Loading...
HomeMy WebLinkAbout20171548 Ver 1_Response to Non-Compliance Notice_20191126DIRECTION 36.06046°N ACCURACY 16 ft 244 deg(T) 079.48683°W DATUM WG584 Diamond Sack Grand Oaks 2019-10-09 Upstream... 13:56:32-04:00 DIRECTION 36.06031"N ACCURACY 16 ft 223 deg(T) 079.48714°W DATUMWGS34 . Aaa,: m' Y' Diamond Back Grand Oaks 2019-10-09 Outlet... 14:01:12-04:00 DIRECTION 49 deg(T) 36.06678°N 079.48821°W d ACCURACY 1.63 mi DATUM WG584 Diamond Sack Grand Oaks 2019-10-09 internal baffle loca_. 13:59:41-04:00 �0 N r-i -- � 9d I CD � m I r-4 IT At ri. mm mob'. mn '•.— ma: ¢ . m ��43Rr ~ N o ,3 DIRECTION 7 deg(T) 079 48716 W ACCURACY 16 ft *' - `� -' .�: �. „ ., '.�.+• @ DATUM WG584 Iii Tr a:.'3. • ' Viz.. � �`'' co Ln CL cc O w 73 c cc 19 Diamond Back Grand Oaks 2019-10-09 internal baffle iota... 14:00:15-04:00 DIRECTION 36.06032°N ACCURACY 16 ft DIRECTION 36.06060°N ACCURACY 16 ft 67 deg(T) 079.48717'W DATUM WG584 219 deg(T) 079.48706'W DATUM WG584 A' Diamond Back Grand Oaks 2019-10-09 Diamond Back Grand Oaks 2019-10-09 Outlet... 14:01:05-04:00 Green Ashe for sil... 14:06:38-04:00 Strickland, Bev From: Perry Isner <perryisner@wetlands-waters.com> Sent: Tuesday, November 26, 2019 4:01 PM To: Homewood, Sue Cc: David.E.Bailey2@usace.army.mil; Nolan Franz; Chris Huysman Subject: [External] SAW-2017-02386, Huffman Point Non-compliance Attachments: H uffma n Pt_p hotos. pdf Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon Sue and David. This email is in regard to the non-compliance for the project referenced above. Please see below for a brief conceptual outline of the proposed remedy, as well as some representative photographs. We have confirmed that this approach is satisfactory with the project engineer (cc'ed). 1. Leave upstream as it is; accumulation should occur over time as a result of activities below: 2. Install brick baffles at each drop inlet location (upstream side of each junction spanning the width of the flat spot). From inlet, the first one should be 1-3 inches above the invert. The second one should cause 1-3 inches of back water on the first baffle. 3. Install baffle on splash pad with an elevation sufficient to cause 1-3 inches of back water. 4. Establish a channel through the rip -rap pad with a modest slope that is field adjusted to the sill- see next item. 5. Install a notched log sill at the end of the rip -rap pad with a 3-8 inch drop which should cause 1 -3 inch backwater at splash pad. Nearby tree has been marked for this use- photo included- (24" Green Ash). Don't hesitate to let me know if you have any questions about the provided information. Best regards, Perry Isner Wetlands & Waters, inc. 328 East Broad St. Suite D Statesville, NC 28677 704.773.4239 1 perryisner(a)-wetlands-waters.com WETLANDS & WATERS The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for your cooperation and consideration.