Loading...
HomeMy WebLinkAboutNCG130064_CEI_20191202ROY COOPER Governor MICHAEL S. REGAN SecMatry S. DANIEL SMITH Director Sonoco Products, Company Attn: Bobby Pritchard, Plant Manager 3226 Mid Pines Road Fayetteville, NC 28306 NORTH CAROLINA Environmental Quality December 2, 2019 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit.NCG130000 Sonoco Products Company Sonoco Recycling Fayetteville, Certificate of Coverage NCG130064 Cumberland County Dear Mr. Pritchard: On November 19, 2019, Ms. Melissa Joyner and Ms. Penny Markle, Inspectors from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Sonoco Recycling Fayetteville facility located at 3226 Mid Pines Road, Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Mr. Michael Steele, PE, Senior Environmental Engineer was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG130000 under Certificate of Coverage NCG130064. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as an unnamed tributary to Big Sandy Run (Lake Lynn) and an unnamed tributary to Buckhead Creek (Buckland Creek), both Class C waterbodies in the Cape Fear River Basin. As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG130000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3384 or by e-mail at melissa.joyner@ncdenr.gov. Sincerely, `% /2��"av Melissa Joyner Environmental Specialist DEMLR Enclosure: Compliance Evaluation Inspection Report ec: Michael Steele, PE, Senior Environmental Engineer (via email) cc: FRO — DEMLR, Stormwater Files North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 mwo w 910.433,3300 Compliance Inspection Report Permit: NCG130064 Effective: 06/01/18 Expiration: 05/31/23 Owner: Sonoco Products Co SOC: Effective: Expiration: Facility: Sonoco Recycling Fayetteville 3226 Mid Pines Rd County: Cumberland Region: Fayetteville Fayetteville NC 28306 Contact Person: Drake Loflin Title: Phone: 843-383-7994 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Bobby Pritchard 910-423-8700 On -site representative Michael Steele 843-383-3383 Related Permits: Inspection Date: 11/19/2019 Entry Time: 09:27AM Exit Time: 11:22AM Primary Inspector: Melissa A Joyner fA/}5 Phone: Secondary Inspector(s): Penny Markle PA Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater Discharge CDC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG130064 Owner- Facility: Son000 Products Cc Inspection Date: 11/19/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner and Penny Markle met with Mr. Michael Steele, Senior Environmental Engineer and Mr. Bobby Pritchard, Plant Manager at the Sonoco Recycling Fayetteville facility. The Stormwater Pollution Prevention Plan (SPPP) was reviewed and fully contained the information stipulated in General Permit NCG130000. The Qualitative Monitoring records were reviewed. Analytical Monitoring is not required for this permit. The facility's grounds were inspected, including Outfalls 1 and 2 with no issues noted. The site is in compliance. Page 2 of 3 Permit: NCG130064 Owner -Facility: Sonoco Products Co Inspection Date: 11/19/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Yes No NA NE ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ E ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: The facility is not required to conduct Analytical Monitoring per the conditions in NCG130000. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page 3 of 3