Loading...
HomeMy WebLinkAbout740021_Response to Notice_20191126November 26,2019 David May Water Quality Regional Operations Supervisor Washington Regional Office Subject: In Reference to Recommendations of Intent Mr. May: Violation 1: The facility irrigated on 3A , pulls 1,2 and 3, and failed to remove the recovering crop. Second cutting of hay will be cut and baled when dry enough. Violation 2: Facility failed to provide sludge survey. A sludge survey was taken in 2018 and has been completed in 2019. Violation 3: Facility failed to provide a 2018 calibration for irrigation equipment in field 1. A calibration for field 1 was completed on November 21, 2019. Violation 4: Maintenance needed on spray fields. Fields 1 & 2 have been overseeded with oats and aerated. Field 3A has been cut where there were spots of weeds and seeded with fescue. Sincerely, Ephraigm H. Smith 7267 NC 43 South Greenville, NC 27858