Loading...
HomeMy WebLinkAbout20191628 Ver 1_Mingo_Creek_Greenway_Wetland_and_SW_Permit_Drawings_11_20_2019_20191126I O I IN i IS —All gw� —Ll R— STA. 14 + 34.42 ,411 TO)" OF KNIGHTDALE W PUBLIC WORKS DEPARTMENT PERMIT DRAWING SHEET 1 OF • MINGO CREEK GREENWAY EXTENSION BILL SUMMERS JAMES ROBERSON TOWN MANAGER MAYOR LOCATION WETLAND AND SURFACE WATER IMPACTS PERMIT 8 9 ENE g—MKN—KN�H� SITE 1 —J SITE 2 THIS PROJECT IS WITHIN THE MUNICIPAL SITE 3 BOUNDARIES OF THE TOWN OF KNIGHTDALE. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. THIS PROJECT IS WITHIN THE NEUSE RIVER BASIN AND IS SUBJECT TO RIPARIAN BUFFER REQUIREMENTS. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF KNIGHTDALE AND/ OR NCDOT STANDARDS AND SPECIFICATIONS. Prepared by. JSo' VHB Engineering NC, P.C. (C-3705) �P�/I�� 940 Main Campus Drive, Suite 500 Y VVV Raleigh, NC 27606 GRAPHIC SCALES 300 150 0 300 600 PLANS 0 SITE 5 3 SITE 4 PROJECT LENGTH LENGTH OF ASPHALT TRAIL = 1.08 MILES LENGTH OF CONCRETE TRAIL = 0.17 MILES LENGTH OF BOARDWALK = 0.04 MILES TOTAL LENGTH OF PROJECT = 1.29 MILES '-- SITE 7 SITE 6 oar \ro + 81'ASB 8TAT6 PRW6Cl' BOHRBNCB N0. PNO.T �•�• C-5604HA 8PA18 PROANQ P.AP801.NQ D89Cq�L[ON ,awn�amfia„ian. This design has been reviewM by Me Engwee, f, the]'own ofA ghWe andto the beatofmy knowledge end belief, it conforms w Me requirements established in Me So—d Specifications of Me Town of KnighWale. By: Dee: Town Engineer These pleos.re app,oved by Me T ofK ghtdele and carve as coeswcgoe plans fo,- protect. By: Date Admiwatretor r C C CY a C 0 U O Z +> (1) 3 E Cl C`') r` (V / co / C7 C 3 to i O to +1 C N E C 0 i C W DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY FILL IN WETLAND DENOTES MECHANIZED CLEARING IPglRl R. WRI HTEN m BM 1 284 PG 1 88 m CHr ANTHO ARIE J E 47PGG 18' / t] DENOTES TEMPORARY / IMPACTS IN SURFACE WATE � SITE 1 9 \ F C. F --- 60" RCP —III r- % n •Ar n air � b `-� 60" SI 1 TOWN OF KNIGHTDALE DB 1876 PG 67 BM 1967 PG 62 16 S� - Z1 G 0� e � EIP NES EIP VEIP PERMIT DRAWING SHEET 2 OF 8 r HERIBERTO JOVEL TOP=262.50' MARIIA DEISI PGALACIOS / DBM 14984 PG 1088 II � II �' ONYY X l I o 1088 �? LAURENS WAY COMPANY+ LIMITED PARTNERSHIP BB 7220 PG M 1999 PG 6t7 CLASS I P RAP h EST TONS 'V 75 SY GEO ILE PROJECT REFERENCE NO. C-5604HA RiW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED alta www.altaplanning.com 111 S. Main Street Suite 100 Durham, North Carolina 27701 p:919.484.8448 ENGINEERING NC License#P-1301 BZ 2 EIP X II �O SITE 2 w/MH REMOVE FE to __ —1 � ' • \ �� �� II II REMOVE FE �EIP II EI � r ' SIP �e� 8g � IP \ �'� Q \ • C \ c EST 2\,TObdS /-- I N op gq� T.ST 7 S�` �E,0 JjLF "\ ✓ C C7 C- Q C O U +1 a� 3 E Q r` (V / co / C 3 16 i O 16 +1 C N E C 0 i C W r- % n •A( A n ZA&I'AAF DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY FILL IN WETLAND DENOTES MECHANIZED CLEARING ZI WRI HTEN 1210R.PG 2 30 84 PG 1 88 NES A Ant J tJ EIP 47PGG 18 A DENOTES TEMPORARY IMPACTS IN SURFACE WATER \\ OS UP SITE 1 S /�s\\ 51 66 ---F F \ 60" SI 1 V TOWN OF KNIGHTDALE DB 1876 PG 67 BM 1967 PG 62 16 Ci AV BZ BZ 1 PERMIT DRAWING SHEET 3 OF 8 EIP EIP HERIBERTO JOVEL TOP=262.50' MIA DEISI PALACIOS / DBM 14984 PG 088 806 1088 CLASS I P RAP EST TONS '� ESY'75 SY GE O �i`ILE II II �, II LA�RENSMITED PARTNERSHIPY+ DB 7220 PG 491 BM II999 PG 254 + ' ��� O BM 1995 PG 637 _ BZ 2 F II PROJECT REFERENCE NO. C-5604HA RiW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED aIta www.altaplanning.com 111 S. Main Street Suite 100 Durham, North Carolina 27701 p:919.484.8448 ENGINEERING NC License#P-1301 'J FE SITE 2 REMOVE w/MH \ T ,rlAl)-- VIP EI i I IP SS. ALI- REMOVE \ 8S � �1' �%11-*% C \ 2 (^ \` CL *A* EST 2'\$1J14dS SST 7 S�`E�L �Ak-k � F 1 Jc 1 1 1 1 1 -k Ate z - - - - - - C "wRIP-+-WAcPk�11���1�1������� 23 I WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 18+20/18+94 -L1 R- 60" RCP 0.01 < 0.01 68 28 2 22+00/23+37 -L1 R- Multi -use Trail Fill < 0.007 < 0.006 3 26+80/26+99 -L1 R- 18" HDPE 0.014 < 0.01 < 0.01 4 29+56/30+37 -L1 R- 66" RCP < 0.01 < 0.01 65 33 5 61+54/62+45 -L4- Boardwalk 0.024 6 69+74/70+18 -L4- 30" HDPE 0.016 < 0.007 7 71+89/72+42 -L4- 30" HDPE 0.009 < 0.002 TOTALS*: 0.039 < 0.007 0.039 0.02 < 0.01 133 61 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb