Loading...
HomeMy WebLinkAbout20091083 Ver 1_Approval Letter_20091030ff si r ® NC®ENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Dee Freeman Director Secretary October 30, 2009 Clay County DWQ Project No. 091083 NC Highway 69 APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. J.B. Setzer, P.E. Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer: You have our approval, in accordance with the attached conditions and those listed below, for the following impacts in an unnamed tributary of Blair Creek for the purpose of constructing a turn lane on NC Highway 69 in Clay County: Stream Impacts in the Hiwassee River Basin Site Permanent Streambank Permanent Fill in Temporary Total Stream Stream Fill in Stabilization in Perennial Stream Dewatering in Impact" Impacts Intermittent Perennial Stream (linear ft) Perennial Stream (linear ft) Requiring Stream (linear ft) (linear ft) Mitigation linear ft linear ft Site I 0 0 31 134 165 .0 Total 0 0 31 134 165 0 Total Stream Permanent Impact for Project: 31 linear feet. Temporary Impacts for Project: 134 linear feet. The project should be constructed in accordance with your application dated October 6, 2009 (received October 14, 2009), including the environmental commitments made in the application letter. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification No. 3704, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify NCDWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed.one acre, or if total impacts to streams (now or in the ' future) exceed 150 linear febt, compensatory mitigation may be required as described inJ5A,NCAC2H.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in Ihe,attached certification.and any additional conditions listed below. SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-29645001 FAX : 828-299-7043 Customer Service: 1-877-623-5748 Internet: www.n=atemuali y.om An Equal Opportunity 1 At6rma6ve Action Employer No rthCarolina Natitrallry Mr. J.B. Selzer, P.E. October 30, 2009 Page Two Condition(s) of Certification; 1. There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste 'or Borrow-sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 2. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters "'t standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d., The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 4. Unless otherwise approved in this certification, placement of culverts and other structures in waters, streams, and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 5. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 6. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. 7. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. Any applicable riparian buffer impact for access to the stream channel shall be temporary and revegetated with native riparian species. 8. For projects impacting waters classified by the NC Environmental Management Commission as Trout (Tr),'High Quality Waters (HQW) or Water Supply I or II (WS-I, WS-II), stormwater shall be directed to'vegetated buffer areas,, grass-lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff prior to discharging directly into streams. Mowing of existing vegetated buffer areas is strongly discouraged. Mr. J.B. Setzer, P.E. October 30, 2009 Page Three 9. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut:and red maple) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. . 10. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 11. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 12. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 13. The use of riprap above the Normal High Water Mark shall be minimized. Any riprap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 14. Heavy equipment shall be operated from the banks rather than in the stream channels in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 15. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 16. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 17. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in.or adjacent to surface waters is prohibited. 18. No rook, sand or other materials shall be dredged from the stream ehannel, except where.authorized by this certification. 19. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. 20. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 21. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the NCDOT Division Engineer and the on-site project manager. 22. The issuance of this certification does not exempt the Permittee form complying with any and all statutes, rules, regulations or ordinances that may be imposed by other government agencies (i.e. local, state and federal) having jurisdiction, including but not limited to applicable buffer rules, Stormwater management rules, soil erosion and sedimentation control requirements, etc. 23. The pcrmittee and its authorized agents shall conduct its activities in a manner consistent with Stale water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State or Federal law. If NCDWQ determines that such standards or laws are not being met (including failure to sustain a designated or achieved use) or that State of Federal law if being violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification. 24. The Permittee shall report any violations of this certification to the Division of Water Quality within 24-hours of discovery. 25. Upon completion of the project, the,NCDOT Division. Engineer shall complete and return the enclosed "Certificate of Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed. This form shall be returned to the Transportation Permitting Unit of the NC. Division of Water Quality, 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604. Mr. J.B. Setzer, P.E. October 30, 2009 Page Four If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500. Sincerely, lot Coleen H. Sullins, Director Gf Division of Water Quality cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental David Baker, USACE, Asheville Field Office Transportation Permitting Unit Mike Parker, Asheville Regional Office 091083 (Setzer) NC Highway 69