Loading...
HomeMy WebLinkAbout20091161 Ver 1_More Info Received_20091102 N .'W ErBURDETTE LAND CONSULTING, INC. 10212 Creedmoor Road - Raleigh, North Carolina 27615 Telephone (919) 841-9977 - Fax (919) 841-9909 S 09-1161 October 26, 2009 Ms. Amy Chapman NC Division of Water Quality 401 Oversight/Express Review Permitting Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 RE: PCN Application Submittal Bellevue Lot 164, Wake County, NC BLC Project #: 9280 Dear Ms. Chapman: Duo V'ETI-MM AND STORRtA%ATER BRANCH We discussed this project in a meeting at your office on October 20, 2009. It consists of a single-family home constructed in 2006. The builder purchased this lot in 2004. The City of Raleigh notified the builder that the stream channel and riparian buffer needed to be included on the site plan for the lot. The builder retained Sullivan Surveying to locate the stream channel on the lot and set survey pins for the house foundations to ensure the house would not encroach into the buffer. The house was built and sold in 2006. After numerous closing delays, contract disputes, and a change order to the deck, the buyer hired Cathome, Moss, & Panciera, PC to resurvey the stream channel in 2009. The new survey showed that the rear deck and screened porch are located with Zone 2 of the riparian buffer. Both the deck and the screened porch had concrete patios poured underneath. We met with you to review the extenuating circumstances in which the builder attempted to comply with the buffer rules, but after construction discovered that a small corner of the screened porch is located within Zone 2 of the riparian buffer. ,I . Ms. Amy Chapman October 26, 2009 Page 2 of 2 Attached please find five copies of this letter and PCN application package for your buffer authorization review. Please feel free to contact us if you have any questions. Sincerely, Burdette Land Consulting, Inc. Jennifer A. Burdette Environmental Specialist c: Woody Teague - Teague & Skelton, Inc. r i?A Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: El Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ® Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Belleview Lot 164 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: Bellevue Terrace 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Teague & Skelton, Inc. 3b. Deed Book and Page No. Book11239, Page 0654 3c. Responsible Party (for LLC if applicable): Charles W. Teague 3d. Street address: 8368 Six Forks Road - Suite 204 3e. City, state, zip: Raleigh, North Carolina 27615 3f. Telephone no.: (919) 676-7644 3g. Fax no.: (919) 676-7049 3h. Email address: woodyteague2@nc.rr.com Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Jennifer A. Burdette 5b. Business name (if applicable): Burdette Land Consulting, Inc. 5c. Street address: 10212 Creedmoor Road 5d. City, state, zip: Raleigh, North Carolina 27615 5e. Telephone no.: (919) 841-9977 5f. Fax no.: (919) 841-9909 5g. Email address: JBurdetteBLC@Bellsouth,net Q??r?oeA? ROV 2 2009 DENR - WATER QUALITY WETLANDS AND STORMNATER BRANCH Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 1705667902 Latitude: 35.8284367N Longitude: - 1 b. Site coordinates (in decimal degrees): 78.6399497W (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.45 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Crabtree Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C;NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site consists of a 0.45 ac lot with one residential house located on the property. The lot is located in a residential neighborhood that was developed in the 1970's in the northern side of the city of Raleigh. Figure 1 depicts the location of the property on the US Geological Survey (USGS) Raleigh West, NC 7.5-minute quadrangle topographic map. Figure 2 shows the location of the site on the applicable Wake County Soil Survey map. 3b. List the total estimated acreage of all existing wetlands on the property: 0 ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 175 If 3d. Explain the purpose of the proposed project: The purpose of the project is to provide a single-family residence. 3e. Describe the overall project in detail, including the type of equipment to be used: The project consists of a single-family home constructed in 2006. The builder purchased this lot in 2004. The City of Raleigh notified the builder that the stream channel and riparian buffer needed to be included on the site plan for the lot. The builder retained Sullivan Surveying to locate the stream channel on the lot and set survey pins for the house foundations to ensure the house would not encroach into the buffer. The house was built and sold in 2006. After numerous closing delays, contract disputes, and a change order to the decks, the buyer hired Cathorne, Moss, & Panciera, PC to resurvey the stream channel in 2009. The new survey showed that the rear deck and screened porch are located with Zone 2 of the riparian buffer. Both the deck and the screened porch had concrete patios poured underneath. Figure 3 shows the location of the house, deck, and screened porch in relation to the riparian buffer onsite. We met with Amy Chapman to review the extenuating circumstances in which the builder attempted to follow the rules, but after construction discovered that a small corner of the screened porch is located within Zone 2 of the riparian buffer. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ® No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. j@@Lr#OW?2 h10 v 2 zoos DENR. WATER?TY SANDS AND STpRIWWATU BRANC, Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there, are perennial. or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - PER or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ -non-404, width ar e Temporary (T) (INT ? other) (feet) et ) f S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no' 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): NOV 5k. Method of construction: 6. Buffer Impacts (for DWC) WETLANDS AND STORMWATElt BRAN If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. 131 ®P ? T Decks UT to Crabtree Creek ®Neos 38 B2 ? P ? T ? Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: The builder has removed the concrete patio from the riparian buffer located underneath the deck and screened Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version porch. Because both of these features are in excess of 12 feet in height and the impervious surface beneath them has been removed and as explained in our meeting with Amy Chapman on October 20, 2009, we understand that these features qualify for the deck exemption and mitigation is not necessary. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The builder hired a licensed land surveyor to locate the stream channel and located the house fondations outside of the riparian buffer. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The builder's architect prepared a rendition of the changes to the screened porch to remove it completely from the buffer, but the buyer would not agree to the structural changes. Losing a contracted buyer that the builder has already invested so much time and resources in would inflict a significant economic hardship on the builder. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, w hich mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a` Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: J[Ra---N[g0WEp NOV 3 2009 DENR - WATER QUALITY WETLANDS AND STORMWATER 8114104 Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: This is a single lot in which the subdivision infrastructure was already in ? Yes ® No place prior to implementation of the riparian buffer rules. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 22.9% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Because the impervious amount is less than 24% and the subdivision infrastructure was already in place prior to implementation of the riparian buffer rules. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ® Yes ? No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. is this an after-the-fact permit application? ® Yes ? No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Please see 3e. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The site is connected to the city of Raleigh water and sewer system oL=@GOVCE B NOV 2 2009 DENR . WATER QUALITY wETIANDS AND STORMWATER BRANCH Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes ? No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes ? No 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes ? No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Jennifer A. Burdette _ 10/26/09 Applicant/Agent's Printed Name Apr an ent' ignature (Agent's s gnature is valid only, i orization letter from the applicant is provided.) Date Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version .•-.... W E' BURDETTE LAND CONSULTING, INC. 10212 Creedmoor Road - Raleigh, North Carolina 17615 Telephone (919) 841-9977 - Fax (919) 841-9909 AGENT AUTHORIZATION FORM US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 To Whom It May Concern: North Carolina Division of Water Quality Central Office Mail Service Center 1650 Raleigh, North Carolina 27699 By signing below, the current property owner gives representatives of Burdette Land Consulting, Inc. permission to act as their authorized agent for jurisdictional and isolated waters and riparian buffer determinations, delineation, and permitting for the subject project. This authorization includes permission to enter the site to conduct site meetings with US Army Corps of Engineers and NC Division of Water Quality personnel, as necessary. Project Name: Bellevue Subdivision Lot BLC Project #: 9280 Current Property Owner or Easement Holder: Name: Teague & Skelton, Inc. (include contact person if a corporation, partnership, or government) Mailing Address: 8368 Six Forks Rd Ste 204 Raleigh, North Carolina 27615 Telephone: (919) 676-7644 Fax: (919) 676-7049 Signature Print Name (include title, if appro late) 9 9 p Date E? '•, Qrp ? 5?or?.v ?tf?' r ) ? wt > ? ? ? ? ?? ?/? ?• ? ft? w a ? /? ?_???? A,? r ' / 1 •j irk 7 r ti?,,?// F, f , ?{?3J d ???/r? ?' ? i''?i? w ? 4?• ? ? ". 1~ . r-•?'?? Ca.. ?, _ ,. ? ? ? ?'/!% M1?e>? ? per' /? ? ?? ?? , W "? 4 y?r y ?V ` 1 ilP. ?'?. ? ?=? ?'"_ ? ;/? ?r? k??i-- ??f/f?rrrn"?rg?r may? *40 111 r!l 41 A-V .?? afh. It ?I '\.? 4PR ' ?` b r . ^ t fil`?iH??p;4aD?•? i f'.; * ' y f e, er ??? ' ?!? VI! 1, t l t `?; ?. ?• ? .1, '?? ? ? v ?1 ' 1? 'SSA,, ?,N. ? I r? C._J ? r ?1 ?. Af ?a'. 5,,t6, ar?? ?'1 r.?' f??-x .^ ? ? ? st???•.i ?? i ? Cpl ?? ? !•?t ?`? 1 f a? ' ?I$?.r 00 5 w wl ? , -,' C MAO ? q Rd i ??,` 1 A Sr .l r '?f •'Tya .? ` `? ? ? ?,. r? I? A+r ?1 '? l 1 t a vt ?^ ? `, ?` ?J ? ^ ? -i•1d?sfO,?A? F .•rY fl! s ,r _r- ? ? "1 ? .+' . ,fi: Rc u 1 v r T P ? J ?f. ,/ .?•_,--<`T- -*• /???7 yr? lI aa+lmaat•'•=e"'_-_ .? "" ti\'`., a ? 3fr slv pp , © (-1 ?, • e ?,, Rothgeb tea: % Pj(k { q?, rv , +? 3 r ---r' -• !Cal r "" ?? S( 3 l !I' '^ '. f?C X11 ?` 1 . •f91y -s? ? { !? L V dska? it r rfl ?" f!. gyn.. S J r t41 ?, ,? 1•ry Ciu.?.`'h J r iJ ? ???. C•j.0UP "At r°`g ?,. t J r 1. • ti ! !I..:k.' , ti) ?, t ?lJ I? -rv?R JJjj 5? /?? i ? i !,{r t f/? u? ,• I ¦ ? s s-' ,--^ r ^? 'f'" -\r ?T! ,, i., ?'. J, .f/ ?,????''??_ . ..rt?' 1' ; i ,r` ?']: ?•'; _--.' ?.lr H:Yh1,SCrh ?'a , ? -?c.?^?--?'?r?, 71(??1,.?6 .. _.•. ??l ? I I?tE t• _?. - h j 7 I ??/I.t alas:/' `•:y ? t??..4a p I S ti\ GRAPHIC SCALE N r = 2000' USGS LOCATION MAP 2000' 0 2000' 164 BELLEVUE RALEIGH, WAKE COUNTY, NC '?•N???' DATE: 9-08-09 USGS 7.5' TOPO QUAD: . W E.= BU"ETTE LAND CONSULTING, INC. DRAWN BY: TMB RALEIGH WEST 10212 Creedmoor Road - Raleigh, North Carolina 27615 CHK'D BY: JAB Telephone (919) 841-9977- Fax (919) 841-9909 FIGURE #: 1 S PROJECT #: 9280 GRAPHIC SCALE 1" = 1320 WAKE COUNTY SOIL SURVEY MAP N 1320' 0 1320' 164 BELLEVUE RALEIGH, WAKE COUNTY, NC '?•N???' DATE: 9-08-09 SHEET(S): 39 W E?I BURDETTE LAND CONSULTING, INC. DRAWN BY: TMB CHK'DBY: JAB 10212 Creedmoor Road - Raleigh, North Carolina 27615 Telephone (919) 841-9977- Fax (919) 841-9909 PROJECT #: 9280 FIGURE #: 2 S N / / / / MINIMUM AMOUNT 20.0' e\ OF CON,CRETE TO BE REMOVED FRAM ZONE 2 / / sv ... r t WOOD ST/AIRS TO REMAIN / / MINIMUM,AMOUNT OF CONCRETE TO BE REK40VED f / FRQ ZONE 2 SCREENED PORCH ABOVE R6ICK DECK CONCRETE PATIO BELOW / SUPPORTS TO / REMAIN / / i NOTE: 1.) SEE ATTACHED SURVEY-fROM CATHORNE, MOSS, AND PANCIERAAOR LOT LAYOUT AND FEATURE LOCATIONS 2.) THIS MAP DOES N T/REPRESENT A SURVEY OF SITE FEATURES'FOR LOT 164 AND IS TO BE USED FOR INFOR)CIATIONAL PURPOSES ONLY / DECK ABOVE CONCRETE PATIO BELOW GRAPHIC SCALE 1"=10' 10' 0 10' NEUSE RIVER RIPARIAN BUFFER IMPACT MAP BELLEVUE LOT 164 RALEIGH, WAKE COUNTY, NC N DATE: 10-26-09 SCALE: F= 10' 'W E BU"ETTE LAND CONSULTING, INC. DRAWN BY: TMB CHKDBY: JAB 10212 Creedmoor Road - Raleigh, North Carolina 27615 PROJECT #: 9280 FIGURE M 3 S Telephone (919) 841-9977-Fax (919) 841-9909 SURVEY FOR AUBREY S. TOMLINSON, JR. O_ Sri 0 0 N m 0 0_ 0 I- d 0 0 a I I CI OF I U J ^ I CL J 0 U7 I LU Y CB O m 3I Cr I 1 MH EIP LOT 164, BELLEVUE TERRACE 3519 TURNBRIDGE DRIVE PIN #1705.11-66-7809 D.B. 11239, PG. 654 B.M. 2005, PG. 1736 CITY OF RALEIGH WAKE COUNTY, NORTH CAROLINA MARCH 30, 2009 50 25 0 50 100 -1 OM0019 SCALE 1 "=50' 16 I ? I I I I KENNETH M. do I? I DEBRA B. MANESS I D.B. 3192, PG. 717/ B.M. 1947, PG. 79' CS) PIN #1705.11-67-6063 / S 87'45'13" E ' / /t, WOOD /B RIDGE r/ 100' NEUSE RIVER RIPARIAN BUFFER (50' EACH SIDE TOP OF BANK) /CONTROL / `CORNER SCREENED CONCRETE PORCH PATIO BELOW a? 149.97' 1EIP BRICK I 1 2ps' 18' j3g 66' DWELLING 1 JI ?o WAL J II,/ I 1 CONCRETE E 1 .6• DRIVEWAY NIP 66. o a FEN 73 N Z ?? 908„ w 20' CITY OF RALEIGH EIP / SANITARY SEWER l EASEMENT / 20' CONSTRUCTION 10' PE Z NNENT EASEMENT DRAINAGE EASEMENT HEADWALL / INTERSECTION OF W/ 42-RCP OD / T?NBRIDI DRIVE/ N/F k BROOKS DRIVE TEAGUE do SKELTON, INC./ D.B. 11239, PG. 654 B.M. 2005, PG. 1736 PIN #1705.11-66-7809 ' I K LINE TABLE LINE LENGTH BEARING L-1 69.89 N 02'20'17" E L-2 69.62' S 28'53'52" W L-3 69.69' N 02'21'49" E L-4 382.26' N 18'45'42" E ?O / I`V / 4? Q PP q\* 2Q I I SI VICINITY MAP LEGEND: EIP - EXISTING IRON PIPE EPK - EXISTING PK NAIL NIP - NEW IRON PIPE SET R/W - RIGHT OF WAY CATV - CABLE TV BOX EB - ELECTRIC BOX TEL - TELEPHONE PEDESTAL PP - POWER POLE OHL - OVERHEAD LINE LP - LIGHT POLE WM - WATER METER WV - WATER VALVE CO - SEWER CLEAN-OUT P 168 `, N `S7• DAVID do DANA COMAN / g9• D.B. 13149, PG. 905 Ada B.M. 2006, PG. 315 ?. PIN #1705.11-66-7999 w/,` MH / CB QsY / / LINE TYPE LEGEND / / PROPERTY LINE - LINE SURVEYED - RIGHT-OF-WAY - ADJOINING LINE - LINE NOT SURVEYED - OVERHEAD LINE - BUILDING SETBACK - - - - - - - EASEMENT - BUFFER - FLOOD HAZARD SOILS CAWTHORNE, MOSS & PANCIERA, P.C. El Professional Land Surveyors / 333 S. White Street Post Office Box 1253 Wake Forest, N.C. 27588 (919)556-3148 N/ M ?v NIP / 164 25.2' 0.446 AC. 3 STORY I DECLARE THAT THIS SURVEY COMPLIES WITH THE NORTH CAROLINA STANDARDS OF PRACTICE FOR SURVEYING, (SECTION 1600) FOR CLASS A SURVEYS AND THAT THE CALCULATED RATIO OF PRECISION BEFORE ADJUSTMENTS IS 1:10,000+. FURTHERMORE, PROPERTY CORNERS SHOWN ARE PRIMARY CONTROL MONUMENTATION FOR THE RE- ESTABLISHMENT OF PROPERTY CORNERS IN THE ABSENCE OF GRID MONUMENTS AND OTHER SUBDIVISION PROPERTY CORNERS. THIS SURVEY IS NOT TO BE RECORDED WITH- OUT THE WRITTEN AUTHORIZATION OF THE SURVEYOR. PROFESSIONAL LAND SURVEYOR L-