Loading...
HomeMy WebLinkAbout20191297 Ver 1_More Info Received_20191127 Strickland, Bev From:Eva King <Eva@adamsandhodge.com> Sent:Wednesday, November 27, 2019 12:34 PM To:Sullivan, Roscoe L III CIV (US); wyatt brown Cc:Goss, Stephanie; Williams, Andrew E CIV USARMY CESAW (USA) Subject:\[External\] RE: \[Non-DoD Source\] Fwd: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) Attachments:C4.01 - EROSION CONTROL-C4.09.pdf; C5.04 - SCM DETAILS-STORMWATER POND.pdf; C5.01 - GRADING & DRAINAGE-C5.01.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Ross, I see what you are referring to. It appears we didn’t catch the grading and erosion control discrepancy on the plans before sending them to you. My apologies. Attached are updated Grading, ESC and SCM Details sheets showing a 6’retaining wall that will limit the stream impact to 119LF, allowing an additional foot for construction activities if needed. We proposed the retaining wall because the steep grades forced us to play catch up with the existing grade and increased the stream impact to an unnecessary length. Unfortunately, though, we failed to update the plans before sending them to you. As I would like to get this project wrapped up before you get transferred, please let me know if this is sufficient or it you require any additional information from us. Phone calls are always welcome. Thank you, Eva King, PE Adams & Hodge Engineering, PC 314 E. Main Street Clayton, NC 27520 (M) 980-253-5773 Firm # C-4187 From: Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.army.mil> Sent: Wednesday, November 27, 2019 11:25 AM To: Eva King <Eva@adamsandhodge.com>; wyatt brown <brownenvgrp@gmail.com> Cc: stephanie goss <stephanie.goss@ncdenr.gov>; Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil> Subject: RE: \[Non-DoD Source\] Fwd: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED 1 Eva, Thanks for the information. However, the “Wetland Impact Map” does not match what is shown on the most recent plans as described in my email below. The “Wetland Impact Map” proposes to impact only 120 linear feet of stream; whereas, the impacts on the “Overall Erosion Control Plan” (sheet C4.07) measure to be approximately 145 linear feet of stream impact as measured from the headcut to the end of the proposed riprap dissipator pad (see attached file with my notes and the Wetland Impact Map for comparison). Do the most recent plans accurately show the proposed project? If so, please revise the “Wetland Impact Map” to reflect the changes. If not, please provide accurate plans that match the “Wetland Impact Map.” I need to have an accurate accounting for what is being proposed by the project. Feel free to give me a call to discuss as it may be easier to ensure we are on the same page. Also, note that next Friday is my last day in the Raleigh Regulatory Field Office as I am moving to another Corps office. Therefore, I have included Andy Williams (email: Andrew.E.Williams2@usace.army.mil) in the email as he will be helping out with Johnston County projects after my departure. Best regards, Ross Sullivan Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers - Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office #: 919-554-4884. Ext. 25 Email: roscoe.l.sullivan@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://cops.usace.army.mil/sites/RD/ORM2_Blog/_layouts/15/WopiFrame.aspx?sourcedoc={AE95B1BE- 995E-4A7E-9968-B619432F7CEB}&file=National_Customer_Survey_for_Dec_2018.xlsx&action=default From: Eva King \[mailto:Eva@adamsandhodge.com\] Sent: Wednesday, November 27, 2019 9:48 AM To: Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.army.mil>; wyatt brown <brownenvgrp@gmail.com> Cc: stephanie goss <stephanie.goss@ncdenr.gov> Subject: RE: \[Non-DoD Source\] Fwd: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) Ross, The last sentence should read Given all the above information it is our opinion that the proposed wet pond design/location minimizes the impacts to waters to the maximum extent practical. In regards to the increase impact, the information given on the Wetland Impact Map is correct. Eva King, PE Adams & Hodge Engineering, PC 314 E. Main Street 2 Clayton, NC 27520 (M) 980-253-5773 Firm # C-4187 From: Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.army.mil> Sent: Wednesday, November 27, 2019 9:41 AM To: wyatt brown <brownenvgrp@gmail.com> Cc: Eva King <Eva@adamsandhodge.com>; stephanie goss <stephanie.goss@ncdenr.gov> Subject: RE: \[Non-DoD Source\] Fwd: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED Hey Wyatt, The engineer’s response to item 1 does not appear to be complete as the last sentence is left unfinished. Can you provide the complete response? Also, the plans (Sheets C4.07, C5.01, and C5.04) submitted in your response appear to show more impacts to the stream below the stormwater pond than the “Wetland Impact Map” submitted with the PCN application submitted to the Corps on 9/26/2019. If this is a change, please revise the “Wetland Impact Map” to show the actual amount of impacts proposed by the project. Best, Ross Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers - Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office #: 919-554-4884. Ext. 25 Email: roscoe.l.sullivan@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttps://cops.usace.army.mil/sites/RD/ORM2_Blog/_layouts/15/WopiFrame.aspx?sourcedoc={AE95B1BE-995E- 4A7E-9968-B619432F7CEB}&file=National_Customer_Survey_for_Dec_2018.xlsx&action=default From: wyatt brown \[mailto:brownenvgrp@gmail.com\] Sent: Sunday, November 10, 2019 10:44 PM To: Sullivan, Roscoe L III CIV (US) <Roscoe.L.Sullivan@usace.army.mil> Subject: \[Non-DoD Source\] Fwd: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) Ross 3 Please see below the forwarded information you requested on SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC . Please don't hesitate to contact me if you have any questions. thanks Wyatt ---------- Forwarded message --------- From: Eva King <Eva@adamsandhodge.com> Date: Fri, Nov 8, 2019 at 8:17 AM Subject: RE: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) To: wyatt brown <brownenvgrp@gmail.com> Cc: Andrew Hodge <andrew@adamsandhodge.com>, Donnie Adams <donnie@adamsandhodge.com> Wyatt, Please see below for our responses in red. Please let me know if you need anything else. Eva King, PE Adams & Hodge Engineering, PC 314 E. Main Street Clayton, NC 27520 (M) 980-253-5773 Firm # C-4187 Begin forwarded message: From: "Sullivan, Roscoe L III CIV (US)" <Roscoe.L.Sullivan@usace.army.mil> Date: October 25, 2019 at 8:54:32 AM EDT To: wyatt brown <brownenvgrp@gmail.com>, "james@myhtr.com" <james@myhtr.com> Cc: "Goss, Stephanie" <stephanie.goss@ncdenr.gov>, "Williams, Andrew E CIV USARMY CESAW (USA)" <Andrew.E.Williams2@usace.army.mil> Subject: SAW-2019-01488 Request for Additional Information, (Academy Pointe), Johnston County, NC (UNCLASSIFIED) 4 CLASSIFICATION: UNCLASSIFIED Hey Wyatt, Thank you for the Pre-Construction Notification (PCN) and attached information, dated and received 9/26/2019, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the NWP or consider your application withdrawn and close the file: 1. As indicated by the Corps during the 6/26/2019 site visit, the NWP 29 2017 Regional Condition 4.1.1 prohibits "\[d\]ischarges in perennial streams, intermittent streams and wetlands for stormwater management facilities." However, with sufficient justification it may be possible to permit impacts to streams/wetlands for stormwater management facilities under a NWP 18 for Minor Discharges. Please provide a more detailed explanation for how the proposed stormwater wetland design has avoided and minimized impacts to waters to the maximum extent practicable. This should include an explanation for the size and location of the proposed SCM and why stormwater could not be treated at other locations within the project area. Note that the Corps discourages the use of existing creeks, streams, lakes and wetlands to remove pollutants from storm water runoff (in-stream treatment). Please review the attached EPA Region 4 guidance on the subject of in-stream treatment. This site is an urban infill project and has many challenges that complicate the site design. It is nestled between three roads (northeast to southwest) and a perennial stream that almost completely divides the northern portion of the property. The existing topography offered another set of challenges. The overall site layout is designed such that perennial stream impacts are avoided, and intermittent stream impacts are minimized to the maximum extent practical. The street network and associated utilities systems are designed to avoid perennial stream and intermittent stream impacts. However, there are proposed impacts to the intermittent stream on the eastern portion of the site. This proposed intermittent stream impact is for a portion of the embankment of the proposed wet pond (mislabeled as stormwater wetlands on original submittal) with a greenway trail along the dam. (Please note: No existing creeks, stream, lakes or wetlands will be used to remove pollutants form stormwater runoff.) We considered other locations for stormwater control measures; however, topographic constraints as well as existing adjacent development patterns made alternative locations impractical. The proposed wet pond is located at the most practical low point on the site and is sized to meet the Town of Clayton, Johnston County and North Carolina stormwater quantity and quality requirements. The wet pond is designed to follow existing contours as much as possible, curving to minimize intermittent stream impacts to the maximum extent practical. The proposed 120lf impact is mainly from the inside top of dam to existing condition tie-in points of the slope, outside the pond. Alternative designs were considered but required extensive retaining walls reaching heights up to 20’ near the property line adjacent to the existing Cooper Academy school site rendering those designs unsafe and not practical. It should also be noted that the majority of the drainage area currently feeding this intermittent stream is the aforementioned adjacent Cooper Academy elementary school site. The contributing portion of the school site is more than 50% impervious. Currently the runoff from this portion of the school site enters the stream via overland flow without receiving any stormwater treatment (quantity nor quality). The proposed wet pond design will allow this runoff to be captured and treated (quantity and quality) before 5 being released back into the intermittent stream, providing opportunity for debris, suspended solids, nutrients, etc. to be captured and filtered out. The wet pond will also reduce the existing peak flow for the 1yr, 2yr, 5yr and 10yr storm events. Given all the above information it is our opinion that the proposed 2. Provide detailed plans for the proposed stormwater wetland. These should include construction drawings, proposed final conditions, details on outlet structure/pipe (length, dimensions, material), etc. Additionally, will there be any outlet protection proposed for the stormwater wetland's outlet? If not, how do you propose to minimize downstream impacts to aquatic resources during large storm events? Please see attached sheet C5.04 for SCM details as well as the pond routing calculations provided. As can be seen from the routing calculations, even the 100-year storm is expected to leave the proposed wet pond via the outlet structure, which discharges into an appropriately sized riprap pad to allow the water energy to dissipate before entering the stream. Also, since the proposed pond treats water that is currently entering the stream untreated (above mentioned runoff from Cooper Academy and neighboring impervious areas) the treatment of this water should improve the aquatic resources compared to existing conditions. 3. Provide plans to show how the proposed lots will be serviced by utilities (sanitary/sewer, septic, water, gas, electric, etc.). Will any of the necessary utilities impact any potential jurisdictional waters? There are no additional impacts necessary/proposed to provide utility service for all lots in the project. Please see attached sheets C3.01 for an overall utility layout. 4. Provide grading and erosion control plans for the total project. Please see attached sheets C4.07 and 5.01 for Erosion Control and Grading plans. Please feel free to contact me with any questions or concerns. Sincerely, Ross Ross Sullivan, PWS, ISA Certified Arborist Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers - Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office #: 919-554-4884. Ext. 25 Email: roscoe.l.sullivan@usace.army.mil 6 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: BlockedBlockedhttps://cops.usace.army.mil/sites/RD/ORM2_Blog/_layouts/15/WopiFrame.aspx ?sourcedoc={AE95B1BE-995E-4A7E-9968- B619432F7CEB}&file=National_Customer_Survey_for_Dec_2018.xlsx&action=default CLASSIFICATION: UNCLASSIFIED -- Wyatt Brown, LSS, CPESC Brown's Environmental Group, Inc 919-524-5956 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED 7 �6AYGGI�/AY,p NO �f 3915 40 Ilk REVISED 11/27/2019 12:09 PM GRAPHIC SCALE ( IN FEET) 1 inch = 80 ft. z Z 0 L aj H E W ov W N Lo r a N r- N O CM zUL�� Q Z C7 U Z Co N *k U c � Q' w Q co LL J U o Co w a 1 13 u 0 w E9 2 W W 2 E9 2 W 13 Z_ J O W z o z o O U Z C O c i- U W = Q O Q z O U < J \� U LL O z O 06 CD Z Z Q Q �! W CD Q J Z � Q W p O DESIGN DCA/PCE/EK DRAWN ADS/EK CHECKED DCA HORIZONTAL SCALE SEE GRAPHIC SCALE VERTICAL SCALE NIA DATE 05/09/2019 JOB NO. SHEET L 5.01 25 88 62 4 2 0 - 8 S S 7 0 8 8 CB-73 2 1.UNDER NO CIRCUMSTANCES SHALL THE STORMWATER POND BE FINALIZED AND PLANTED PRIOR TO COMPLETION OF 8 S 2 2 T 1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH JOHNSTON COUNTY AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIONS. 8 CONSTRUCTION AND STABILIZATION OF ALL AREAS WHICH DRAIN TO IT. - 7 8 3 2.THE CONTRACTOR SHALL WARRANTY ALL PLANTED MATERIALS FOR A PERIOD OF 2 YEARS FROM DATE OF INSTALLATION. AT THE END OF THE 9 CB-66 2.IF STORMWATER POND IS TO BE USED AS A SEDIMENT BASIN DURING CONSTRUCTION, ROUGH GRADE PER PLANS. FILL 8 2 2 FIRST YEAR AND AT THE END OF THE SECOND YEAR, THE CONTRACTOR SHALL REPLACE ALL PLANTS WHICH DO NOT SURVIVE. ANY HEALTHY 8 PLACEMENT AND OUTLET STRUCTURE CONSTRUCTION SHALL BE IN COMPLIANCE WITH DETAILS AND STORMWATER POND 118 S 9 T PLANTS DAMAGED DURING PLANT REPLACEMENT SHALL ALSO BE REPLACED. S CONSTRUCTION NOTES HEREON. IF THE STORMWATER POND HAS BEEN PREVIOUSLY ROUGH GRADED AND/OR USED AS A N 2 - E 1 0 0 7 E 3,661.77 SF 9 3 - 2 A 0 SEDIMENT BASIN, REMOVE AND DISPOSE OF SEDIMENT DEPOSITS WITHIN THE BASIN AREA. JB-74 M T U 0.08 ACS 2 E MH-4S '3.SOILS FOR STORMWATER POND SHALL BE TESTED BY THE USDA AGRICULTURAL EXTENSION OFFICE FOR pH, WHICH MUST FALL BETWEEN 5.5 AND SS 5 9 S T 7 P A 2 ET 0 2 7.0. TESTS SHALL ALSO BE PERFORMED FOR NUTRIENTS SUCH AS NITROGEN, PHOSPHORUS, AND POTASSIUM, AND FOR MINERALS SUCH AS I 4599.40 SF E U 0 3.ROUGH GRADE STORMWATER POND AS NECESSARY AFTER SEDIMENT REMOVAL AND TO FINALIZE BASIN GRADES. ALL FILL L - M ' Y 0.11 ACS 6 P CHELATED IRON AND LIME. AMENDMENTS TO SOIL RECOMMENDED BY USDA SHALL BE INCORPORATED INTO SOIL TO PROMOTE VIGOROUS I B 3,864.79 SF T U T PLACEMENT SHALL BE IN COMPLIANCE WITH THE SPECIFICATION IN THE CONSTRUCTION NOTES ON THIS SHEET. I E6 133 B L L 2 0.09 ACS VEGETATION AND PLANT GROWTH. RECORDS OF TESTS AND AMENDMENTS PROVIDED BY CONTRACTOR SHALL BE PROVIDED TO THE ENGINEER. I Y L N T I 9 I C C U 1 T 119 U 4.AFTER ROUGH GRADING STORMWATER WETLAND, BEGIN FINE GRADING TO CONSTRUCT FOREBAY BERMS/WALLS , SHALLOW S C T I 0 4.LANDSCAPING PLANTINGS SHOWN HEREON SHALL BE INSTALLED DURING FALL SEASON OR EARLY WINTER IF POSSIBLE FOR MAXIMUM PLANT I L L T 7 3 PLANTING ZONES AND TEMPORARY INUNDATION ZONES. GRADING TOLERANCE FOR THE STORMWATER POND SHALL BE +/- 0.20 I B 2 132 8 T - SURVIVABILITY. S Y D CB-71U 7 FEET FROM GRADES SHOWN ON THIS PLAN. A 2 P T E 9 N ' 4 A - 3 0 3,607.50 SF 7 S 2 1 1 E 9 5.CONTRACTOR SHALL PAY CLOSE ATTENTION TO PROPER PLACEMENT OF DRAWDOWN PIPE IN RELATIONSHIP TO LITTORAL SHELF. DRAWDOWN PIPE 2 0.08 ACS 3878.40 SF 2 M 9 5.IN CONJUNCTION WITH GRADING AND FILL PLACEMENT, CONSTRUCT OUTLET STRUCTURES TO BRING IT INTO COMPLIANCE WITH 5 4 E 0.09 ACS 0 SHALL BE PLACED ACCORDING TO DETAILS TO ALLOW PLANTS AND CALCULATIONS TO PERFORM AS INTENDED. - N THESE PLANS. IF OUTLET STRUCTURES WERE CONSTRUCTED WITH ROUGH GRADING WHEN USING THE STORMWATER POND AS S 2 T 9 S 5 5 SEDIMENT BASIN, SKIP TO NEXT STEP. 6 2 2 6.THE CONTRACTOR OR OWNER SHALL EMPLOY A GEOTECHNICAL ENGINEER TO TEST ALL EMBANKMENTS AND FILL PLACEMENT FOR PROPER 131 9 6 CB-72 COMPACTION. PROPER COMPACTION SHALL BE PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS OR THESE PLANS, WHICHEVER IS MORE 2 6.WHEN FINE GRADING AND OUTLET STRUCTURE IS COMPLETE, CALL SURVEYOR AND ENGINEER FOR ASBUILT SURVEY AND 9 STRINGENT. EMBANKMENTS FOR BASINS SHALL BE PLACED IN 6 INCH LOOSE LAYERS AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN FES75 7 3,607.50 SF EVALUATION. 2 0.08 ACS 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE 9 919-243-1332 3926.07 SF 8 FIRM # C-4187 CONTENT IN ACCORDANCE WITH ASTM D698. THE CONTRACTOR SHALL TAKE PHOTOGRAPHS OF THE OUTLET STRUCTURE AT ALL PHASES OF 0.09 ACS 2 7.IF SURVEYOR AND ENGINEER DETERMINE THAT GRADING IS NOT IN COMPLIANCE WITH THESE DRAWINGS, MAKE CORRECTIONS 9 MH-2 INSTALLATION AND SHALL RETAIN WITH GEOTECHNICAL TESTING DATA. THE CONTRACTOR SHALL ALSO RETAIN ALL SHIPPING RECORDS AND 9 MH-5 CLAYTON, NC 27520 AS REQUIRED BY THE ENGINEER. AND REPEAT PREVIOUS STEP. OTHERWISE PROCEED TO NEXT STEP. 3 SPECIFICATIONS FOR THE OUTLET STRUCTURE MATERIALS AND STRUCTURES. ALL OF THE ABOVE DATA MAY BE REQUIRED AS PART OF THE 0 130 314 EAST MAIN STREET 0 info@adamsandhodge.com MUNICIPALITY AS-BUILT PROCESS AND SHALL BE MADE AVAILABLE TO THE ENGINEER UPON REQUEST. THE CONTRACTOR AND OWNER SHALL 3 8.UPON NOTIFICATION FROM THE ENGINEER AND JOHNSTON COUNTY THAT THE STORMWATER POND IS IN COMPLIANCE WITH 0 0 6 1 HAVE DOCUMENTATION OF THESE TESTS AVAILABLE UPON REQUEST. 3,607.50 SF 2 2 THESE DRAWINGS, PROVIDE LANDSCAPING IN COMPLIANCE WITH THE PLAN SHOWN ON THIS SHEET AND ANY ADDITIONAL S S 6 3 0.08 ACS 2 07 T SPECIFICATIONS FROM THE OWNER. IF TIMING IS SUCH THAT PLANTINGS WOULD OCCUR IN SUMMER MONTHS, COORDINATE 2 6 2 7.TOLERANCES FOR FINAL GRADES SHALL BE WITHIN +/- 0.20 FEET. JOHNSTON COUNTY WILL REQUIRE AN ASBUILT SURVEY OF THE CONSTRUCTED 9 N 3 WITH THE ENGINEER, OWNER, AND THE LOCAL MUNICIPALITY ABOUT DELAYING PLANTINGS UNTIL FALL OR EARLY WINTER FOR 7 0 S E S 0 3 STORMWATER POND THEREFORE STRICT ADHERENCE TO THE GRADING ON THIS PLAN AND THE TOLERANCES SPECIFIED HEREON SHALL BE MAXIMUM SURVIVABILITY OF PLANTINGS. M 3 2 0 REQUIRED PRIOR TO CERTIFICATION BY THE ENGINEER THAT THE STORMWATER POND HAS BEEN BUILT IN COMPLIANCE WITH THESE DRAWINGS. 6 129 8 E 4 S S S 2 UPON COMPLETION OF THE FINAL GRADING (PRIOR TO PLACEMENT OF ANY PLANT MATERIAL) THE CONTRACTOR SHALL CONTACT THE SURVEYOR 7 30 9.SEED ALL DISTURBED AREAS, INCLUDING THE DAM, WITH NON CLUMPING GRASS (BERMUDA, CENTIPEDE OR EQUIVALENT). TOP A 0 3,607.50 SF 5 TO SURVEY THE ASBUILT CONSTRUCTED STORMWATER WETLAND. THE CONTRACTOR SHALL NOTIFY THE ENGINEER THAT THE CONSTRUCTED 2 E 6 OF BERM WILL INCLUDE A 10' PAVED WALKING TRAIL WITH 2' SEEDED SHOULDERS ON EACH SIDE. 9 0.08 ACS 3 0 S STORMWATER POND HAS BEEN COMPLETED AND THE ENGINEER SHALL EVALUATE THE ASBUILT SURVEY DATA FOR COMPLIANCE WITH THESE S S 6 S S DRAWINGS. IF THE STORMWATER POND IS FOUND TO BE OUT OF COMPLIANCE WITH THESE DRAWINGS, THE CONTRACTOR SHALL REGRADE THE S 3 E 10.CALL JOHNSTON COUNTY STORMWATER INSPECTOR FOR APPROVAL OF STABILIZATION. 0 0 - 7 5 0 STORMWATER POND AS NECESSARY TO BRING THE STORMWATER POND INTO COMPLIANCE WITH THESE DRAWINGS. THE COST OF ANY C - S 2 S S 128 C S ADDITIONAL SURVEY OR ENGINEERING EVALUATION REQUIRED RESULTING FROM INCOMPLETE OR INCORRECT GRADING OF THE STORMWATER 11.CONTRACTOR SHALL WATER NEW PLANT MATERIAL PLANTED IN THE STORMWATER POND DAILY UNTIL COMPLETION OF ALL A POND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3,607.50 SF D OTHER SITE RELATED CONSTRUCTION. AFTER THE FULL SCOPE OF THE CONTRACTOR'S WORK IS COMPLETED, IT SHALL BE THE 0.08 ACS N OWNER'S RESPONSIBILITY TO WATER PLANTS DAILY UNTIL PLANTS HAVE BECOME WELL ESTABLISHED AND WATERING IS NO A LONGER NECESSARY. E D G 127 A N I Q A 3,607.50 SF3,607.50 SF 0 R 9 0.08 ACS0.08 ACS 7 D 7 6 - 2 6 2 C I 2 L 9 B 0 D H 126 8 N 6 U A 7 6 E 2 P G 2 A 2 T N I N MH-1 A E 3607.69 SF R M D O E 0.08 ACS S C I A L E B 20' PU J BLIC US UT ILI TY E AS EM ENT S P E C C A 125 S 3667.62 SF '!IPEHF 0.08 ACS F F 124 SLOPE PROPOSED GREENWAY TRAIL AT A RETAINING MAXIMUM SLOPE OF 5% TO PROPOSED WALL O EMERGENCY SPILLWAY ELEVATION (SEE TABLE ON J SHEET C5.04). 123 LINE OUTSIDE OF BERM WITH RIPRAP ALL THE WAY H TO EXISTING GROUND FOR ADDITIONAL O STABILIZATION. FES77 F 0 5 7 0 4 7 2 S 5 8 2% 2 8 2 E G 2 7 T 2 D 7 R 2 A 0 A R 2 D 6 - G 0 E 2 6 2 7 % 945 5 7 2 62 6 6 6 9 7 0 0 9 0 0 2 3 6 BEBNT 7 10' 6 2 82 9 2 6 2 7 2 T 7 6 7 OS-76 N 0 2 5 E 5 9 M 2 E 2 2 S A 6 7 E 8 S 0 S 2 E 7 6 C C 2 A 2 8 D EMERGENCY SPILLWAY 7 GRAPHIC SCALE 0 N 0 97 A 2 E G 2 A 40204080160 7 N 0 I 8 A R 4 7 D 2 2 2 5 C 7 I 2 7 7 L 5 B 9 U 5 P 8 2 2 8 5 2 0 0 8 ( IN FEET ) 8 2 8 2 5 40 1 inch = ft. REVISED 11/27/2019 12:20 PM R E R U VALVE STEM AND WHEEL T C MOUNTED ON SIDE OF PHASES 3 & 4 A F MANHOLE U N TOP OF RISER 'L' A M R E ACADEMY POINTE P BERM (TYP.) TOWN OF CLAYTON, JOHNSTON COUNTY, NORTH CAROLINA 'M' PVC SCREW TYPE PLUG NOT TO SCALE 'M' PVC TEE INV = 'O' PERMANENT POOL ABLE LOCK 56" ELEVATION 'M' DIA. PVC H CESS HATC AC STUBBED INTO BOX ') (2'x4 CATION PICAL LO TY LAR PENDICU SING PER ES CROS PIP ETING IPES ME 'M' PVC CAP WITH 'N'OF P ••••• •••••••••••• •••••••••• L•••••••• SS STEE••••• STAINLE LATE ORIFICE DRILLEDBASE P E INUM PIP O.D.) ALUM H BLE CATC CA 'Q' (INTER IOR) N NSTRUCTIO CO PRECAST 18" CONCRETE BOX 56" H E TRAS SECUR (2) 12'X6' 3000 PSI CONC. W/ REBAR 5x5 CONCRETE CONCRETE RACK ANTI-SEEP COLLARS (MIN. 18" BOX " SS TH 1/2"X4 BOX WI BEYOND OUTER DIA. OF STORM 3" x1/4" C HANNEL SIDE VIEW R MANHOLE STEPS - (1) PE ANCHOR PIPE) CL OSURE PLATE IN. SIDE M ALUMINUM TRASH RACK MATERIALS AND WELDING SPECIFICATIONS PLAN VIEW 6" GATE VALVE SCM DETAIL SHEET ALUMINUM MATERIALS USED IN TRASH RACK FABRICATION: M HINGE ALUMINU RICATED PREFAB 6061-T6 HINGES RAME (3) LDED TO F WE GENERAL CHARACTERISTICS: 68" VIDED PRO 6061-T6 HEAVY DUTY STRUCTURAL CORROSION RESISTANCE 'S' RCP 'T' LF @ 'U'% 'P'(B) STRESS, CRACKING (B) INV IN = 'V' MIN 2:1 ALUMINUM MILL PRODUCT SPECIFICATIONS: 6 " DI P D RA INA GE PIP E @ 1 % INV OUT = 'W' 6061 PIPE MILITARY (MIL-P-25995) ASTM B241) ANSI (H38.7) PERIMETER 3"x1/4" 8" 1 CONCRETE BALLAST TYPICAL MECHANICAL PROPERTIES: E T PLAT SUPPOR TENSILE STRENGTH (ksi) 6061-T6 ULTIMATE (45) YIELD (40) T TO TOP CHOR BOL AN ULTIMATE SHEARING STRENGTH ksi (30) CTURE OF STRU NGS R OPENI 5.5" CLEA 5.5"X TYPICAL MECHANICAL PROPERTIES OF TIG WELDED JOINT ON ETE 5x5 CONCR ALUMINUM ALLOYS: X BO WELD DUCTILITY BASE METAL 6061 FILLER 5356 ULTIMATE SIDE VIEW STRENGTH (29,000#) YIELD STRENGTH (17,000 #) NOTE: WELDING OF ALUMINUM HAS LITTLE, IF ANY, ROOT PENETRATION INTO BASE METAL. TO ACHIEVE PROPER JOINT ATTACHMENT CUTOFF TRENCH (KEY) BEVELING OF BASE METAL IS NECESSARY AND GENEROUS AMOUNT OF WELD ROD IS REQ'D. WE USE BOTH 4043 AND 5356 FILLER RODS TO 6" DEEP WASHED STONE (SHALL EXTEND INTO SOILS ACHIEVE THE BEST STRENGTH AND CORROSION RESISTANCE FOR THE APPLICATION. ALL PIPES THAT CROSS PERPENDICULAR TO ONE SUITABLE FOR EMBANKMENT ANOTHER ARE WELDED TOP AND BOTTOM WITH A 1/4" TO 3/8" WIDE FILLET. PIPES THAT MEET THE BASE PLATES ARE WELDED COMPLETELY FOUNDATION) AROUND WITH A 1/4" TO 3/8" WELD FILLET. ALL WELDS ARE DONE IN A MANNER TO ACHIEVE MAXIMUM STRENGTH AND IN AN EFFORT TO MINIMIZE ANNEALING OF THE BASE METAL IN ORDER TO AVOID CRACKING. NOT TO SCALE C5.04 NOT TO SCALE EROSION CONTROL SEQUENCE OF CONSTRUCTION EROSION LEGEND: -OUTLET PROTECTION iiiiiiiiiiiFw-LIMITS OF DISTURBANCE -SILT FENCE -CONSTRUCTION ENTRANCE 220 -PROPOSED CONTOUR -CHECK DAM 4maTD4mmTD4mm -TEMPORARY DIVERSION -DITCH LINER - NAG C350 OR EQUAL 1 I -CONCRETE WASHOUT AREA 4mmPD4mmPD4mm -PERMANENT DIVERSION *NOTE* ALL DITCHES LINED W/6"NAG S150 -SKIMMER BAFFLES -WATTLE UNLESS OTHERWISE NOTED. -ARC INLET PROTECTION � ^ -SILT FENCE OUTLET ' ' -EXISTING CONTOUR -INLET PROTECTION SOURCES OF INFORMATION: 1. EXISTING SURVEY OF SITE PROVIDED BY STOKES SURVEYING AND MAPPING PLLC, 1425-105B ROCK QUARRY ROAD, RALEIGH NC 27610, DATED 11/27/2018. 2. EXISTING LIDAR CONTOURS OUTSIDE OF SITE FROM JOHNSTON COUNTY GIS DATED 2017. 3. PARCEL INFORMATION FROM JOHNSTON COUNTY GIS DATED 2018 4. EXISTING CONDITIONS FOR ACADEMY POINTE PROVIDED BY ADAMS & HODGE ENGINEERING, PC CLAYTON, NC 27520 DATED 5/9/2019. 5. BUFFER CALL MADE BY THE STATE. SEE LETTER DATED OCTOBER 18, 2018. FOR GRAPHIC PURPOSES SILT FENCE AND LIMITS OF DISTURBANCE ARE SHOWN SEPARATED. SILT FENCE IS TO BE INSTALLED AT THE ACTUAL LIMITS OF DISTURBANCE. THIS SHEET IS FOR GRADING AND EROSION CONTROL PURPOSES ONLY. DO NOT USE THIS SHEET FOR STORMDRAIN INSTALLATION. JOHNSTON COUNTY AND TOWN OF CLAYTON RESERVES THE RIGHT TO MODIFY THE EROSION AND SEDIMENTATION CONTROL PLAN IF THE EXISTING PLAN OR ITS IMPLEMENTATION PROVE TO BE INADEQUATE. ALL DITCHES/SWALES ARE TO BE LINED USING NAG S150 OR SOD UNLESS OTHERWISE SPECIFIED. 1. OBTAIN GRADING PERMIT. 2. THIS PROJECT IS DIVIDED INTO THREE (3) STAGES. STAGE 1 EROSION CONTROL - CLEARING & GRUBBING SITE. STAGE 2 EROSION CONTROL - SITE GRADING AND CONSTRUCTION WHILE PROTECTING ONSITE WETLANDS, STAGE 3 - FINAL GRADING AND CONSTRUCTION (INCLUDING PHASE 2 CONSTRUCTION TO BE PERMITTED AT A LATER DATE) g19 BEFORE BEGINNING ANY LAND DISTURBING ACTIVITY THE CONTRACTOR SHALL CONTACT JOHNSTON COUNTY UTILITIES, (919-938-4717) TO SET UP A PRE -CONSTRUCTION MEETING. BEGIN STAGE 1 EROSION CONTROL 4. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCES 5. INSTALL ALL SILT FENCING AND WIRE & WASHED STONE OUTLETS IN SILT FENCE AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. 6. BUILD SEDIMENT BASIN # 1 AND #2 AS SHOWN TO BE USED DURING CONSTRUCTION. CUT FROM ROUGH GRADING OF DIPLOMA DRIVE AND TEMPORARY DIVERSION CONSTRUCTION SHALL BE USED TO FILL THE SIDES OF BASIN #2 AS NEEDED. 7. CLEAR AND INSTALL TEMPORARY DIVERSION DITCHES SHOWN ON STAGE 1 EROSION CONTROL PLANS DISTURBING THE SMALLEST AREA POSSIBLE. 8. EROSION CONTROL MEASURES SHOWN ON PLANS ARE MINIMUM AND MIGHT NOT BE SUFFICIENT TO CONTROL EROSION AND SEDIMENTATION. CONTRACTOR TO INSTALL ADDITIONAL MEASURES AS GRADING CONDITIONS CHANGE TO ROUTE STORMWATER TOWARDS BASIN AND INLETS. CONTACT ENGINEER AS NEEDED FOR FURTHER DESIGN AND INSTRUCTION. 9. GROUNDCOVER MUST BE APPLIED TO DISTURBED AREAS ACCORDING TO THE "GROUND STABILIZATION" TABLE ON SHEET 131.03 (PER THE NEW STORMWATER RULES). STABILIZE TE AS AREAS ARE BROUGHT UP TO GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. 10. CALL JOHNSTON COUNTY UTILITIES FOR ON SITE INSPECTION AND CERTIFICATE OF COMPLIANCE. (SEE NOTE 3.) BEGIN STAGE 2 EROSION CONTROL ON EAST SIDE OF ROSEMARY STREET. 11. INSTALL STORM PIPES ST-73 AND ST-74 PER CONSTRUCTION PLANS. CONTRACTOR SHALL VERIFY THE TEMPORARY DIVERSION FEEDS INTO THE SEDIMENT BASIN THROUGH THE NEWLY INSTALLED STORM PIPES. 12. INSTALL STORM PIPES ST-52, ST-54, ST-55, ST-58 THROUGH ST-66, AND ST-71 THROUGH ST-72 ALONG WITH ASSOCIATED BOXES AND INLET PROTECTION. 13. INSTALL STORM PIPES ST-33 THROUGH ST-35, ST-50 AND ST-51 ALONG WITH ASSOCIATED BOXES AND INLET PROTECTION. 14. CALL JOHNSTON COUNTY UTILITIES FOR ON SITE INSPECTION AND CERTIFICATE OF COMPLIANCE. (SEE NOTE 3.) BEGIN STAGE 2 EROSION CONTROL ON WEST SIDE OF ROSEMARY STREET. 15. BEGIN TO CLEAR AND GRUB SITE. DURING THE INITIAL CLEARING AND ROUGH GRADING STAGE, ENSURE THAT STORMWATER IS ROUTED TO EXISTING BASINS UNTIL THE PROPOSED DRAINAGE PATTERNS ARE ESTABLISHED. MAINTAIN DEVICES AS NEEDED. 16. INSTALL TEMPORARY DIVERSION DITCHES WEST OF ROSEMARY STREET AS SHOWN ON PLANS FOR STAGE 2 TO DRAIN TO CB-33 AND CB-35. 17. ONCE STORMWATER CONVEYANCE SYSTEM HAS BEEN INSTALLED FOLLOWING STEPS 11, 12, AND 13 AS NOTED ABOVE CARRYING STORMWATER TO BASIN #2, BASIN #1 MAYBE REMOVED AS APPROVED BY ENGINEER AND JOHNSTON COUNTY UTILITIES. MAKE SURE WETLANDS ARE PROTECTED UNTIL APPROPRIATE 4011404 PERMITS HAVE BEEN RECEIVED AND JOHNSTON COUNTY UTILITIES HAVE APPROVED STAGE 3 i - 11r- I 111 11 IF////, A ff, A A A frAllw1l., I S � IN 0 4 M - WE i- rat e • • a ham FNUFjuz>tzu i CONTOUR .�..� - r EXISTING CONTOURS am _Mw MUG � ,� � i IEAC�••ps f�' �� • �� a �•iy•tU� ,,� � REVISED ��11.��� C: ,• �aP irer.i. rr,_■■..��..■■�iiwTl'11I11i1ii11L►: ® r ILE 1 � .®Irk®.��� � � �. s® �® (I �% � _ •' • .. r rriz� ■ari CONSTRUCTION ENTRANCE (TY P. ) SEE SHEET C4.06 DISTURBED AREA = 24-59 AC STAGE 3 EROSION H � 0 C/) z GRAPHIC SCALE ( IN FEET) 1 inch = 50 ft. z z 0 D aj i- E W N o LO r a N r- V1 N O M Z U c Q Z M U Z Co N *k U) Cu � W Q Cu J U o co w 13 0 v a w E9 z 11 W W z E9 z W 14 1 13 z J O W _ z o z o O U Z C O c I- U W = Q O Q z O U J < U LL O z O W z � J C 0 O L M �zLLJ W z vJ O W O 0 W DESIGN DCA/PCE/EK DRAWN ADS/EK CHECKED DCA HORIZONTAL SCALE SEE GRAPHIC SCALE VERTICAL SCALE NIA DATE 05/09/2019 JOB NO. SHEET C4.09