January 21, 1999
Pamlico County
WQC 401 Project # 981202
APPROVAL of 401 Water Quality Certification
Edward Mays
PO Box 976
Oriental, NC 28571
Dear Mr. Mays:
You have our approval, in accordance with the attached conditions, to dredge in 6805 square feet of or waters for the
purpose of creating boat slips, installing a bulkhead and construct a dock, pier and pilings, as you described in your
application dated December 7, 1998. After reviewing your application, we have decided that this fill is covered by
General Water Quality Certification Number 3112. In addition, you should get any other federal, state or local permits
before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater,
Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or
CAMA permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your
project, you must notify us and send us a new application. If the property is sold, the new owner must be given a copy of
this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for
this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC
2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh,
N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you
have any questions, please telephone John Dorney at 919-733-1786.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Washington Field Office
Washington DWQ Regional Office
Mr. John Domey
Central Files
John Parker, DCM
Sin r y,
Howard, P.E.
981202.1tr
Division of Water Quality • Environmental Sciences Branch
Environmental Sciences Branch, 4401 Reedy Creek Rd, Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Edward J. Mays
2. LOCATION OF PROJECT SITE: Pamlico County, Town of Oriental, at 1117 Link Lane, on Tarpon
Canal off Whitaker Creek
Photo Index - 1995: 78-854 (indexed by J-22) 1989: 2 119 12 (indexed by P-10-11)
State Plane Coordinates - X: 2,687,150 Y: 467,980
3. INVESTIGATION TYPE: CAMA/D&F C
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - October 7, 1998
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received - October 16, 1998
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Town of Oriental
Land Classification From LUP - Conservation
(B) AEC(s) Involved: - PT, EW, and ES
(C) Water Dependent: Yes
(D) Intended Use: Private basin and dock
(E) Wastewater Treatment: Existing - None
Planned - None
(F) Type of Structures: Existing - None
Planned - Dock and bulkhead
(G) Estimated Annual Rate of Erosion: None
Source - Site inspection
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non-Vegetated Wetlands
Estuarine Waters of Tarpon Canal 680 fe
(C) Other
Estuarine Shoreline High Ground 1,689 fe
(D) Total Area Disturbed: 2,369 fe
(E) Primary Nursery Area: Yes
(F) Water Classification: SA NSW Open: No
8. PROJECT SUMMARY: The applicant proposes to excavate a high ground basin off a manmade canal,
install a bulkhead along two sides and construct a 6' X 31' dock with a 3' X 15' finger pier and 2
mooring pilings.
Form DCM-MP-1
AtL-31rwL]!_CA'101 . SEF 2 S 1??'?
(To be completed by all applicants) ``` '`
b. City, town, community or landmark
ORIENTAL, N. C. 28571
1. APPLICANT
C. Street address or secondary road number
1117 LINK LANE
a. Landowner: -
Name EDWARD J. MAYS
Address* P. O. BOX 976
. City ORIENTAL
State N. C.
Zip 28571 Day Phone 252-249-2431
Fax 252-249-2406
b. Authorized Agent:
Name DAVID SIMPSON CONSTRUCTION CO., INC.
Address P.O. BOX 590
City ORIENTAL
State N. C.
Zip 28571 Day Phone 252-249-1381
Fax 252-249-2253
c. Project name (if any) EDWARD J. MAYS
NOTE: Permit will be issued in name of landowner(s), and/or
project name.
2. LOCATION OF PROPOSED
PROJECT
a. County PAMLICO
d. Is proposed work within city limits or planning
jurisdiction? X ...Yes No
e. Name of body of water nearest project (e.g. river,
creek, sound, bay) TARPON CHANNEL
OFF WHITTAKER CREEK
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a, List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities.
EXCAVATE AN INLAND BOAT BASIN INTO
HIGH GROUND. INCLUDES BULKHEAD, DOCK
FINGER PIER, & MOORING PILINGS
STEPS AND RAMP
b. Is the proposed activity maintenance of an existing
project, new work, or both? NEW WORK
c. Will the project be for public, private or commercial
use? PRIVATE
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If mores ace is needed, please attach
additionaVI ages, THE PURPOSE IS TO CREATE
2 BOAT PS VOR THE PRIVATE 57
PLEASURE BOATS. THE BULKHEAD ALONG THE
LOT # 4PROPERTY LINE WILL BE INSTALLED AN
THE-BASIN WILL THEN BE EXCAVATED. THE SPO
WILL BE HAULED TO UP LAND SITES. THE
REMAINING BULKHEAD, PIERS, & MOORING
PILINGS WILL BE INSTALLED FROM THE
WATER WITH A BARGE.
Rt!viwd 03/95
Form DCM-MP-1
SE? 2 S 1999
site. Lialude highway or secondary road (SR)
numbers, landmarks, and the like.
i
6. CERTIFICATION AND PERMISSION
0 A Stormwater Certification, if one is necessary.
° A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and pints
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management. Upon signing this form, the applicant
further certifies that such notice has been provided.
Name . DR. HENRY FOSCUE
Address 2761 DEL. MAR DR. GULF BREEZE, FL.
Phone 904-934-3260 32561
Name MR. DAVID PRITCHETT
Address 182-201 WIND CHIME..`CT RALEIGH--N . -C
Phone 252-847-8626 27615
Name
Address
Phone
° A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,.
permittee, and issuing dates.
NONE
• A check for $250 made payable to the Department of
Environment, Health, and Natural Resources
(DEHNR) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public lands, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
TO ENTER ON LAND
I understand that any permit issued in response to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's
approved Coastal Management Program and will be
conducted in a manner consistent with such program.
I certify that I am authorized to grant, and do in fact,
grant permission to representatives of state and federal
review agencies to enter on the aforementioned lands in
connection with evaluating information related to this
permit application and follow-up monitoring of the
project.
4I further certify that the information provided in this
application is truthful to the best of my knowledge.
This is the a-S' day of S&'pr , 19-W.
Print Name E-4) Id
A S
Signature
L.fl*mr or Awho ' gent
Please indicate attachments pertaining to your proposed
project.
X DCM MP-2 Excavation and Fill Information
DCM MP-3 Upland Development
X DCM MP-4 Structures Information
DCM MP-5 Bridges and Culverts
DCM MP-6 Marina Development
NOTE: Please sign and date each attachment in the
space provided at the bottom of each form.
Revised 03/95
Furin-DCM-MP-2
e. Does the disposal area include any coastal wetlands
(marsh), SAVS or other wetlands?
Yes ' _ x No
f. Does the disposal include any area in the water?
Yes X No
3. SHORELINE STABILIZATION
a. Type of shoreline stabilization
' X Bulkhead . Riprap
b. Length 86'
c. AveragN?Astance waterward of MHW or NWL
distance waterward of MHW or NWL
d. Maximum u?A
a. ShorelW7,erosion during preceding 12 months
(Source of information)
f. Type of bulkhead or riprap material FIBERGLASS
STEEL, AND OR VINVr SHEET .PILING-
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap O
• (2) Bulkhead baekfill 0
h. Type of fill material SPOIL FROM THE
EXCAVATION TO
SITE
i. Source of fill material
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
a. Will fill material be,brought to site?
Yes X No
If Yes, P 1c?
(1) Amount of material toEbe placdti? the
water
(2) Dimensions of fill area
(3) Purpose of fill
b. Will fill material be placed in coastal wetlands
(marsh), SAVS or other •., Wands?
Yes X _ Nu
If Yes,
(1) Dimensions of fill area
(2) Purpose of fill
5. GENERAL
a. How will excavated or rill material be kept on site
and erosion controlled? THE EXCAVATED DRY _
MATERIAL WILL BE TRUCKED TO AN TTPT Np SITE
THE WET MATERIAL WILL
LA E PART OF LOT 3 AND CONT
F
b. What type of construction equipment will be used .
(for example, dragline, backhoe, or hydraulic
dredge)?-
DRA
c. Will wetlands be crassed in transporting equipment
to project site? Yes X No
if yes, explain steps that will be taken to lessen
environmental impacts.
!at. ieaAjeect Na e r
nat
SF%i
Date
Revised 03195
o ?
SEP 2 3 1995
r??o
o
"Zi^/ N cyq °?' e
-}-
JE?(l5Tl?1G r- AM; MGbRINa.. PfLInl4S - ? ?G.F'?y
VICINITY MA
/
? w_ ltL
` <
`
4 ? ?
' fir.
v4
cn
- ?
c S
?
L
o ' _
Z
_6 _X_3t `__Do?K 1? 4 3_
' +/ a?PS - Li! vJ
x
32
J
3 < a ¢ _-..
AL=
.
-
f
PRITG4r_ T h .-HAYS ! FO5cUe.
L T ¢ - - 'L.OT- _ ?r?TtoN _6F Lor i
N
_SUPS ? d- Z
'
-- LOT
Lcr-RTIoN ; LOT 3 $r-?.r " B" F_DWArRD J. MAYS
554 VISTA" , ORIENTAL W?ic?HTS AR; A PO3 976
.1117 LINK'LAHE ORIENTAL NC 28571
-- - JUNG 16 m`t8
C??wN 1?Y D. SIMP..DV4 PALF- / OF -.
zw>
W
CID
00
C2
h II ?, o
W
co 3 S z
v. . ` b 0
W? W ? o Q L o?
y
to v ` V j O .C
ri)
W W o 0 m 3 .L m
oW V O Iv ,
v Q (V '? W
of Q ? o ? h
W m
0 Q ?N ,
Wrc 3Z
(5 Ww
cv.
41
Qj,
Wp Wp Wc? ? h N
Rt o f s o 0 +V D Ci
WQ WQ ?O N ??0 Q
t? \ J J
:zt Q W W coo' v
0
n
W W p
CD
W
v xy 1 `u Q h Q
is SSW
Vill.
b? .» ?SS?S i ? Mk .7a I?
e "N
?? ?vw ? .. f V7 0° J
yr safi : ,
? • r? +ytss % s_ n,,.^ ?. V tai (-? ? N {r ?.
?? ?? • :? 'st >wr .g 111 ?? to
W O +?
?.` 1d ?,t 141111
sir tJs' ' . s O tL
it . s 2
P
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Washington Regional Office
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
Kerr T. Stevens, Director
MEMORANDUM
Divisions of Water Quality
Date:
To: John-Parker
DCXIBa_leigh
From: Deborah Sawyer
1, •?'
NCDENR
NORTH CAltoumA DePoRTMQdr of
ENV1RoNMENT AND NAnitAL RESOUROES
Subject: CAMA Major Permit App cationReview Comments
nProject Name: z . J - mctj/S
Y??? /•'e- o County
The above subject project has been reviewed by this office. There is no fill proposed by the applicant.
in waters or wetlands therefore there is no Section 401 required. Review of this project for a
determination of whether water quality standards will be violated has been made and a determination
made that there should be no violation of the .State water -quality .standards if the project is
constructed as proposed. -This office has no objections to the issuance of the CAMA Major Permit.
If you have -any questions or comments; please call-this office at (919)946-6481. Thank you.
cc: f/- d Dorsey
WaRO.File
CentralFrle
943 Washington:Square:Mall, S: Washington,'North-'Carolina':22869- "Telephone-252-946-6481 `FAX".252- -
975-3716
An Equal opportunity Affirmative Action.Employer
p
t
DIVISION OF ENVIRONMENTAL MANAGEMEbn
CAMA/COE PERMIT APPLICATION REVIEW
WARO ::PROJECT . T WQ SUPERVISOR: TH, E
REVIEWER:. SAWYER DATE: 5?! L 7
WETLARD _ INIFOBMATION FOR "CENTRAL `-OFFICE -TRACKING
:PERMIT.. P NO. COUNTY:
PROJECT-1NAME•. '
-MffT # k, COE DOT 1:
PROJECT 4TYPE 'TYPE:=
RCD -:FROM " CDA:.... 1 DATE -FROM __CDA:
REG70FFICEs WARD BZV?R.--AMID
?A.S l
STRTAM :' OR- ADJACENT WAT =MODY: I z
CLASS: - L(J STREAM
OPEN - OR W) WL__TYPE:
WL-AMQ.UESTED: WL!ACR=: .
HYDRO CNBCT?: WLl_SCORE:
MITIGATION: MITIGATION -_TYFE:
-MITIGATION=SIZE: _RATING- C®?.
RECOMMENIDATION:__::.__ISSUE ISSUE/:COND" -DENY. HOLD
To: John borney
Planning Branch
S TORMWATER PLAN __REQ' D : ? IF YES , DATE ::APPROVED
PROJECT DPTON: G
IF '.YES,":TYPE:
SEWAGE-DISPOSAL
TYPE .OF :.DISPOSAL '.._PROPOSED: ?U
(EXISTING,. ..PROPOSED, ..-SEPTIC -TANK --.ETC.)
TO :_BE 'PF'RMT't"?'F'n-Y;
(DEM, -_DHS, COUNTY)
IF_:BY__DEM.SS: ;SITE - VATr:ARt.F .,PERMIT :.ISSUANCE -:PROBABLE:
WATERNETLAND.=FnJ.
-AREA_:AF.?ZIJ_:_ _ , -WATER.:. :WETLANDS cam`'
TTM
IS:T•
ASIGNIEICAI?IT?[JSE? .:.
C L?s? Q- !Y !5-
de I
WATER QUALITY`'-CERT. (40)
CERT. _.REQ!D:VV fl 'ATTSF a'7.';JV ?ATQ'r-_T SIOF.
IS wSP.DIL'?AT,? ?A?EOUATELY? "i417TTRFT?'_
I
RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS:
7a q44,L-
To: John borney
Planning Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT
LAMA/COE:PERMIT APPLICATION REVIEW
WaRO PROJECT. WQ SUPERVISOR: THO)PE?
REVIEWER .. _ SAWYER DATE: Lt Z?
WETLAM : NFORMATION FOR `:CENTRAL s:OFFICE "TRACKING
Y:71af
PERMIT.'M: e _PEHKIT_ COUN,T
PROJECT f_f
_PROJECT-TYPE PERMIT :=TYPE: Q?'?n.uE
COE #: DOT #:
RCD FROM.-CDA: CD DATE=FROM ._CDA:
REG`OFFICE: . ;WaRO.. •S ID.?S$$A.S?.SyS-/ ?ck9
STREAM-DR I ATERBODY: g /S CL
CLASS: 5 `" _._ STREAM
OPEN. o
WL rxp terrt,?w WL'T?E:
WL Qc. m-Wi: ;r A? :
HYDRO JCNELT?: _WL-:SCORE:
MITIGATION : MITIGATION-TYPE:
MITIGATION -SIZE:.... "A9TPACHED?
BECOMMENIDATION.,.`:ISSUE'.°°' r7SSUE/COND DENY HOLD
STORMWATER :.PLAN _.MEQ' D : ? IF YES , . DATE APPROVED: PROJECT ,DESCRIPTION:
1?n ?az?z ccD
WATER UAT•T'PY "CERT. (401)
IF YES, TYPE: / Q,QQ
10
SEWAGE =DISPOSAL
TYPE -::OF DISP_OSAL'_PROPOSED : -
(EX.ISTING., `:'PROPOSED, ..,-SEPTIC : TANK ::ETC . )
TO -BE ?:PERMITTED_Y: -
COLRM)
IF. _:BY.w DEM, WIS ]AV LE-AILABAND:_PERMIT _ZSSUANCE ?:PROBABLE:
WATERIVETLANDIFILL
AREAF -Fi_.: WATER: n???'< WETLAND: lam,
IS nE A __JSE?. cam l? I ?LQ
DREDGZBG"
Al?F.A`-'t'U?BE ="T1R?FT1 ?--.??• / v l =?J _
IS ?POIL'??G eT'' AZlEI71IA'?
MARINA
ARE: TEE 7011DWING ADEQITATELY .`-AMDRRSS
:SEWAGETDIS DSAL S.:
031 S?GEN31V' BASINi:`° CLOSURE70K SIFT . <WATERS:i
CCz ". WaRO; v:Central-Files::DCM.7'ield_`Offi-ces, ;_COE-Wash n7t-r,?, :Office
t1
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Washington Regional Office
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
Kerr T. Stevens, Director
MEMORANDUM
Division of Water Quality
Date: I?M l/t '
To: John-Parker
DCMIRaleigh
1, •:'
NCDENR
NDRrN CAROUNA Depmume R or
ENVIRONMENT AND NATURAL RcscuRc6
From: Deborah Sawyer
Subject: CAMA Major Permit plicatio $evi Cppmm
Project Name: xc T'0=4 •'a ?? 5
?'? County
The above subject project has been reviewed by this office. There is no fill proposed by the applicant
in waters or wetlands therefore there is no Section 401 required. Review of this project for a
determination of whether water quality standards will be violated has been made and a determination
made that there should be no violation of the State water quality standards if the project is
constructed as proposed. This office has no objections to theissuance .ofthe CAMAMajor Permit.
If you have any questions or comments, :please call -this office at (919)946-6481. Thank you.
cc: tJoIj Dorney
WaRO_File
Cenft-dfile
943 Washington Square Mall, Washington; North-Carolina`27889`Telephonei252-946-6481 FAX"252-
975-3716
An Equal Opportunity Affirmative Action Employer
x
To: John Dorney
Planning Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT
CAMA/COE PERMIT 'APPLICATION REVIEW
WaRO PROJECT_# WQ SUPERVISOR: THO E?
.REVIEWER SAWYER DATE:
WETLAND '. IlFORMATION FOR CENT AL `':OFFICE TRACKING
PERMIT M: N O.,. e co
/ly??
PROJECT _NAME: e C%
PROJECT (TYPE: ;,A- PERMIT TYPE: fdAbCOE /
COE #: DOT #:
RCD _ MOK ._CDA: Lii) DATE =FROM._CDA: l LLL???
REG:=CE: .WaRO RIVER-AND B_A-SIN /
STREAM.=OR -ADJACENT--WATER -BODY:m i%/ ^
CLASS: J STREAM _:II= . #:
OPEN -_OR L S
WL -?At'r: WLPE:
WL_REQIIESTED: WL_ACR.= M:
HYDRO OCMKGT?: WL _-SCORE:
1?QTI MON: MITIGATION -TYPE:
1ffTIGATION -SIZE: G---SHEET-ATTACHED?
RECOMMENDATION: ISSUE/COND DENY HOLD
STORMWATER.:: PLAN REQ'.D : IF YES, DATE APPROVED -L ,'-? u •`U-J
PROJECTA)ESCRIPTION:
WATER CERT. (401)
CERT. REQ'D: /Aj
IF--YES,. TYPE:
SEWAGE DISPOSAL
TYPE -OF -DISPOSSED:
EPROPOSED, SEPTIC TANK ETC.TO--BE =-PERMI_ Y:
(DEM, :_DH C
IF-BY :.:DEM,::IS ._SITE.-AVAILABLE_AND_ PERMIT- _-.ISSUANCE PROBABLE:
WATER/WE'i'iMM -FILL _._
AREA_OE:-:FILL: _ :WATER::::: Jam( WETLANDVVZ7_ ?
:3S LZ F'TTMTNIG'i'TTTGwA _SIGNIFIrANT-.USE?
:DREDGING-
AREA -- O 1BE_EDffiGED _ /l v-y?
_ZS 0.TAUSE::A`SIGNIEICA1y'i QSS" OF "
IS_:SP.OIL: M.ISPDSAL.-ADEQUAI__A DRESSED? _
MARINA::
ARE = FOLLOWING-DEQIrATELY
-SEWAGE ISF05AT, MARINA:; SERVICES :..:
OXYGENIIN_ :BASIN; CLOSURE 70F. LZISBING =_WAMERS s
CC: ' WaRO; :Central -Files; .::DCM :Field :Offices; _COE :Washington :Office