Loading...
HomeMy WebLinkAbout19981202 Ver 1_COMPLETE FILE_19990129State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director ILT?I'A '&46140 2 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES January 21, 1999 Pamlico County WQC 401 Project # 981202 APPROVAL of 401 Water Quality Certification Edward Mays PO Box 976 Oriental, NC 28571 Dear Mr. Mays: You have our approval, in accordance with the attached conditions, to dredge in 6805 square feet of or waters for the purpose of creating boat slips, installing a bulkhead and construct a dock, pier and pilings, as you described in your application dated December 7, 1998. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3112. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washington Field Office Washington DWQ Regional Office Mr. John Domey Central Files John Parker, DCM Sin r y, Howard, P.E. 981202.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd, Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Edward J. Mays 2. LOCATION OF PROJECT SITE: Pamlico County, Town of Oriental, at 1117 Link Lane, on Tarpon Canal off Whitaker Creek Photo Index - 1995: 78-854 (indexed by J-22) 1989: 2 119 12 (indexed by P-10-11) State Plane Coordinates - X: 2,687,150 Y: 467,980 3. INVESTIGATION TYPE: CAMA/D&F C 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - October 7, 1998 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - October 16, 1998 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Town of Oriental Land Classification From LUP - Conservation (B) AEC(s) Involved: - PT, EW, and ES (C) Water Dependent: Yes (D) Intended Use: Private basin and dock (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - None Planned - Dock and bulkhead (G) Estimated Annual Rate of Erosion: None Source - Site inspection 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands Estuarine Waters of Tarpon Canal 680 fe (C) Other Estuarine Shoreline High Ground 1,689 fe (D) Total Area Disturbed: 2,369 fe (E) Primary Nursery Area: Yes (F) Water Classification: SA NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to excavate a high ground basin off a manmade canal, install a bulkhead along two sides and construct a 6' X 31' dock with a 3' X 15' finger pier and 2 mooring pilings. Form DCM-MP-1 AtL-31rwL]!_CA'101 . SEF 2 S 1??'? (To be completed by all applicants) ``` '` b. City, town, community or landmark ORIENTAL, N. C. 28571 1. APPLICANT C. Street address or secondary road number 1117 LINK LANE a. Landowner: - Name EDWARD J. MAYS Address* P. O. BOX 976 . City ORIENTAL State N. C. Zip 28571 Day Phone 252-249-2431 Fax 252-249-2406 b. Authorized Agent: Name DAVID SIMPSON CONSTRUCTION CO., INC. Address P.O. BOX 590 City ORIENTAL State N. C. Zip 28571 Day Phone 252-249-1381 Fax 252-249-2253 c. Project name (if any) EDWARD J. MAYS NOTE: Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County PAMLICO d. Is proposed work within city limits or planning jurisdiction? X ...Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) TARPON CHANNEL OFF WHITTAKER CREEK 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a, List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. EXCAVATE AN INLAND BOAT BASIN INTO HIGH GROUND. INCLUDES BULKHEAD, DOCK FINGER PIER, & MOORING PILINGS STEPS AND RAMP b. Is the proposed activity maintenance of an existing project, new work, or both? NEW WORK c. Will the project be for public, private or commercial use? PRIVATE d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If mores ace is needed, please attach additionaVI ages, THE PURPOSE IS TO CREATE 2 BOAT PS VOR THE PRIVATE 57 PLEASURE BOATS. THE BULKHEAD ALONG THE LOT # 4PROPERTY LINE WILL BE INSTALLED AN THE-BASIN WILL THEN BE EXCAVATED. THE SPO WILL BE HAULED TO UP LAND SITES. THE REMAINING BULKHEAD, PIERS, & MOORING PILINGS WILL BE INSTALLED FROM THE WATER WITH A BARGE. Rt!viwd 03/95 Form DCM-MP-1 SE? 2 S 1999 site. Lialude highway or secondary road (SR) numbers, landmarks, and the like. i 6. CERTIFICATION AND PERMISSION 0 A Stormwater Certification, if one is necessary. ° A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and pints by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name . DR. HENRY FOSCUE Address 2761 DEL. MAR DR. GULF BREEZE, FL. Phone 904-934-3260 32561 Name MR. DAVID PRITCHETT Address 182-201 WIND CHIME..`CT RALEIGH--N . -C Phone 252-847-8626 27615 Name Address Phone ° A list of previous state or federal permits issued for work on the project tract. Include permit numbers,. permittee, and issuing dates. NONE • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. 4I further certify that the information provided in this application is truthful to the best of my knowledge. This is the a-S' day of S&'pr , 19-W. Print Name E-4) Id A S Signature L.fl*mr or Awho ' gent Please indicate attachments pertaining to your proposed project. X DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development X DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revised 03/95 Furin-DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVS or other wetlands? Yes ' _ x No f. Does the disposal include any area in the water? Yes X No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization ' X Bulkhead . Riprap b. Length 86' c. AveragN?Astance waterward of MHW or NWL distance waterward of MHW or NWL d. Maximum u?A a. ShorelW7,erosion during preceding 12 months (Source of information) f. Type of bulkhead or riprap material FIBERGLASS STEEL, AND OR VINVr SHEET .PILING- g. Amount of fill in cubic yards to be placed below water level (1) Riprap O • (2) Bulkhead baekfill 0 h. Type of fill material SPOIL FROM THE EXCAVATION TO SITE i. Source of fill material 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be,brought to site? Yes X No If Yes, P 1c? (1) Amount of material toEbe placdti? the water (2) Dimensions of fill area (3) Purpose of fill b. Will fill material be placed in coastal wetlands (marsh), SAVS or other •., Wands? Yes X _ Nu If Yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or rill material be kept on site and erosion controlled? THE EXCAVATED DRY _ MATERIAL WILL BE TRUCKED TO AN TTPT Np SITE THE WET MATERIAL WILL LA E PART OF LOT 3 AND CONT F b. What type of construction equipment will be used . (for example, dragline, backhoe, or hydraulic dredge)?- DRA c. Will wetlands be crassed in transporting equipment to project site? Yes X No if yes, explain steps that will be taken to lessen environmental impacts. !at. ieaAjeect Na e r nat SF%i Date Revised 03195 o ? SEP 2 3 1995 r??o o "Zi^/ N cyq °?' e -}- JE?(l5Tl?1G r- AM; MGbRINa.. PfLInl4S - ? ?G.F'?y VICINITY MA / ? w_ ltL ` < ` 4 ? ? ' fir. v4 cn - ? c S ? L o ' _ Z _6 _X_3t `__Do?K 1? 4 3_ ' +/ a?PS - Li! vJ x 32 J 3 < a ¢ _-.. AL= . - f PRITG4r_ T h .-HAYS ! FO5cUe. L T ¢ - - 'L.OT- _ ?r?TtoN _6F Lor i N _SUPS ? d- Z ' -- LOT Lcr-RTIoN ; LOT 3 $r-?.r " B" F_DWArRD J. MAYS 554 VISTA" , ORIENTAL W?ic?HTS AR; A PO3 976 .1117 LINK'LAHE ORIENTAL NC 28571 -- - JUNG 16 m`t8 C??wN 1?Y D. SIMP..DV4 PALF- / OF -. zw> W CID 00 C2 h II ?, o W co 3 S z v. . ` b 0 W? W ? o Q L o? y to v ` V j O .C ri) W W o 0 m 3 .L m oW V O Iv , v Q (V '? W of Q ? o ? h W m 0 Q ?N , Wrc 3Z (5 Ww cv. 41 Qj, Wp Wp Wc? ? h N Rt o f s o 0 +V D Ci WQ WQ ?O N ??0 Q t? \ J J :zt Q W W coo' v 0 n W W p CD W v xy 1 `u Q h Q is SSW Vill. b? .» ?SS?S i ? Mk .7a I? e "N ?? ?vw ? .. f V7 0° J yr safi : , ? • r? +ytss % s_ n,,.^ ?. V tai (-? ? N {r ?. ?? ?? • :? 'st >wr .g 111 ?? to W O +? ?.` 1d ?,t 141111 sir tJs' ' . s O tL it . s 2 P State of North Carolina Department of Environment and Natural Resources Division of Water Quality Washington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director MEMORANDUM Divisions of Water Quality Date: To: John-Parker DCXIBa_leigh From: Deborah Sawyer 1, •?' NCDENR NORTH CAltoumA DePoRTMQdr of ENV1RoNMENT AND NAnitAL RESOUROES Subject: CAMA Major Permit App cationReview Comments nProject Name: z . J - mctj/S Y??? /•'e- o County The above subject project has been reviewed by this office. There is no fill proposed by the applicant. in waters or wetlands therefore there is no Section 401 required. Review of this project for a determination of whether water quality standards will be violated has been made and a determination made that there should be no violation of the .State water -quality .standards if the project is constructed as proposed. -This office has no objections to the issuance of the CAMA Major Permit. If you have -any questions or comments; please call-this office at (919)946-6481. Thank you. cc: f/- d Dorsey WaRO.File CentralFrle 943 Washington:Square:Mall, S: Washington,'North-'Carolina':22869- "Telephone-252-946-6481 `FAX".252- - 975-3716 An Equal opportunity Affirmative Action.Employer p t DIVISION OF ENVIRONMENTAL MANAGEMEbn CAMA/COE PERMIT APPLICATION REVIEW WARO ::PROJECT . T WQ SUPERVISOR: TH, E REVIEWER:. SAWYER DATE: 5?! L 7 WETLARD _ INIFOBMATION FOR "CENTRAL `-OFFICE -TRACKING :PERMIT.. P NO. COUNTY: PROJECT-1NAME•. ' -MffT # k, COE DOT 1: PROJECT 4TYPE 'TYPE:= RCD -:FROM " CDA:.... 1 DATE -FROM __CDA: REG70FFICEs WARD BZV?R.--AMID ?A.S l STRTAM :' OR- ADJACENT WAT =MODY: I z CLASS: - L(J STREAM OPEN - OR W) WL__TYPE: WL-AMQ.UESTED: WL!ACR=: . HYDRO CNBCT?: WLl_SCORE: MITIGATION: MITIGATION -_TYFE: -MITIGATION=SIZE: _RATING- C®?. RECOMMENIDATION:__::.__ISSUE ISSUE/:COND" -DENY. HOLD To: John borney Planning Branch S TORMWATER PLAN __REQ' D : ? IF YES , DATE ::APPROVED PROJECT DPTON: G IF '.YES,":TYPE: SEWAGE-DISPOSAL TYPE .OF :.DISPOSAL '.._PROPOSED: ?U (EXISTING,. ..PROPOSED, ..-SEPTIC -TANK --.ETC.) TO :_BE 'PF'RMT't"?'F'n-Y; (DEM, -_DHS, COUNTY) IF_:BY__DEM.SS: ;SITE - VATr:ARt.F .,PERMIT :.ISSUANCE -:PROBABLE: WATERNETLAND.=FnJ. -AREA_:AF.?ZIJ_:_ _ , -WATER.:. :WETLANDS cam`' TTM IS:T• ASIGNIEICAI?IT?[JSE? .:. C L?s? Q- !Y !5- de I WATER QUALITY`'-CERT. (40) CERT. _.REQ!D:VV fl 'ATTSF a'7.';JV ?ATQ'r-_T SIOF. IS wSP.DIL'?AT,? ?A?EOUATELY? "i417TTRFT?'_ I RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: 7a q44,L- To: John borney Planning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT LAMA/COE:PERMIT APPLICATION REVIEW WaRO PROJECT. WQ SUPERVISOR: THO)PE? REVIEWER .. _ SAWYER DATE: Lt Z? WETLAM : NFORMATION FOR `:CENTRAL s:OFFICE "TRACKING Y:71af PERMIT.'M: e _PEHKIT_ COUN,T PROJECT f_f _PROJECT-TYPE PERMIT :=TYPE: Q?'?n.uE COE #: DOT #: RCD FROM.-CDA: CD DATE=FROM ._CDA: REG`OFFICE: . ;WaRO.. •S ID.?S$$A.S?.SyS-/ ?ck9 STREAM-DR I ATERBODY: g /S CL CLASS: 5 `" _._ STREAM OPEN. o WL rxp terrt,?w WL'T?E: WL Qc. m-Wi: ;r A? : HYDRO JCNELT?: _WL-:SCORE: MITIGATION : MITIGATION-TYPE: MITIGATION -SIZE:.... "A9TPACHED? BECOMMENIDATION.,.`:ISSUE'.°°' r7SSUE/COND DENY HOLD STORMWATER :.PLAN _.MEQ' D : ? IF YES , . DATE APPROVED: PROJECT ,DESCRIPTION: 1?n ?az?z ccD WATER UAT•T'PY "CERT. (401) IF YES, TYPE: / Q,QQ 10 SEWAGE =DISPOSAL TYPE -::OF DISP_OSAL'_PROPOSED : - (EX.ISTING., `:'PROPOSED, ..,-SEPTIC : TANK ::ETC . ) TO -BE ?:PERMITTED_Y: - COLRM) IF. _:BY.w DEM, WIS ]AV LE-AILABAND:_PERMIT _ZSSUANCE ?:PROBABLE: WATERIVETLANDIFILL AREAF -Fi_.: WATER: n???'< WETLAND: lam, IS nE A __JSE?. cam l? I ?LQ DREDGZBG" Al?F.A`-'t'U?BE ="T1R?FT1 ?--.??• / v l =?J _ IS ?POIL'??G eT'' AZlEI71IA'? MARINA ARE: TEE 7011DWING ADEQITATELY .`-AMDRRSS :SEWAGETDIS DSAL S.: 031 S?GEN31V' BASINi:`° CLOSURE70K SIFT . <WATERS:i CCz ". WaRO; v:Central-Files::DCM.7'ield_`Offi-ces, ;_COE-Wash n7t-r,?, :Office t1 State of North Carolina Department of Environment and Natural Resources Division of Water Quality Washington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Kerr T. Stevens, Director MEMORANDUM Division of Water Quality Date: I?M l/t ' To: John-Parker DCMIRaleigh 1, •:' NCDENR NDRrN CAROUNA Depmume R or ENVIRONMENT AND NATURAL RcscuRc6 From: Deborah Sawyer Subject: CAMA Major Permit plicatio $evi Cppmm Project Name: xc T'0=4 •'a ?? 5 ?'? County The above subject project has been reviewed by this office. There is no fill proposed by the applicant in waters or wetlands therefore there is no Section 401 required. Review of this project for a determination of whether water quality standards will be violated has been made and a determination made that there should be no violation of the State water quality standards if the project is constructed as proposed. This office has no objections to theissuance .ofthe CAMAMajor Permit. If you have any questions or comments, :please call -this office at (919)946-6481. Thank you. cc: tJoIj Dorney WaRO_File Cenft-dfile 943 Washington Square Mall, Washington; North-Carolina`27889`Telephonei252-946-6481 FAX"252- 975-3716 An Equal Opportunity Affirmative Action Employer x To: John Dorney Planning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA/COE PERMIT 'APPLICATION REVIEW WaRO PROJECT_# WQ SUPERVISOR: THO E? .REVIEWER SAWYER DATE: WETLAND '. IlFORMATION FOR CENT AL `':OFFICE TRACKING PERMIT M: N O.,. e co /ly?? PROJECT _NAME: e C% PROJECT (TYPE: ;,A- PERMIT TYPE: fdAbCOE / COE #: DOT #: RCD _ MOK ._CDA: Lii) DATE =FROM._CDA: l LLL??? REG:=CE: .WaRO RIVER-AND B_A-SIN / STREAM.=OR -ADJACENT--WATER -BODY:m i%/ ^ CLASS: J STREAM _:II= . #: OPEN -_OR L S WL -?At'r: WLPE: WL_REQIIESTED: WL_ACR.= M: HYDRO OCMKGT?: WL _-SCORE: 1?QTI MON: MITIGATION -TYPE: 1ffTIGATION -SIZE: G---SHEET-ATTACHED? RECOMMENDATION: ISSUE/COND DENY HOLD STORMWATER.:: PLAN REQ'.D : IF YES, DATE APPROVED -L ,'-? u •`U-J PROJECTA)ESCRIPTION: WATER CERT. (401) CERT. REQ'D: /Aj IF--YES,. TYPE: SEWAGE DISPOSAL TYPE -OF -DISPOSSED: EPROPOSED, SEPTIC TANK ETC.TO--BE =-PERMI_ Y: (DEM, :_DH C IF-BY :.:DEM,::IS ._SITE.-AVAILABLE_AND_ PERMIT- _-.ISSUANCE PROBABLE: WATER/WE'i'iMM -FILL _._ AREA_OE:-:FILL: _ :WATER::::: Jam( WETLANDVVZ7_ ? :3S LZ F'TTMTNIG'i'TTTGwA _SIGNIFIrANT-.USE? :DREDGING- AREA -- O 1BE_EDffiGED _ /l v-y? _ZS 0.TAUSE::A`SIGNIEICA1y'i QSS" OF " IS_:SP.OIL: M.ISPDSAL.-ADEQUAI__A DRESSED? _ MARINA:: ARE = FOLLOWING-DEQIrATELY -SEWAGE ISF05AT, MARINA:; SERVICES :..: OXYGENIIN_ :BASIN; CLOSURE 70F. LZISBING =_WAMERS s CC: ' WaRO; :Central -Files; .::DCM :Field :Offices; _COE :Washington :Office