HomeMy WebLinkAbout20191628 Ver 1_Mingo_Creek_Greenway_Wetland_and_SW_Permit_Drawings_11_20_2019_20191126I O
I
IN i IS —All
gw�
—Ll R— STA. 14 + 34.42
,411 TO)" OF KNIGHTDALE
W PUBLIC WORKS DEPARTMENT
PERMIT DRAWING
SHEET 1 OF •
MINGO CREEK
GREENWAY EXTENSION
BILL SUMMERS JAMES ROBERSON
TOWN MANAGER MAYOR
LOCATION
WETLAND AND SURFACE WATER IMPACTS PERMIT
8 9
ENE
g—MKN—KN�H�
SITE 1 —J
SITE 2
THIS PROJECT IS WITHIN THE MUNICIPAL SITE 3
BOUNDARIES OF THE TOWN OF KNIGHTDALE.
CLEARING ON THIS PROJECT SHALL BE PERFORMED
TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS WITHIN THE NEUSE RIVER BASIN
AND IS SUBJECT TO RIPARIAN BUFFER
REQUIREMENTS.
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH
ALL TOWN OF KNIGHTDALE AND/ OR NCDOT
STANDARDS AND SPECIFICATIONS.
Prepared by.
JSo' VHB Engineering NC, P.C. (C-3705)
�P�/I�� 940 Main Campus Drive, Suite 500
Y VVV Raleigh, NC 27606
GRAPHIC SCALES
300 150 0 300 600
PLANS
0
SITE 5
3
SITE 4
PROJECT LENGTH
LENGTH OF ASPHALT TRAIL = 1.08 MILES
LENGTH OF CONCRETE TRAIL = 0.17 MILES
LENGTH OF BOARDWALK = 0.04 MILES
TOTAL LENGTH OF PROJECT = 1.29 MILES
'-- SITE 7
SITE 6
oar
\ro
+
81'ASB 8TAT6 PRW6Cl' BOHRBNCB N0. PNO.T
�•�• C-5604HA
8PA18 PROANQ P.AP801.NQ D89Cq�L[ON
,awn�amfia„ian.
This design has been reviewM by Me Engwee, f, the]'own ofA ghWe andto the beatofmy knowledge end belief, it
conforms w Me requirements established in Me So—d Specifications of Me Town of KnighWale.
By: Dee:
Town Engineer
These pleos.re app,oved by Me T ofK ghtdele and carve as coeswcgoe plans fo,- protect.
By: Date
Admiwatretor
r
C
C
CY
a
C
0
U
O
Z
+>
(1)
3
E
Cl
C`')
r`
(V
/
co
/
C7
C
3
to
i
O
to
+1
C
N
E
C
0
i
C
W
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
FILL IN WETLAND
DENOTES MECHANIZED
CLEARING
IPglRl R. WRI HTEN
m
BM 1 284 PG 1 88
m
CHr ANTHO
ARIE J E
47PGG 18'
/ t]
DENOTES TEMPORARY /
IMPACTS IN SURFACE WATE �
SITE 1
9 \
F
C.
F ---
60" RCP —III
r-
% n
•Ar
n
air
� b
`-� 60"
SI 1
TOWN OF KNIGHTDALE
DB 1876 PG 67
BM 1967 PG 62
16
S� -
Z1
G
0�
e
� EIP
NES
EIP
VEIP
PERMIT DRAWING
SHEET 2 OF 8
r HERIBERTO JOVEL TOP=262.50'
MARIIA DEISI PGALACIOS /
DBM 14984 PG 1088
II �
II �'
ONYY X l
I o
1088 �?
LAURENS WAY COMPANY+
LIMITED PARTNERSHIP
BB 7220 PG
M 1999 PG 6t7
CLASS I P RAP h
EST TONS
'V 75 SY GEO ILE
PROJECT REFERENCE NO.
C-5604HA
RiW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
alta
www.altaplanning.com
111 S. Main Street
Suite 100
Durham, North Carolina 27701
p:919.484.8448
ENGINEERING
NC License#P-1301
BZ 2 EIP X II �O
SITE 2
w/MH REMOVE FE
to __ —1 � ' • \ �� �� II
II REMOVE FE
�EIP II
EI � r ' SIP �e� 8g �
IP
\ �'� Q \ • C
\ c
EST 2\,TObdS /--
I N op gq� T.ST 7 S�` �E,0 JjLF
"\ ✓
C
C7
C-
Q
C
O
U
+1
a�
3
E
Q
r`
(V
/
co
/
C
3
16
i
O
16
+1
C
N
E
C
0
i
C
W
r-
% n
•A(
A n
ZA&I'AAF
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
FILL IN WETLAND
DENOTES MECHANIZED
CLEARING
ZI WRI HTEN
1210R.PG 2 30
84 PG 1 88
NES
A Ant J tJ EIP
47PGG 18
A
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER \\ OS UP
SITE 1
S /�s\\ 51 66 ---F
F \
60"
SI 1
V
TOWN OF KNIGHTDALE
DB 1876 PG 67
BM 1967 PG 62
16
Ci
AV
BZ BZ 1
PERMIT DRAWING
SHEET 3 OF 8
EIP
EIP
HERIBERTO JOVEL TOP=262.50'
MIA DEISI PALACIOS /
DBM 14984 PG 088
806
1088
CLASS I P RAP
EST TONS
'� ESY'75 SY GE O �i`ILE
II
II �,
II
LA�RENSMITED PARTNERSHIPY+
DB 7220 PG 491
BM II999 PG 254 + ' ��� O
BM 1995 PG 637 _
BZ 2
F
II
PROJECT REFERENCE NO.
C-5604HA
RiW SHEET NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
4
HYDRAULICS
ENGINEER
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
aIta
www.altaplanning.com
111 S. Main Street
Suite 100
Durham, North Carolina 27701
p:919.484.8448
ENGINEERING
NC License#P-1301
'J
FE
SITE 2
REMOVE
w/MH \ T
,rlAl)-- VIP
EI i I
IP
SS.
ALI-
REMOVE
\
8S �
�1' �%11-*%
C
\ 2 (^ \`
CL *A*
EST 2'\$1J14dS
SST 7 S�`E�L
�Ak-k � F
1 Jc 1 1 1 1 1
-k Ate z - - - - - -
C "wRIP-+-WAcPk�11���1�1�������
23
I
WETLAND AND SURACE WATER IMPACTS SUMMARY
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
18+20/18+94 -L1 R-
60" RCP
0.01
< 0.01
68
28
2
22+00/23+37 -L1 R-
Multi -use Trail Fill
< 0.007
< 0.006
3
26+80/26+99 -L1 R-
18" HDPE
0.014
< 0.01
< 0.01
4
29+56/30+37 -L1 R-
66" RCP
< 0.01
< 0.01
65
33
5
61+54/62+45 -L4-
Boardwalk
0.024
6
69+74/70+18 -L4-
30" HDPE
0.016
< 0.007
7
71+89/72+42 -L4-
30" HDPE
0.009
< 0.002
TOTALS*: 0.039
< 0.007
0.039
0.02
< 0.01
133
61
0
*Rounded totals are sum of actual impacts
NOTES:
2018 Feb