Loading...
HomeMy WebLinkAboutNCC192954_ESC Approval Submitted_20191126CITY OF BURLINGTON ENGINEERING DEPARTMENT W. Todd Lambert, P.E. City Engineer November 25, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Burlington Levcor - Harvest, LLC by Levcor, Inc. 7800 Washington Avenue, Suite 800 Houston, TX 77007- Subject: Huffman Mill Commons - Shell Building C Huffman Mill Road Alamance Tax Map: 3-18-38 Permit Number: 653 Dear R. John Hoag: The Engineering Department has reviewed the sedimentation and erosion control plans received on 10/30/2019, and find these plans to be acceptable and hereby issue this "Letter of Approval with Modifications" as listed on the attached page. This plan approval shall expire no more than three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The City's Sedimentation and Erosion Control Ordinance is a performance -oriented program requiring protection of the natural resources and adjoining properties. If following commencement of this project it is determined that the plan needs to be modified, then this office will require that the plan be modified to comply with the City's ordinance. Please consider this letter the Notice required by Section 31.5-18 of our right of periodic inspection to insure compliance with the approved plan. Please be aware that effective April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deg.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas0,)ncdenr.gov or Paul Clark at Paul. ciark@ncdenr.aov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A copy of the Fact Sheet on the New NCG01 Permit enclosed with this letter for your convenience. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. MAILING ADDRI?SS: 425 S. LF,XINGTON AVP:. BURLINGi'ON, NC 27215 TI,LI;PIIONE: (336) 222-5050 FAX: (336) 513-5467 WWW.BURLINGfONNC.GOV Erosion & Sedimentation Control Permit Letter 11 /25/2019 Page 2 of 3 Please understand that the person financially responsible for conducting this land disturbing activity is also responsible for borrow material brought onto the site and waste material from the site that is disposed elsewhere. Separate sites from which borrow material is obtained, and which is not regulated by the provisions of the Mining Act of 1971, shall be considered as part of the land - disturbing activity for this site. Separate sites to which waste material is disposed of, other than permitted landfills regulated by the NCDEQ's Division of Waste Management, shall also be considered as part of the land -disturbing activity for this site. These off site areas shall therefore be included and shown on the approved erosion control plan and have the necessary erosion control measures in place. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. This could include the Division of Water Quality under storm water or water quality regulations; the U.S. Army Corps of Engineers under Article 404 jurisdiction; county, city or town agencies under other local ordinances; or other approvals that may be required. Please be aware that this approval does not supersede any other permit or approval. Check with the local North Carolina Department of Transportation office to determine if an encroachment will be needed for any operations on DOT right-of-way. Permits will be required for driveways. Please have your contractor notify the Engineering Department, phone number (336-222-5050), to schedule a preconstruction conference so that we may discuss the Erosion Control Plan prior to initiation of construction. Please be advised that the Engineering Department will request a copy of your COC and applicable NCDOT encroachments be submitted prior to the request for a preconstruction conference. Your cooperation is appreciated and we look forward to working with you on this project. Enclosures cc: Mr. Zac Lentz Division of Land Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Mr. Jay Mebane Chief Inspector Sincerely, rs �- s Brandon Holt, PE Erosion Control Administrator Mr. Erik Messina, PE Civil & Environmental Consultants, Inc. 3701 Arco Corporate Drive, Suite 400 Charlotte, NC 28273 Ms. Amy Cameron Stormwater Manager Erosion & Sedimentation Control Permit Letter 11/25/2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL PROJECT NAME: LOCATION: FINANCIAL RESPONSIBLE PARTY DATE APPROVED: Huffman Mill Commons - Shell Building C Huffman Mill Road R. John Hoag 11 /25/2019 1. The information provided on the official FRO form does not reflect the information that the North Carolina Secretary of State has on file. Update and submit accurate information or proved documentation supporting the supplied information. This information will be required prior to holding a pre -construction meeting. NOTE: Be advised that the above "Modifications Required for Approval' is considered to be a part of the approved plan unless an equally effective alternative is submitted to and approved by this department prior to beginning this land -disturbing activity. All above "Modifications Required for Approval' shall be incorporated into the plans and approved by this department prior to beginning this land -disturbing activity. �O � o N TLrr Es � enC C > 1-1� N +�"+ " � J � � W Z V� g�� a) El ..r �y a � U � vi •N 'o = � � � � 'n Pa cl) � U � � e •L [ oA '� n� � � C O y 71 4-4 O M U 01 j L b C C '"-" aLi v ' R U ccd -- kn kn V i O zQ cd a •1'v cue Q L L C +'' O N p..i �' N �I W R A L '- ca O AU M W b z 4 4 M ice. L W u p m '• Q U R= O y U C b N N CAROl T_ �1 a� C s C _ o > cn U ��^>+ W v � ¢p00 u L i..i O ^ O 7+ d. �J Ir•• `4 C = C by N 00 0000 aCi O N R C N 0.l �� •O u ��+ �Eo.Ef do i••l E-� A FchU d a.9b is• 0G00I-xa 04:FNU