October 26, 2009
Ashe County
NCDWQ Project No. 20090367, v.2
Hwy 221 Bridge Replacement
TIP No. B-1037
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Dr. Greg Thorpe, P.E.,
NCDOT PDEA-NEU
1598 Mail Service Center
Raleigh, NC 27699-1598
Dear Dr. Thorpe:
You have our approval, in accordance with the conditions listed below, for the following impacts for the
purpose of replacing bridge no. 39 over South Fork of the New River on US 221 in Ashe County, Federal
Aid Project: BRSTP-0221(20).
Stream Impacts in the New River Basin
Site No. Stream name Permanent Fill Temporary Fill Total Stream
in Perennial in Perennial Stream Impacts
Stream (linear Stream (linear Impact Requiring
ft) ft) (linear ft) Mitigation
linear ft)
1 UT1 to South 185 21 206 185
Fork of New
River
2 Ufl to South 0 32 32 0
Fork of New
River
2 South Fork of 0 120 120 0
New River
2 UT 2 to South 0 67 67 0
Fork of New
River
3 UT2 to South 0 24 24 0
Fork of New
River
NA 185 264 449 185
Total
Total Stream Impacts for Project: 449 linear feet.
North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 7714600 Customer Service NaihCarolina
Internet. h2o.encstale.mus Winston-Salem, NC 27107 FAX (336) 771-4630 1-877-623-6748 NatuCa"Y
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Dr. Greg Thorpe, PE
October 26, 2009
DWQ9 09-0367, v.2
Page 2
The project shall be constructed in accordance with your application dated March 30, 2009 and received
by the Division of Water Quality April 6, 2009. After reviewing your application, we have decided that
these impacts are covered by General Water Quality Certification Number 3701 and 3688. This
certification corresponds to the Nationwide Permits23 and 33, respectively. In addition, you should
acquire any other federal, state or local permits before you proceed with your project including (but not
limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This
approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified
below). Should your project change, you must notify the NCDWQ and submit a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter, and is
thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in
the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet,
compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this
approval to remain valid, you must adhere to the conditions listed in the attached certification.
Condition(s) of Certification:
1. The permittee shall use /Design Standards in Sensitive Watersheds/[15A NCAC 413.0 124(a)-(e)]
in areas draining to ORW waters. However, due to the size of the project, NC DOT shall not be
required to meet 15A NCAC 4B .0124(a) regarding the maximum amount of uncovered acres.
A specified appropriate mix of herbaceous vegetation shall be planted on all bare soil as soon as
possible following the completion of permanent or temporary ground disturbing activities to
provide long-term erosion control. Supplemental seeding may be needed to assure a satisfactory
vegetative establishment. Tall fescue shall not be used in establishment of temporary or
permanent groundcover within riparian areas*. For the establishment of permanent herbaceous
cover, erosion control matting shall be used in conjunction with appropriate seeding on disturbed
soils within the riparian area and on disturbed steep slopes with the following exception: Erosion
control matting is not necessary if the area is contained by perimeter erosion control devices, such
as silt fence, temporary sediment ditches, basins, etc. Matting should be secured in place with
staples, stakes, or, wherever possible, live stakes of native trees. Erosion control matting placed
in riparian buffer areas shall not contain a nylon mesh grid, which can impinge and entrap small
animals. For the establishment of temporary groundcover within riparian areas, hydro seeding,
along with wood or cellulose based hydro mulch applied from a fertilizer and limestone free tank,
is allowable at the appropriate rate in conjunction with the erosion control measures. Discharging
hydro seed mixtures and wood or cellulose mulch into surface waters is prohibited.
*Riparian areas are defined as a distance 25 feet landward from top of stream bank.
3. The outside buffer, wetland or water boundary located within the construction corridor approved
by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing
activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this
certification.
4. Compensatory mitigation for 185 linear feet of impact to streams is required. We understand that
you have chosen to perform compensatory mitigation for impacts to streams through the North
Carolina Ecosystem Enhancement Program (EEP), and that the EEP has agreed to implement the
mitigation for the project. EEP has indicated in a letter dated February 24, 2009 that they will
assume responsibility for satisfying the federal Clean Water Act compensatory mitigation
Dr. Greg Thorpe, PE
October 26, 2009
DWQ# 09-0367, v.2
Page 3
requirements for the above-referenced project, in accordance with the Tri-Party MOA signed on
July 22, 2003 and the Dual-Party MOA signed on April 12, 2004.
5. Bridge deck drains should not discharge directly into the stream. Stormwater shall be directed
across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour
holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of
Stormwater Best Management Practices.
6. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter
surface waters. This water shall be captured, treated, and disposed of properly.
7. Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge
Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401
Water Quality Certification.
8. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft
construction methods. More specifically, jetting or other methods of pile driving are prohibited
without prior written approval from NCDWQ first.
9. All pile driving or drilling activities shall be enclosed in turbidity curtains to the maximum extent
practicable.
10. The post-construction removal of any temporary bridge or pipe structures must return the project
site to its preconstruction contours and elevations. The impacted areas shall be revegetated with
appropriate native species.
11. For projects impacting waters classified by the NC Environmental Management Commission as
Trout (Tr), High Quality Waters (HQW), or Water Supply 1 or II (WSI, WSII) stormwater shall be
directed to vegetated buffer areas, grass-lined ditches or other means appropriate to the site for the
purpose of pre-treating storm water runoff prior to discharging directly into streams. Mowing of
existing vegetated buffers is strongly discouraged.
12. NCDOT shall design, construct, and operate and maintain hazardous spill catch basins (HSCBs) at
stream crossing within the ORW watershed. The HSCBs shall be located as described in the plans
dated 1-13-09 at approximate Station numbers 20+70 to 21+81.
13. During the construction of the project, no staging of equipment of any kind is permitted in waters
of the U.S., or protected riparian buffers.
14. The dimension, pattern and profile of the stream above and below the crossing shall not be
modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions.
15. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed
for stream stabilization shall be placed in stream channels in such a manner that it does not
impede aquatic life passage.
16. The Pennittee shall ensure that the final design drawings adhere to the permit and to the permit
drawings submitted for approval.
17. Heavy equipment shall be operated from the banks rather. than in the stream channel in order to
minimize sedimentation and reduce the introduction of other pollutants into the stream.
Dr. Greg Thorpe, PE
October 26, 2009
DWQ# 09-0367, v.2
Page 4
18. All mechanized equipment operated near surface waters must be regularly inspected and
maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or
other toxic materials.
19. No rock, sand or other materials shall be dredged from the stream channel except where authorized
by this certification.
20. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent
to surface waters is prohibited.
21. A copy of this Water Quality Certification shall be maintained on the construction site at all times.
In addition, the Water Quality Certification and all subsequent modifications, if any, shall be
maintained with the Division Engineer and the on-site project manager.
22. The issuance of this certification does not exempt the Permittee from complying with any and all
statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e.
local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules,
stormwater management rules, soil erosion and sedimentation control requirements, etc.
23. The Permittee shall report any violations of this certification to the Division of Water Quality
within 24 hours of discovery.
24. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters
associated with this permit without appropriate modification. Should waste or borrow sites, or
access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation
wilt be required since that is a direct impact from road construction activities.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699. This certification and its
conditions are final and binding unless you ask for a hearing. This letter completes the review of the
Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please
contact Amy Euliss at (336)771-4959.
Sincerely,
Coleen H. Sullins
Director
Cc: Monte Matthews, US Army Corps of Engineers, Raleigh Field Office
Heath Slaughter, Division 11 Environmental Officer
Beth Harmon, EEP
Marla Chambers, NC Wildlife Resources Commission
Troy Wilson, USFWS, Asheville Office
Wetlands, 401 Transportation Unit
File Copy