HomeMy WebLinkAbout20191252 Ver 1_Final2015-04-30-RGP31-signed_20191126DEPARTMENT OF THE ARMY
Wilmington District, Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
April 30, 2015
Regional General Permit No. 198200031
Name of Permittee: North Carolina Department of Transportation
Effective Date: Apri130, 2015
Expiration Date: Apri130.2020
DEPARTMENT OF THE ARMY
REGIONAL GENERAL PERMIT
A regional general permit (RGP) to perform work in or affecting navigable waters of the United
States and waters of the United States, upon recommendation of the Chief of Engineers, pursuant
to Section 10 of the Rivers and Harbors Act of March 3, 1899 (33 U.S.C. 403), and Section 404
of the Clean Water Act (33 U.S.C. 1344), is hereby modified and re -issued by authority of the
Secretary of the Army by the
District Commander
U.S. Army Engineer District, Wilmington
Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403-1343
TO AUTHORIZE THE DISCHARGE OF DREDGED OR FILL MATERIAL IN
WATERS OF THE UNITED STATES (U.S.), INCLUDING WETLANDS, ASSOCIATED
WITH MAINTENANCE, REPAIR, AND CONSTRUCTION PROJECTS CONDUCTED
BY THE VARIOUS DIVISIONS OF THE NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION (NCDOT) INCLUDING THE NCDOT DIVISION OF
HIGHWAYS, RAIL, BICYCLE/PEDESTRIAN, ECT.
Activities authorized are:
a. Construction, maintenance, and repair of bridges, to include work on the approaches, where
permanent impacts resulting in a loss of waters of the U.S. will be less than or equal to 500 linear
feet (If) of stream and/or one (1) acre of wetland/non-tidal open water for each single and complete
linear project.
b. Best -fit widening projects that have undergone interagency review and completed the
current interagency Merger Process, which merges the requirements of the National Environmental
Policy Act (NEPA) with those found within Section 404 of the Clean Water Act (CWA).
While there is no impact threshold for these widening projects, the Corps has the discretion to
require an individual permit if it determines that the proposed impacts will have more than a
minimal impact on the aquatic environment or on other environmental factors, or if the project
would normally require an Environmental Impact Statement (EIS) under current Federal Highway
Administration (FHWA) guidelines. Best -fit projects may include a small amount of new location
roadway for components such as interchanges or intersections, provided the new location portion
has been concurred upon by the merger team.
c. Minor widening projects, such as paving and/or widening secondary roads, or interchange
improvements, when permanent impacts which result in a loss of waters of the U.S. from
installation and/or extension of culverts and/or pipes will be less than or equal to 5001f of stream
and/or one (1) acre of wetland/non-tidal open water for each single and complete linear project*.
d. Stream relocation(s) associated with projects identified in a-c above. Stream relocation
lengths are to be evaluated independently and are not included within each respective maximum
limit threshold for the authorized actions stated above.
*Single and complete linear project: A linear project is a project constructed for the purpose of
getting people, goods, or services from a point of origin to a terminal point, which often involves
multiple crossings of one or more waterbodies at separate and distant locations. The term "single
and complete project" is defined as that portion of the total linear project proposed or
accomplished by one owner/developer or partnership or other association of owners/developers
that includes all crossings of a single water of the U.S. (i.e., a single waterbody) at a specific
location. For linear projects crossing a single or multiple waterbodies several times at separate
and distant locations, each crossing is considered a single and complete project for purposes of
this RGP. However, individual channels in a braided stream or river, or individual arms of a
large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of
such features cannot be considered separately.
Generally, off -site detours are preferred to avoid and minimize impacts to the human and natural
environment. However, if an off -site detour is considered impracticable, then an on -site detour
may be considered as a necessary component of the actions described above. Impacts from the
detour may be considered temporary and may not require compensatory mitigation if the
impacted area is restored to its pre -project condition after construction is complete. If the
construction of a detour (on -site or off -site) includes standard undercutting methods, removal of
all material and backfilling with suitable material is required.
1. Special Conditions.
a. The applicant must submit a pre -construction notification (PCN) with specified
attachments to the District Engineer and receive written verification from the Corps that the
proposed work complies with this RGP prior to commencing any activity authorized by this
RGP.
b. If the project will not impact a designated "Area of Environmental Concern" (AEC)
in the twenty (20) counties of North Carolina covered by the North Carolina Coastal Area
Management Act (CAMA), then a consistency submission is not required. If the project will
impact a designated AEC and meets the definition of "development", then the applicant must
2
obtain the required CAMA permit. Development activities may not commence until a copy of
the approved CAMA permit is furnished to the appropriate Wilmington District Regulatory Field
Office (Wilmington Field Office — 69 Darlington Avenue, Wilmington, NC 28403 or
Washington Field Office — 2407 West 5th Street, Washington, NC 27889).
The twenty (20) CAMA counties in North Carolina include Beaufort, Bertie, Brunswick, Camden,
Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, New Hanover, Onslow,
Pamlico, Pasquotank, Pender, Perquimans, Tyrrell, and Washington.
c. Discharges into Waters of the U.S. designated by either the North Carolina Division
of Marine Fisheries (NCDMF) or the North Carolina Wildlife Resources Commission (NCWRC)
as anadromous fish spawning areas are prohibited during the period between February 1 and June
30, without prior written approval from NCDMF, NCWRC, National Marine Fisheries Service
(NMFS), and the Corps. Discharges into waters of the U.S. designated by NCDMF as primary
nursery areas and discharges into waters of the U.S. designated by NCWRC as primary nursery
areas in inland waters shall be coordinated with NCDCM (per existing agreement with NCDMF)
and NCWRC prior to being authorized by this RGP. Coordination with NCDCM and NCWRC
may result in a required construction moratorium during periods of significant biological
productivity or critical life stages.
The applicant should contact:
NC Division of Marine Fisheries North Carolina Wildlife Resources Commission
3441 Arendell Street Habitat Conservation Program Manager
Morehead City, NC 28557 1721 Mail Service Center
Telephone 252-726-7021 Raleigh, NC 27699-1721
or 800-682-2632 Telephone (919) 733-7638
d. This permit does not authorize the use of culverts in areas designated as anadromous
fish spawning areas by the NCDMF or the NCWRC.
e. Waters of the U.S. designated as sturgeon spawning areas are excluded during the
period between February 1 and June 30, without prior written approval from NMFS.
f. If the project is located within the twenty (20) counties of North Carolina designated as
coastal counties by CAMA, then all pipe and culvert inverts will be buried at least one foot
below normal bed elevation when they are placed within the Public Trust AEC and/or the
Estuarine Waters AEC as designated by CAMA. If the project is not located within the twenty
(20) counties of North Carolina designated as coastal counties by CAMA, then culvert inverts
will be buried at least one foot below the bed of the stream for culverts greater than 48 inches in
diameter. Culverts 48 inches in diameter or less shall be buried or placed on the stream bed as
practicable and appropriate to maintain aquatic passage, and every effort shall be made to
maintain the existing channel slope. The potential for destabilization of the channel and head
cutting upstream should be considered in the placement of the culvert. A waiver from the depth
specifications in this condition may be requested in writing. The waiver will only be issued if it
can be demonstrated that the impacts of complying with this condition would result in more
adverse impacts to the aquatic environment. Culverts placed in wetlands do not have to be buried.
g. No work shall be authorized by this RGP within the twenty coastal counties, as defined
by the NCDCM, without prior consultation with NOAA Fisheries. For each activity reviewed by
the Corps where it is determined that the activity may affect Essential Fish Habitat (EFH) for
federally managed species, an EFH Assessment shall be prepared by the applicant and
forwarded to the Corps and NOAA Fisheries for review and comment prior to authorization of
work.
h. Discharges of dredged or fill material into waters of the U.S., including wetlands, must
be minimized or avoided to the maximum extent practicable.
i. No activity may result in substantial permanent disruption of the movement of those
species of aquatic life indigenous to the waterbody, including those species that normally migrate
through the area. The dimension, pattern, and profile of the stream above and below a pipe or
culvert should not be modified by widening the stream channel or by reducing the depth of the
stream in connection with the construction activity. It is acceptable to use rock vanes at culvert
outlets to ensure, enhance, or maintain aquatic passage. Pre -formed scour holes are acceptable
when designed for velocity reduction. The width, height, and gradient of a proposed opening
should be such as to pass the average historical low flow and spring flow without adversely
altering flow velocity. Spring flow should be determined from gauge data, if available. In the
absence of such data, bankfull flow can be used as a comparable level. Where adjacent floodplain
is available, flows exceeding bank -full should be accommodated by installing culverts at the
floodplain elevation, if practicable. If multiple culverts are used, the construction of floodplain
benches and/or sills to maintain base flow is required, if practicable.
j. Upon completion of any work authorized by this RGP, all temporary fills (to include
culverts, etc.) will be completely removed from waters of the U.S. and the areas will be restored
to preconstruction conditions, to include pre -project elevations and contours, restoring natural
hydrology and stream corridors, and reestablishing native vegetation/riparian corridors. This
work will be completed within 60 days of completion of project construction. If this timeframe
occurs while a required moratorium of this permit is in effect, the temporary fill shall be
removed in its entirety within 60 days of the moratorium end date. If vegetation cannot be
planted due to the time of the year, all disturbed areas will be seeded with a native mix
appropriate for the impacted area, and vegetation will be planted in the fall. A native seed mix
may contain non-invasive small grain annuals (e.g. millet and rye grain) to ensure adequate cover
while native vegetation becomes established. The PCN must include a restoration plan showing
how all temporary fills and structures will be removed and how the area will be restored to pre -
project conditions.
k. All activities authorized by this RGP shall, to the extent practicable, be conducted "in
the dry", with barriers installed between work areas and aquatic habitat to protect that habitat
from sediment, concrete, and other pollutants. Where concrete is utilized, measures will be taken
to prevent live or fresh concrete, including bags of uncured concrete, from coming into contact
with waters of the U.S. until the concrete has cured/hardened. All water in the work area that has
been in contact with concrete shall only be returned to waters of the U.S. when it no longer poses
a threat to aquatic organisms (concrete is set and cured).
1. In cases where new alignment approaches are to be constructed and the existing
approach fill in waters of the U.S. is to be abandoned and no longer maintained as a roadway, the
rd
abandoned fill shall be removed and the area will be restored to preexisting wetland/stream
conditions and elevations, to include restoring natural hydrology and stream corridors, and
reestablishing native vegetation/riparian corridors, to the extent practicable. This activity may
qualify as compensatory mitigation credit for the project and will be assessed on a case -by -case
basis in accordance with Special Conditions "q" and "r" below. A restoration plan detailing this
activity will be required with the submittal of the PCN.
in. To the maximum extent practicable, the pre -construction course, condition, capacity,
and location of open waters must be maintained for each activity, including stream
channelization and storm water management activities, except as provided below. The activity
must be constructed to withstand expected high flows. The activity must not restrict or impede
the passage of normal or high flows. The activity may alter the pre -construction course,
condition, capacity, and location of open waters if it benefits the aquatic environment (e.g.,
stream restoration or relocation activities).
n. The project must be implemented and/or conducted so that all reasonable and
practicable measures to ensure that equipment, structures, fill pads, and work associated with the
project do not adversely affect upstream and/or downstream reaches. Adverse effects include, but
are not limited to, channel instability, flooding, and/or shoreline/streambank erosion. During
construction, the permittee shall routinely monitor for these effects, cease all work if/when
detected, take initial corrective measures to correct actively eroding areas, and notify the Corps
immediately. Permanent corrective measures may require additional authorization from the
Corps.
o. All PCNs will describe sedimentation and erosion control structures and measures
proposed for placement in waters of the U.S. To the extent practicable, structures and measures
should be depicted on maps, surveys or drawings showing location and impacts to jurisdictional
wetlands and streams. In addition, appropriate soil and erosion control measures must be
established and maintained during construction. All fills, temporary and permanent, must be
adequately stabilized at the earliest practicable date to prevent erosion of fill material into
adjacent waters or wetlands.
p. Before discharging dredged or fill material into waters of the U.S. in the twenty-five
(25) mountain counties of North Carolina, the applicant will submit a PCN to the NCWRC and
the Corps concurrently. The PCN shall summarize alteratives to conducting work in mountain
trout waters considered during the planning process, detail why alternatives were or were not
selected, and contain a compensatory mitigation plan for all unavoidable adverse impacts to
mountain trout waters. For proposals where a bridge is replaced with a culvert, the PCN must
also include details of any on -site evaluations that were conducted to determine that installation
of a culvert will not adversely affect passage of fish or other aquatic biota at the project site. This
information must include factors such as the proposed slope of the culvert and determinations of
how the slope will be expected to allow or impede passage, the necessity of baffles and/or sills to
ensure passage, design considerations to ensure that expected baseflow will be maintained for
passage and that post -construction velocities will not prevent passage, site conditions that will or
will not allow proper burial of the culvert, existing structures (e.g., perched culverts, waterfalls,
etc.) and/or stream patterns up and downstream of the culvert site that could affect passage and
bank stability, and any other considerations regarding passage. The level of detail for this
information should be based on site conditions (i.e., culverts on a slope over 3% will most likely
5
require more information than culverts on a slope that is less than 1 %, etc.). Also, in order to
evaluate potential impacts, describe bedforms that will be impacted by the proposed culvert —
e.g., pools, glides, riffles, etc. The NCWRC will respond both to the proponent and directly to the
Corps.
The twenty-five (25) designated trout counties of North Carolina include Alleghany, Caldwell,
Watauga, Ashe, Mitchell, Wilkes, Avery, Burke, Stokes, Surry, Buncombe, Henderson, Polk,
Cherokee, Jackson, Rutherford, Clay, Macon, Swain, Graham, Madison, Transylvania,
Haywood, McDowell, and Yancey.
The applicant may contact NCWRC at:
North Carolina Wildlife Resources
Commission
Ms. Marla Chambers
Western NCDOT Permit Coordinator
206 Charter Street
Albemarle, NC 28001
Office: 704-982-9181
q. Compensatory mitigation will be required for permanent impacts resulting in a loss of
waters of the U.S., including wetlands, from culverts/pipes and associated fill. Mitigation will
also be required for stream relocation projects. The applicant will attach a proposed mitigation
plan to the PCN. Mitigation proposals will be in accordance with currently approved
Wilmington District and/or Corps -wide mitigation regulations and guidance. The Corps Project
Manager will make the final determination concerning the appropriate amount and type of
mitigation.
r. Stream relocation(s) associated with projects may be authorized under this RGP. As
stated above, mitigation will be required for all relocation projects. If the stream relocation is
conducted in accordance with the requirements stated below in 1-5, the relocated segment of
stream may* be considered toward reducing the amount of compensatory mitigation required. A
relocation plan must be submitted with the PCN that addresses all factors required within the
current Wilmington District, Corps of Engineers Stream Mitigation Guidelines, which can
include, but may not be limited to:
(1) The relocated stream has pattern, profile, and dimension based on natural
channel design. If natural channel design construction is not possible due to site constraints, the
relocated stream must have pattern, profile, and dimension similar to, or better than, the existing
stream. Note that site constraints do not include those situations where NCDOT chooses not to
acquire additional adjacent property that is available for purchase.
(2) The new stream meets the current buffer requirements as stated in current
District stream mitigation guidance. If the required buffer widths cannot be obtained, a project -
by -project decision will be completed to determine if additional compensatory mitigation is
required.
(3) The new location allows the relocated stream to remain stable (e.g., in a
rol
valley vs. on a slope, no bends that will impact stability, etc.).
(4) There is no loss of channel for any reason (e.g., old channel is 200' and new
channel is 150' = 50' channel loss; part of the new channel is put in a culvert; the new channel
(sides and bottom) is hardened with concrete, rip rap, etc.).
(5) The Corps will determine if monitoring and reporting will be required for a
specific project and the parameters of any required monitoring and reporting. If monitoring is
required, a monitoring plan must be included with the PCN and meet current requirements.
All relocation plans must clearly depict both the existing channel and the proposed (relocated)
channel.
* Conducting stream relocation(s) in accordance with 1-5 above may not fully compensate for
the impact and may require additional compensatory mitigation. The Corps Project Manager
will determine if the proposed amount of mitigation is adequate on a project -by -project basis.
If stream relocation cannot be conducted in accordance with 1-5 above, mitigation at a 2:1 ratio
will typically be required unless: (1) the applicant provides a Stream Quality Assessment
Worksheet or NCSAM documentation (when available) that supports a different mitigation
ratio; (2) the Corps Project Manager determines that the relocated stream, while not in full
compliance with 1-5 above, warrants partial mitigation, or; (3) the Corps determines that the
existing stream is an excellent quality stream, in which case a 3:1 mitigation ratio may be
required. The Corps Project Manager will make the final determination concerning the
appropriate amount and type of mitigation.
If the Corps determines that the proposed stream relocation is of such a magnitude that it cannot
be authorized by this RGP, an Individual Permit will be required.
s. The applicant shall sign and return the compliance certificate that is attached to the
RGP verification letter.
t. In the event that any Federal agency maintains an objection or any required State
authorization is outstanding, no notice to proceed will be given until objections are resolved and
State authorizations are issued.
u. The Corps may place additional special conditions, limitations, or restrictions on any
verification of the use of RGP 31 on a project -by -project basis.
2. General Conditions.
a. Except as authorized by this RGP or any Corps approved modification to this RGP, no
excavation, fill or mechanized land -clearing activities shall take place within waters or wetlands,
at any time in the construction or maintenance of this project. This permit does not authorize
temporary placement or double handling of excavated or fill material within waters or wetlands
outside the permitted area. This prohibition applies to all borrow and fill activities connected
with this project.
7
b. Authorization under this RGP does not obviate the need to obtain other federal, state,
or local authorizations.
c. All work authorized by this RGP must comply with the terms and conditions of the
applicable CWA Section 401 Water Quality Certification for this RGP issued by the NCDWR.
d. The permittee shall employ all sedimentation and erosion control measures necessary
to prevent an increase in sedimentation or turbidity within waters and wetlands outside the
permit area. This shall include, but is not limited to, the immediate installation of silt fencing or
similar appropriate devices around all areas subject to soil disturbance or the movement of
earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must
remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statutes Chapter 113A Article 4).
e. The activities authorized by this RGP must not interfere with the public's right to free
navigation on all navigable waters of the U.S. No attempt will be made by the permittee to
prevent the full and free use by the public of all navigable waters at or adjacent to the authorized
work for a reason other than safety.
f The permittee understands and agrees that, if future operations by the U.S. require the
removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be
required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural
work or obstructions caused thereby, without expense to the U.S. No claim shall be made against
the U.S. on account of any such removal or alteration.
g. The permittee, upon receipt of a notice of revocation of this permit or upon its
expiration before completion of the work will, without expense to the U.S. and in such time and
manner as the Secretary of the Army or his authorized representative may direct, restore the
affected water of the U.S. to its former conditions.
h. The permittee will allow the Wilmington District Engineer or his representative to
inspect the authorized activity at any time deemed necessary to assure that the activity is being
performed or maintained in strict accordance with the Special and General Conditions of this
permit.
i. This RGP does not grant any property rights or exclusive privileges.
j. This permit does not authorize any injury to the property or rights of others.
k. This RGP does not authorize the interference with any existing or proposed federal
project.
1. In issuing this permit, the Federal Government does not assume any liability for the
following:
(1) Damages to the permitted project or uses thereof as a result of other permitted
or unpermitted activities or from natural causes.
(2) Damages to the permitted project or uses thereof as a result of current or
future activities undertaken by or on behalf of the U.S. in the public interest.
(3) Damages to persons, property, or to other permitted or unpermitted activities
or structures caused by the activity authorized by this permit.
(4) Design or construction deficiencies associated with the permitted work.
(5) Damage claims associated with any future modification, suspension, or
revocation of this permit.
in. Authorization provided by this RGP may be modified, suspended or revoked in whole
or in part if the Wilmington District Engineer, acting for the Secretary of the Army, determines
that such action is in the best public interest. The term of this RGP shall be five (5) years unless
subject to modification, suspension or revocation. Any modification, suspension or revocation of
this authorization will not be the basis for any claim for damages against the U.S. Government.
n. This RGP does not authorize any activity, which the District Engineer determines,
after any necessary investigations, will adversely affect:
(1) Rivers named in Section 3 of the Wild and Scenic Rivers Act (15 U.S.C.
1273), those proposed for inclusion as provided by Sections 4 and 5 of the Act, and wild, scenic
and recreational rivers established by state and local entities.
(2) Sites included in or determined eligible for listing in the National Registry of
Natural Landmarks.
(3) NOAA designated marine sanctuaries, National Estuarine Research Reserves,
and coral reefs.
(4) Submerged Aquatic Vegetation (SAV) as defined by the N.C. Division of
Marine Fisheries at 15A NCAC 03I.0101(4)(i)).
o. Endangered Species.
(1) No activity is authorized under this RGP which is likely to directly or indirectly
jeopardize the continued existence of a threatened or endangered species or a species proposed for
such designation, as identified under the Federal Endangered Species Act (ESA), or which will
directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is
authorized under this RGP which "may affect" a listed species or critical habitat, unless Section 7
consultation addressing the effects of the proposed activity has been completed.
(2) Federal agencies should follow their own procedures for complying with the
requirements of the ESA. Federal permittees (and when FHWA is the lead federal agency) must
provide the district engineer with the appropriate documentation to demonstrate compliance with
we
those requirements. The district engineer will review the documentation and determine whether
it is sufficient to address ESA compliance for the RGP activity, or whether additional ESA
consultation is necessary.
(3) Non-federal permittees must submit a PCN to the district engineer if any
listed species or designated critical habitat might be affected or is in the vicinity of the project, or
if the project is located in designated critical habitat, and shall not begin work on the activity
until notified by the district engineer that the requirements of the ESA have been satisfied and
that the activity is authorized. For activities that might affect federally -listed endangered or
threatened species or designated critical habitat, the PCN must include the name(s) of the
endangered or threatened species that might be affected by the proposed work or that utilize the
designated critical habitat that might be affected by the proposed work. The district engineer will
determine whether the proposed activity "may affect" or will have "no effect" to listed species
and designated critical habitat and will notify the non-federal applicant of the Corps'
determination within 45 days of receipt of a complete PCN notification. In cases where the non-
federal applicant has identified listed species or critical habitat that might be affected or is in the
vicinity of the project, and has so notified the Corps, the applicant shall not begin work until the
Corps has provided notification that the proposed activities will have "no effect" on listed
species or critical habitat, or until Section 7 consultation has been completed. If the non-federal
applicant has not heard back from the Corps within 45 days, the applicant must still wait for
notification from the Corps.
(4) As a result of formal or informal consultation with the U.S. Fish and
Wildlife Service (USFWS) or NMFS, the district engineer may add species -specific
endangered species conditions to the RGP.
(5) Authorization of an activity by a RGP does not authorize the "take" of a
threatened or endangered species as defined under the ESA. In the absence of separate
authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take"
provisions, etc.) from the USFWS or the NMFS, the ESA prohibits any person subject to the
jurisdiction of the U.S. to take a listed species, where "take" means to harass, harm, pursue, hunt,
shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word
"harm" in the definition of "take" means an act which actually bills or injures wildlife. Such an
act may include significant habitat modification or degradation where it actually kills or injures
wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or
sheltering.
(6) Information on the location of threatened and endangered species and their
critical habitat can be obtained directly from the offices of the USFWS and NMFS or their world
wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and
http://www.noaa.gov/fisheries.html respectively.
p. The permittee is responsible for obtaining any "take" permits required under the
USFWS's regulations governing compliance with the Migratory Bird Treaty Act or the Bald and
Golden Eagle Protection Act. The permittee should contact the appropriate local office of the
USFWS to determine if such "take" permits are required for a particular activity.
q. For proposed activities the sixteen counties listed below, applicants must provide a
10
copy of the PCN to the USFWS, 160 Zillicoa Street, Asheville, North Carolina 28801. This
PCN must be sent concurrently to the USFWS and the Corps Project Manager for that specific
county.
Counties with tributaries that drain to designated critical habitat that require notification to the
Asheville USFWS: Avery, Cherokee, Forsyth, Graham, Haywood, Henderson, Jackson, Macon
Mecklenburg, Mitchell, Stokes, Surry, Swain, Transylvania, Union and Yancey.
Applicants may contact the appropriate USFWS office listed below or the US Army Corps of
Engineers:
US Fish and Wildlife Service
Asheville Field Office
160 Zillicoa Street
Asheville, NC 28801
Telephone: (828) 258-3939
Asheville USFWS Office counties: All counties west of and including Anson, Stanly, Davidson,
Forsyth and Stokes Counties.
US Fish and Wildlife Service
Raleigh Field Office
Post Office Box 33726
Raleigh, NC 27636-3726
Telephone: (919) 856-4520
Raleigh USFWS Office counties: all counties east of and including Richmond, Montgomery,
Randolph, Guilford, and Rockingham Counties.
r. Permittees are advised that development activities in or near a floodway may be
subject to the National Flood Insurance Program that prohibits any development, including fill,
within a floodway that results in any increase in base flood elevations. This RGP does not
authorize any activity prohibited by the National Flood Insurance Program.
s. The permittee must make every reasonable effort to perform the work authorized
herein in a manner so as to minimize any adverse impact on fish, wildlife and natural
environmental values.
t. All activities authorized by this RGP that involve the use of riprap material for
bank stabilization, the following measures shall be applied:
(1) Filter cloth must be placed underneath the riprap as an additional requirement
of its use in North Carolina waters.
(2) The placement of riprap shall be limited to the areas depicted on submitted
work plan drawings and not be placed in a manner that prevents or impedes fish passage.
(3) The riprap material shall be clean and free from loose dirt or any pollutant
11
except in trace quantities that will not have an adverse environmental effect.
(4) It shall be of a size sufficient to prevent its movement from the
authorized alignment by natural forces under normal conditions.
(5) The riprap material shall consist of clean rock- or masonry material such as,
but not limited to, granite, marl, or broken concrete.
(6) A waiver from the specifications in this general condition may be requested in
writing. The waiver will only be issued if it can be demonstrated that the impacts of complying
with this condition will result in greater adverse impacts to the aquatic environment.
u. The permittee must install and maintain, at his expense, any signal lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities.
For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office
at (910) 772-2191.
v. The permittee must maintain any structure or work authorized by this permit in good
condition and in conformance with the terms and conditions of this permit. The Permittee is not
relieved of this requirement if the Permittee abandons the structure or work. Transfer in fee
simple of the work authorized by this permit will automatically transfer this permit to the
property's new owner, with all of the rights and responsibilities enumerated herein. The
permittee must inform any subsequent owner of all activities undertaken under the authority of
this permit and provide the subsequent owner with a copy of the terms and conditions of this
permit.
w. At his sole discretion, any time during the processing cycle, the Wilmington District
Engineer may determine that this RGP will not be applicable to a specific proposal. In such
case, the procedures for processing an individual permit in accordance with 33 CFR 325 will be
available.
x. The activity must comply with applicable FEMA approved state or local floodplain
management requirements.
y. All fill material placed in waters or wetlands shall be generated from an upland source
and will be clean and free of any pollutants except in trace quantities. Metal products, organic
materials (including debris from land clearing activities), or unsightly debris will not be used.
z. All excavated material will be disposed of in approved upland disposal areas.
aa. Historic Properties.
(1) In cases where the district engineer determines that the activity may affect
properties listed, or eligible for listing, in the National Register of Historic Places (NRHP), the
activity is not authorized, until the requirements of Section 106 of the National Historic
Preservation Act (NHPA) have been satisfied.
12
(2) Federal permittees (or when FHWA is the lead federal agency) should follow
their own procedures for complying with the requirements of Section 106 of the NHPA. Federal
permittees must provide the district engineer with the appropriate documentation to demonstrate
compliance with those requirements. The district engineer will review the documentation and
determine whether it is sufficient to address Section 106 compliance for this RGP activity, or
whether additional Section 106 consultation is necessary.
(3) Non-federal permittees must submit a PCN to the district engineer if the
authorized activity may have the potential to cause effects to any historic properties listed on,
determined to be eligible for listing on, or potentially eligible for listing on the NRHP, including
previously unidentified properties. For such activities, the PCN must state which historic
properties may be affected by the proposed work or include a vicinity map indicating the
location of the historic properties or the potential for the presence of historic properties.
Assistance regarding information on the location of or potential for the presence of historic
resources can be sought from the State Historic Preservation Officer (SHPO) or Tribal Historic
Preservation Officer (THPO), as appropriate, and the NRHP (see 33 CFR 330.4(g)). When
reviewing PCNs, district engineers will comply with the current procedures for addressing the
requirements of Section 106 of the NHPA. The district engineer shall make a reasonable and
good faith effort to carry out appropriate identification efforts, which may include background
research, consultation, oral history interviews, sample field investigation, and field survey.
Based on the information submitted and these efforts, the district engineer shall determine
whether the proposed activity has the potential to cause an effect on the historic properties.
Where the non-federal applicant has identified historic properties on which the activity may
have the potential to cause effects and so notified the Corps, the non-federal applicant shall not
begin the activity until notified by the district engineer either that the activity has no potential to
cause effects or that consultation under Section 106 of the NHPA has been completed.
(4) The district engineer will notify the prospective permittee within 45 days of
receipt of a complete PCN whether NHPA Section 106 consultation is required. Section 106
consultation is not required when the Corps determines that the activity does not have the
potential to cause effects on historic properties (see 36 CFR §800.3(a)). If NHPA Section 106
consultation is required and will occur, the district engineer will notify the non-federal applicant
that he or she cannot begin work until Section 106 consultation is completed. If the non-federal
applicant has not heard back from the Corps within 45 days, the applicant must still wait for
notification fiom the Corps.
(5) Prospective permittees should be aware that Section 1 l0k of the NHPA (16
U.S.C. 470h-2(k)) prevents the Corps from granting a permit or other assistance to an applicant
who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally
significantly adversely affected a historic property to which the permit will relate, or having legal
power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after
consultation with the Advisory Council on Historic Preservation (ACHP), determines that
circumstances justify granting such assistance despite the adverse effect created or permitted by
the applicant. If circumstances justify granting the assistance, the Corps is required to notify the
ACHP and provide documentation specifying the circumstances, the degree of damage to the
integrity of any historic properties affected, and proposed mitigation. This documentation must
include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the
13
undertaking occurs on or affects historic properties on tribal lands or affects properties of interest
to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted
activity on historic properties.
bb. If you discover any previously unknown historic or archeological remains while
accomplishing the activity authorized by this permit, you must immediately notify this office of
what you have found. We will initiate the Federal and state coordination required to determine if
the remains warrant a recovery effort or if the site is eligible for listing in the NRHP.
cc. There will be no unreasonable interference with navigation or the right of the public
to riparian access by the existence or use of activities authorized by this RGP.
dd. Heavy equipment working in wetlands or mudflats must be placed on mats, or other
measures must be taken to minimize soil disturbance.
ee. This RGP will not be applicable to proposed construction when the Wilmington
District Engineer determines that the proposed activity will significantly affect the quality of
the human environment and determines that an EIS must be prepared.
ff. Activities which have commenced (i.e. are under construction) or are under contract
to commence in reliance upon this general permit will remain authorized provided the activity is
completed within twelve months of the date of the general permit's expiration, modification, or
revocation. Activities completed under the authorization of this general permit which were in
effect at the time the activity was completed continue to be authorized by the general permit.
BY AUTHORITY OF THE SECRETARY OF THE ARMY:
7Z?/nd
Pc
Kevin P.Sr.
Colonel,y
District Commander
14