the report. P PP The texture of the soil on a site, which is the proportion of sand, silt, and clay in the soil, is an important physical indicator of the site's ability to support vegetation, In heavy clay soils amendments may be necessary to provide an adequately drained planting medium. Conversely, in extremely sandy soils, amendments may be required to provide for moisture and nutrient retention. 6.11.2 Rev. 5108 Practice Standards and Specifications Soil tests will indicate the texture of the given soil but will not provide recommendations for amendments that will improve the soil P P texture. General) the addition of organic materials will improve the Y. g P porosity of hen, clay soils and improve the water holding capacity of P ty heavy Y P g P IY extremely sandy soils. On sites where these different soil conditions exist, it is recommended that a design professional with experience in soil modification be employed to recommend the proper amendments. For more information visit the NCDA Agronomic Services Soil Testing web page http://www.agr.state.nc.us/agronomic/sthome.htm SOIL PREPARATION Proper soil preparation is necessary for successful seed germination and root establishment. It is also necessary for establishment of rooted sprigs, sod and woody plants. Heavily compacted soils prevent au, nutrients and moisture from reaching roots thereby retarding or preventing plant growth. The success of site stabilization and reduction of future maintenance are dependent on an adequately prepared soil bed. Following are the requirements for preparation of areas to be vegetated by grassing, sprigging, sodding, and/or planting of woody plants: General Requirements: • Preparation for primary/permanent stabilization shall not begin until all construction and utility work within the preparation area is complete. However, it may be necessary to prepare for nurse crops prior to completion of construction and installation of utilities. • A North Carolina Department of Agriculture Soils Test (or equal) shall be obtained for all areas to be seeded, sprigged, sodded or planted. Recommended fertilizer and pH adjusting products shall be incorporated into the prepared areas and backfill material per the test. • Allareas to be seededorplanted shallbe tilled orrippedto adepth specified on the approved plans, construction sequence and/or construction bid list. Ripping consists of creating fissures in a criss-cross pattern over the entire surface area, utilizing an implement that will not glaze the side walls of the fissures. Site preparation that does not comply with these documents shall not be acceptable. The depth of soil preparation may be established as a range based on the approval of the reviewing state or local agency. Once tilled or ripped according to the approved plan, all areas are to be returned to the approved final grade. pH modifiers and/or other soil amendments specified in the soil tests can be added during the soil preparation procedure or as described below. • All stones larger than three (3) inches on any side, sticks, roots, and other extraneous materials that surface during the bed preparation shall be removed. Rev. 5/08 6.11.3 Provisions for soils test during and/or after initial grading is complete shall be included on the approved plan, in the approved construction sequence, and on the bid item list utilized for the project. If you did not obtain a soil test: Follow these recommendations for all grasses except centipedegruss. 1. Apply 75 pounds of ground limestone per 1,000 sq. ft. 2. Apply a starter type fertilizer (one that is high in phosphoms) based on the type of grass and planting method. Fertilizer bags have a three -number system indicating the primary nutrients, such as 8-8-8 or 5-10-10. These numbers denote the N-P-K ratio the percentage of each nutrient in a fertilizer. The percentages are always noted in the following order: N Nitrogen for green color and growth. P,O, Phosphorus for good establishment and rooting. K,O Potassium to enhance pest and environmental stress tolerance. Some common examples of starter type fertilizers required for a 1,000 sq. ft. area include 40 pounds of 5-10-10, 20 pounds of 10-20-20, or 16 pounds of 18-24-6. For sandy soils, typical to coastal plain and sandhills of North Carolina, fertilizer rates should be increased by 20 percent. Where available, it is recommended that the design professional specify organic compounds that meet the fertilization requirements, pH and other element requirements. Initial studies have indicated that these compounds have a more positive effect on the environment than some of the synthetic compounds used to manufacture inorganic fertilizers. These materials are readily available in the commercial trade as well as found in recycled yard waste debris, sewerage sludge, lime -stabilized sludge and animal manures. Materials proposed for use must be industry certified and/or privately tested and certified to be acceptable for proposed areas of use and application prior to approval. MULCHES AND TACKING AGENTS Mulches and tacking agents may be required or necessary to protect a seedbed's disturbed surface until the seed can germinate and provide the required protection from erosion. Selection of the materials used in this application should be based on their ability to hold moisture in the soil, as well as protect exposed soil from rainfall, storm water runoff, and wind. The availability of the selected material and the means to apply it are critical factors to consider when planning for the stabilization of any disturbed area. The mulch must cover a minimum of eighty (80) percent of the soil surface and must be secured by a tacking agent, crimping, or protective biodegradable netting. Netting that incorporates plastic mesh and/or plastic twine should not be used in wetlands, riparian buffers or floodplains due to the potential of small animal mortality. See Section 6.14 for detailed specifications and product applications. SOIL BLANKETS Soil blankets can be an acceptable and effective method of temporary sediment and erosion control in lieu of nurse crops. See Section 6.17 of the manual for descriptions of this product and how it can be used in conjunction with this section. In absence of mulches and tracking agents other means of protection may be necessary and required. Areas to be Seeded: • Till or disc the prepared areas to be seeded to a minimum depth of four (4) inches. Remove stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated during the soil preparation process, add pH modifier and fertilizers at the rate specified in the soil test report. • Re -compact the area utilizing a cultipacker roller. The finished grade shall be a smooth even soil surface with a loose, uniformly fine texture. All ridges and depressions shall be removed and filled to provide the approved surface drainage. Seeding of graded areas is to be done immediately after finished grades are obtained and seedbed preparation is completed. Areas to be Sprigged, Sodded, and/or Planted: • At the time of planting till or disc the prepared areas to a depth of four (4) to six (6) inches below the approved finished grade. Remove all stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. Hoof incorporated in the ripping process, add pH modifier, fertilizer, and other recommended soil amendments. • Re -compact the area utilizing a cultipacker roller and prepare final grades as described above. Install sprigs, sod and plants as directed immediately after fine grading is complete. Mulch, mat and/or tack as specified. VEGETATION Availability of seed and plant materials is an important consideration of an construction stabilization effort. Throughout North Carolina, climate y g C a, economics, construction schedule delays and accelerations, and other factors present difficult challenges in specifying the different vegetation needed for site stabilization. To help resolve this issue, vegetative stabilization requires consideration in three categories: ■ Immediate Stabilization —nurse crop varieties (Note: temporary Ymulchin8 may be utilized for immediate stabilization if outlined on the approved plan and construction sequence.) ■ Primary Stabilization — plant varieties providing cover up to 3 years with a specified maintenance program ■ Long Term Stabilization —plant varieties providing protective cover with maintenance levels selected by the owner An adequate job in one of these areas does not guarantee success in the later phases. Horticultural maintenance must be included in the plans. Immediate vegetative cover will always require additional fertilization, soil amendments, soil tests, overseeding and/or other horticultural maintenance until primary vegetative cover is established. 6.11.4 Rev. 5108 Permanent native seed species within the seed mixture should be selected based on natural occurrence of each species in the project site area. Climate, soils, topography, and aspect are major factors affecting the suitability of plants for a particular site and these factors vary widely across North Carolina, with the most significant contrasts occurring among the three major physiographic region of the state — Mountain, Piedmont, and Coastal Plain. Sub -region of the state should also be considered. For example, the Triassic Basin in the Piedmont region may have characteristics that call for special soil treatment, limited plant selection, and special maintenance. Even within the riparian area, there may be need for different species depending on site condition (i.e., dry sandy alluvial floodplains with wet pockets). Therefore, thoughtful planning is required when selecting species for individual sites in order to maximize successful vegetation establishment. Native seed and plant species are included on the plant list in Appendix 8.02 of this manual. The design professional should note that regardless of the benefits and advantages of native seeds and plants, there are potential issues if proper plandnmg, installation and maintenance do not occur. These may include: • Potential for erosion or washout during the establishment stage; • Seasonal limitation on suitable seeding dates and availability of seed and plants; • Adaptability of species at specific sites; • Availability of water and appropriate temperatures during germination and early growth; and • Lack of maintenance to control invasive plants and undesirable competition. PLANTING • Seed — Prepare the seed bed as described above in soil preparation. APPIY seed at rates specified on the plans, and/or as recommended in Tables 6.1la-c of this manual, with a cyclone seeder, prop type spreader, drill, or hydroseeder on and/or into the prepared bed. Incorporate the seed into the seed bed as specified. Provide finished grades as specified on the approved plan and carefully culti-pack the seedbed as terrain allows. If terrain does not allow for the use of a cultipacker, the approved plans and construction sequence must provide an alternative method of lightly compacting the soil. Mulch immediately. • Sprigs and Sod — Install onto the prepared seed bed per the most current guidance in Carolina Lawns, NCSU Extension Bulletin AG-69, or Practice 6.12 Sodding. 6.11.6 Rev. 5108 1 6.11.10 Rev. 5/08 HERBACEOUS PLANTS -Seeding recommendations for immediate stabilization/nurse crops Table 6.11.a (2 to 5 weeks for development; effectiveness goal: 6 months to 1 year stabilization) NURSE CROP SPECIES Optimal Planting Dates Common Name Botanical Name Native / Introduced seeding Rates Ibs/acre Fertilization/ limestone Ibs/acre Mountains Piedmont coastal Plains Sun/Shade tolerant Wetlands Riparian Buffers Invasive Yes or No Installation / Maintenance Considerations Other information, commentary Rye Grain Secale cereale 1 40 lbs By soil test 1111 - 4130 8/15 - 4/15 8/15 - 4/15 Sun Yes Yes No Must be mown to reduce competitiveness with permanent or long term Ivegetation Wheat Triticum aestivum 1 30 lbs By soil test 11/1 - 4/30 8/15 - 5/15 8/15 - 4/15 Sun Yes Yes No Must be mown to reduce Not water tolerant. Maybe used competitiveness with in wetlands that are not permanent or long term continuously saturated. vegetation German Millet Setaria italica 1 10 lbs By soil test 5/11 - 9/30 5/15 - 8115 4/15 - 8/15 Sun Yes Yes No Crop should be cut / disc Not water tolerant. May be used .prior to planting rims or in wetlands that are not on term vegetation continuously saturated. Browntop Millet Urochloa ramose 1 10 lbs By soil test 5/11 - 9/30 5/15 - 8115 4/15 - 8/15 Sun Yes Yes No Crop should be cut / disc Not water tolerant. May be used prior to planting primary or in wetlands that are not long term vegetation continuously saturated. Sudangrass (hybrids) Sorghum saccharatum 1 15 lbs By soil test NR NR 4/15-8/15 Sun No No Yes Crop should be cut / disc Use only where plants and seed S. bicolorssp.Drummondi prior to planting primary or can be contained and controlled. long term vegetation Kobe Lespedeza Kummerowia striate v. kobe 1 10 lbs By soil test 5/1-9/1 5/1-9/1 5/1-9/1 Sun No No No Consult qualified Use in Coastal Plain horticulturalist or extension agent or over-seedin with primary cover Korean Lespedeza Kummerowia stipulacea 1 10 lbs By soil test 5/1 - 9/1 5/1-9/1 5/1 - 9/1 Sun No No No Consult qualified Use in Piedmont and horticulturalist or extension Mountains. May become agent for over -seeding invasive with primary cover NOTES: 1. Seeding rates are for hulled seed unless otherwise noted. 2. Fertilizer & Limestone - rates to be applied in absense of soils tests. Recommended application rate assumes significantly disturbed site soils with little or no residual value. 3. NR means Species not recommended for this region or application area. 4. Invasive designation as determined by the N.C. Exotic Pest Pant Council and N.C. Native Plant Society . 5. Sprigging is not recommended for immediate stabilization unless terrain is flat heavy mulch is applied and no other immediate stabilization method is practical. 0 Practice Standards and Specifications Where provisions are made for regular maintenance, primary vegetative cover may be the end result. An example of rim vegetative cover being Y P primary g g acceptable as an end use would be lawns in residential and commercial developments that are established monitored and complimented with regular P , P and approved horticultural maintenance practices. (See Example 6.1 La.) In projects where continual maintenance will not be provided or scheduled following the primary stabilization of a project, long-term stabilization will be necessary. Maintenance of initial and long-term stabilization can cease only after the long -tern cover has established and hardened to local climatic conditions. Maintenance of long-term vegetation must be included in the project construction sequence and on the approved plans. Examples of areas suitable for long term vegetation include roadsides, reforestation areas, restored flood plains, restored riparian areas, phased closing of landfills, and mining reclamation. Complete stabilization requires using at least two, and most times, all three vegetativephases. The design professional must clearly communicatethis point in their specifications, construction sequence, and in direct communications to owners and installers. The charts in tables 6.1 La through 6.1 Ld provide information to assist the design professional in this task. The tables are not inclusive and are presented only as alternatives. The professional is expected and required to provide design and specifications that combine the information in the manual with knowledge of the particular sites and their constraints. pH AND NUTRIENT AMENDMENTS Determining the nutrients that enable seed and container plants to grow, flourish and become established after planting are critical elements of the P g design and stabilization process. The soils tests previously described will provide a recipe for amendments based on particular plants and particular soils. The test results will recommend the amounts ofbase elements (nitrogen, phosphorous, potassium), pH modifiers and other trace elements that should to be added to the soil for selected species of seeds and plants. The acid/base characteristic of the soil is a primary component of soil fertility. If the soil acidity is not in the proper range, other nutrients will be ineffective, resulting in less productive plant growth. Most plants grow best in a pH range of 6.5 — 7.0 (slightly acidic to neutral). The soil tests will recommend the specific amendments and application rates required to achieve this range. These amendments must be incorporated into the soil not applied on the tP ( PP surface) to be effective. (See the General Requirements for soil preparation specification and timing for incorporation of soil amendments.) The base elements are easily found in bulk quantities. Lime can also be obtained in large quantities. They all must be thoroughly incorporated into the soil through appropriate mechanical means. Ground surface applications without proper soil mixing will result in poor results. In addition to the base fertilizers, other trace elements are needed to produce healthy and vigorous growth. These include but may not be limited to sulfur, manganese, zinc, boron, chlorine and molybdenum. If not already included with bulk mixes of the base elements, they can be obtained from commercial suppliers. Fit— 5/08 6.11.5 Practice Standards and Specifications Seed Mixes for Native Species (Ibs/ac) When Mixed with 3, 4, or 5 Other Native Species (See Table 6.11.a for nurse crop species to be added to these mixes) 3 Other total 4 species) 4 Other (total 5 species) 5 Other total 6 species Switch Grasses (A) 3.5 lbs. 3.0 lbs. 2.5 lbs. Indian Grasses B 7.0lbs. 6.0 lbs. 5.0 lbs. Deertongue (C) 6.0lbs. 5.0lbs. 4.0lbs- Big Bluestein D 7.0lbs. 6.0lbs. 5.0lbs. Little Bluestem (E) 7.0lbs. 6.0lbs. 5.0lbs- Sweet Woodreed F 2.5lbs. 2.0lbs. 1.5lbs. Rice Cutgrass G 6.0lbs. 5.0lbs. 4.0lbs. Indian Woodoats H 2.5lbs. 2.0lbs. 1.5lbs. Virginia Wild Rye 6.0lbs. 5.0lbs. 4.0lbs. Eastern Bottlebrush Grass J 2.5lbs. 2.0lbs. 1.5lbs. Soft Rush K 2.5lbs. 2.0lbs. 1.5lbs. Sedges (L) 2.5lbs. 2.0lbs. 1.5lbs. NOTE: With the native varieties, the seed mix should be in the range of 15 pounds per acre. Depending on availability of native seeds adaptable to North Carolina, the percentage of a particular variety used may be reduced or increased accordingly. Although diversity is desirable, it is imperative that the primary crop develop and become an effective protective cover. In addition to the native species mix, additional nurse crop species must be included to provide immediate stabilization and an adequate ground cover. North Carolina One -Gall Center nor IF. tr.rmtn B .a, sum m VW x tr CNOM IN NORTGALL I-i300-632-4949 UNDERGROUND LOCATORS CONTRACTOR SMALL CONTACT THE UNDERGROUND LOCATORS EVERY 10 DAYS FOR AN L1PCA7E To UTLM LOCAnow- Gall BEFORE you 0161 "It's The Law" C%2 t9 L0 F L,) M U 6 Z mi O J Q L to O U CU E O m � N Y (B N U) O z to O LO O O O M < C5 Q Q E 00 O O U O M O CO U C= E O 3 �° J O c O U E 0 m 0 NO I..L 2 U W z) J LL U p W Z Z^Z v J O I U\Tz � C) > 1 = U) O Z W 4 wZ Z o U U � cn z z0 Jz� W m co O U 10� _ Z W U W Z O U W Z KAI BURK LICENSE NO. 043463 1 PLAN STATUS 1 DATE DESCRIPTION PL BG I KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FI LE C1.5 - EROSION CONTROL DETAILS CAD file name: V:\120003 — Circle K\120003-01-045 (ENG) — Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C1.2 EROSION CONTROL DETAILS.DWG 11 Z SHEET C1.5 \ ♦ \ `\\ \ `\ 1. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. U 2. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL LOCAL REGULATIONS AND O.S.H.A. STANDARDS. Z \\ any \ 3. CONTRACTOR SHALL REFER TO ARCHITECT PLANS FOR EXACT BUILDING LOCATION AND DIMENSIONS AND UTILITY ENTRANCE LOCATIONS. m / \ 4. CONTRACTOR SHALL REFER TO SPECIFICATIONS AND GEOTECHNICAL REPORT DETAILS FOR PAVING DESIGN AND PROPER MATERIALS. o 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE SITE UNTIL WORK IS ACCEPTED BY THE OWNER. N ♦♦ / \ \ `\ \ 6. ALL SIGNS SHALL BE PER THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND NCDOT. L 7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ADEQUATE TRAFFIC CONTROL THROUGHOUT THE PROJECT, INCLUDING PROPER TRAFFIC CONTROL DEVICES AND/OR \ PERSONNEL AS REQUIRED. THIS INCLUDES BOTH VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND THE NORTH CAROLINA Q / 21 \ \ \\ `\ DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARDS. / \ \ 8. ANY ROADWAY PAVEMENT MARKINGS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED AT COMPLETION OF PROJECT BY CONTRACTOR. o \ 9. CONTRACTOR SHALL BE RESPONSIBLE FOR UTILIZING ALL APPLICABLE AND CURRENT NCDOT AND CDOT (CHARLOTTE DEPARTMENT OF TRANSPORTATION) DRAWINGS INCLUDING, BUT NOT 2 ♦♦ R3' ` \ \ 1 CU LIMITED TO THE DRAWINGS INCLUDED IN THESE PLANS AND THE APPROVED PERMIT PACKAGE. S \ \\ 10. SIDEWALK AND CURB AND GUTTER TO BE REMOVED AND REPLACED FROM JOINT TO JOINT. L 00, 14 \ \ \ \ U 18 26 17 °b Z 601 22 ♦♦ / \�' ,� 17 \ \ \\ R30' \ \ 18 `\ \ 25 \ LEGEND EXISTING O SITE KEY NOTES 0 / � O \ \ \ `\ - EDGE OF PAVEMENT 1. FUELING CANOPY ♦♦ / / 10 \ 8 // \ \ \ CURB AND GUTTER 2. UNDERGROUND STORAGE TANKS / 5.00' \ \ 7Q (a-`\ \ PROPERTY LINE 3. DUMPSTER ENCLOSURE (PER ARCH PLANS CCU 16 15 \ , •O, \ 15 \ UTILITY POLE 4. AIR AND VACUUM MACHINE D. ♦♦ / e d % D D 06 \ \` \\ SIGN 5. FUELING VENT PIPES / 25 3 ° D D / \ \\ © ELECTRIC BOX 6. PROPANE STORAGE WITH 12' X 6' CONCRETE PAD 22 \\ J Q / 19 \ \® O CURB DRAIN INLET (CDI)/DRAIN INLET (DI) 7. BICYCLE PARKING ° p R15' 25 4 \ \ 0- \ STORM DRAIN MANHOLE (SDMH) 8. SITE SIGNAGE o � 0 0 24 ♦ / 10 \\ \ �S SANITARY SEWER MANHOLE (SMH) 9. BOLLARD, PER DETAIL SHEET C2.2 CO o M M / R10 / \ 21 10 R30 �� STREET LIGHT/LAMP 10. 36" X 36" STOP SIGN, PER NCDOT STANDARD INDEX AND MUTCD STANDARD R1.1 - N 0 w 17 } `gyp ♦ 28 \cfb ` 11. ADA SIGN, PER DETAIL SHEET C2.2 0 �° 0 U ♦ / \ \ \� P R POSED LEGEND 12. ADA PARKING STRIPING, PER DETAIL SHEET C2.2 U O ca N CU c ��R / CAR WASH 10 18 \ 1 25 `��/� \\ / - 13. DOUBLE SOLID YELLOW LANE STRIPE E .2 o E Or)O FFE 851.25' Q��� / \ �\ \�\t �/� - - PROPERTY LINE 14. 4" WHITE PARKING LOT STRIPING o rn O 22 X, * 22 2-O 10 R15' \ 10 41* �-,v� \N INTEG L CURB 15. 24" WIDE STOP BAR. EPDXY ON CONCRETE PAVEMENT AND THERMOPLASTIC ON ASPHALT m " 22 5 0' 25 \\ \ `\ \ XX PARKIINNG 16. HEAVY DUTY CONCRETE PAVEMENT, PER DETAIL SHEET C2.2 5.0 \ \ 15 `�\ \ \ O \ 17. STANDARD DUTY CONCRETE PAVEMENT, PER DETAIL SHEET C2.2 25 24 25 \ -�� ?S• 19 / ` \ �\ �T �li \ G 18. STANDARD DUTY ASPHALT PAVEMENT, PER DETAIL SHEET C2.2 \ Q�Q�♦♦ 0 1g R3 � \ ��\�2/�\ \ O �Q-y's %\ 19. CONCRETE SIDEWALK, PER DETAIL SHEET C2.2 \ QQ`O QQi�c` 20 J� ycS��\�� �i A�• \�� \ 20. TRANSFORMER WITH 6' X 6' CONCRETE PAD O O F b ` LL O��G �J 7� 37 %, j �A \ 21. 18" CURB AND GUTTER, PER DETAIL SHEET C2.2 OQ ♦ QQ' O' 7 NX \ S \ Q A G O \ 22. INTEGRAL CURB, PER DETAIL SHEET C2.2 Q� ♦ O�GP PROPOSED 17 w p �� \ ��° \ cS� G� j �� j '9 \ 23. PATIO �Pr\ �OPG STORE 6 22 ��, 2� ���\ C� \ Q L / 5,471 SQFT \G�\ u' \ 2 \ °b \ 24. PEDESTRIAN RAMP, PER DETAIL SHEET C2.3 \ \ ♦ '�O G5Q' FIFE 851.50' �� \\ 25. LANDSCAPE AREA, PER LANDSCAPE PLANS f= ♦ �� 7.0' 19.0' 30.0' : Q 26. RAISED CONCRETE MEDIAN, PER DETAIL SHEET C2.2 U J\� 25 \ \ ,� ' \ \ \ \ \ \ � \ 27. SIDEWALK FLUME WITH PLATE, PER DETAIL SHEET C2.2 O 28. RIGHT TURN ONLY SIGN, PER NCDOT STANDARD INDEX AND MUTCD R3-5 U ♦ 22 / b1 w \ \ \ J 0 °b \ U \ O 14 : \ \ ^ Z 24 R30' 7 STO MWATER \ `\ Q } / 24 p ° - 11 DETTION \ \ \ \ Z AREA \ \ 9b \ z Z ♦ / a .b p / 23 \ \ \ \ \ \ Q U � Q � \ R3' \ /5.00 \ \ J 19 \ \ \ 0 \\25 \ \ GRAPHIC SCALE " \ ♦ \ / 12.0' 19 9 12 2� R30' \ • \ �� \ \ W W ♦ / o 0 o O \ \ > 0 10 20 40 O z R225 5' 133. �O R15 22 3 ` \ \ \ \\ �9l °� \ � Uj ! � J \ R10 O \ \ F \ O z \ \ / R3' R3' R R3 �O. c +s \ \ F� R1 5' 9.0' 8.0' 8.0' 8.0 9.0 IN FEET ) W m �'� �� \ \ \�ti \ SCALE: 1" = 20' Q Cfl ` \ 27 14 0 25 14 R40' \ �20� p�2 tica \\ \F \ 22 j \ N 17 'l`b , `S 17 �,, \ \ A� \ \\ \X \ \ 17 'X \A a'\ 25 9 TYP. 218.0' �$ G �� \ 19 d \ U z ULU z YC �° \tee°4;n^�O2V:001 7 Q' \ e. 40.0' Ob ° O ° .�] e. \dd= O� ����' \. \° d O.a ° d'e _ a .d d c .' ad '• � ' • N \a � °. . d . \ � �j ��i N • \ \ d \ O _qCd. d� '% �� STORMWATER 5 O a d \\ \ \ \ `�o�`:,•�1CIAR0�'''�. DETENTION p a D D 1 O �° AREA � D ° 16 22 STORMWATER / �z; �S �.jjO Q• o DETENTION \ \ \ y act, Top,F W \ : QQ' «�� T�Iq AREASAL - D D 1 17 C \ �2 c� MH= \\ = 3 1. D v 17(51 SEWER R15' / D R40' �� \ `ram `rv' \ \ \ ' �, GINS• `` 45-- 27/ ,� o o 30' BUILDING SETBACK \LO\NSe TBAGK� -��' ���� Al KAI BURK ------ - �� .�_ R20 22 _ _ _ __ � n - -=- -R20 - - _ _ _ _ _ _ _PROPOSED UTILITY EASEMENT \ LICENSE NO 043463 15' LANDSCAPE BUFFER - ___ �- �� NCU" ��' N PLAN STATUS 8 25 25 - --�-OME�T AS SHOWN w - / // F''z`'RE + 6�' N 15° 23 \ 40.0' ± 316' RADIUS 2958.59' CHORD LENGTH + `i1 rF-In--r-Q �ARINGN - - - - �i�8' do-10 0 lg p� 20.00 . --- % 0' 'MELTAANdtE 6° 06' 4 TANGENT 157.98' - - � _ _ �- � � g1 N 28 EX. 20' UTILITY EASEMENT --------_--- - 16 \ / --------------------------------QD - EXISTING NCDOTR/W / ------ ±478' _ \\ /-------------------------•--------- ---- / I ar � - 0 18 j \ \ \\ \ \\ MATCH LINE (SEE SHEET C1.1)MR V \ ` Z \ \ SITE SUMMARY \ \ \\\ GENERAL SITE NOTES M � \ \ \ ZONING B-N, B-G, ELDD FUTURE LAND USE CONVENIENCE STORE/ GAS STATION ZONING REQUIREMENTS PROVIDED PROJECT AREA 102,238 SF (100%) (2.35AC) TOTAL IMPERVIOUS AREA PAVING / SIDEWALK AREA BUILDING AREA (INCLUDING CANOPY AREA) 64,741 SF (63.3%) (1.49 AC) 54,038 SF (83.5%) (1.24 AC) 10,703 SF (16.5%) (0.25 AC) TOTAL PERVIOUS AREA (GREEN SPACE) 37,497 SF (36.7%) (0.86 AC) BUILDING SIZE 5,471 SF HEIGHT 22' VEHICLE PARKING REQUIRED* 16* PROPOSED REG SPACES 28 (9' X 19') HANDICAP SPACES 2 (8' x 19') TOTALSPACES 30 *1 PER 350 GROSS FLOOR AREA SETBACKS & BUFFERS SETBACKS REQ'D CIRCLE-K CANOPY LANDSCAPE FRONT YARD (W) 30' 158' 62' 15' SIDE STREET YARD (S) 30' 87' 78' 10, SIDE YARD (N) 10' 147' 104' 20' REAR YARD (E) 25' 33' 103' 10, ---------------- - 5 17 t- -- - - - - - - - - - - - - - - - - �y \� O I 0 IGINAL D - •- - I I 26 EE ►NE - �- -------------------------� _----------- _-�_ 4 / I I I I (VARIABLE PUB - I \ I I _ CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C2.0 SITE PLAN.DWG 11 /27/2019 a DATE DESCRIPTION PL BG KB '•` DESIGN DRAWN CHKD •. SCALE 1" = 20' JOB No. 120003-01-045 �of DATE FILE C2.0 - SITE PLAN SHEET C2.0 c� z J z 0 U Z Q C) 0 m 0 r m Q J 0 _ w m J J Q _ cn c� z J Lo Lo z 0 U Z Q 0 m r m z 0 Q a_ Q 0 a 0 z Q z 0 Q 0 Q z w o= 0 0 _ z w U O 0 z 0 w U z J w of LLJ Uj z 0 w 0 w of LLJ U) Q U _ 0 L� z w U 0 Z Q w 0 rZ U L� U Uj RZ w 0 J Z 0 0 w 0 z z w U w 0 z w Of z Q Q z w _ 0 z U) w z 0 0 z Q Cn w U Z O U w w w 0 z U O 0 En _ H SETBACKS & BUFFERS SETBACKS REQ'D CIRCLE-K CANOPY LANDSCAPE FRONT YARD (W) 30' 158' 62' 15' SIDE STREET YARD (S) 30' 87' 78' 10, SIDE YARD (N) 10, 147' 104' 20' REAR YARD (E) 25' 33' 103' 10' SITE SUMMARY ZONING B-N, B-G, ELDD FUTURE LAND USE CONVENIENCE STORE/ GAS STATION ZONING REQUIREMENTS PROVIDED PROJECT AREA 102,238 SF (100%) (2.35AC) TOTAL IMPERVIOUS AREA PAVING / SIDEWALK AREA BUILDING AREA (INCLUDING CANOPY AREA) 64,741 SF (63.3%) (1.49 AC) 54,038 SF (83.5%) (1.24 AC) 10,703 SF (16.5%) (0.25 AC) TOTAL PERVIOUS AREA (GREEN SPACE) 37,497 SF (36.7%) (0.86 AC) BUILDING SIZE 5,471 SF HEIGHT 22' VEHICLE PARKING REQUIRED 16* PROPOSED REG SPACES 28 (9' X 19') HANDICAP SPACES 2 (8' x 19') TOTALSPACES 30 "1 PER 350 GROSS FLOOR AREA GENERAL SITE NOTES 1. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 2. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL LOCAL REGULATIONS AND O.S.H.A. STANDARDS. 3. CONTRACTOR SHALL REFER TO ARCHITECT PLANS FOR EXACT BUILDING LOCATION AND DIMENSIONS AND UTILITY ENTRANCE LOCATIONS. 4. CONTRACTOR SHALL REFER TO SPECIFICATIONS AND GEOTECHNICAL REPORT DETAILS FOR PAVING DESIGN AND PROPER MATERIALS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE SITE UNTIL WORK IS ACCEPTED BY THE OWNER. 6. ALL SIGNS SHALL BE PER THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND NCDOT. 7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ADEQUATE TRAFFIC CONTROL THROUGHOUT THE PROJECT, INCLUDING PROPER TRAFFIC CONTROL DEVICES AND/OR PERSONNEL AS REQUIRED. THIS INCLUDES BOTH VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARDS. 8. ANY ROADWAY PAVEMENT MARKINGS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED AT COMPLETION OF PROJECT BY CONTRACTOR. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR UTILIZING ALL APPLICABLE AND CURRENT NCDOT AND CDOT (CHARLOTTE DEPARTMENT OF TRANSPORTATION) DRAWINGS INCLUDING, BUT NOT LIMITED TO THE DRAWINGS INCLUDED IN THESE PLANS AND THE APPROVED PERMIT PACKAGE. 10. SIDEWALK AND CURB AND GUTTER TO BE REMOVED AND REPLACED FROM JOINT TO JOINT. LEGEND - EXISTING EDGE OF PAVEMENT CURB AND GUTTER PROPERTY LINE 0 UTILITY POLE SIGN © ELECTRIC BOX ® OO CURB DRAIN INLET (CDI)/DRAIN INLET (DI) STORM DRAIN MANHOLE (SDMH) �S SANITARY SEWER MANHOLE (SMH) STREET LIGHT/LAMP PROPOSED LEGEND PROPERTY LINE INTEGRAL CURB OPARKING COUNT \ \ \ \ \ \ \ 9b \ \ \ \ \ \ \ \\ R30' \\ \ \ \ \\ \ R 15' \ R10,// \ \ R30' O SITE KEY NOTES 1. FUELING CANOPY 2. UNDERGROUND STORAGE TANKS 3. DUMPSTER ENCLOSURE (PER ARCH PLANS 4. AIR AND VACUUM MACHINE 5. FUELING VENT PIPES 6. PROPANE STORAGE WITH 12' X F CONCRETE PAD 7. BICYCLE PARKING 8. SITE SIGNAGE 9. BOLLARD, PER DETAIL SHEET C2.2 10. 36" X 36" STOP SIGN, PER NCDOT STANDARD INDEX AND MUTCD STANDARD R1.1 11. ADA SIGN, PER DETAIL SHEET C2.2 12. ADA PARKING STRIPING, PER DETAIL SHEET C2.2 13. DOUBLE SOLID YELLOW LANE STRIPE 14. 4" WHITE PARKING LOT STRIPING 15. 24" WIDE STOP BAR. EPDXY ON CONCRETE PAVEMENT AND THERMOPLASTIC ON ASPHALT 16. HEAVY DUTY CONCRETE PAVEMENT, PER DETAIL SHEET C2.2 17. STANDARD DUTY CONCRETE PAVEMENT, PER DETAIL SHEET C2.2 18. STANDARD DUTY ASPHALT PAVEMENT, PER DETAIL SHEET C2.2 19. CONCRETE SIDEWALK, PER DETAIL SHEET C2.2 20. TRANSFORMER WITH F X F CONCRETE PAD 21. 18" CURB AND GUTTER, PER DETAIL SHEET C2.2 22. INTEGRAL CURB, PER DETAIL SHEET C2.2 23. PATIO 24. NOT USED 25. LANDSCAPE AREA, PER LANDSCAPE PLANS MATCH LINE (SEE SHEET C1.0) GRAPHIC SCALE 0 10' 20' 40' MEN INN ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center OW 2 a" WORE 0"M N "' G aw GALL I-WO-632-4949 UNDERGROUND LOCATORS. CONTRACTOR SMALL CONTACT THE UNDOMMNO LOCATORS EVERY TO DAYS FOR AN UPDATE TO UTLITY LOGLONS Call BEFORE you 0161 "It's The Law" J Q O U C (B E O� � ca CU O z L0 N a) U) LO O 0 cli a)C= � _Q Q coO (p M r- CO O E U O U E 3 �° J O T- c O U m E 0 m m O Q O/ U W LL U 0 �-zz U ~ w 1-. 0 Z z I � � z � J U � Q _ U) p U a LL] `- W LU Z O cn W > ? J w J C) m U z ULU z 0. O U LU O�'FEssi' % ?QQ-°I1/.27Iq <�9 SEAL - 3 = •., GINS .• ' 1% KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGNI BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FILE C2.1 - SITE PLAN il SHEET C2.1 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C2.0 SITE PLAN.DWG 11 /27/2019 PCC JOINT DETAIL BLOW-UP NOTE: 1. CONTRACTION JOINT SPACING TO BE 15' O.C. MAXIMUM. CONTRACTION JOINT SAWCUT FULL DEPTH OF SLAB A DISTANCE BACK FROM EXISTING EDGE TO ENSURE A STRAIGHT EDGE ALONG ENTIRE LENGTH OF PAVEMENT. OBTAIN OWNER'S REPRESENTATIVE APPROVAL PRIOR TO SAWCUTTING. A -1/4" WIDE BY 1" DEEP SAW CUT. FILL WITH PAVEMENT SEALANT. MAKE SAW CUT IMMEDIATELY PRIOR TO INSTALLING PAVEMENT SEALANT. - PCC JOINT DETAIL BLOW-UP 6" MIN. I DOWEL CLIP BY PNA DOWEL WITH NON -SHRINK GROUT 3/4" SQUARE DOWEL FOR 6" THICK PAVEMENTS. APPLY CURING COMPOUND 1/2" SQUARE DOWEL FOR TO SLAB FACE AT A 4" TO 5" THICK PAVEMENTS. ENSURE GROUT IS FLUSH WITH COVERAGE RATE OF 300 SF SPACE DOWELS AT 18" O.C. FACE OF EXISTING SLAB MAX PER GALLON TO ACT AS DO NOT GREASE DOWEL. A BOND BREAKER AT LEAST 48 HOURS PRIOR TO PLACING NEW SLAB. CONSTRUCTION JOINT TO EXISTING PAVEMENT 1/4" WIDE BY 1" DEEP SAW CUT. FILL WITH PAVEMENT SEALANT. MAKE SAW CUT PCC JOINT DETAIL BLOW-UP IMMEDIATELY PRIOR TO INSTALLING PAVEMENT SEALANT. (FIRST PLACEMENT) (SECOND PLACEMENT) ZU) z LLI .. .:..'.. .',. 4. LU W Q ...... ...... .... LLI.::::'. Uj .. W Q 2 U) W 3/4" DIAMETER DOWEL FOR 6" THICK PAVEMENTS `APPLY CURING COMPOUND AND 1/2" DIAMETER DOWEL FOR 4" OR 5" THICK TO SLAB FACE AT A PAVEMENTS. DOWELS TO BE 10" LONG CENTERED COVERAGE RATE OF 300 SF WITH JOINT SPACED AT 18" ON CENTER. MAX PER GALLON TO ACT AS DOWEL TO BE INSTALLED IN FORM WITH A BOND BREAKER AT LEAST AN APPROVED DOWEL BASKET. 48 HOURS PRIOR TO PLACING LIGHTLY OIL FULL LENGTH OF DOWEL. NEW SLAB. NOTE: 1. PLACE CONSTRUCTION JOINTS AT END OF PLACEMENTS AND AT LOCATIONS WHERE PLACEMENT OPERATIONS ARE STOPPED FOR PERIOD OF MORE THAN 1/2 HOUR. CONSTRUCTION JOINT CONCRETE JOINT DETAILS / 6" PORTLAND CEMENT 8" PORTLAND CEMENT CONCRETE MIN. 4000 PSI CONCRETE MIN. 4000 PSI COMPACTED STRENGTH COMPACTED STRENGTH e e ..be ... ..bn ed 4 .4 4 '..d 4.. '..d 4' 4 , e 4 WAIT AS LONG AS FEASIBLE TO SEAL JOINTS TO ALLOW CONCRETE SHRINKAGE TO OCCUR. IF REQUIRED, RE -SAW JOINT IMMEDIATELY PRIOR TO INSTALLING SEALANT TO ACHIEVE A 1/4 " JOINT WIDTH. T ENSURE JOINT IS CLEAN, DRY AND TOP OF SIDES PREPARED PER MANUFACTURER'S PAVEMENT RECOMMENDATIONS. t „ T/2 BUT NOT LESS THAN 1/4" J\-PAVEMENT SEALANT CLOSED CELL BACKER ROD. TYPICALLY 1/8" TO 1/4" LARGER THAN JOINT WIDTH. 1/8" FIRST SAWCUT 1/4" SECOND SAWCUT (IF REQUIRED) NOTES: 1. ENSURE JOINTS ARE CLEAN AND DRY PRIOR TO THE APPLICATION OF THE JOINT SEALANT. 2. INSTALL CLOSED CELL BACKER ROD AFTER JOINTS HAVE BEEN CLEANED AND DRIED IN ACCORDANCE WITH SEALANT MANUFACTURER'S REQUIREMENTS. 3. INSTALL BACKER TOD AT CONSISTENT AND UNIFORM DEPTH. 4. JOINT SEALANT APPLICATION SHALL BE IN STRICT COMPLIANCE WITH SEALANT MANUFACTURER'S REQUIREMENTS. PCC JOINT DETAIL BLOW-UP (TYP.) TYPE S9.5C 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE TYPE 119.00 8" ASPHALT CONCRETE BASE COURSE TYPE B25.00, IN EACH OF TWO LIFTS, FIRST LIFT EXTENDING 6" BEHIND CURB, SECOND LIFT EXTENDING 3" BEHIND CURB STANDARD DUTY CONCRETE HEAVY DUTY CONCRETE ASPHALT (FLEXIBLE) PAVEMENT - NCDOT R/W SCALE: NONE SCALE: NONE SCALE: NONE PAVEMENT SECTIONS SCALE: NONE 0! 1 I non RAnI INITCn OI�NI 3E OF PAVEMENT TROWELED, ROUNDED CONCRETE 6" 0 STEEL PIPE (SCHEDULE 80) FILLED WITH CONCRETE INTED BLUE E TYP. 3S AISLE AND ANCHOR STEEL PIPE IN CONCRETE FOOTING, NG STALLS TO HAVE )RE THAN 2G/D SLOPE 2'-O" DIAMETER x 2'-6" DEPTH ' DIRECTION ASPHALT PAVEMENT APPLICATIONS ACCESSIBLE PARKING SYMBOL LOCATE AT EDGE OF PARKING SPACE UNLESS ACCOMPANIED BY "VAN" LETTERING 8' 8' NOTE: STRIPING SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE AND COUNTY CODES AND SPECIFICATIONS VAN ACCESSIBLE HANDICAP PARKING SPACE DETAIL SCALE: NONE CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C2.2 SITE DETAILS.DWG 11 /27/2019 w U) ry w 1-- 0 0 w O z U) U) W J z 0 v 2'-0" BOLLARD DETAIL SCALE: NONE 24" 0 SIGN MOUNTING DETAIL WITH BOLLARD PROTECTION `EXPANSION JOINT CONCRETE PAVEMENT/ SLAB APPLICATIONS EO SCALE: NONE BACKI I�A1►1 r.1NR.l ==�Nrr.rr. 6" VARIES - SEE PLAN 6" NOTES: 1. PROVIDE 1/2" EXPANSION JOINT BETWEEN SIDEWALK AND ALL FIXED OBJECTS A 2. CONCRETE SHALL BE 3000 PSI. 1" DEEP SAWED JOINT (TYP.) SEE SITE PLA 1/4" THICKNESS PREMOLDED EXPANSION JOINT FILLER SPACED @ 35' O.C. MAX.2 SLOPE 1/4" /FT. EXTEND JOINT FILLER FULL DEPTH OF SIDEWALK (TY ) 2 MAX. 5.0' 5.0' 5.0' 5.0' 5.0' 5.0' 5.0' (TYP) 1/2"R (TYP) <Q NOTE: 4" �` PC CONCRETE 3,000 PSI CONCRETE. (TYP) (TYP)TYP SECTION A -A 4" AGGREGATE BASE SECTION B-B 6TT COURSE COMPACTED TO 90% STD. PROCTOR (TYP) CONCRETE SIDEWALK SCALE: NONE NOTE- SIDEWALK INSIDE NCDOT RIGHT-OF-WAY, REFER TO STANDARD DRAWING 848.01 3" RAD. N 6 � 1 -0 3" RAID. co o CO A d V-6" r � 18" CURB AND GUTTER SCALE: NONE J Q � D3 LID 00 E o J (0 U 2 NOTE: GUTTER SLOPE TO MATCH o �, ADJACENT PAVEMENT, o N s TRAVERSE AND LONGITUDINAL. o m 00 1 1/2" MIN. RADIUS C= co ° 1" MAX. RADIUS C) o U Q v Z o I E LLo Q �° ?� wo 1. m 0 L P.C. CONCRETE PAVING SEE PAVING DETAILS FOR PAVEMENT SECTIONS, SUBBASE, SUBGRADE AND COMPACTION REQUIREMENTS. INTEGRAL CURB DETAIL SCALE: NONE 0.5' 3.0' 0.5' 3.0' 0.5' NOTES: 1. CONCRETE TO BE CITY OF MIDLAND CLASS "C", 3600 PSI. USE FIBER REINFORCED A Q Q Q Q Q Q Q Q Q Q 4 Q Aj CONCRETE PAVEMENT THROUGHOUT. O% O % O O O O O O D 2. STEEL PLATE MUST BE FIXED UTILIZING ONE 5.01 ° 01 OF THE OPTIONS IN THIS DETAIL, Q Q Q Q Q Q o% Q Q Q Q a 3. SEAL ALL CONCRETE JOINTS. 4. MATERIAL AND CONSTRUCTION METHODS TO CONFORM TO THE CITY OF MIDLAND STANDARDS AND SPECIFICATIONS. 3/8" DIAMOND 5. CONSTRUCT AS SHOWN UNLESS CURB FACE STEEL PLATE SIDEWALK OTHERWISE APPROVED IN WRITING BY THE PAVEMENT EDGE CITY ENGINEER. (DG) 0 ffi a° a a ° ° j - a 6.0" ° a a EXPANSION JOINT EXPANSION JOINT SECTION A -A AANCHOR ONC. COUNTERSUNK BOLT WELDED STUD JRB O 3/6" DIAMOND 3 318" DIAMOND STEEL PLATE STEEL PLATE "x 2 1/2" x 112" ANGLE3/8" DIAMOND 1 1/2" x 1 1/2" x 112" 1 1/2" x 1 1/2" x 112" STEEL PLATE ANGLE ANGLE CONCRETE ANCHOR CONCRETE ANCHOR CONC. ANCHOR r 1" -- - 3" 1 3" SIDEWALK FLUME CROSSING DETAIL EXISTING GRATE INLET X.0 RIM ELEV. 597.83' L 4" -„ COMPACTED GRAVEL MINIMUM DEPTH OF 4" THICK TOE PROTECTION SECTION B-B CONCRETE FLUME DETAIL SCALE: NONE 6" MIN North Carolina One -Gall Center M IF. N..&Mb. B .& ftw w GN 2 m offOW DOONO N NORIN GVmIIN GALL I-W0-632-4949 UNDERGROUND LOCATORS. CONTRACTOR SMALL CONTACT TIME UNDERGROUND LOCATORS EVERY 10 DAYS FOR AN UPDATE TO UTILITY LOCALONS. Call BEFORE you D161 "It's The Law" 112" VARIABLE 2 U RADIUS 40d SPIKE y.� } _ 0.02 SLOPE I_ Q - a � N ` 2" RADIUS W J (L H z o W QZLL= JOINT SEALER BASE COURSE VAR. Q U = O H JOINT FILLER SURFACE COURSE 1$q" RADIUS SHOWING EXPANSION JOINT U) ALL oN J i6„ 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED) ;zCC 148" RADIUS ON ASPHALT CONCRETE PAVEMENT H H j (USE ON ISLAND 4' WIDE OR GREATER) W O VARIABLE ':i' %:i'.':;.J' v''•`:�(:K°: i;''.%°: rf i%i: rf'.% 0.02 SLOPE 9rr SEE TYPICAL SECTIONS N JOINT SEALER FOKEYR PIN ON THEAVEMENT DEPTH. LAST LAYER OF 7 SHOWING GROOVED JOINT PAVEMENT SURFACE T- 000RSE SURFACE COURSE 2" RADIUS PARTIAL LONGITUDINAL SECTIONS BASE COURSE BINDER COURSE 13/4" RADIUS 00 OR EXISTING PAVEMENT ILL. OF PAVED ISLANDS 5" MONOLITHIC CONCRETE ISLAND (KEYED IN) 0 N ON ASPHALT CONCRETE PAVEMENT z NOTE: WHEN MONOLITHIC CONCRETE ISLAND IS ON TOP OF SURFACE (USE ON ISLAND LESS THAN 4' WIDE) VARIABLE J COURSE, DRIVE 40d SPIKES INTO SURFACE UNDER MONOLITHIC O 1/2" x 6" LONG DIA. DEFORM N CONCRETE ISLAND. STAGGER SPIKES ON 2' CENTERS EACH WAY. BARS ON 24" C STAGGERED 9" 0.02 SLOPE N Q W IN THE CONCRETE PAVEMENT (ISLAND) AND CONCRETE ISLAND :. z W (MONOLITHIC) PLACE 1/2" EXPANSION JOINTS AT 30' INTERVALS la - AND GROOVED JOINTS 1" DEEP AT 10' INTERVALS BETWEEN tt13/4" RADIUS. 2"s RADIUS V z EXPANSION JOINTS. 5" MONOLITHIC CONCRETE ISLAND < v (SURFACE MOUNTED) ON CONCRETE PAVEMENT 0 LINE UP THE JOINTS IN THE CONCRETE PAVEMENT (ISLAND) VARIABLE p WITH THE JOINTS IN THE CURB OR CURB AND GUTTER. JOINT SEALER Cr FILL AND SEAL THE TOP 1/2" OF THE EXPANSION JOINTS AND JOINT FILLER CURB AND GUTTER 4" CONC. COVER THE ENTIRE DEPTH OF GROOVED JOINTS WITH JOINT SEALER. AS CALLED FOR ON 0.02 SLOPE PLANS. FOR JOINTS IN THE CURB AND/OR CURB AND GUTTER, SEE SURFACING ash.;.=�0::4:,=oc;q. s s.'Q.°oalq;=oa:oe=ri'•.•":° BASE COURSE,:,, STANDARD NO. 846.01 _ SHEET 1 OF 1 -- PAVED CONCRETE ISLAND $52.01 0 Q 0�/ U W LL U O U z ~ zU J z `U VJ 0 W `J W W z z ov W > cn z_ cn J w m J U0� I U - z U W Nz 0. O U z `�`1111111111/�'' , CAIQD '�.. i O 6" ssi" % ?.Q�I06_l/.2 T Iq <�9 SEAL - 3 = i i GINS . '�. 14 KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BIG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FILE C2.2 - SITE DETAILS SHEET C2.2 0 LLJ _ U) Q U _ 0 w z U 0 Z Q Cn 0 m m U U w 0- CIO w _ H O w r J Z 0 0 w 0 z w z U w w 0 z w Of Of z z Q U) Q z w w 0 w z U) w _ z c� Cn w 0 0 z Cn _ w U Z O U w _ of w 0 z w U O 0 En C%2 IIIIIIIIIIII� L0 M U 0 z 0 N L O Q 0 O M U L Z" O U J � J Q ca LO E co O O Y O O U O L (B O t9 U M N M cli r- O c CO U O O (n C= U U O � C z E m Q O 3 E c>3 E Lo Q �° 0 orn m m 0 '0r' 2 U LU 0 LL U U ~ �zz0 z J I � C) > U>- z w �U) GRAPHIC SCALE " w 0 10' 20' 40' L L] W z 0 MENw i (n z_ J ( IN FEET ) j uJ m SCALE: 1" = 20' Q North Carolina One -Gall Center U M t IF. WLORTrR wa. M O ae 0� am -am ' x4sT � Z x Dos r" caw x xoRRM cwouu GALL I-WO-632-4949 LL UNDERGROUND LOCATORS. CONTRACTOR SMALL CONTACT Uj THE UNDERGROUND LOCATORS EVERY TG DAYS FOR AN UPDATE 7 TO URlTY LCCATONS. z Gall BEFORE you 0161 "It's The Law" 0 U W z EXPANSION JOINT CONCRETE SIDEWALK `\\1\III Illll/ 6" STANDUP CURB OR CURB & -'(N CA% PROVIDE 5' SQUARE MINIMUM cpNr GUTTER AS APPLICABLE (SEE Q oFESS/Q•. Rq SITE PLAN) Z';Q, `�'�T/ ti9.� LANDING AT TOP OF RAMP FOR ip, crip LANDSCAPE AREA p CHANGE IN DIRECTION L 1 JPRG v7�11 3 EXPANSION 1051 5 EP�PT�I JOINT V� F T"� �I� :�� '•. GINS,.• ' `� MII`� � llBllll\\\�\ �7 cp �or�oti ��'Vo s� KAI BURK F��FF F LICENSE NO. 043463 0 PLAN STATUS EXPANSION JOINT N LANDSCAPE AREA DATE DESCRIPTION PL BG KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE PEDESTRIAN RAMP DETAIL FILE C2.3 - SITE DETAILS SCALE: NONE ^ ^ SHEET C2.3 CAD file name: V:\120003 — Circle K\120003-01-045 (ENG) — Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C2.2 SITE DETAILS.DWG 11/27/2019 45 MPH POSTED SPEED LIMIT - NC-16 BUSINESS 45 MPH POSTED SPEED LIMIT - UNITY CHURCH ROAD 4. p o' •o oa °•o e < a Ll N \ U-- \ -------------------------- o _ \ — — — — — — — — — — — — — — — — — �______________PPOUTILITY EASEMENT ��• • � ' ----------RO-k0XjME&1::g SHSEDOWN_---- W - �" / N/F _ --�-_ _ _ _ _ - �� STATESVILLE ROAD r / LAND COMPANY LLC - DP DP DP DP OK dP DP DPI-•BI' •° _ _ dP ap _- °P �'' PIN# 4603656377 \� (DB. 2630, PG. 357) NCDOT --------------------- / -�- P, O 0 E) 900' NC-16 BUSINESS RIRO ACCESS SCALE: 1" = 30' UNITY CHURCH ROAD RIRO ACCESS SCALE: 1" = 30' CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C2.5 SIGHT DISTANCE PLAN.DWG 11 /27/2019 1 a or 1 \ EAP 1 - I 1 \ i $ I 1 NC-BUSINES 1 I 16 FH Id. - go r C%2 1 Z M (0 L0 FM L") M U Z mi0 O N O Q (� o ca L 0 N Z" O U J Q L U) O U c� E orn � ca Y (B O z Lo N (n O O O M < rl- � _Q Q CO O M CO O E O U U � E 3 �° J O i� � O U m E 0 m m O Q O U LL U O� U ~ z LLI U (n ^ z C) z z � o > � i U�a GRAPHIC SCALE LU 0 10' 20' 40' LUz 0 W i cn Z m J ( IN FEET ) SCALE: 1" = 20' Lu Q North Carolina One -Gall Center IU ft T. YeWRTOR W O tiT xHST z 2 WS WORE DO= N "' Caw GALL I-WO-632-49441 LL UNDERGROUND LOCATORS CONTRACTOR SMALL CONTACT THE UNDEROROUNO LOCATORS EVERY TO DAYS FOR AN UPDATE 7 TO UttGO lTY LAONS z Call BEFORE you 0161 "It's The Law" O U LU z CAIQD '�.. O-•'FEssi' % 711 <�9 SEAL - = 3 = � '•., GINS .••' KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FILE C2.5 - SIGHT DISTANCE SHEET C2.5 z J Cn Cn z 0 U Z Q O m O J m Q J 0 _ m J Cn CD z En z 0 U Z Q O m M m Z O H w 0 a 0 z Q z 0 Q N_ O _ H Q Z w H H O _ z w U 0 0 z 0 w U z w of LLJ co LLJ z 0 w 0 of Q LLJ Lo Q U _ 0 w z U 0 Z Q Cn 0 m m U U w 0- N w _ H O w J Z 0 0 w 0 z z V) w U w 0 z w Of Cn N z z Q U) Q z w w 0 w z w Lo _ Cn z Cn w 0 0 z Q Cn _ w U Z O U w of CD 0 I z w U O 0 En _ H 45 MPH POSTED SPEED LIMIT - NC-16 BUSINESS 45 MPH POSTED SPEED LIMIT - UNITY CHURCH ROAD E —------- _— — �-- EX. UTILITYEASE� F - - --------------- // __ \ ___1i / \ \ I }O�aa/ / 40 41.\\\ �w pC> ao� t , = = ROPOSEp UTILIT_YEAS_EMENT — r ® as, � UNITY CHI URCH ROAD UNITY CHURCH ROAD FULL ACCESS SCALE: 1" = 30' GRAPHIC SCALE 0 10' 20' 40' MEN INN ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center M..V.A.M B.& MftW O R � OW 2 DM'"01w N NORIN GVmIIN GALL I-WO-632-4949 UNDERGROUND LLC ONTA CONTRACTOR MN CONTACT THE UNDERGROUND LOGTORS EVERY 10 DAYS FOR AN IIPDA7E To uTurr LorwnoNs. Call BEFORE you D161 "It's The Law" C%2 Z O L0 HL') M U 6 z mi 0 O V LD -6 J az O 7 U)� O U CU E orn N � O o L0 N U) LO O O O M < � Q Q t9 4 M CO � E OU O U C= E � �° J c O U E 0 m m 0 0 2 U LU z) LL U O� LLI U z ~ z C) U (n ^ z z i � o > <U a z U) 0 LUZ LU i O w i (n z Jwm (.C) I U - z U LU 'z 0. O U LU z KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FILE C2.6 -SIGHT DISTANCE SHEET C2.6 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C2.5 SIGHT DISTANCE PLAN.DWG 11 /27/2019 c� z J z 0 U Z ¢ C) 0 m O r J m J 0 w m J J cn c� z J cn z 0 U Z Mi 0 m r m z 0 Q m ¢ 0 0 z ¢ z 0 N O x z w 0 0 x z W U O 0 x z 0 w U Z ¢ J W m w _ 0 m 0 z ¢ w 0 w 0 W of ¢ m w m m cn ¢ U x O w z w U 0 z Q w 0 m rr _ U V= U w W x H m 0 w r z 0 w 0 z w z U m w W 0 H Z w Of z z V) z w x 0 w z w cn m z c� w 0 0 z Q m w U z 0 U w m w x w C) O Z w U O 0 IN / Sig `� \ ��`� \\ \\ MATCH LINE (SEE SHEET C3.1)V I �° \ I CPs' CP ` \ 2 `� \\\\ \ � GRADING GENERAL NOTES LEGEND - EXISTING M 1. ALL ELEVATIONS ARE BASED ON NGVD 88. _ - g50r INDEX CONTOUR z 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION OW - 352- INTERMEDIATE CONTOUR GROUAND/ND) D) ASS OWNR ELEVATION OON THESE PLANS ARE F ALL EXISTING IAPPROX MATEES (ABOVE DANDLWERE EDGE OF PAVEMENT N LOCATED BASED ON EITHER VISUAL OBSERVATIONS AT THE SITE, EXISTING L CURB AND GUTTER C, , \ I SURVEYS, AND/OR FROM UTILITY OWNERS. THE OWNER DOES NOT co CO `\ \ I \ 1 \ \ \\ \\ GUARANTEE THAT EXISTING UTILITY LOCATIONS ARE EXACT. IT SHALL BE PROPERTY LINE / can / \° \ \ "/ \ \ I \ THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT W WATER LINE Q G' 850.30 \ \ ME:851. LOCATIONS OF EXISTING UTILITIES(ABOVE AND BELOW GROUND) BEFORE o ( � A. C \ o, \ \ 1'39 \ \ BEGINNING ANY CONSTRUCTION. THE CONTRACTOR SHALL CALL S SANITARY SEWER 2 \ 8 CU 1 16 RIM = 49.67 \ \ \ \ \ `\ APPROPRIATE UTILITY COMPANIES AND THE UTILITIES PROTECTION CENTER STORM SEWER CU to IN� 15")��45.64 , \ 1 \�" , \ AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD `� \ ` INV'OUT = 845.39 \ \I \\ a-v�\\ \ J `\ LOCATIONS OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE OHE OVERHEAD ELECTRIC L 850.39 - - -- --- - -- --- - -- - - - - - --- - - - .._...- a� � 852. \ 850.71/ 000lo \\\ \ \ / V \ '' \ I AND DEBRIS. 849 / 851.10 850 A/ `\ C N\ ``\ \`\ \ \ .3-YI \ 5. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING ® 0° CURB DRAIN INLET (CDI)/DRAIN INLET (DI) / NV I ) = 8 851. 7 \�°, \ \ 8 E:850. CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SD STORMWATER MANHOLE (SDMH) INV 1 ") = 4 .55 ds� } ( \ 850 5 \ \ \\ REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO 85 g 0 4 yyy° \ \ \ RETURN IT TO EXISTING CONDITIONS OR BETTER. OS SANITARY SEWER MANHOLE (SDMH) u NICE 7 5 2 $ \ \ ES \\ �� \ 6. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH .44 CONCRETE PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 0\ \ 0 \ MANHOLES IN UNPAVED AREAS SHALL BE 6 ABOVE FINISH GRADE. LIDS FLARED END SECTION \ \ L " 0.26 850.37 \ \ SHALL BE LABELED "STORM SEWER". .50% ° D 0 5018 0.14� `�� \ ` \ ` 7. CONTRACTOR SHALL ASSURE POSITIVE AND FOR ALL NA NATURAL PAVEDAREADRAINAGE INAGEAWAY FROM BUILDING o i V J � J \ / 851.19 \ PROPOSED LEGEND D \ 8. FOR PIPE BEDDING REFERENCE NCDOT STANDARDS 300 Q Ln I` E Z 850 70 6�0 \ 850 \ \ � 3 p ou O o \ / A4.HCI 850.67 °: ab1'.1 0 6 D 5 0 L O \ / co R = 850.30 5 '6 Ij `\ ME:84 6 - - PROPERTY LINE U d o M \ I I 2')=847.27 �• % 0 851.25 $ D5 / A.1 N 9.86 \ , 1 \ GRADING KEY NOTES � o Q M \ / I UT (12") = 847.27 RIM = 8 .4 5 \ \ \ G �' N (� \� \ 49.3 \� 350 1� INDEX CONTOUR � d O w 851. 4 V IN (18") = 8 4.85 J% 1. ADA PARKING AREA v) _ co 0 O c \ / 850.62 850.68 850. INV OUT (18") = 8 4.85 .65 \ `�6 1� O'IfU) N U \ / / 850.49 850.70 C6 850.55 \ , 2. BIORETENTION AREA, SEE DETAIL SHEET C3.3 GRADING AND DRAINAGE DETAILS 352 INTERMEDIATE CONTOUR L / 850.70 <n \ \ U O ca a) c 850.70 85D.57 50.45 \ - \ \ \��// `\ 3. SEDIMENT CHAMBER, SEE DETAIL SHEET C3.3 GRADING AND DRAINAGE DETAILS C z _Q o E I CURB AND GUTTER 3 E \ 85 0 85 9 CAR WASH 850.62 �; \ � \� G � o Q � p � �� 8 .62 850.62 °. \� E Lo O 8s FFE 851.25' Q c. S N \ \ \ ,% . 4. SAND FILTER, SEE DETAIL SHEET C3.3 GRADING AND DRAINAGE DETAILS PROPOSED SD (STORM DRAIN) m 7 1 % 850.E �O ' Q ��, 850.42 \ �%0 / �� ��y� \ \ \ `� 5. DRAINAGE MAINTENANCE EASEMENT ppp OO I / �° 0.67 H5 .25 51.17 ��GQ 4'�� 6. 6" PVC CLEANOUT SAND FILTER MEDIA AREA ��o� 850.70 M /�\ \ \ `\ \ 7. 6" PERFORATED PVC UNDERDRAIN SYSTEM; PERFORATIONS $" DIAMETER SPACED 6" O.C. I / 851.19 a� /��j, \ \ \ _ \ y RIPRAP OUTLET PROTECTION Q 1 3% 85 .42 851.48 851. 2 e 1.22 850.3 \ \ \ �\ Q8. SAND FILTER MEDIA AREA 8 1.12 850.64 \ \851.50 / ° 8511 5% / \ \ \ �\ \�Q� A �Q \ GRAVEL PRETREATMENT AREA O l 0 5 D 3 4� hti h0 O5ti ° $g Og �g O5 gh g o \ Q\XXX.XX' PROPOSED SPOT ELEVATION /�A \ 850.57 851.27 I ^ �j \ \ / PROPOSED 5/8851.27 = 8 1.22 I \ \\ \ �4j ME: XXX.XXMATCH EXISTING SPOT ELEVATION ' LL STORE o a 1. \ Q \Uj 5,471 SQFT / / �51.38.0. / \ \\ `\J \\ \ \ 7 FIFE 851.50' / 851 2 � j� L IN 0 _ \ w �zz 850 49.99 / - - - - / P. ES � \ \ \ \ �( \ \ �(V , INV OUT (1 - 844.00 \ \ \ \\ \ z ` Q CO / 849.6 50.02 �� - - 8 ° D / \ - 7- 49.75 - - - vE? 851. 851.�2 b� / I I 3 B EGTION L 0 \ \\O\ \ \\� \\ \ \ L ' z z 850.01 851.22 " ° 851.42 �r l r7 1 �\ /g5 \ \ \ \ \ 849.98 °° / 1 851.1 850.87 D.4-YI / 849.68 8 50.00 851.1 • 851.31 851.31 851.31 •851.3 851.31 s / 850.80 \ \``\\ \ \ = v J O RIM 4;y17 84998 ° / \ \ \ \ \ \ yx\ \N `\ GRAPHIC SCALE 1- W J IN U�(18") = 843.95 u7 A.0-M �Q \ ♦ \ \ 0 849.62 - - - / - NV N RIM = 849 \ J O S'i w - U s5 / t g51 I I (8) = s \ \\ \\° c \ \ 0 10' 20' 40' z �Z/� 0 9.33 / r� 851.0 INV IN (- 1- 4.41 SD \ 4 \ \ \ \ \ \ c w > U) z � 49.77 V" \ \ \ 9� \ z � J / 85850. 850.9 850.80 INV OUT{ $') = 44.31 \ 5 / 849.68 / , 849.58 / 850.80 850.8 850.70 \ F� \ \ ' \ O 848.96 851.03 1 / / �\ A \ �s2 \ /a e \ \\�`�°� \ ( IN FEET ) (� L1J m s / / o .� \ G� c \ \tip, \ SCALE: 1" = 20' z Q Q CO 847 5 84 500 NMI, \ l \\ ) Q 59, \ p� \ \ \ / \ North Carolina One -Gall Center U ° tl01 T.WYeM1k Wd. O ti4 7 \ / , O \ \ ♦ \ CP \ \\ \ 3 cwnu x LL B. 1GALL I-800-632-494A LL \ - 3 J RIM 5349 65 / / RIM = 849.03 �\ / \ \ �\ \ \/ \ co"rrrwcra � co'� r w INV IN 15" 84'4.7 \ \ �(\ \ e,e UNWORMNo Lo°ar°ns INV IN ) = 845.12 SD ( ) = w \ \ EVERM UTKm LORrw oNs.°A7E z f INV IN (18� 844.53 \ / \ \ INV OU (8") = 845.12 SD o �j .2 E � \ 18" PIPE @ 0. /o = I I TNN 18" 844.0 \ G BEFORE you 16! e ° IN T (18") 844. 3 8 8. 2 ) /\ \ \\ Coll It's The Lcvw" D .d I I \\ / \ O 49.31d 98a ,849. ° _852- \(` 11 \ \ / A.:.e. 0 e :.d?-.. _d. �tf. z J 9. 6 e 84 2 849 �4. 85 06. ° de 4 - �849.47 ° d .. ° 4.. a 849.2 . 849.07 848 I I p \ \ .a a dO d d y. e d e / . e ° . a � - 4- . d 3 . ° .. '. 8 .2 847. .-851- /- d .� d. d ° -° ° ° e-..- _ sz a.. °--.4°= _ I 84 .06 \ ) \ L 1 84 d o�.� 849'69 .. d: 4 .2a . 8 848.87 7 j�7.90' \ ♦ `\ I \ `\ SL 1 I / A° D -° �� -84�\ RIM = 847.7 4 .61 INV OUT (15") = 88444 7. (} Q 2 847.17 '`��/ /�d�° - v p ° O D O ° .` :...:... ♦ ` �\ \ �i -%A BVa�` `�s- i 8 6. 847. / D . ° . � \ _ � /;•;:-: � i / ` ) \ 'D D D 848.06 \ CS 6. 9 .04 848.03 849.61 8 848.80 a48 \ ` KAI BURK 845 \\ \ / LICENSE NO. 043463 \ _ - 4 ^ - - - - - ----------- 847 I ' _ Y EASE_ME_N1� ___ --- � 847.12 48.1 - - - - - - - - - - - _--�--__-_-- PLAN STATUS a1 , \ - 4 .24� 847.57 2 g - - - - --- SHOWN w - s / \ /84.9:'t6 848.52 a - - 847.E 18' = 841.45 / 847 \ 848 846.99 8 6.8 / 846 I / CO J \ 847 / _ 84 5 18„ PIPE 85% - - - INDT�14 - - 4� _ 843 844 P.0-MH 84 1 8 6.2 - - 5 INV IN (4 '2= 839.63 INV IN (1 ) = 839.63 � 1 - - - '-X' UI1L SD INV OUT/(18") = 839.63 � - EY F�SEMEIV - EXISTING NCDOT _-_-------- 845.69 845.62 846- ---------------- R/W 8Z �.5- 84 845 ----- _ = - - - - - - -/- INV OUT(15") = 8 8 �' . -844- - - - - - - - ---- L ES P . - - _ - Dz�F - 845.51 - - - - - - - - - _ 842 INV OUT(18")- 9.75 - DATE DESCRIPTION - _ - 44.87 _ INV IN (18") = 842.89 - - - - - - _ - - - - - - - - - ----------- -- - -- .. 11 Cd - _ _ _ _ _ _ _ PL BG KB _--_-_----_-� -_ -- sa----------- - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - / - - 843 - - - - - - - _ _ _ I - @os9� I '~ DESIGN DRAWN CHKD - - - --- - - _ _ _ _ _ _ \ / ° SCALE 1" = 20' 844 _ I _ _ / - a2 JOB No. 120003-01-045 - O IGINAL DEE INE - _ �_-------------- - - \ =- DATE r -'844 / / __--- v / -, \ \------- -- �6=841.93' x.o- E=839.00' FILE C3.0-GRADING AND DRAINAGE PLAN - - (VARIABLE PUB --- \� ---- --__- -�-- C3.0 • SHEET CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C3.0 GRADING AND DRAINAGE PLAN.dwg 11 /27/2019 c� z J z C) U z Q C) 0 m O F- r m Q 0 w m J J Q cn c� z J cn z 0 U Z Q 0 m r m z F- Q a 0 z Q z 0 Q N 0 x Q z o= F- 0 0 x z w U O 0 z 0 w U Z J w of w m 0 of z w 0 w 0 w Q w V) a U x 0 z w U LLJ Z Q 0 U U N w 0 L` J z 0 0 w 0 z w z LLJ U w w 0 z w F_ z z Q V) z w x 0 w t- z w cn w rr m z C, U) w 0 0 z w U Z U U w x F- w x w 0 z U O 0 Cn F- i \ R / GRADING KEY NOTES 1. AUA NAKKINU AKEA 2. BIORETENTION AREA, SEE DETAIL SHEET C3.3 GRADING AND DRAINAGE DETAILS 3. SEDIMENT CHAMBER, SEE DETAIL SHEET C3.3 GRADING AND DRAINAGE DETAILS 4. SAND FILTER, SEE DETAIL SHEET C3.3 GRADING AND DRAINAGE DETAILS 5. DRAINAGE MAINTENANCE EASEMENT 6. 6" PVC CLEANOUT 7. 6" PERFORATED PVC UNDERDRAIN SYSTEM; PERFORATIONS $" DIAMETER SPACED 6" O.C. DRAINAGE STRUCTURE TABLE STRUCTURE STRUCTURE PIPE PIPE RIM ELEV. ID TYPE INVERTS INFORMATION OUT (SE) = 844.31 31 LF, 18" PIPE @ 1.00% A.0-MH 48" MANHOLE RIM = 849.71 IN (E) = 844.41 100 LF, 18" PIPE @ 0.44% IN (SW) = 844.41 50 LF, 18" PIPE @ 0.25% OUT (W) = 844.85 100 LF, 18" PIPE @ 0.44% A.1-HCI HOODED CURB INLET RIM = 849.49 IN (NE) = 844.85 97 LF, 18" PIPE @ 0.55% OUT (SW) = 845.39 97 LF, 18" PIPE @ 0.55% A.2-HCI HOODED CURB INLET RIM = 849.67 IN (NW) = 845.64 91 LF, 15" PIPE @ 1.00% OUT (SE) = 846.55 91 LF, 15" PIPE @ 1.00% A.3-YI YARD INLET RIM = 849.62 IN (W) = 846.80 31 LF, 12" PIPE @ 1.50% OUT (E) = 847.27 31 LF, 12" PIPE @ 1.50% A4.HC1 HOODED CURB INLET RIM = 850.30 IN (W) = 847.27 30 LF, 12" PIPE @ 3.64% OUT (NE) = 844.53 50 LF, 18" PIPE @ 0.25% B.0-MH 48" MANHOLE RIM = 849.03 IN (W) = 844.78 64 LF, 15" PIPE @ 0.25% IN (N) = 844.53 211 LF, 18" PIPE @ 0.28% OUT (S) = 845.12 211 LF, 18" PIPE @ 0.028% B.1-MH 48" MANHOLE RIM = 849.65 IN (W) = 845.12 18 LF, 8" PIPE @ 2.80 /D C.0-HCI HOODED CURB INLET RIM = 847.75 OUT (E) = 844.94 64 LF, 15" PIPE @ 0.25% D.0-FES 18" FES RIM = 841.40 OUT (S) = 839.75 23 LF, 18" PIPE @ 0.50% D.1-FES 18" FLARED END SECTION RIM = 843.10 IN (N) = 841.45 78 LF, 18" PIPE @ 1.85% D.2- FES 18" FLARED END SECTION RIM = 844.54 OUT (S) = 842.89 78 LF, 18" PIPE @ 1.85% D.3-FES 18" FLARED END SECTION RIM = 844.90 IN (E) = 843.25 146 LF, 18" PIPE @ 0.48% D.4-YI YARD INLET RIM = 849.17 OUT (W) = 843.95 146 LF, 18" PIPE @ 0.48% IN (N) = 839.63 23 LF, 18" PIPE @ 0.50% P.0-MH 48" SDMH RIM = 843.20 IN (NE) = 839.63 88 LF, 18" PIPE @ 2.13% OUT (SW) = 839.63 76 LF, 18" PIPE @ 0.69% P.1-CS OUTLET CONTROL STRUCTURE RIM = 843.99 OUT (SW) = 841.50 88 LF, 18" PIPE @ 2.13% P.2-FES 18" FLARED END SECTION RIM = 845.65 BIDIRECTIONAL (NE) = 844.00 66 LF, 18" PIPE @ 0.00% P.3 18" PEROFRATED DETENTION STANDPIPE RIM = 845.64 BIDIRECTIONAL (SW) = 844.00 66 LF, 18" PIPE @ 0.00% PA-FES 18" FLARED END SECTION RIM = 845.65 IN (NW) = 844.00 31 LF, 18" PIPE @ 1.00% P.5-FES 15" FLARED END SECTION RIM = 844.67 IN (E) = 843.28 30 LF, 15" PIPE @ 0.73% P.6-CS OUTLET CONTROL STRUCTURE RIM = 844.99 OUT (W) = 843.50 30 LF, 15" PIPE @ 0.73% F-x-.o-CB EXISTING STRUCTURE RIM = 841.93 IN (NE) = 839.11 76 LF, 18" PIPE @ 0.69% PIPE ANALYSIS \ \ \ \ \ \ \ \ \ \ \ \ \ ID FLOWRATE SIZE LENGTH INVERT UP INVERT DOWN SLOPE HGL UP HGL DOWN (Cfs) (in) (ft) (ft) (ft) M (ft) (ft) A.0-P.4 4.08 18 30.74 844.00 844.31 1.01 845.14 845.08 A.1-A.0 3.66 18 100.33 844.41 844.85 0.44 845.15 845.59 A.2-A.1 2.52 18 97.03 844.85 845.39 0.56 845.87 845.99 A.3-A.21 1.23 15 92.87 845.64 846.55 1.00 845.99 846.99 A.4-A.3 1.09 12 31.17 846.80 847.27 1.51 847.13 847.71 R.0-A.4 0.79 12 29.59 847.27 848.35 3.65 847.71 848.72 13.0-A.0 1.09 18 49.67 844.41 844.53 0.24 845.08 845.10 6.1-113.0 0.79 18 211.1 844.53 845.12 0.28 845.15 845.47 C.0-13.0 1 0.69 15 64.05 844.78 844.94 0.25 845.16 845.32 P.3-P.2 0.12 18 66.49 844.00 844.00 0.00 844.81 844.81 D.4-D.3 0.32 18 146.13 843.25 843.95 0.48 844.10 844.16 P.6-P.5 0.17 15 29.68 843.28 843.50 0.74 843.98 843.66 P.0-X.0 0.83 18 76.18 839.11 839.63 0.68 840.03 839.97 P.1-P.0 0.32 18 87.88 839.63 841.50 2.13 839.97 841.71 D.2-D.1 0.44 18 77.87 841.45 842.89 1 1.85 1 842.32 843.13 D.0-P.0 0.58 18 23.5 839.63 839.75 1 0.51 1 839.97 840.03 \ 1 \ \ \ \ \ J \ ` \ �\ \ 1.39 \ ME:851. \ C ` 00 \ 49.67 � \ � \ \ 345.39O��\\ / J \ 345.� \ \ \ 0 -850 aQ2'XT \ 5000 5 \ \ \ o \ \\ \ 85 \\ \ \ 0.44 \ \\ \ 850.14 / 0.26 850.37 \ \\ \ \ 5 .18 1001111111 \ 850.03 \ 0.14 0. 1.5% \ 8 850 5 0 \ \ \ \ 0 \\ \ \ \ 8 0 5 9.86 \`v \\ `E:84 6 1 \ / \ LEGEND - EXISTING - - 350-'- INDEX CONTOUR - - - 352- INTERMEDIATE CONTOUR EDGE OF PAVEMENT CURB AND GUTTER PROPERTY LINE VIA WATER LINE S SANITARY SEWER STORM SEWER OHE OVERHEAD ELECTRIC C COMMUNICATION SERVICE HANDICAP SYMBOL SIGN ❑E ELECTRIC BOX ® OO CURB DRAIN INLET (CDI)/DRAIN INLET (DI) SD STORMWATER MANHOLE (SDMH) �S SANITARY SEWER MANHOLE (SDMH) CONCRETE FLARED END SECTION PROPOSED LEGEND - - PROPERTY LINE 350 1\ INDEX CONTOUR 352 INTERMEDIATE CONTOUR CURB AND GUTTER PROPOSED SD (STORM DRAIN) RIPRAP OUTLET PROTECTION GRAVEL PRETREATMENT AREA XXX.XX' PROPOSED SPOT ELEVATION ME: XXX.XX' MATCH EXISTING SPOT ELEVATION GRAPHIC SCALE 0 10' 20' 40' MEN ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center nog •. N A.Mn u.& Mft W c VW x ors eaac axxG x NORIN GVmIIN GALL I-800-632-4949 UNDERGROUND LOCATOFM CONTRACTOR SMALL CONTACT THE UNDERGROUND LOCATORS EVERY 70 DAYS FOR AN L1POATE TO UTUTY LOCAnow- Gall BEi=ORE you D16! "It's The Law" CO CU d d C) C)< oj Q L C)co C)(0 Cl)-- 3- M 00 E o a C O J 0 0) }�- U) c L U) L o 0 C) � Q O � � o CO O U LU 0� Q U a-p I- z (Dz r^ ^ � Z z ' C4 0 z H QU Q _ O Q U W O z � W z LLJ CO J zUoco U Q N LL Z � VLU U z 0. O U LU MATCH LINE (SEE SHEET C3.0) ,.``MINICAR1/j/ , O� e •., GINS .• ' KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1 " = 20' JOB No. 120003-01-045 DATE FI LE C3.1- GRADING AND DRAINAGE PLAN SHEET C3.1 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C3.0 GRADING AND DRAINAGE PLAN.dwg 11 /27/2019 U' z J Cn Z O U Z Q C) O m O r m Q J H 0 J Q cn c� z J En Z O U Z Q O m M m z 0 m Q 0 a 0 z Q z 0 Q N O _ H Q z 0 z w U O 0 z 0 w U Z Q J w o, of w O 0-1 z 0 w w 0 w o, Q o_ LLJ V) Q U 0 z U LLJ Z Q 0 o, U L` U D_ 0 L� J Z 0 0 w 0 z z U LiJ 0 LLJ z z Q V) Q z w 0 w z w w z U) 0 0 z Q w U Z O U w o, w 0 z U 0 0 - � W 00 r r r ^C0 OC) 00 ._.60 LO r Oi �L0 N 77, r Ln LL) •0 CD aLq C I III zz 2 II z 0 II Z Z r > > N :E > > ' Qom— — Q�z —855. 855 --- ---- / / 850 850 845 845 1 MMMMM 7ro777 15 HD 97 LF 18" HDPE @ 0.55% 100LF18"H SANITAF Y SEWERLINE SANITAR CAR WAS W SEER LINE ROSSING CROSSIN 0+00 A.0-P.4 PROFILE VIEW HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1 "=2' —0+25 0+00 1+00 STRM C PROFILE VIEW HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1 "=2' O O O �� �1• —0+25 0+00 1 +00 SAND FILTER PIPE PROFILE VIEW HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1"=2' 0+00 1 +00 2+00 A.3-A.0 PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=2' •• s FUTURE GRADE -I ■ 1 11111;,� 0+00 1 +00 STRM D.4-D.3 PROFILE VIEW HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1"=2' • ��L�' 'ice �1■ _ ELM 111111110!�-\1111 am �IM11111111� MIN WE ■ ' 1 1111AA�— —0+25 0+00 1+00 2+00 SAND FILTER OUTFALL PROFILE VIEW HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1 "=2' 3+00 N LID L N ti N ppco N O 00 M O ao In °O U = _ EXISTING GRADE —Z Z —Z \855. 855 FUTURE GRADE 850 D-YR HGL NOW 3.64% 31 LF 12" HDPE a 1.50D/o 845 845 0+00 R.0-A.3 PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1 "=2' 0+00 1+00 STRM D.2-D.1 PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1"=2' 'MM CI: n ' �I .� IM11111111 �II/MS 11111111� 0+00 BIORETENTION OUTFALL PROFILE VIEW HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1 "=2' 00 N N pO n CID — — 00 LID co 11 ~ EXISTING GRADE 1`t 11 F- 1S1 Z ee Z Z ' r L > > I — — Z 850 10-YR H L 845 845 ,I 0 0+00 1 +00 2+00 STRM B PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1 "=2' �1111111111 lee 0+00 STRM D.0-P.0 PROFILE VIEW HORIZONTAL SCALE: 1"=20' VERTICAL SCALE: 1 "=2' GRAPHIC SCALE 0 10' 20' 40' ( IN FEET ) SCALE: 1" = 20' North Carolina One -Gall Center M IF. MA.Mr B .& xta M c � OW 2 Dos ' Draw N NORIN GVmIIN GALL I-WO-632-4949 UNDERGROUND LOCATORS CONTRACTOR SN111 CONTACT THE UNDERGROUND LOCATORS EVERY TO DAYS FOR AN UPDATE M UttlTY LOCMNS Call BEFORE you 0161 "It's The Law" L0 M U O Z Mi 0 O J Q L U' O U CU CU E o� � N Y (B O Z Lo N (n LO O O C)O(O M < � 2- Q CID M r (O C O E O U O U C= E 3 �° J O c O U m E 0 m M o Q O LU w J LL LL U Op a_ zz LLI U) .-. z z Q(.0 zU>- 1 Q z = U)0 � Q W LU z -j O W > co z QJwm C) (D z U Q z U 'AaN1r,' ..� ICI W O U z CAIQD '�.. O�'FEssi' % SEAL - = 3 = � '•., GINS .••' 'tAI KAI BURK LICENSE NO. 043463 1 PLAN STATUS 1 1 DATE I DESCRIPTION 1 PL BG I KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FI LE C3.2 - GRADING AND DRAINAGE PRO SHEET C3.2 CAD file name: V:\120003 — Circle K\120003-01-045 (ENG) — Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C3.0 GRADING AND DRAINAGE PLAN.dwg 11 /27/2019 z_ H Cn Cn Z O U Z U m O } m ¢ J H O _ W Cn J _ c� z J Cn N Z U U Z CD O r m z 0 a 0 0 Q z O H N Of O _ r w Of r 0 _ z w U O Cn z 0 w U Z ¢ w Of Of O Of m 0 z O w N Of 0 w Of w Cn ¢ U _ CD 0 LLJ U Z Q Cn 0 U U w cn cn _ Of O L_ } J Z 0 0 w LLJ Cn w U > Of w Cn 0 z w Of Cn z Q Cn z w Of w z w Of 0- Cn z CD Cn w 0 0 z Cn w U Z O U w Of w Li 0 z w U O N _ H REMOVABLE TRASH RACK WITH ACCESS DOOR BOLT TO OUTLET BOX TRASH RACK DETAIL SCALE: NONE EMBANKMENT I E = 848.00' PEAK ATTENUATION WATER SURFACE 1 E 846.50' DESIGN VOLUME WATER SURFACE 1 E 846.00' CAPPED CLEANOUT (AT LEAST ONE PER UNDERDRAIN) INFLOW TRASH RACK 31 SLOPE 2 16' WEIR IE = 84625' 3:1 SLOPE 72, 6" WEIR IE=845.60' \ \\\\ BOTTOM OF POND TEMPORARY POND IE 845.00' MULCH BOTTOM OF MEDIA CHAMBER 1 E 843.50' BOTTOM OF PERFORATED UNDERDRAIN 1 E 843.00' 6" PERFORATED UNDERDRAIN PIPE IN GRAVEL BED PIPES: MIN 1% SLOPE, gHOLES SPACED 6" O.C. GRAVEL: CLEAN AGGREGATE, MAX DIA 3.5", MIN DIA 1.5", VOID SPACE ABOUT 30% RIM IE = 846.25' 6" WEIR I E = 845.60' 18" DIA HALF ROUND PERFORAI WITH HINGES AND LOCKING ME( IE = 845.00' IE=84: PLANTI.NG::MMA :.. :...:.:...', ;.. . IN —SITU SOIL BIORETENTION DETAIL SCALE: NONE FRONT ELEVATION OUTLET CONTROL OUTFLOW 15" PIPE I E = 843.00' PLANTING MEDIA MIX: 75-85% MEDIUM TO COARSE WASHED SAND 8-10% FINES (SILT AND CLAY) 5-10% ORGANIC MATTER (SUCH AS PINE BARK FINES) STRUCTURE P.6-CS CONTROL STRUCTURE DETAIL SCALE: NONE IE 841.50' PIPES: MIN 1% SLOPE, J' HOLES SPACED 6" O.C. GRAVEL: CLEAN AGGREGATE, MAX DIA 3.5", MIN DIA 1.5", VOID SPACE ABOUT 30% SAND FILTER DETENTION DETAIL RIM IE = 848. 4" WE IE = 84" 18" DIA HALF ROUND PERFORATED P WITH HINGES AND LOCKING MECHAN IE = 844.00' SAND FIL IE=844 I E = 841.50' SCALE: NONE FRONT ELEVATION STRUCTURE P.1-CS CONTROL STRUCTURE DETAIL SCALE: NONE \DE North Carolina One -Gall Center uN a rNY.N� OW, a.e. NA o r I .Nn 9 �ON01� N GALL I-WO-632-4449 CONIR911NL OCOOONMUM 11@ 1NOFNOflOLNO IOGOON4 EYFAY 10 OM4 PoN M IPOIOE 1O N011Y IOC11110101. Call BEFORE you 0161 "It's The Law" J W 0 w Z N< I..L 0 0 Z Q cD z aJ O O (B O d 04 M O = � z Q O O Q Lo d7 0 I..L U ry W =5 LL U O U ~ Z ' co I) Una 2 U) W W z W>U) J w m Ubco U Z U W 'z 0. O U W Z O z 0 0 J E ci 0 O 0 U O c U O C= U (13 3 E � o CO 0 z O J O J CAIQD '�.. c�0 oF0-sSip = 3 = •., GINS .• ' �A/ B6a* KAI BURK LICENSE NO. 043463 1 PLAN STATUS 1 1 DATE I DESCRIPTION 1 PL BIG KB DESIGN DRAWN CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE 1 A LE C3.3 - GRADING AND DRAINAGE DETAIL] SHEET C3.3 CAD file name: V:\120003 — Circle K\120003-01-045 (ENG) — Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C3.3 GRADING AND DRAINAGE DETAILS.DWG 11/27/2019 c� z J U) z 0 U z Q C) 0 m O J m Q J 0 m J J Q cn CD J V) cn z 0 U Z Q O m M m z 0 Q w Q 0 a 0 z Q z 0 Q N 0 _ Q z w o= 0 z w U 0 0 z 0 w U Z Q J w of w 0 CO z w O w w 0 w Q w _ V) Q U _ 0 w z w J U 0 z Q w 0 m U U w w 0 w J z 0 0 w 0 z w z w U w w O z w Of z z Q V) Q z w 0 w z w cn w w z U) w 0 0 z Q w U Z U U LLJ w _ C) 0 z U O 0 cn INSET SCALE 1" _ E MATCH LINE (SEE SHEET C4.1) GENERAL UTILITY NOTES 1. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND IS RESPONSIBLE TO REPAIR ANY DAMAGE TO EXISTING UTILITIES DURING CONSTRUCTION AT NO COST TO THE OWNER. 2. ALL UTILITIES ARE SHOWN FROM INFORMATION GATHERED AND SHOULD NOT BE USED AS EXACT. CONTRACTOR SHALL VERIFY EXACT DEPTHS AND LOCATIONS PRIOR TO UTILITY INSTALLATION. 3. CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANY FOR INSTALLATION AND SPECIFICATION \ REQUIREMENTS. 4. ALL PIPE MATERIALS SHALL COMPLY WITH LOCAL REGULATIONS. EXISTING 8" ER MAIN 5. ALL TRENCHING AND BEDDING SHALL BE PER THE UTILITY TRENCH AND BEDDING DETAIL. PER LINCOLN W ER SYSTEM IMPROVEMENTS 6. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR ALL BUILDING UTILITY TIE INS. DRAWING #12 9/30 003 7. ALL CERTIFICATES AND SHOP DRAWINGS MUST BE SUBMITTED, REVIEWED, AND APPROVED PRIOR TO STARTING CONSTRUCTION. 8. THE CONTRACTOR WILL COORDINATE THE WORK WITH THE UTILITY COMPANIES AND WILL VERIFY ALL \ EXISTING PIPE INVERTS AND EXISTING ROAD ELEVATIONS PRIOR TO CONSTRUCTION. EXISTING 15" SANITAR SEWER \ 9. PROPOSED ELECTRIC UTILITY IMPROVEMENTS TO BE UNDERGROUND \ PER LINCOLN WATER S TEM IMPRO MENTS AWING #12 9/30/2003 \ UTILITY KEY NOTES ELECTRIC \ \ `\ `\ 1. ELECTRIC TRANSFORMER \\ \ 2. PROPOSED UNDERGROUND ELECTRIC LINE TO TRANSFORMER (BY OTHERS). SEE ELECTRICAL PLAN FOR EXACT BUILDING CONNECTION LOCATION. INSET" 'THIS SHEE \ WATER \ \ 100. PROPOSED 8" x 2" TAPPING SLEEVE AND VALVE 101. PROPOSED 2" LINE 3 102. PROPOSED 2" x 2" x 2" TEE 20 \ 103. PROPOSED 2" VALVE \ 104. PROPOSED 2" METER (BY LINCOLN COUNTY PUBLIC WORKS) \ \ \\ 105. PROPOSED 2" RPZ FOR COMMERCIAL SERVICE \ \ 106. PROPOSED 2" 135' BEND 107. PROPOSED 8" X 3/4" TAPPING SLEEVE \J� 108. PROPOSED 3/4" LINE FOR IRRIGATION SERVICE 201 \�� `\ 109. PROPOSED 3/4" VALVE FOR IRRIGATION SERVICE 110. PROPOSED 3/4" METER FOR IRRIGATION SERVICE (BY LINCOLN COUNTY PUBLIC WORKS) 111. PROPOSED 3/4" RPZ FOR IRRIGATION SERVICE 100 \/� `\ / \ 112. PROPOSED 2" 90' BEND 113. PROPOSED 2" WATER SERVICE BUILDING CONNECTION. SEE PLUMBING PLANS FOR EXACT LOCATION 107 \� . 101 \ \\\ SEWER 6 108 /$• \ \ \ 200. 6" SANITARY SEWER BUILDING CONNECTION WITH CLEANOUT @ 845.50'. SEE PLUMBING PLANS �\ ,y /� FOR EXACT LOCATION. / / v 112 3 \ \ st• "J`/\ 1,C� ��\\ _ r// ^� \ 201. 6" PVC PIPE @MIN 1.00°/D �/ /L /� \` -9 \ QS ( \ 202. 6" CLEANOUT 203. 1000 GAL GREASE INTERCEPTOR, SEE ARCHITECTURAL PLANS �� 204. OIL AND GRIT SEPARATOR, SEE ARCHITECTURAL PLANS A / PROPOSED - 2 p��\ \ O�� •���j STORE 200 2 \ \ Q \ O \ WASTEWATER CAPACITY (NCAC 02T .0114) CONVENIENCE STORE, WITH FOOD PREPARATION: 60 GAL/100 SF 3,283 GAL (5,471 SF BLDG) CAR WASH FACILITIES: 1,200 GADBAY 1,200 (1 BAY) TOTAL 4,483 GAL FIFE 851.50' / 203 00, 5 \ \ \ � O \ DAILY WATER FLOW (NCAC 18C .0409) / \ \ BUSINESS, WITHOUT SHOWERS: 25 GAL/PERSON/SHIFT 2,275 GAL (7 EMPLOYEES \ / Q 202 \ / 201 \\ 17�, ' \ \ \ `\\ `\ GRAPHIC SCALE SD IN FEET ) 0\ SCALE: 1" = 20' North Carolina One -Call (enter ^\`\ 2W T. WY•Mn Wd. 9" 2R • •\ - • \ `` \ \ 2 DM B61Y[ DI06N0 N •• \ \ \ \ \ GNORIN GW„ / \ ALL I-SOO-632-4949 \/ \ ONRACTO °ND LOCATORS (all BEFORE you 0161 \ \ \ "It's The Law" r` - ♦ ` G \ •• � O a0 O 0= _ _ = O O O O � •. \ \ MATCH LINE (SEE INSET"B" / ___--- --- --- --_-_ w ♦ // \ `\ �� \ SHEETC4.1) 94 \ HSS=844.3 \ -------------------------------- --- -- _----_-_ °° -��_--_--_ _PROPOSED UTILITY EASEMENT I ` IE-835.80 10 0N-9T--S-S-H-- �. I 1 5„ OIP pp Mp dP pp pp OIP OIP �� BII'- _ pP w _ _ ___ �- --- -- --- - ---- EX. 20' UTILITY EASEMENT S / F,n % EXISTING NCDOT / y ----------------- MHSS=8Z 43 ------ _ ------------------- Y EXISTING 18" SANITARY SEWER PER LINCOLN WATER SYSTEM V ------ _ I ar- �- MHSS=84 �----------------------------------------- mar - IE-835.90' A) ss ----__ �---------------------- "PVC - _ _ -�---aw=� _ --- 3----- -_ IE=834. '(IN) -_------------------------------- LIP - IE=B4.40'(OUT) G --� G - ss I O IGINAL p ------ - - --- =---_ --- ----- G - G �_ EE INE _ --- - - - - - - - - - - - _ _ - G - - - - - - - - - - - - - - 3 S --�_ 4 / G- I I I CB=841.93' 3 G (III G E=839.00' (VAR AI ILx �- I \\ CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C4.0 UTILITY PLAN.DWG 11 /27/2019 'RDVEMENTS DRAWING #12 9/30/2003 0 J 0z L O U CU E orn � N O C) Lo N U)C L 0 OCU M < � Q- Q (D t9 M � CO 0 E O U O U E 3 �° J O c O U E 0 m m o Q O 2 U W z) LL U O1 z z z w U z Q I z C) < o a I.. _ V J U LU LU z O z J (n J wm J C) I U z ULU z � L.I_ O U LU KAI BURK LICENSE NO. 043463 PLAN STATUS Y \ DATE DESCRIPTION PL BG KB '~ DESIGN DRAWN CHKD •. SCALE 1" = 20' JOB No. 120003-01-045 �of DATE FILE C4.0 - UTILITY PLAN C4.0 - SHEET c� z_ J Cn Z 0 U Z ¢ C) O m O r m J H O w m J J Cn C' z H J vl Z U Z O m M m Z 0 ¢ 0 ¢ 0 z ¢ z 0 Q N_ O H Z w H lY H 0 O z w U O 0 z 0 w U Z ¢ J w m of w w O 0-1 Z ¢ w 0 w N w LLJ w m V) H U x Cr w Z w U LLJ Z Q O w m m U Li U w N LLJ tY 0 w r J Z 0 0 w 0 z Z In w U w (n O Z w Of IY H N z z ¢ V) z w x 0 z w vl w m m LLJ C' 0 z U Z O U 0 z w U O 0 Cn H COMPACTED GRANULAR BEDDING LOAD FACTOR 1.9 2' MINIMUM NATIVE BACKFILL _ ONLY IF MATERIAL IS SUITABLE _ COMPACTED TO 95% STANDARD PROCTOR DENSITY 12" MIN. i CAREFULLY COMPACTED _ SELECT BACKFILL 95% _ STANDARD PROCTOR DENSITY (COMPACTED IN 6" LIFTS) /\\\ / SPRING LINE HAUNCHING # 57 WASHED STONE - COMPACTED GRANULAR MATERIAL 95% STANDARD PROCTOR DENSITY 1/4 D (4" MINIMUM) NOTES: 1. STAINLESS TAPPING SADDLES ARE NOT PERMITTED FOR SIZE -ON -SIZE TAPS. UNLESS APPROVED IN WRITING BY LCPW. 2. USE MUELLER OR EQULIVENT DUCTILE IRON OR 316 STAINLESS STEEL TAPPING SLEEVES FOR TAP SIZES 3" - 24". 3. USE THRUST BLOCKING FOR WET TAPS UNLESS OTHERWISE APPROVED BY LCPW. 4. DEPTH FROM GROUND SURFACE TO TOP OF BLOCKING SHALL BE GREATER THAN HEIGHT OF BLOCKING. 5. THE END OF THE TAPPING SLEEVE SHALL BE NO CLOSER THAN 5 FEET TO A JOINT. 6. ALL PRESSURE TESTING SHALL BE WATER TESTING ONLY. NO AIR TESTING PERMITTED. TEST DURATION WILL BE 2HRS AT 1.5 TIMES STATIC PRESSURE OF THE LINE BEING TAPPED (200 PSI MINIMUM) . CLASS C (TYPICAL FORCEMAIN SHAPED BOTTOM LOAD FACTOR 1.5 VIEW M.J. WITH LCPW APPROVED RESTRAINING GLAND CONCRETE SUPPORT BLOCKING UNDER VALVE TAPPING VALVE MUELLER T-2360-16 OR EQUHIVENT FLANGE JOINT M.J. TAPPING SLEEVE MINIMUM CONCRETE STRENGTH C D 3000 PSI. TYPICAL TAPPING SLEEVE PROPERTY LINE 4" THREADED CLEAN OUT PVC PLUG 4 NOTES: 1. WHEN A SADDLE IS USED, THE HOLE SHALL BE INSTALLED BY CORING FINISHEDJOGRADEg 2. THE FULL LENGTH OF THE SERVICE DITCH SHALL BE COMPACTED IN 6" LAYERS WITH MECHANICAL TAMP. \/�\/,'• t GUARD STAKE REQUIRED � \ AT CLEAN OUT LOCATION \\/\\/�\/. UNTIL LANDSCAPING IS '.; „ .Y COMPLETED •\/\/\/\/ \�\ 4" PVC 34 SDR36 OR 4'-0" 4" Cl SOIL PIPE PLUG UNTIL HOUSE s BARREL OF PIPE TO SERVICE CONNECTION IS MADE REST ON UNDISTURBED SOIL CONCRETE 1/4" PER FT. MIN. CORE & NEOPRENE \ -� 181,--� BOOT BY DEVELOPER COMBINATION LONG ON NEW MH TURN PATTERN Y _ - x AND 1/8 BEND N \\\\\\\\\\\\\\/ PROPERTY OWNER'S RESPONSIBILITY FROM M.H. OR MAIN TO 1/8 BEND STRUCTURE TAPPING SADDLE OR TEE .' LINCOLN COUNTY PUBLIC WORKS 45° V 115 W. MAIN STREET ' . . .. " . ' LINCOLNTON, NC 28092 Phone (704) 736-8497 Fax (704) 736-8499 EXISTING •. MAIN (SEE TAP SPECIFICATIONS) LATERAL CONNECTION TO EXISTING SEWER • ' .. APPROVED: MCN 12/31/2013 DRAWN BY: JDH SCALE: N.T.S. FIGURE: SS-05 TAP D�IB= SIZE W H D 3" & 4" 1.6 12 1.0 6" 2.0 IA 1.0 S. 3.5 2.0 1.4 10" 4.0 2.5 1.8 12" 5.0 3.0 2.5 THREE INCH "W" TO BE STAMPED OR SAW -CUT IN CURB AT SERVICE LOCATION PAVEMENT CURB TAPPING SADDLE WITH CC HREAD 11" MINIMUM AND HINGED BRASS BODY FOR 3/4 "AND 1" I FORD #S-90 FOR C-900 PIPE SIZES UP TO 12" FORD STYLE 202BS➢ FOR OTHER MATERIAL OR PIPE DIAMETER ABOVE l2" TO 24" OR APPROVED EQUAL CORPORATION STOP Mueller #H-15008 or equal COPPER (TYPE K) (TO MATCH SERVICE SIZE) TAPPING SADDLE WITH B'S THREAD AND STAINLESS STEEL BODY FOR 2" FORD STYLE 202BSD FOR PIPE DIAMETER ABOVE 12" TO 24" OR APPROVED EQUAL. 2" RESILIENT WEDGE 2" COPPER OR BRASS MAY BE USED. GATE VALVE (SEE WS-07) SEE TABLE FOR SETTER INFORMATION NO. 4 REBAR BLUE STAKE W/CAP FINISHED GRADE 18" MIN. I Mueller # H-15451 IGRAVEL FORDRAINE Straight Coupling ANTI STABILIZATION B P S PROPERTY OR R/W LINE NOTES: 1. CONTRACTOR WILL PROVIDE ALL MATERIAL SHOWN OR INDICATED AND INSTALL SERVICES UNDER LCPW SUPERVISION. 2. ALL TAPS WILL BE MADE IN ACCORDANCE WITH LCPW SPECIFICATIONS AND AW WA GUIDELINES 3. LCPW SHALL INSTALL ALL 34 , 1, AND 2" METERS 4. ALL IRRIGATION SERVICES ALSO REQUIRE A RPZ ASSEMBLY (SEE WL-7) SERVICE SPECIFICATIONS SERVICE SIZE MUELLER SETTER MODEL MUELLER LID AND FRAME %4 203-IS-15-18-F-S-A-N-N 282920 or790007-TR2 1 330-RS-18-24-F-S-A-N-N 282921 or790018-TR2 2 550-VB-27-30-F-B-A-N 7900981 and 282921 or 790018-TR2 NOTES: 1, COPPER, DI, OR BRONZE INLET AND OUTLET REQUIRED 2, CONCRETE SLAB AND STABILIZER SUPPORTS BETWEEN BACKFLOW AND GROUND TO BE SIZED ACCORDINGLY OR BY MANUFACTURERS' RECOMMENDATIONS. 3. RPZ ASSEMBLY MUST BE CERTIFIED AND TESTED PRIOR TO ACTIVATION. CERTIFICATION AND TEST RESULTS SHALL BE SUBMITTED TO LCPW 4. APPROPRIATE THRUST RESTRAINT AND SUPPORT MEASURES ARE TO BE DETERMINED BY OWNER/INSTALLER. 5. LCPW RECOMMENDS THE INSTALLATION OF A HEATED PROTECTIVE ENCLOSURE AROUND ALL RPZs. n: u,�,r w a r nlvuruel� ua r e1rL eirvu �ray.lr ri,r� r r�ry ���vr � FINISH VALVE BOX SHALL BE SOUTHERN METER VALVE BOX 562-S OR EQUAL BRICK GATE VALVE W/2"x2"IX / OPERATING NUT COMPACTED EARTH J WATER MAIN unIAIL3\L�rw wa-v/.Vwv SEWER CAST IRON LID WATER \ PRECAST VALVE BOX PROTECTOR WITH REINFORCING BARS 27" DIAMETER BRICK /= SUPPORT BLOCK i North Carolina One -Gall Center i0M If. N YA Mn eer4 Mft W ft-b m N & C.Wb VW x Dos IErD1c DiccxD x AOL IIORaI CNil M GALL I-WO-632-4949 UNDERGROUND LL CONTACT CONTRACTOR MNL OCAM iNE UNDERGROUND now- S EVERY 10 DAYS FOR AN IIPDAIE 1w tG unm LorwnoNs. Call BEFORE you 0161 "It's The Law" NOTES 1. ALL POTABLE WATER VALVES SHALL BE RESILIENT SEAT GATE VALVES CONFORMING TO AW WA C509-01 OR CURRENT 2. ALL SEWER FORCE MAIN VALVES SHALL BE ECCENTRIC PLUG VALVES UNLESS APPROVED IN WRITING BY LCPW 3. ANY VALVE WITH AN OPERATING NUT DEEPER THAN C BELOW GRADE SHALL BE EQUIPED WITH A RISER STEM TO WITHIN 12" OF GRADE 4. SUPPORT BLOCK SHALL BE SIZED TO EVENLY DISTRIBUTE THE WEIGHT OF THE VALVE,VALVE BOX ASSEMBLY, AND ANY OTHER APPLICABLE LOADS AS DETERMINED BY THE DESIGN ENGINEER C%2 QD L0 In M U 0 z C 0 V J li L C (� o U co E � CB Y CL6 CL O z Lo O t Z3 U) LO O O Cl) = CL (O O M r- (O c O E O U 0) O U E �: J SZ O - c O C) E m O 00 0 C0 '0 2 U LUD I� U 0 C) z 1 z Jr^ 1--:1D U z Q I � z LU U\z Q p Q 5 = U >- F �`/� W Z 0 J III / z z LLJ co J C) (.C) I U xxxxxx� Z U LU NZ 0. 0 U LU KAI BURK LICENSE NO. 043463 PLAN STATUS DATE DESCRIPTION PL DESIGN BG DRAWN KB CHKD SCALE 1" = 20' JOB No. 120003-01-045 DATE FILE C4.2 - UTILITY DETAILS SHEET C4.2 CAD file name: V:\120003 - Circle K\120003-01-045 (ENG) - Denver (Unity Church Rd), NC\Engineering\Engineering Plans\C4.2 UTILITY DETAILS.DWG 11 /27/2019 LANDSCAPE REQUIREMENTS A. FOUNDATION PLANTINGS REQUIRED 1. Min. 5' wide planting area along building walls facing public roads. PROVIDED 1. Planting provided along west and south side of the building facing public roads. B. BUFFERS 0 20 40 FT / ) / \ \ \ \ a REQUIRED 1. North: 20' wide Class A buffer with 1 canopy, 2 understory and 8 shrubs per 100 LF ° \ \ � � 135 LF / 100- 1.35 - 1 canopy, 3 understory, 11 shrubs 2. East: 10' wide Class A buffer with 2 canopy, 2 understory and 12 shrubs per 100 LF. 285 LF / 100= 2.85 = 6 canopy, 6 understory, 34 shrubs 3. NC16: 15' wide Class A buffer with 2 canopy, 1 understory, 10 shrubs per 100 LF 404 LF / 100= 4.04 = 8 canopy, 4 understory, 40 shrubs 4. Unity Church: 10' wide Class A buffer with 2 canopy, 2 understory, 12 shrubs per 100 LF / 380 LF / 100= 3.8 = 8 canopy, 8 understory, 46 shrubs 3-Shumard Oak 5. Parking buffer: perimter of all parking areas with frontage shall be screened. ° ° I 1 18-Dwarf Bamford H/9ky Screening shall be a min. 18" Hgt; reach 36" Hgt @ 3 years PROVIDED 1. North: 1 Oak, 3 NRS Holly, 13 Dwf Burford Holly = 1 canopy, 3 understory, 13 shrubs 2. East: 6 Pistache, 6 NRS Holly, 38 Dwf Burford Holly = 6 canopy, 6 understory, 38 shrubs / 20-Dwarf Burford Holly ° I \ 1 3. NC16: 6 Bald Cypress, 2 Pistache, 4 Crepe Myrtle, 48 Dwf Burford Holly = 8 canopy, 4 understory, 48 shrubs / 3-Chinese Pistache / / ° I F\ \ 4. Unity Church: 6 Oak, 2 Pistache, 8 NRS Holly, 48 Dwf Burford Holly = 8 canopy, 8 understory, 48 shrubs x \ l \ \ 0 \ C. PARKING 5. Perimeter of parking areas is screened with Burford Holly and Loropetalum installed at 18" Hgt. / � \ � \\ \ o REQUIRED 1. Perimeter of all parking areas with frontage shall be screened. 2. Screening shrubs shall be a min. 18 Hgt at install and reach 36 Hgt after 3 years. / ° ° o i \ PROVIDED 1. Perimeter of all parking area along the frontage(s) is screened by Dwf Burford Holly and Loropetalum. / o \ \ \\ \ \ 2. Screening shrubs are a min. 18" Hgt; see plant list. These shrubs are also being used to meet buffer shrub req. d 7-Ruby Loropeta \ \ 1-Emerald Green Arb ' ae 5-Cinnamon Girl Distyliu \ \ / 5-Heavy Metal Switch Gi \ \ \ \ J CAR WASH -Adagio r ss\ FFE 851.25' y� Sod o o hod 6-Nellie Stevens Holly r 17-Dwarf Burford Holly / \ i uby Loropetalu \ / / F// A -Big Blue Liriope \ \ \ PROPOSED — -Heavy Metal Switc Gra STARE / 8-Sunshine Ligustrum o / Od 5,471 SQFT FIFE 851.50' / 0 \ \ \ 5-Heavy Metal Switch Grass PLANT LIST Qty Botanical Name Common Name Scheduled Size Remarks Trees 17 Ilex x'Nellie R. Stevens' Nellie Stevens Holly Min. 4' Hgt. Full to ground 4 Lagerstroemia indica'Muskogee' Muskogee Crepe Myrtle Min. 6' Hgt. Multi -stem; min. 3 canes 10 Pistacia chinensis Chinese Pistache Min. 1.5" Cal; 6' Hgt. Full well branched 7 Quercus shumardii Shumard Oak Min. 1.5" Cal; 6' Hgt. Single straight leader 6 Taxodium distichum Common Bald Cypress Min. 1.5" Cal; 6' Hgt. Single straight leader Shrubs 15 Distylium'PIIDIST-V' Cinnamon Girl Distylium 3 Gal. Full well branched 146 Ilex cornuta'Dwarf Burford' Dwarf Burford Holly Min. 18" Hgt. Full well branched 20 Juniperus squamata expansa 'Parson i i' Parson's Juniper 3 Gal. 25 Ligustrum sinense'Sunshine' Sunshine Ligustrum 3 Gal. Full well branched 48 Loropetalum chinense'Ruby' Ruby Loropetalum Min. 18" Hgt. Full well branched 14 Miscanthus sinensis'Adagio' Adagio Grass 3 Gal. 13 Panicum virgatum 'Heavy Metal' Heavy Metal Switch Grass 3 Gal. 3 Thuja occidentalis'Smaragd' Emerald Green Arborvitae 6' Hgt. Full to ground; full well branched Groundcovers 65 Liriope muscari'Big Blue' Big Blue Liriope 1 Gal. Plant 18" O.C. Other x / / / 29-Big Blue Liriope / p / \ \ 10-Sunshine Ligustrum ,� ° \ \ 18-DwarfrBur olyd \ Holly 0 1-Emerald Green Arborvitae / / ° \ y �5-�nnamon Girl Distylium \ \ 5-Nellie Steven's \v Seed / o o o o \\\ 0 7-S nshin Ligust um 23 Big Blu Liriop Sod Sod _ 14meral rbor i e �d - innam n Girl i iu s Sod \ \ \ \ / 0 i \ 3-Chinese Pistache So \ -Adagio Grass S \ \ \\ 1-S and Oak / 2-Chinese Pistache \ Sod / ° 12-Dwarf Burford Holly \ / / s s ° x 3-Nellie Stevens Holly 1-Common Bald Cypress \ _ _ o o 1 \ 9 Ruby Loropetalum 0 0 0 0 0 0 0 / \ / 8-Dwarf Burford Holly II \I - NeWie Stevens Holly / S d \ / \ 5-Dwarf Burford Holly / / \ 20-Parsorf s Juniper -gand I Medi Sod 4-Muskogee Crepe Myrtle _ — — 17-Ruby Loropetalum / \ \ 2-C h nese-R — 3-CommonBTd'Cypress od — 2B- arf Bur or Holly �— / 0 0 0 0 0 0 0 a L AND D E S I G N Landscape Architecture 770.442.8171 tel 770.442.1123 fax Manley Land Design, Inc. 51 Old Canton Street Alpharetta, Georgia 30009 manleylanddesign.com CQ to U 4 � J c/) o o O C o C� o ��U s CL M O � m � � 0 0 U U 0 z U � U zo z CO Ct � Q � U) z O �wQo =zOU W �W�z p� =) J J 1 > m O z 0 U cz w O z ,,,t•t1t1i711111i/��' s .ems 13 ar2�lt11in�� REVISION SCHEDULE NO. DATE DESCRIPTION MLD PROJECT # 2019119 DRAWN BY ADN CHECKED BY SLM DATE 10.31.19 Landscape Plan Lml nO Varies L Varies As shown on L-100 Native soils subgrade) "V" Trench Bed Edge _ Mulch depth as defined in the Landscape Notes; mulch type as defined in the Landscape Notes or on the Landscape Plan Planting pit to be twice the - width of the rootball SHRUB BED PLANTING DETAIL SCALE: NTS A = Row Spacing B = On Center Spacing Space plants in a triangular pattern as shown, spaced equally from each other at spacing indicated on the plant list PLANT SPACING U X ROW SPACING'A' PLANTS/10SF 8" O.C. 6.9" 26 12" O.C. 10.4" 12 151, O.C. 13.0" 7 181, O.C. 15.7" 5 Mulch depth as define, Landscape Notes; mul defined in the Landsce on the Landscape Plai Topsoil as defined in tl Landscape Notes Native soils subgrade NOTE 1. Space groundcover plants in accordance with indicated spacing listed on the plant list, or as shown on the landscape plan. 2. Adjust spacing as necessary to evenly fill planting bed with indicated quantity of plants. 3. Plant to within 24" of the trunks of trees and shrubs within planting bed and to within 18" of edge of bed. GROUNDCOVER PLANTING DETAIL SCALE: NTS Topsoil as defined In the Landscape Notes Backfill planting pits with topsoil and native excavated soil Shrubs; type and size as defined on the plant list TURF SIDE PLANTING BED SIDE Mulch as defined in the Landscape Notes. Hold Mulch 4" from tree trunk and shrub stems Shovel Cut Bed Edge at 45 degree angle, 6" deep Finished grade at bedline 1IIII=IIII=IIII=IIII=IIII=IIII=IIII=IIII IIII IW IIII III Topsoil as defined in the Landscape Notes. Native soils subgrade "V" TRENCH BED EDGING SCALE: NTS Guy above first branch with woven Set top of rootball so that trunk flar( is visible and above finished grade Place rootball on unexcavated subgrade Tamp soil around rootball, and wat( in 6" layers to remove air pockets Topsoil and planting mix as defined the Landscape Notes Remove all twine, rope, burlap and cut vire basket from top 1/3 of rootball i" Hgt. earth saucer beyond edge of 'oot ball for water retention. Outer Age of saucer to be 6' diameter lardwood stakes 3 stakes, P x 2", driven firmly into subgrade prior o backfilling Mulch depth as defined in the Landscape gotes; mulch type as defined in the -andscape Notes or on the Landscape Plan. Bold mulch 4" from tree trunk. NOTE 1. Hole to be twice the width of the rootball. 2. Do not heavily prune tree at planting. Prune only crossover limbs, broken or dead branches; Do not remove the terminal buds of branches that extend to the edge of the crown. 3. Each tree must be planted such that the trunk flare is visible at the top of the rootball. Trees where the trunk flare is not visible shall be rejected. Do not cover the top of the rootball with soil. Mulch to be held back 4" away from trunk. 4. Remove Guy Wires and Staking when warranty period has expired (after one year). TREE PLANTING & STAKING SCALE: NTS Mound islands 6"-8" height above island curbing. Mulch depth as defined in the Landscape Notes; mulch type as defined in the Landscape Notes or on the Landscape Plan Width Varies =IIII ( IIII IIII E LL 6"-8" Hgt dl ll l l / 24" Depth Pavement T Yp Curb & Gutter T Yp Compacted Subgrade p g Uncompact subgrade to a minimum depth of 24" from top of curb Topsoil as defined in the Landscape Notes; minimum 4" depth NOTE 1. Clean construction debris from within landscape island areas (ie. concrete, rocks, rubble, building materials, ect), prior to installing topsoil and plant material. 2. Island plant material as per the Landscape Plan. 3. Install plant material as per tree, shrub and ground cover planting details, and as defined in the Landsacpe Notes. 4. Install mulch or sod as specified on the Landscape Plan, and as defined in the Landscape Notes. 5. Fracture/loosen existing subgrade to a minimum 24" depth. Remove and replace any subgrade unsuitable for planting. Once subgrade is clean of debris and loosened, add topsoil to a minimum bermed 6"-8" height above island curbing. PARKING ISLAND DETAIL SCALE: NTS LANDSCAPE NOTES 1. Prior to installation, the Landscape Contractor shall inspect the sub grade, general site conditions, verify elevations, utility locations, irrigation, approve topsoil provided by General Contractor and observe the site conditions under which the work is to be done. Notify General Contractor of any unsatisfactory conditions. Work shall not proceed until such conditions have been corrected and are acceptable to the Landscape Contractor and/or Construction Manager. 2. Landscape Contractor shall locate and protect all underground utilities, prior to installation. 3. General and Landscape Contractor are responsible for protecting existing trees from damage during construction. General Contractor to install tree protection fencing prior to any site work as directed on the landscape plans. 4. All shrubs and groundcover beds (existing and new) to be mulched with a minimum 4 inches of mulch. Mulch type to be double shredded hardwood mulch. 5. All annual and perennial beds to be tilled to a minimum depth of 18 inches and amended with 4 inches of organic material. Mulch planted beds with 3 inch depth of pine bark mini nuggets. 6. Planting holes to be dug a minimum of twice the width of the root ball of both shrubs and tree. Amend backfill with topsoil mix. Backfill and tamp bottom of hole prior to planting so top of root ball does not settle below surrounding grade. 7. Topsoil Mix to be 4 parts screened topsoil and 1 part organic material (i.e. Nature's Helper or Pro Mix). 8. Existing grass in proposed planting areas is to be removed and area to be hand raked to remove all rocks and debris larger than 1 inch in diameter prior to planting shrubs. 9. Soil to be tested to determine fertilizer and lime requirements. Lime and fertilizer to be distributed prior to laying sod. 10. Sod to be delivered fresh (Cut less than 24 hours prior to arriving on site), laid immediately, rolled and watered thoroughly within one hour of installation. 11. All changes to design and/or plant substitutions are to be authorized by the Landscape Architect at Manley Land Design - 770.442.8171 12. All parking islands to be bermed 6" - 10" with clean friable topsoil prior to planting. 13. All landscaping shall be installed in conformance with ANSI Z60.1 the "American Standard for Nursery Stock", and the latest accepted standards of the American Association of Nurserymen. 14. Site to be 100% irrigated by an automatic underground irrigation system. 15. The Landscape Contractor shall guarantee all plants installed for one full year from date of acceptance by the owner. All plants shall be alive and at a vigorous rate of growth at the end of the guarantee period. The Landscape Contractor shall not be responsible for acts of God or vandalism. 16. Any plant that is determined dead, in an unhealthy or unsightly condition, lost its shape due to dead branches or other symptoms of poor, non -vigorous growth shall be replaced by the Landscape Contractor with the cost of the replacement included in the bid or proposal price. 17. Stake all evergreen and deciduous trees. 18. Remove all stakes and guying from all trees after one year from planting. 19. Water thoroughly twice in the first 24 hours and apply mulch immediately. 20. The plant quantities are for the contractor's convenience, all numbers must be verified. , 4111111111W manie L__ ---' Landscape Architecture 770.442.8171 tel 770.442.1123 fax Manley Land Design, Inc. 51 Old Canton Street Alpharetta, Georgia 30009 manleylanddesign.com C` U o Z 0 N J N o CU L7 �Mcu CID�� � �� Cn M cB Co coo 00 0 2 U Iry 2 U O Z U :D U Z pCC Z Z H lO U) 0 W Q O = z O U LJJ JI >m o Z cfl U W LU Z O U W Z CAH(0) FCN REVISION SCHEDULE NO. DATE DESCRIPTION MILD PROJECT # 2019119 DRAWN BY ADN CHECKED BY SLIM DATE 10.31.19 Landscape Details Lml 01