Loading...
HomeMy WebLinkAbout20180181 Ver 1_FINAL MIT PLAN_20191122SCARBOROUGH MITIGATION PROJECT VICINITY MAP N.T.S. PROJECT LOCATION OPO ARRNG o PECA T NeRi >Ty OG,FRO'9p O N m� Po �0 G� G �JP J5 E WAYNE COUNTY, NC NEUSE RIVER BASIN (CU 03020202) USACE ACTION ID # SAW-2017-02527 TYPE OF WORK: STREAM, WETLAND, NUTRIENT AND BUFFER MITIGATION PROJECT SUMMARY Project Reach Designation Type of Mitigation Proposed Stream Length(LF) Mitigation Ratio (X:1) Proposed Stream Mitigation Credits(SMCs) UT1-R1 Stream Restoration (HW/PI) 2,808 1 2,808 UT1-R2 Stream Restoration (PIIPII) 1.861 1 1.861 UT1-R3 Stream Restoration (Pit) 1,485 1 1,485 UT1A Stream Restoration (PI) 241 1 241 UT1B Stream Restoration (HW/PI) 1,166 1 1,166 UT2 (upper) istrearn Enhancement (HINIPI) 1 586 1 4 1 147 UT2 (lower) Stream Restoration (HWtPo 1,712 1 1 1,712 UT3 Stream Restoration (HWIPI) 1,483 11 11,483 Total 11,342 10'i Note 1: No mitigation credits were calculated outside the conservation easementboundarles. Note 2: Headwater (HVO stream mitigation credits were calculated using valley length. Project Wetland Area Type of Mitigation Proposed Wetland Acreage (AC) Mitigation Ratio (X:1) Proposed Wetland Mitigation Credits (WMCs) W1 Wetland Preservation 2.15 10 0.21 WS Wetland Preservation 1.18 10 0.12 SW1 Wetland Re-establishment 10T40 1 10T40 SW2 Wetland Enhancement 7.92 3 2.64 Total 118.65 110.37 Note 1: No mitigation credits were calculated outside the conservation easement boundaries. Note 2: No wetland mitigation credits were calculated within the 100-foot wade NW stream corridor. SHEET INDEX 1 COVER SHEET 2 LEGEND/CONSTRUCTION SEQUENCE /GENERAL NOTES 3 TYPICAL SECTIONS 4-7 DETAILS 8-24 PLAN AND PROFILE 25-29 REVEGETATION PLAN 30-48 GRADING PLAN RING _ — — — — — --v1------ — — — — — — — — — — - 1 ■ 1 ■ I 1 1 \ ■ 1 � \, 1 i � ■ 1 1 ■ 1 1 \■ 1 1 / ,� / 1 ■ 1 1 • 1 1 � � 1 '�� 1 , ' 1 ■ 1 3 � 1 ,'• i r 1 1 ■ 7,: 1■ END CONSTRUCTION UT1-R3 ■ � 11 � _ _ 1 , "i 1 ■ 1 44 STATION 72+44.68 1 ■ � 1 1 1 1 1 , • 1 ■ 1 1 ; u i 1 1 1 ■ 1 � ,,; ; 4, ; 1 1 1 1 1 I CONST UCTION UT3 A, 1 1 1 ■ I 1 \• BEGIN CONSTRUCTION U IFIB A 7 ,'� , ■ BEGIN CONSTRUCTION UT1-R3 o -- � TON10+0.00 1 ■ 1 1 STATION 10+00.00 1 ■ 1 j>, �\ 1 1 STATION 57+60.05 1 1 1 1 ,� 1 F---■Jai— --———r——————————— y---------------- — M�---- 16-----------L — — — — — — T===1 ■ Gam/ 31 , '> r•` ® ---- 1 END CONSTRUCTIONUTI-R2 1 ■,Q- ■ 1 , ■ , STATION 56+84.53 1 ,I 0 1 , • 1 1 t END CON3TRUCTION UT3 / n\ 1 1 ■ , 33 ' \ 1 1 , ■ STATION +82.53 , p'� ♦p1 r' j ■ 1 ti`•■ 1 ��♦ 1 1 Ir� 1 ■ �!e'� 1 I ■ END CONSTRUCTIONUT2(LOWER) 1 ■ 1 i A l 1 !,�30\ 1 i YSTATION 32+98.10 1 ♦♦ 1\\ �% 3 t 1 t ■ 1 {-��I N_ 1'i' 1 rPm� ■ 1 1 IN 1 a ♦ l i s1 ■ --------� -1 - ` -!` `-- l------- 1--♦ ■.�� �T-,�-- - ;----�-------ti------- ---1 ♦ l 1� BEGIN CONSTRUCTMUT1-R1 �-y "�\� / �\ `UTi_RI� e ` Tl ♦♦ �♦ ■ 1y� 1 ' I I 1 END CONSTRUCT N UT1-R1 IN STATI(�1 10+15.18 l ♦ j/ 1 ♦ ��♦ 1 , / 1 r- I , BEGIN CONSTRU ION UT1-R2 ■ 1� ♦♦ l� i 1 ♦ �1 ♦ ■x♦ �. , /� t-E -7 1 1 STATION 38+22.67■ ; 1 - 7 1 `���T / sue' ` I��ri`` � ��Be�s ; 0 � R ��jj 1 \\. ■ ■ 1/ 1 s 1 I 1 ��_� ■ ,� / �,1� ■ IR I , END CONSTRUCTION UT2(UPPER)- ■ 1 1 / ■ T ♦R BEGIN CONSTRUCTION UT2(LOWER) ■ ■ L--------e----J-------------- �L----■- +-f\-\ri�L- ----J STATION15+86.50 ; \ END CONSTRUCTION UT16•�..r-"'- "�-;/-.�° ■ �-.-� i --}r \ 1 ; \- — '��� ■ STATION 21+66.60 ems' .af ♦♦♦ ♦♦` ■ \v • ���>> i / ■ V� BEGIN CONSTRUCTION UT1A ■ j ♦��-"-°6p� i ; ■ A STATION 10+00.00 ■ 1 ,' j ■ 2 . ■ �T F END CONSTRUCTION UT1A ; 1 �'`� \ ■ / ■ -\ o , STATION 12+41 Rl ■ 1 . ■ ���-UT1-R1 IN CONSTRUCTION UT2 UPPER 1—/ ■ �� STATION 30+06.29 ■ , A XON0+00.00 / ■ � , WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER _ C ARC 0/ :s16 .G I N'E J\,`` 4` ENGINEERING SERVICES BY \AILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 01_SCARBOROUGH IAITIGATION COVER.DPIC DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: V=800' VERT. SCALE: NIA L. NORTH 350 175 0 350 700 GRAPHIC SCALE SHEET NAME COVER SHEET SHEET NUMBER LEGEND ROOTWAD LOG VANE 0 LOG WEIR ee 0 e CONSTRUCTED STONE RIFFLE ie 11 CONSTRUCTED LOG RIFFLE " GEOLIFT W/TOEWOOD ­=>==>==>==>==> PROPOSED OUTLET CHANNEL - FP FP 100 YEAR FLOOD PLAIN OPEL EXISTING OVERHEAD ELECTRIC TEMPORARY STREAM CROSSING CE CE PROPOSED CONSERVATION EASEMENT BOUNDARY - - - -100- - - - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR 101 PROPOSED MINOR CONTOUR - GF C/F - CUTIFILL LIMITS -WLB WILD - EXISTING WETLAND BOUNDARY EXISTING WOODUNE PROPOSED TOP OF STREAM BANK - - - - EXISTING PROPERTY BOUNDARY EXISTING FENCE 15+00 - - PROPOSED CENTERLINE (THALWEG) TP TP PROPOSED TREE PROTECTION FENCE EXISTING FARM PATH PROPOSED ACCESS PATH y+iy EXISTING TREE CHANNEL BLOCK/DITCH PLUG CHANNEL FILLIDITCH FILL EXISTING STRUCTURE IIryWLB W W WLB I W W W� EXISTING WETLAND AREA 9lTit *lM CONSTRUCTION SEQUENCE THE ENGINEER WILL PROVIDE CONSTRUCTION OBSERVATION DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE USED DURING PROJECT CONSTRUCTION IMPLEMENTATION. PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES, NOTIFICATION OF AND RECEIPT OF THE CERTIFICATE OF APPROVAL MUST BE RECEIVED FROM NCDEQ- LAND QUALITY SECTION. THE CONTRACTOR SHALL CALL NC DEC) LQS AT 919-791-4200 TO SCHEDULE A PRE CONSTRUCTION MEETING AT LEAST 72 HOURS PRIOR TO PROJECT ACTIVATION. THE CONTRACTOR SHALL REFER TO THE APPROVED EROSION AND SEDIMENTATION CONTROL PERMIT AND CORRESPONDING PLANS AND TECHNICAL SPECIFICATIONS FOR SPECIFIC CONSTRUCT ON SEQUENCING ITEMS AND SHALL BE RESPONSIBLE FOR FOLLOWING THE APPROVED PLANS AND PERMIT CONDITIONS. 1. THE CONTRACTOR SHALL NOTIFY (NC 811) (1-800-632-4949) BEFORE ANY EXCAVATION BEGINS. ANY UTILITIES AND RESPECTIVE EASEME TS SHOWN ON THE PLANS ARE CONSIDERED APPROXIMATE AND THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES AND ADJOINING EASEMENTS AND SHALL REPAIR OR REPLACE ANY DAMAGED UTILITIES AT HIS/HER OWN EXPENSE. 2. THE CONTRACTOR SHALL PREPARE STABILIZED CONSTRUCTION ENTRANCES HAUL ROADS AND SHALL MOBILIZE EQUIPMENT, MATERIALS, PREPARE STAGING AREA($) AND STOCKPILE AREA(S) AS SHOWN ON THE PLANS. HAUL ROADS SHALL BE PROPERLY MAINTAINED AT ALL TIMES DURING CONSTRUCTION. 3. CONSTRUCTION TRAFFIC SHALL BE RESTRICTED TO THE AREA DENOTED AS LIMITS OF DISTURBANCE OR HAUL ROADS AS SHOWN ON THE PLANS. 4. THE CONTRACTOR SHALL INSTALL TEMPORARY ROCK DAMS AT LOCATIONS INDICATED ON THE PLANS. 5. THE CONTRACTOR SHALL INSTALL TEMPORARY SILT FENCE AROUND THE STAGING AREA(S). TEMPORARY SILT FENCING WILL ALSO BE PLACED AROUND THE TEMPORARY STOCKPILE AREAS AS MATERIAL IS STOCKPILED THROUGHOUT THE CONSTRUCTION PERIOD. 6. THE CONTRACTOR SHALL INSTALL ALL TEIAPORARY AND PERMANENT STREAM CROSSINGS AS SHOWN ON THE PLANS IN ACCORDANCE WITH THE APPROVED SEDIMENTATION AND EROSION CONTROL PERMIT. THE EXISTING CHANNEL AND DITCHES ON SITE WILL REMAIN OPEN DURING THE INITIAL STAGES OF CONSTRUCTION TO ALLOW FOR DRAINAGE AND TO MAINTAIN SITE ACCESSIBILITY. 7. THE CONTRACTOR SHALL CONSTRUCT ONLY THE PORTION OF CHANNEL THAT CAN BE COMPLETED AND STABILIZED WITHIN THE SAME DAY. THE CONTRACTOR SHALL APPLY TEMPORARY AND PERMANENT SEED AND MULCH TO ALL DISTURBED AREAS AT THE END OF EACH WORK DAY, WITH THE REQUIREMENT OF ESTABLISHING TEMPORARY AND PERMANENT GROUND COVER THROUGH VEGETATION ESTABLISHMENT. 8. THE CONTRACTOR SHALL CLEAR AND GRUB AN AREA ADEQUATE TO CONSTRUCT THE STREAM CHANNEL AND GRADING OPERATIONS AFTER ALL EROSION AND SEDIMENTATION MEASURES HAVE BEEN INSTALLED AND APPROVED. IN GENERAL, THE CONTRACTOR SHALL WORK FROM UPSTREAM TO DOWNSTREAM AND IN -STREAM STRUCTURES AND CHANNEL FILL MATERIAL SHALL BE INSTALLED USING A PUMP -AROUND OR FLOW DIVERSION MEASURE AS SHOWN ON THE PLANS. 9. CONTRACTOR SHALL BEGIN CHANNEL CONSTRUCTION UPSTREAM AND PROCEED IN A DOWNSTREAM DIRECTION WITH CONSTRUCTION. THE DESIGN CHANNEL SHOULD BE CONSTRUCTED OFFLINE AND/OR IN THE DRY WHENEVER POSSIBLE. THE CONTRACTOR SHALL EXCAVATE AND CONSTRUCT THE PROPOSED CHANNEL TO PROPOSED DESIGN GRADES AND SHALL NOT EXTEND EXCAVATION ACTIVITIES ANY CLOSER THAN WITHIN 10 FEET (HORIZONTALLY) OF THE TOP OF EXISTING STREAM BANKS IN ORDER TO PROTECT THE INTEGRITY OF THE EXISTING STREAM CHANNEL UNTIL ABANDONMENT. 10. THE CONTRACTOR WILL CONTINUE CONSTRUCTION BY EXCAVATING CHANNEL FILL MATERIAL. THE CONTRACTOR MAY FILL NON JURISDITRIONAL DITCHES WHICH DO NOT CONTAIN ANY WATER DURING THE GRADING OPERATIONS. ALONG STREAM REACHES EXCAVATED MATERIAL SHOULD BE STOCKPILED IN AREAS SHOWN ON THE PLANS. IN ANY AREAS WHERE EXCAVATION DEPTHS WILL EXCEED 10 INCHES, TOPSOIL SHALL BE HARVESTED, STOCKPILED AND PLACED BACK OVER THESE AREAS TO A MINIMUM DEPTH OF 8 INCHES TO ACHIEVE DESIGN GRADES AND CREATE A SOIL BASE FOR VEGETATION PLANTING ACCORDING TO THE DESIGN PLANS AND CONSTRUCTION SPECIFICATIONS. 11. AFTER EXCAVATING AND CONSTRUCTING THE PROPOSED CHANNEL TO PROPOSED DESIGN GRADES, INSTALL IN -STREAM STRUCTURES, BIOENGINEERING MEASURES, PERMANENT AND TEMPORARY SEEDING AND ALL REQUIRED AMENDMENTS. MULCHING, VEGETATION TRANSPLANTS, TO COMPLETE CHANNEL CONSTRUCTION AND READY THE CHANNEL TO ACCEPT FLOW PER APPROVAL BY THE ENGINEER. 12. STREAM FLOW WILL BE DIVERTED BACK INTO THE CONSTRUCTED CHANNEL ONCE THE RESTORED STREAM CHANNEL AND ASSOCIATED RIPARIAN AREA HAS BEEN STABILIZED, AS DETERMINED BY THE ENGINEER AND IN COMPLIANCE WITH APPROVED PERMIT REQUIREMENTS. ONCE STREAM FLOW IS RETURNED TO A RESTORED STREAM CHANNEL REACH, THE CONTRACTOR SHALL IMMEDIATELY BEGIN PLUGGING, FILLING, AND GRADING THE ASSOCIATED ABANDONED REACH OF STREAM CHANNEL, AS INDICATED ON PLANS, MOVING IN A DOWNSTREAM DIRECTION TO ALLOW FOR POSITIVE AND ADEQUATE DRAINAGE OF THE ABANDONED CHANNEL REACH. STREAM FLOW SHALL NOT BE DIVERTED INTO ANY SECTION OF RESTORED STREAM CHANNEL PRIOR TO THE COMPLETION OF THE CONSTRUCTION OF THAT REACH OF PROPOSED CHANNEL, INCLUDING, BUT NOT LIMITED TO FINAL GRADING, STABILIZATION WITH TEMPORARY AND PERMANENT SEEDING AND ALL REQUIRED AMENDMENTS, MULCHING, VEGETATION TRANSPLANT INSTALLATION, INSTREAM STRUCTURE INSTALLATION, BIOENGINEERING INSTALLATION, AND COIR FIBER MATTING INSTALLATION. 13. THE RESTORED CHANNEL SECTIONS SHALL REMAIN OPEN AT THEIR DOWNSTREAM END TO ALLOW FOR DRAINAGE DURING RAIN EVENTS. 14. ALL GRADING ACTIVITIES ADJACENT TO THE STREAM CHANNEL AND RIPARIAN AREAS SHALL BE COMPLETED PRIOR TO DIVERTING STREAM FLOW INTO THE RESTORED STREAM CHANNEL REACHES. ONCE CONSTRUCTION IS COMPLETED ON A REACH OF PROPOSED STREAM CHANNEL, ADDITIONAL GRADING ACTIVITIES SHALL NOT BE CONDUCTED WITHIN 10 FEET (HORIZONTALLY) OF THE NEWLY RESTORED STREAM CHANNEL BANKS. THE CONTRACTOR SHALL NOT FINALIZE GRADE OR ROUGHEN AREAS WHERE REQUIRED EXCAVATION ACTIVITIES HAVE NOT BEEN COMPLETED. 15. ONCE CONSTRUCTION IS COMPLETE WITHIN A PUMP -AROUND WORK AREA OR CONSTRUCTION WORK PHASE LIMIT., THE CONTRACTOR SHALL APPLY TEMPORARY SEEDING TO ANY AREAS DISTURBED DURING CONSTRUCTION WITHIN HOURS. ALL SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED WITH GROUND COVER AS SOON AS BRACT CABLE WITH 7 CALENDAR DAYS. ALL OTHER DISTURBED AREAS AND SLOPES FLATTER THAN 3:1 SHALL BE STABILIZED WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 16. PERMANENT GROUND COVER SHALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. ALL DISTURBED AREAS SHOULD HAVE ESTABLISHED GROUND COVER PRIOR TO DEMOBILIZATION. REMOVE ANY TEMPORARY STREAM CROSSINGS AND TEMPORARY EROSION CONTROL MEASURES. HAUL ROADS TO BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN FOUND PRIOR TO CONSTRUCTION. 17. ALL REMAINING DISTURBED AREAS SHALL BE STABILIZED BY TEMPORARY AND PERMANENT SEEDING AND MULCHING BEFORE CONSTRUCTION CLOSEOUT IS REQUESTED AND DEMOBILIZATION CAN OCCUR. ALL WASTE MATERIAL MUST BE REMOVED FROM THE PROJECT SITE. 18. THE CONTRACTOR SHALL TREAT AREAS OF INVASIVE SPECIES VEGETATION THROUGHOUT THE PROJECT AREA ACCORDING TO THE CONSTRUCTION CONTRACT DOCUMENTS, INCLUDING THE APPROVED PERMIT, PLANS AND TECHNICAL SPECIFICATIONS PRIOR TO DEMOBILIZATION. 19. THE CONTRACTOR COMPLETE ALL REMAINING PLANTING ACTIVITIES, INCLUDING SHRUB AND TREE PLANTING, REMAINING TRANSPLANT INSTALLATION, INSTALLATION OF REMAINING BIOENGINEERING MEASURES. AND LIVE STAKE INSTALLATION, ACCORDING TO THE CONSTRUCTION CONTRACT DOCUMENTS, INCLUDING THE APPROVED PERMIT, PLANS AND TECHNICAL SPECIFICATIONS. THE CONTRACTOR SHALL COMPLETE THE RE -FORESTATION PHASE OF THE PROJECT AND CONDUCT REMAINING PERMANENT SEEDING IN ACCORDANCE WITH THE CONSTRUCTION CONTRACT DOCUMENTS, INCLUDING THE APPROVED PERMIT, PLANS AND TECHNICAL SPECIFICATIONS. 20. THE CONTRACTOR SHALL ENSURE THAT THE SITE IS FREE OF TRASH AND LEFTOVER CONSTRUCTION MATERIALS PRIOR TO DEMOBILIZATION FROM THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OFF -SITE REMOVAL OF ALL TRASH, EXCESS BACKFILL, AND ANY OTHER INCIDENTAL MATERIALS PRIOR TO DEMOBILIZATION OF EQUIPMENT FROM THE SITE. THE DISPOSAL AND STOCKPILE LOCATIONS SELECTED MUST BE APPROVED TO THE ENGINEER AND ANY FEES SHALL BE PAID FOR BY THE CONTRACTOR. GENERAL NOTES 1. THE PROJECT SITE IS LOCATED APPROXIMATELY FOUR MILES SOUTHWEST OF THE TOWN OF GOLDSBORO IN WAYNE COUNTY, NC (35.3211000', -77.98972222°) AS SHOWN ON THE COVER SHEET VICINITY MAP. TO ACCESS THE SITE FROM GOLDSBORO, TAKE US HIGHWAY 117 SOUTH (US-117 S)/US HIGHWAY 13 SOUTH (US-13 S) FOR APPROXIMATELY 2 MILES. TURN LEFT ONTO ARRINGTON BRIDGE ROAD AND CONTINUE APPROXIMATELY 3 MILES. TURN RIGHT ONTO CASEY MILL ROAD AND CONTINUE APPROXIMATELY 0.2 MILES AND ARRIVE AT THE SITE ENTRANCE ON THE RIGHT. 2. THE PROJECT SITE BOUNDARIES ARE SHOWN ON THE DESIGN PLANS AS THE PROPOSED CONSERVATION EASEMENT. THE CONTRACTOR SHALL PERFORM ALL RELATED WORK ACTIVITIES WITHIN THE PROJECT SITE BOUNDARIES AND/OR WITHIN THE LIMITS OF DISTURBANCE (LOD). THE PROJECT SITE SHALL BE ACCESSED THROUGH THE DESIGNATED ACCESS POINTS SHOWN ON THE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PERMITTED ACCESS THROUGHOUT ALL CONSTRUCTION ACTIVITIES. 3. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS AND MEASURES TO PROTECT ALL PROPERTIES FROM DAMAGE. THE CONTRACTOR SHALL REPAIR ALL DAMAGE CAUSED BY HIS/HER OPERATIONS TO ALL PUBLIC AND PRIVATE PROPERTY AND LEAVE THE PROPERTY IN GOOD CONDITION AND/OR AT LEAST EQUIVALENT TO THE PRE -CONSTRUCTION CONDITIONS. UPON COMPLETION OF ALL CONSTRUCTION ACTIVITIES, THE AREA IS TO BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN FOUND PRIOR TO CONSTRUCTION. 4. THE TOPOGRAPHIC BASE MAP WAS DEVELOPED USING SURVEY DATA COLLECTED BY WITHERSRAVENEL, INC. (WR) IN THE SUMMER OF 2018. THE HORIZONTAL DATUM WAS TIED TO NAD83 NC STATE PLANE COORDINATE SYSTEM, US SURVEY FEET AND NAVD88 VERTICAL DATUM USING VHS NETWORK AND NCGS MONUMENT. IT IS POSSIBLE THAT EXISTING ELEVATIONS AND SITE CONDTIONS MAY HAVE CHANGED SINCE THE ORIGINAL SURVEY WAS COMPLETED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM EXISTING GRADES AND ADJUST QUANTITIES, EARTHWORK, AND WORK EFFORTS AS NECESSARY. 5. THE CONTRACTOR SHALL VISIT THE CONSTRUCTION SITE AND THOROUGHLY FAMILIARIZE HIM/HERSELF WITH ALL EXISTING CONDITIONS. PRIOR TO BEG NNING CONSTRUCTION. THE CONTRACTOR SHALL VERIFY THE ACCURACY AND COMPLETENESS OF THE CONSTRUCTION SPECIFICATIONS AND DESIGN PLANS REGARDING THE NATURE AND EXTENT OF THE WORK DESCRIBED. 6. THE CONTRACTOR SHALL BRING' ANY DISCREPANCIES BETWEEN THE CONSTRUCTION PLANS AND SPECIFICATIONS AND/OR FIELD CONDITIONS TO THE ATTENTION OF THE SPONSORS ENGINEER BEFORE CONSTRUCTION BEGINS. 7. THERE SHALL BE NO CLEARING OR REMOVAL OF ANY NATIVE SPECIES VEGETATION OR TREES OF SIGNIFICANCE, OTHER THAN THOSE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 8. THE CONTRACTOR SHALL EXERCISE CARE DURING GRADING ACTIVITIES IN THE VICINITY OF NATIVE VEGETATION AND TREES OF SIGNIFICANCE AT THE CONSTRUCTION SITE. ALL GRADING IN THE VICINITY OF TREES NOT IDENTIFIED FOR REMOVAL SHALL BE MADE IN A MANNER THAT DOES NOT DISTURB THE ROOT SYSTEM WITHIN THE DRIP LINE OF THE TREE. 9. WORK ACTIVITIES ARE BEING PERFORMED AS AN ENVIRONMENTAL RESTORATION PLAN. THE CONTRACTOR SHALL MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS, PROTECT PUBLIC SAFETY, AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. ALL AREAS SHALL BE KEPT NEAT, CLEAN, AND FREE OF ALL TRASH AND DEBRIS, AND ALL REASONABLE PRECAUTIONS SHALL BE TAKEN TO AVOID DAMAGE TO EXISTING ROADS, VEGETATION, TURF, STRUCTURES, AND PRIVATE PROPERTY. 10. PRIOR TO START OF WORK, THE CONTRACTOR SHALL SUBMIT THE SOURCE OF MATERIALS, INCLUDING AGGREGATES, EROSION CONTROL MATTING, WOOD AND NATIVE PLANTING MATERIAL TO THE ENGINEER FOR REVIEW AND APPROVAL. NO WORK SHALL BE PERFORMED UNTIL THE SOURCE OF MATERIAL IS APPROVED BY THE ENGINEER. 11. THE CONTRACTOR SHALL BE HELD SOLELY RESPONSIBLE FOR ANY NECESSARY COORDINATION BETWEEN THE VARIOUS COUNTY. STATE OR FEDERAL AGENCIES, UTILITY COMPANIES, HISHER SUB -CONTRACTORS; AND THE ENGINEER FOR THE DURATION OF THE PROJECT. 12. PRIOR TO START OF WORK, THE CONTRACTOR SHALL SUBMIT THEIR DETAILED PLANTING SCHEDULE TO THE ENGINEER FOR REVIEW. NO WORK SHALL BE PERFORMED UNTIL THIS SCHEDULE IS APPROVED BY THE ENGINEER. THE DETAILED PLANTING SCHEDULE SHALL CONFORM TO THE PLANTING REVEGETATION PLAN AND SHALL INCLUDE A SPECIES LIST AND TIMING SEQUENCE. 13. THE CONTRACTOR IS REQUIRED TO INSTALL IN -STREAM STRUCTURES AND CULVERT PIPES USING A BACKHOE/EXCAVATOR WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE STRUCTURES AND MATERIALS INCLUDING LOGS, STONE, AND TEMPORARY WOOD MAT STREAM CROSSINGS. GRADING NOTES 1. NO GRADING ACTIVITIES SHALL OCCUR BEYOND THE PROJECT LIMITS OF DISTURBANCE (LOD) AS SHOWN ON THE DESIGN PLANS. 2. ONCE DESIGN GRADES ARE ACHIEVED AS SHOWN ON THE PLAN AND PLAN AND PROFILE, THE HEADWATER VALLEY, STREAM AND WETLAND, AND FLOODPLAIN AREAS SHALL BE ROUGHENED USING TECHNIQUES DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. 3. ALL SUITABLE SOIL MATERIAL REQUIRED TO FILL AND/OR PLUG EXISTING DITCHES AND/OR STREAM CHANNEL SHALL BE GENERATED ON -SITE AS DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. ANY EXCESS SPOIL MATERIAL SHALL BE STOCKPILED IN DESIGNATED AREAS AND OR HAULED OFFSITE AS APPROVED BY THE ENGINEER. WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER � n C A R Q . i•� 'ti �. 3r",16 '�'• �PHE R P VN' 1fjIJ1111►11W# ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 02 SCAR30ROUGH V.IITIGATION BANI( GENERFL NMESA'M DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: N/A VERT. SCALE: NIA SHEET NAME LEGEND/ CONSTRUCTION SEQUENCE/ GENERAL NOTES SHEET NUMBER 2 EXISTING GROUND GROUND✓ f Wb 1 RIFFLE N.T.S EXIS G ROI EXISTING GROUND EXISTING GROUND GROUND y Wb RIFFLE WITH BANKFULL BENCH N.T.S Reach Name UT1-R2 UT1A UT1-R3 Feature Riffle Pool Riffle Pool Riffle Pool Width of Bankfull, Wbkf (ft) 10.5 13.0 5.4 7.1 11.0 14.0 Average Depth, Dbkf (ft) 0.8 1.1 0.4 O.6 0.8 1.2 Maximum Depth, D-Max (ft) 1.0 1.9 0.5 0.8 1.0 2.0 Width to Depth Ratio, bkf WID 13.0 11.4 14.0 12.9 13.0 11.5 Bankfull Area, Abkf (sq ft) 8.5 14.8 2.1 3.9 9.3 17.0 Bottom Width, Wb (ft) 6.5 2.6 2.9 2.7 6.8 3.0 EXISTING Wbkf GROUND D-max V_ l \� LD-LnZv- �z D-max }� Wb J PROPOSED GROUND Wb PROPOSED PROPOSED GROUND "Wb GROUND POOL N.T.S POOL WITH BANKFULL BENCH N.T.S SINGLE -THREAD CHANNEL VALLEY BOTTOM WIDTH c VALLEY SIDE SLOPES (APPROX. 20' TO 40') \ VARY BASED ON \GRADING PLAN. CHANNEL DEPTH '' (APPROX. 0.3' TO 0.7') CCr'TIrNKI A A MULTI -THREAD CHANNELS AVERAGE WIDTH = 2 TO 4 F AVERAGE DEPTH = 0.3 TO 0 HEADWATER CHANNEL ALIGNMENT GRADED VALLEY ELEVATION PRIOR TO ROUGHING *1 PLAN VIEW OF MICROTOPOGRAPHIC PATTERN HEADWATER (MULTI -THREAD) CHANNEL NOT TO SCALE NOTES: 1. GRADE VALLEY TO DESIGN CONTOURS AS SHOWN ON GRADING PLAN. 2. MICROTOPOGRAPHY IS FORMED USING STANDARD TILLAGE EQUIPMENT TO CREATE MOUNDS AND FURROWS AS DESCRIBED IN THE SPECIFICATIONS. ALTERNATIVE CONSTRUCTION METHODS SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. 3. THE HEADWATER CHANNEL ALIGNMENT SHALL BE APPROVED BY ENGINEER FOLLOWING COMPLETION OF THE MICROTOPOGRAPHY ROUGHENING. 4. HEADWATER (MULTI -THREAD) CHANNELS WILL BE SHAPED TO FORM SMOOTH TRANSITIONS. 5. UPON COMPLETION OF THE HEADWATER CHANNEL FEATURES, APPLY MULCH; TEMPORARY SEED AND PERMANENT SEED TO THE CONSTRUCTED VALLEY IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. STEP POOL CHANNEL N.T.S WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER co A ,���IJ1111►®\��® ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 R FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 03 SCARBOROUGH NI➢OA1101 BANK 7PICI DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: N.T.S. VERT.SCALE: N.T.S. SHEET NAME TYPICAL SECTIONS SHEET NUMBER 3 TOP OF STREAMBANK �1 1 SCOUR `I POOL PLAN VIEW COVERLOG A ROOTN(T AD YP.) TRANSPLANTS EROSION CONTROL MATTING r BERM (0.5' MAX. HT.) BERM(S) TOP OF D RESTORED NOT TO EXTENBEYOND STREAMBANK STREAMBANK LIMITS OF ROOTWADS. 7 BANKFULL STAGE > 1 /2 OF ROOT MASS �� O ��� BA�FL_01,1;1�/��IS BELOW BASE FLOW -T\ �\; ROOTWAD FFFFFFT FL ENTIRE ROOTWAD TRUNK IS COVER LOG BELOW STREAMBED. (OPTIONAL) SECTION A -A ROOTWADS WITHOUT TRANSPLANTS TRANSPLANTS RESTORED STREAMBANK \ > 1/2 OF ROOT MASS IS BELOW BASE FLOW NOTES: 1. THE TRENCHING METHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR THE LOG PORTION OF THE ROOTWAD. A COVER LOG SHOULD BE INSTALLED UNDERNEATH THE ROOTWAD IN A TRENCH EXCAVATED PERPENDICULAR TO THE BANK AND BELOW THE RESTORED STREAMBED. ONE-THIRD OF THE ROOTWAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS. ENTIRE ROOTWAD TRUNK BELOW STREAMBED. ROOTWADS NOT TO SCALE —COVERLOG (OPTIONAL) SECTION A -A ROOTWADS WITH TRANSPLANTS FFFF INVERT/ � \ NONWOVEN GRADE POINT KGEOTEXTILE FABRIC / a` ARM ANGLE I 20° TO 30' \ SCOUR TOP OF STREAM BANK INVERT FIL ELEVATION OW SCOUR STREAMBED POOL STONE BACKFILL HEADER .� NON -WOVEN LOG GEOTEXTILE FABRIC FOOTER LOG 5' MINIMUM SECTION A -A IPOOL " \ 7 2/3 BANKFULL STAGE FLOW— 4,bj0 T1�PE PRM S`O TOP OF STREAM BANK BURY LOGS INTO BANK AT LEAST 5' Al ROOT WAD (OPTIONAL) RESTORED STREAMBED ELEVATION HEADER LOG PLAN VIEW FOOTER LOG NOTES: 1. LOGS SHOULD BE AT LEAST 10" IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED. 2. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS. 3. ROOTWADS SHOULD BE PLACED BENEATH THE HEADER LOG AND PLACED SO THAT IT LOCKS THE HEADER LOG INTO THE BANK. SEE ROOTWAD DETAIL. 4. BOULDERS OF SUFFICIENT SIZE CAN PLACED ON TOP OF HEADER LOG FOR ANCHORING, PER DIRECTION OF ENGINEER. 5. LOGS SHOULD BE BURIED INTO THE STREAM BED AND BANKS AT LEAST 5 FEET. S. GEOTEXTILE FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. 7. TRANSPLANTS CAN BE USED INSTEAD OF ROOTWADS, PER DIRECTION OF ENGINEER. LOG VANE NOT TO SCALE Q w JO B -1.3X CHANNEL WIDTH ^I SCOUR POOL BURYINTO BANK 5' MINIMUM (TYP.) I �, B INVERT ELEVATION PLAN VIEW PROFILE B-B TOP OF STREAM BANK OF STREAM BANK SET INVERT ELEVATION TRANSPLANTS BASED ON DESIGN PROFILE OR LIVE STAKES CONTROL MATTING _17 gANKFULLSTAGE _ ,yy JEROSION _p BASEFLOW / BURYIN70 BANKS' HEADER LOG MINIMUM SECTION A -A FOOTER LOG A a NOTES: 1. LOGS SHOULD BE AT LEAST 12 INCHES IN DIAMETER, RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOGS >24 INCHES IN DIAMETER MAYBE USED ALONE WITHOUT AN ADDITIONAL LOG FILTER FABRIC SHOULD STILL BE USED TO SEAL AROUND LOG, AT THE DIRECTION OF THE ENGINEER. 3. PLACE FOOTER LOGS FIRST AND THEN HEADER (TOP) LOG. SET HEADER LOG AT A MAXIMUM OF 31NCHES ABOVE THE INVERT ELEVATION. 4. CUT A NOTCH IN THE HEADER LOG APPROXIMATELY 30°h OF THE CHANNEL BOTTOM WIDTH AND EXTENDING DOWN TO THE INVERT ELEVATION. NOTCH SHALL BE USED TO CENTER FLOW AND NOT EXCEED 3 INCHES IN DEPTH. 5. USE GEOTEXTILE FABRIC FOR DRAINAGE TO SEAL GAPS BETWEEN LOGS. 6. INSTALL VEGETATION TRANSPLANTS FROM TOE OF STREAM BANK TO TOP OF STREAM BANK 7. SEE TYPICAL SECTION FOR CHANNEL DIMENSIONS. I WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER �\\\\\Illy►�._ C ARC i� Ali • c ` .G ,J�ylJylll►®\��® ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 09? SGARBORDOGH V.IIIIGATION BANK DETNL SHEES.AP,G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: N.T.S. VERT. SCALE: N.T.S. TOP OF STREAM BANK INVERT--,— FLO W ELEVATIO STREAMBED SCOUR POOL STONE BACKFILL SHEET NAME GEOTEXTILE GEOTEXTILE FABRIC HEADER LOG FOOTERLOG 5'MINIMUM PROFILE B-B D ETAI LS LOG WEIR T NUMBER NOT TO SCALE SHEE 4 SECONDARY AND WOODY DI SET INVERT ELEVATION BASED ON DESIGN PROFILE TRANSPLANTS TOP OF STREAM BANK OR LIVE STAKES N CONTROL MATTING 41$EROSIO BANKFULL STAGE BASEFLOWHEADER LOG �FOOTER LOG 5' MINIMUM 5' MINIMUM BURIED INTO BURIED INTO BANK BANK PRIMARY LOGS SPACE EVERY 8'-12' DE OF STREAM BANK lP OF STREAM BANK HEADER LOG KFILL WITH STREA/qy a F/OLN ALLUVIUM / 1 • �M LOGS ELEVATION ., �.. �,. .-., .�., (TYPICAL) O 17 PLAN VIEW o S' MINIMUM FOOTER` NOTES: 1. PRIMARY LOGS SHOULD BE AT LEAST 12" OR MORE IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD BACKFILL N/ITH AND RECENTLY HARVESTED AND EXTENDING INTO THE BANK 5' ON EACH SIDE. SUITABLE ON -SITE 24" MINIMUM DEF 2. SECONDARY LOGS SHOULD BEAT LEAST 4" IN DIAMETER AND NO LARGER THAN 10" AND EXTEND INTO ALLUVIUM THE BANK 3' ON EACH SIDE. WOODY DEBRIS MATERIAL SHALL BE VARYING DIAMETER TO ALLOW PROFILE B-B MATERIAL TO BE COMPACTED. 3. NON -WOVEN GEOTEXTILE FABRIC SHOULD BE NAILED TO THE HEADER LOG BELOW THE BACKFILL. 4. ROOT WADS AND EROSION CONTROL MATTING CAN BE USED INSTEAD OF TRANSPLANTS OR LIVE STAKES PER DIRECTION OF ENGINEER. 5. AFTER TRENCH HAS BEEN EXCAVATED A LAYER OF SECONDARY LOGS AND WOODY DEBRIS SHOULD BE PLACED WITH MINIMAL GAPS. A LAYER OF ON -SITE ALLUVIUM SHOULD BE APPLIED TO FILL VOIDS BETWEEN SECONDARY LOGS BEFORE ADDITIONAL LAYERS ARE PLACED. 6. SEE TYPICAL SECTION FOR CHANNEL DIMENSIONS. CONSTRUCTED LOG RIFFLE SECONDARYLOGS AND WOODY DEBRIS 5' MINIMUM NOT TO SCALE NO LIVE STAKES ON POINT BAR LIVE STAKE A TOP OF STREAMBANK . . �— PLANT LIVE STAKES FROM O� F ! TOP OF STREAMBANK \ TOP OF STREAM BANK TO TOE OF THALWEG \ STREAM BANK IN A DIAMOND s SHAPED, STAGGERED PATTERN TO SPECIFIED SPACING / TOE OF STREAMBANK RESTORED STREAMBED TOE OF STREAMBANK A F TO B' SPACING = Z TO 3' SPACING NO LIVE STAKES LIVE STAKE SPACING PLAN VIEW PLAN VIEW OF STREAM BANK SQUARE CUT TOP BUDS FACING UPWARD TOP OF STREAMBANK VI _p BANKFULL STAGE 3'LENGTH LIVE CUTTING �2'TO LIVE STAKE ---LIVE � MINIMUM 112" DIAMETER TvvV���i iii��i�ivv�� �A/AAA/AA TOE OF STREAMBANK /.(\ ANGLE CUT 30 TO 45 DEGREES RESTORED STREAMBED / / \ BASEFLS7W LIVE STAKE DETAIL \ NOTES: \%\%\%\%\%\%\%\%\%\%\%\%\%\%��\%\%\%\%\%\%\%\%\�� 1. LIVE STAKES SHOULD BE CUT AND INSTALLED ON THE SAME DAY. 2. DO NOT INSTALL LIVE STAKES THAT HAVE BEEN SPLIT. 3. LIVE STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS. 4. LIVE STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANIK. 5. LIVE STAKES SHOULD BE 1/2 TO 2 INCHES IN DIAMETER AND 2 TO 3 FEET LONG. SECTION A - A 6. LIVE STAKES SHOULD BE INSTALLED LEAVING 1/5 OF THE LENGTH OF THE LIVE LIVE STAKING STAKE ABOVE GROUND. NOT TO SCALE • r WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER �\\\\11111►�._ CAR: ,411�IJ1111►®���® ENGINEERING SERVICES BY N/LS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. I DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 09? SCAEORDUGH V.IIIIGATION BANK DETNL SHEES.AP,G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: N.T.S. VERT.SCALE: N.T.S. SHEET NAME D ETAI LS SHEET NUMBER 5 EXTEND WOODY DEBRIS MATERIAL TO 1/4 BANKFULL WIDTH TOP OF RESTORED STREAM BANK STAKE TOP LAYER OF EROSION CONTROL MATTING IN 6" TRENCH (SEE COIR FIBER MATTING DETAIL) BACKFILL 1.5' LIFT OF COMPACTED ON -SITE SOIL (TYP.) PLACE THICK LAYER OF 1 "- 6" DIAMETER WOODY DEBRIS COVER LOGS AND/OR ROOT WADS INSTALLED IN LOCATIONS AS SHOWN ON PLANS AND PER RESPECTIVE DETAILS PLAN VIEW TOP OF RESTORED STREAM BANK 11 DITCH PLUG WITH COMPACTED BACKFILL FIOVv SCOUR 1 DITCH TO BE FILLED DITCH TOP OF BANK \ POOL / `r L FOUNDATION LOGS TO BE INSTALLED AT ANGLES SHOWN BETWEEN 15-25' BANKFULL STAGE ; _ _ HORIZONTAL SETBACK FOR LIFT IS APPROX_ 1 FT. SECTION A -A POINT BAR (SEE TYPICAL SECTIONS) RESTORED STREAMBED INSTALL FOUNDATION LOGS SUCH THAT AT LEAST HALF OF THE LOG DIAMETER IS BELOW THE RESTORED STREAMBED ELEVATION. GEOLIFT W/ TOE WOOD NOT TO SCALE OF STREAM BANK HEAD OF RIFFLE INVERT ELEVATION TOP OF STREAM BANK 1B" MIN. THICKNESS STONE BACKFILL TAIL OF RIFFLE INVERT ELEVATION NOTES: 1. DIG A TRENCH BELOW THE RESTORED STREAMBED FOR THE STONE BACKFILL. 2. FILL TRENCH WITH CLASS WAND "B" STONE BACKFILL. TOP OF STREAM BANK �Z_ BANKFULL STAGE_ -- RIFFLE D... = MAX DEPTH TOE OF STREAMBANK EROSION CONTROL 16" MIN. THICKNESS MATTING SHOULD BE STONE BACKFILL PLACED BENEATH STONE BACKFILL �SINKFUi FLOW— _ _ TAIL OF RIFFLE INVERTELEVATION — � RIFFLE � 'L` \ p BASEFLON/ HEAD OF RIFFLE - b INVERT ELEVATION POOL PROFILE B-B 1 S' MIN. THICKNESS STONE BACKFILL CONSTRUCTED STONE RIFFLE NOT TO SCALE INVERT ELEVATION NOTES: 1. COMPACT DITCH PLUG MATERIAL FOR BACKFILL USING HEAVY EQUIPMENT IN 101NCH LIFTS. 2. CONSTRUCT DITCH PLUG WITH COMPACTED SOIL USING SUITABLE MATERIAL IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. 3. PLACE FILL MATERIAL IN LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY ENGINEER TO ALLOT/ FOR SETTLING. NEW STREAMBANK SHALL BE TREATED AS SPECIFIED IN PLANS OPTIONAL ROOT WAD PLACEMENT OR BANK PROTECTION AS DIRECTED BY ENGINEER PLAN VIEW SECTION A -A DITCH PLUG NOT TO SCALE CHANNEL TO BE RELOCATED TOP OF STREAMBANK NE'N FLOvV DIRECTION CHANNELBLOCK 'UiG?� ��✓�� � O<G� PLAN VIEW PLACE UNCOMPACTED FILL 1.5' \ ABOVE FINISHED GRADE 1 FINISHED GRADE 14PACTED BACKFILL OLD FLOW — WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER AR t � 3r",16 .G I NEB': v'•'• ER 14IJ1111►101 ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 09? SCAEORDOGH V.IIIIGATION BANK DETNL SHEES.AP,G DESIGNED BY: KMV DRAWN BY: APL DATE: 11-22-19 HORIZ. SCALE: N.T.S. VERT.SCALE: N.T.S. SHEET NAME CHANNEL BOTTOM/J ` INVERT ELEVATION NOTES: 1. COMPACT DITCH PLUG MATERIAL FOR BACKFILL SECTION A -A D ETAI LS USING HEAVY EQUIPMENT IN 101NCH LIFTS. 2. CONSTRUCT DITCH PLUG WITH COMPACTED SOIL USING SUITABLE MATERIAL IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. CHANNEL BLOCK 3. PLACE FILL MATERIAL IN LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY ENGINEER TO ALLOW FOR SETTLING. NOT TO SCALE SHEET NUMBER 6 TRANSPLANTED VEGETATION, WITH ROOTMASS, AND SOIL MATERIAL TOP OF STREAM BANK TOE OF STREAM BANK RESTORED STREAMBED LO PLAN VIEW OF STREAM BANK TRANSPLANTED VEGETATION, WITH ROOTASS, AND SOIL MATERIAL BANKFULL STAGE BASE FLOW _ NOTES: 1. EXCAVATE A HOLE IN THE RESTORED STREAM BANK THATWILL ACCOMMODATE THE SIZE OF TRANSPLANT TO BE PLANTED. BEGIN EXCAVATION AT TOE OF THE STREAM BANK. 2. EXCAVATE THE ENTIRE TRANSPLANT ROOT MASS AND AS MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE. IF ENTIRE ROOT MASS CAN NOT BE EXCAVATED AT ONCE, THE TRANSPLANT IS TOO LARGE AND ANOTHER SHOULD BE SELECTED. 3. PLANT TRANSPLANT IN THE RESTORED STREAM BANK SO THAT VEGETATION IS ORIENTATED VERTICALLY. 4. FILL IN ANY HOLES OR VOIDS AROUND THE TRANSPLANT AND COMPACT. 5. ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED. 6. WHEN POSSIBLE, PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT THEIR ROOT MASSES CONTACT. VEGETATION TRANSPLANTS NOT TO SCALE TRENCH LIMITS 24" MAX. TYP (TRENCH ONLY) TOP OF STREAM BANK EROSION CONTROL MATTING TO BE EXTENDED TO TOE OF SLOPE iD-D / 36" MAX. TYP SMALL MATTING STAKES--LO L LARGE MATTING STAKES A PLAN VIEW OF STREAM BANK INSTALL EDGE OF EROSION CONTROL MATTING IN 12 INCH DEEP TRENCH, AND SECURE BY STAKING, BACKFILLING. AND COMPACTING SOIL TO FINISHED GRADE. TOP OF STREAM BANK p BANKFULL STAGE TYPICAL LARGE MATTING STAKE 1.51N 3.51 CM THICKNESS I1.51N 3.61 CM TYPICAL SMALL MATTING STAKE .X" SMALL MATTING STAKES (TYP.) I LEG LENGTH 11.00 IN 27.84 CM HH IN 3.18 CM TOE OF STREAM BANK HEAD THICKNESS 0.40 IN 1.02 CM 0.60 IN 1.52 CM TAPERED TO POINT LEGTOTAL /yj,�/j/ /v/T'./�/ LENGTHS1 12.00 IN 30.48 CM p BASEFLOW _ NOTES: \ 1. RESTORED STREAM BANKS MUST BE SEEDED AND ' ��/\\rj/�/j /\�j/�/�; �j\ // RESTORED STREAMBED %\\j"\y\j\ \9, MULCHED PRIOR TO PLACEMENT OF EROSION CONTROL MATTING. y 7 y//`//`//`//�//`//`//`//`// 2. SEE TECHNICAL SPECIFICATIONS FOR MATTING STAKE �/�//\\��/�%�/�//\\\�///\\\��///% SPACING REQUIREMENTS. SECURE EROSION CONTROL 3. PLACE LARGE STAKES ALONG ALL MATTING SEAMS, IN MATTING AT TOE OF SLOPE THE CENTER OF STREAM BANK, AND TOE OF SLOPE. SECTION A - A WITH LARGE MATTING STAKES. EROSION CONTROL MATTING NOT TO SCALE WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER �\\\\I111I►�._ AR 3rj'il6 v'•'• �PHE R ,�I/IJ1111►®���® ENGINEERING SERVICES BY N/LS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 PLANTING METHOD USING THE r NO. DESCRIPTION DATE 2" PROJECT NAME 7/77 %\ SCARBOROUGH /\\TX, MITIGATION 1. INSERT PLANTING BAR AS 2. REMOVE PLANTING BAR AND 3. INSERT PLANTING BAR PROJECT SHOWN AND PULL HANDLE PLACE SEEDLING AT 21NCHES TOWARD TOWARD PLANTER. CORRECT DEPTH. PLANTER FROM SEEDLING. 0 WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME:09?SCARBOREOGH V.II1GATION BANK DETNL SHEES.DAG \\//,\\Y//� �\ �\ �Y/ DESIGNED BY: KMV \\\/ \//\/\j DRAW N BY : APL DATE: 11-22-19 4. PULL HANDLE OF BAR 5. PUSH HANDLE FORWARD 6. LEAVE COMPACTION HORIZ. SCALE: N.T.S. TOWARD PLANTER, FIRMING SOIL AT TOP. HOLE OPEN. WATER FIRMING SOIL AT BOTTOM. THOROUGHLY. VERT.SCALE: N.T.S. NOTES: 1. PLANT BARE ROOT VEGETATION TO THE WIDTH OF THE BUFFER/PLANTING ZONE AS SHOWN ON THE PLANS. DEFINED IN THE TECHNICAL SPECIFICATIONS. 2. ALLOW FOR 6-10 FEET SPACING BETWEEN PLANTINGS, AS eA" 3. LOOSEN COMPACTED SOIL 4. PLANT IN HOLES MADE BY A MATTOCK, DIBBLE, PLANTING BAR OR PLANTING BAG OTHER APPROVED MEANS. 5. PLANT IN HOLES DEEP AND WIDE ENOUGH TO ALLOW THE ROOTS SHEET NAME TO SPREAD OUT AND DOWN WITHOUT J-ROOTING. 6. KEEP ROOTS MOIST WHILE DISTRIBUTING OR WAITING TO PLANT BY MEANS OF WET CANVAS, BURLAP OR STRAW. 7. HEEL -IN PLANTS IN MOIST SOIL OR SAWDUST IF NOT PROMPTLY PLANTED UPON ARRIVAL TO THE PROJECT SITE. 78. DURING PLANTING, SEEDLINGS SHALL BE KEPT IN A MOIST DETAILS CANVAS BAG OR SIMILAR CONTAINER TO PREVENT ROOT PLANTING BAR SYSTEMS FROM DYING. 9. PLANTING BAR SHALL HAVE A BLADE WITH ATRIANGULAR CROSS SECTION AND SHALL BE 12 INCHES LONG, 41NCHES WIDE AND 1 INCH THICK AT CENTER. 10. ALL SEEDLINGS SHALL BE PRUNED IF NECESSARY, SO THAT NO SHEET NUMBER ROOTS EXTEND MORE THAN 10INCHES BELOW THE ROOT COLLAR. BARE ROOT PLANTING DETAIL 7 NOT TO SCALE l � -------------- Nis/� / — — \ c9 BEGIN CONSTRUCTION UT1-R1 (UPPER) `i/ ` 1 / / STA. 10+15.18 \ /% / ' v I N/F ,O I \ V)" WATER AND LAND SOLUTIONS, LLC — '� / \ 7 0x 7 D.B. 3427, PG. 65 P.I.N.:3507-13-2313 PROPOSED HEADWATER \ 77x \ VALLEY BOTTOMWIDTH(TYP.)00 �- .{ \ \ \ INSTALL CONSTRUCTED LOG / - ` , } \ \ RIFFLE (TYP.) / `• 13+00 , 4k00 CONSERVATION �II \ \ • \ — �/ 1 / / EASEMENT (TYP.) l ` \ — —� / I I \ / ^A STALL \y v I 1 OG WEIR (TA) / / �1 ico WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-51 1 1 wat2rlar�dsalutions.com PROJECT,�lyl���'R CAR ., .••• FESSI0'° 9'•� /jj•.� � ' � SEAL l ° ° 36916 ENGINEERING SERVICES BY WILS FIRM LICENSE ENGINEERING,PLLC l4 0 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 80 80 PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION 70 70 PROJECT NO.: 17-003 FILENAME :18 4- SC1R30ROUGH Idl➢GPil01V BPNK Pl4V 1ND PROFlIEAVrG DESIGNED BY: KMV DRAWN BY: APL w DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : i NORTH 60 60 30 15 0 30 60 DE SIG TH LWE Exls ING GR UND DESIGN GRAPHIC SCALE B NKFULL SHEET NAME UTl-R 1 PLAN AND PROFILE 50 50 SHEETNUMBER 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 Q \\ �,� \ WATER & LAND -{ \ y y y y l� OZ7e % SOLUTIONS \ y y y y y DO NOT EXISTING WETLAND ANIYMATAE \ \ \� / TREES \ ,,, ;;' J.' p.. 7721 Six Forks Rd., Suite 130 W y y y y PROPOSED HEA TER y y y y y y y y r \y I y y Raleigh, NC 27615 919 614-51 1 1 Z , \\LU VALLEY BOTTOM WIDTH( y y y -VP Z waterlandsolutions.com _ � -A_ T� �Z TP' PROJECT ENGINEER y y 1 TP R" ._ y\y- ,,_� y y y f \��� INSTALL CONSTRUCTED LOG F� y y 0+ \CDy y C AR �I �C` Q� ,�� RIFFLE TYP. / .ai- �y �� 22+00 �— y y _ SEAL Cep — 36916 — — . °0 / \ y y y — \ lam ���' F '••Glj � 4 r "I P ,�I / / �•\ \ yLAND ��Zoms-'[ y NSTALL y I .p...•• O ��I��ER � 11 / / WATER D.B. o .7,� � OG WEIR TYP. —� ( ) / � u1111►® / \ \ \ P.I.N.:350 - �3 y y y y y / / p N' SERVICES ENGINEERINGILS \ / Q % ENGINEERING, PLLCY FIRM LICENSE NO. P-1480 / REVISIONS A DRAFT MIT PLAN 6-14-19 1 \ \ \ / w z W B FINAL MIT PLAN 11-22-19 \y Y Al y y y c Ca- Ljj w NO. DESCRIPTION DATE PROJECT NAME 80 80 SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME : IB 4- SC1R30ROUGH Idl➢GPil01V BPNK Pl4V 1ND PROFlIEAVrG 70 70 DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' `R VERT. SCALE : 1" = 6' _ — NORTH 60 4.Doh .4. 8°,6 60 30 15 0 30 BO D SIG TH LnE GRAPHIC SCALE DESI N SHEET NAME UTI-R 1 PLAN AND PROFILE 50 50 SHEET NUMBER 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 9 \ 5 END CONSTRUCTION UT1B STA.21+66.60 X PROPOSED HEADWATER j j VALLEY BOTTOM WIGTH(TYP.) I -A -A \-j -"24+00 �� — r \ 26 00 I \ — .—.—.— INSTALL CONSTRUCTED UT1-R1 CD LOG RIFFLE (TYP.) FLOW ++ I N U) ^ (n � � I6 z — W C) (n cQ LU NSF WATER AND LAND SOLUTIONS, LLC 3427, PG. 65 P.I.N.: 3507-13-2313 27+00 - - - - - - - —� — 28+00 . —. —. \ INSTALL LOG WEIR (TYP.) y�'D _ _ r m ' � N W CDD.B. + CHANNEL BLOCK (TYP.) cm) END CONSTRUCTIIONATION UTl4®�` UT-R1 J�1�0`J� STATION 30+06.29 F/ - - - _ - - / 30 00 — ------ 2e+oo — CONSTRUCT DUAL TRANSITION BET EN HEADWATER VALLEY A D SINGLE THREAD CHANNE REMOVE EXISTING Q i 15" DIA RCPLu O WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 WC7terlandsolutions.com PROJECT ENGINEER C R0S f,,'�. _4" \O' •�`SS/Q : �•�� A SEAL ' - 36916 ,j�/•� G I NE��• ��ft '''f; PHER►®���®� ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT 7 WAYNE COUNTY, NC _ DRAWING INFORMATION 60 0 _ _ �. — — o . 60 PROJECT NO.: 17-003 FILENAME : 88 4SC1R30ROUGH Idl➢GPil01V BPNK Pl4V 1N� PROFlIEWrG _ DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' DESIGN VERT. SCALE: XIS ING ROIJND NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UTl-R l PLAN AND PROFILE 40 40 SHEET NUMBER 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 O N/F WATER AND LAND SOLUTIONS, LLC D.B. 3427, PG. 65 P.I.N.: 3507-13-2313 \ PROPOSED HEADWATER VALLEY BOTTOM WIDTH(TYP.) UT1-R1 FLOW • 37+ 00 34+00 33+00-- INSTALL LOG WEIR (TYP.) INSTALL CONSTRUCTED LOG RIFFLE (TYP.) -i— _ 36+00 W I CD 0 + EVA 1w + v, \ ,�7 0 37+00 I WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER �\\\\\Illy►/I CAR 4?10. �. •'FESSI0' SEAL -A = 36916 .......... `'�0�� ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 DESCRIPTION PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME : 88 2- S1R30ROUGH NITATIOIV WIP Pl4V M PROFILE DM DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : 1" = 6' NORTH 30 15 0 30 60 GRAPHIC SCALE SHEET NAME ImYi� m PLAN AND PROFILE SHEET NUMBER 11 0 PROPOSED HEADWATER / O� VALLEY BOTTOM WIDTH(TYP.) Mx �- �V N/F / — — m� WATER &LAND 1� WATER AND LAND SOLUTIONS. LLC D.B.3427,PG.65 _ N = CHANNEL BLOCK (TYP.) SOLUTIONS P.I.N.: 3507-13-2313 v- 7721 Six Forks Rd., Suite 130 ��✓ v- `' Raleigh, NC 27615 (919)614-5111 � �I �o �� wat2rlar�dsolutions.com w \ 2 �\ 1[. I 'o Q PROJECT ENGINEER A � \ - SNA. 244+82 5RUCTION UT3 \ ,,'����,� ��',,, 0 / �-� !' INSTALL LOG \ '� \ : �FESS10�'..9 v- �� . \ '�� I WEIR (TYP.) ' .'� 9 �� FAO"" •� 58+o U R T= 2 INSTALL LOG VANE (TYP.) -' SEAL = 36916 P V IL v-:' ® • �� �/'HE R u ' CONSTRUCT GRADUAL ' ENGINEERING SERVICES BY MILS ENGINEERING, LLC TRANSITION BETWEEN HEADWATER VALLEY AND 1480 FIRM LICENSE NO. P-80 REVISIONS SINGLE THREAD CHANNEL A DRAFT MIT PLAN 6-14-19 ' B FINAL MIT PLAN 11-22-19 INSTALL CONSTRUCTED INSTALL GEOLIFT WITH END CONSTRUCTION UT1-R1 (LOWER) LOG RIFFLE (TYP.) TOE (TYP.) WOOD , BEGIN CONSTRUCTION UT1-R2 STATION 38+22.67 NO. DESCRIPTION DATE PROJECT NAME 70 70 SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC _ DRAWING INFORMATION — PROJECT NO.: 17-003 FILENAME : 88 2- SNR30ROUGH NITATIOIV WIP PLAN M PROFIIEDM 60 Y _ 60 7 - i 0 n DESIGNED BY: KMV DRAWN BY: APL DATE : 111-22-19 EXITINGRUN 11 SCALE 60' DE IGN THAL WE . VERT. SCALE : 1" = 6' ESI SN BA KF LL NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT1-R2 PLAN AND PROFILE 40 40 T-T ::1 SHEET NUMBER 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 \ t11 '9j, ` � p� �x ` \ INSTALL LOG WEIR (TYP.) 0 0 WATER AND LANDFSOLUTIONS, LLC / A D.B. 3427, PG. 65 DITCH PLUG (TYP.) P.I.N.: 3507-13-2313 % co Ji — Lu INSTALL GEOLIFT WITH J W TOE WOOD (TYP.) _ _ vlcn, ¢ w U7-1-R2 CHANNEL BLOCK (TYP.) INSTALL ROOT WADS (TYP.) FLOW••'•• END CONSTRUCTION UT2 L EP. INSTALL CONSTRUCTED k0� STATION 32+88.92 LOG RIFFLE (TYP.) �J1 CONSTRUCT GRADUAL ' / / / l�O- n\1�TRANSITION BETWEENHEADWATER VALLEY AND SINGLE THEAD CHANNEL V \� �� WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER CI(/ i,p 'Y 36916 :�i• NG I NEB zz';" ER ENWGINEERING SERVICES Y ENGIN E ING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT FAIT PLAN s-1a-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT " s WAYNE COUNTY, NC 41 7 � DRAWING INFORMATION 60 — 5 60 PROJECT NO.: 17-003 FILENAME : 88 2- SNR30ROUGH NITATION WIP Pl4V M PROFIIEDM ' ¢ - 5 l _ DESIGNED BY: KMV - _ _ 3,, _ — _ DRAWN BY: APL -a.7s,6 -11.7E 12.f7ob _ DATE : 11-22-19 HORIZ. SCALE: 1"=60' VERT. SCALE: D SIG ESI N T ALW G AN FUL NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UTI-R2 PLAN AND PROFILE 40 40 SHEET NUMBER 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 13 ' OO INSTALL GEOLIFT WITH TOE WOOD (TYP.) N/F WATER AND LAND SOLUTIONS, LLC D.B. 3427, PG. 65 P.I.N.: 3507-13-2313 INSTALL CONSTRUCTED CONSERVATION LOG RIFFLE (TYP.) EASEMENT (TYP.) 1 \ END CONSTRUCTION UT1-R2 // Y /� STATION 56+84.53 �\ /0 �A T �� /� 0� N/F WATER AND LAND SOLUTIONS, LLC /C/� i, ��� P.I.N.: 3507-33 3302 / CHANNEL BLOCK (TYP.) _ + \ LO UT1-R3 0 / FLOW INSTALL CONSTRUCTED EXI ING 5'H X8' W MP LU H- STONE RIFFLE (TYP.) INV. IN 56.33 / INV.OUT = 56.44 BEGIN CONSTRUCTION UT1-R3 U C= 'J STATION 57+60.05 H W Q W U) WATER &LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, INC 27615 (919)614-51 1 1 wo terlandsolutions.com PROJECT ENGINEER �.'�C ARO�f,�•,. ' ' SEAL l ' _ = _ 36916 `cNQ,'` G I Nli �� ,®�,�OP ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION EXI TIN 5' X8' CM PROJECT WAYNE COUNTY, NC CL 7 DRAWING INFORMATION 60 1 60 PROJECT NO.: 17-003 FILENAME : 88 2- SNR30ROUGH NITATIOIV BPNK_PLAN M PROFILUM _ 1 a DESIGNED BY: KMV ' — \• 1 t — _ /N — DRAWN BY: APL _ _ DATE: 11-22-19 71, VERT. SCALE : DESIGN HAL EG >> e% ESI N EXIST NG GROL ND I V. I = 5 .33 I V.O T = 56.4 / \ NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UTI-R2&R3 PLAN AND PROFILE 40 40 SHEET NUMBER 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 14 CONSERVATION EASEMENT (TYP.) / Q� Q UT1oR3 CHANNEL BLOCK (TYP.) ❑ ,� - cm))FT��Tq ++ INSTALL CONSTRUCTED STONE RIFFLE (TYP.) Q Z UJ EXISTING 5' H X 8' W CMP J W BEGIN CONSTRUCTION UT1-R3 INIV. IN = 56.33 == STATION 57+60.05 !n INV.OUT = 56.44 UJ Q W U) ` INSTALL CONSTRUCTED WATER AND LAND SOLUTIONS, LLC ` LOG RIFFLE (TYP.) P.I.N.: 3507-33 3302 � / \ / INSTALL LOG VANE (TYP.) INSTALL GEOLIFT WITH TOE WOOD (TYP.) INSTALL LOG WEIR (TYP.) `�L' ssx WATER &LAN D SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 lands luti 11 wat2rlar�dsolutions.com PROJECT ENGINEER CAR �.,•��``JJI0�9'9 • ' : Q SEAL 36916 i1I1j FNG I NEB '• �'`�,` o i ►®�®�,® ENGINEERING SERVICES BY FIWILS RM LICENSE ENGINEERING, Pl4 0 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC l _ _ m — — � DRAWING INFORMATION 60 N 60 PROJECT NO.: 17-003 FILENAME :18 2- SNR30ROUGH NITATIOIV BANK PLAN M PROFIIEDM DESIGNED BY: KMV DRAWN BY: APL H ORIZ. SCALE : 1" = 60' VERT. SCALE : NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UTI-R3 PLAN AND PROFILE 46 49 -71 SHEET NUMBER 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 15 J N/F INSTALL CONSTRUCTED Q�" WATER AND LAND SOLUTIONS, LLC LOG RIFFLE (TYP.) �O C -/i//�� D.B. 3464,PG. 54 v% P.I.N.:3507-33-3302 CONSERVATION �� INSTALL GEOLIFT WITH EASEMENT (TYP.) TOE WOOD (TYP.) INSTALL CONSTRUCTED--_ STONE RIFFLE UT1-R3 (TYP.) � I � FLOW TX6g�ES CHANNEL BLOCK (TYP.) EXISTING S H X 8' W CMP INV. IN = 56.95 SFF y�7 INSTALL LOG VANE(TYP.) END CONSTRUCTION UT1-R3 STATION 72+44.68 Fr's` 6s x00 / -� / �/ WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-51 1 1 W(7terlandsolutions.com PROJECT ENGINEER �\\\\\Illy►/I CAR S QAA�''�,�9 SEAL 36916 6VG lit. OPHER ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. I DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC \ _ _ DRAWING INFORMATION 60 60 PROJECT NO.: 17-003 FILENAME : IB 4SNR30ROUGH NITATIOIV WIP Pl4V M PROFILUM DESIGNED BY: KMV J DRAWN BY: APL H ORIZ. SCALE : 1" = 60' - .06°h -9.9 °d -12 64°/n 12. VERT. SCALE : DESIGN TH WE DE ANK IGN ULL \ NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UTI-R3 PLAN AND PROFILE 40 49 SHEET NUMBER 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 16 _ CONSERVATION` _, /i�/ /// �• ` \ / L f F i EASEMENT(IaCR}_ — — /� //j �/� / F — — — i \� / 1 \ �/ �� F� \ P �_- J/�J_ j�/jam/ F� `_ _�\\ J J� �_ J ��\ /j1 / �- r— E F F� \ F \ — — F l r / / F INSTALL CO�d'STk2UCTED f F F\ REMOVE E�STING I ` \ 1 1 L G RIF6CE (TYP.) F F \ F \ F 30" IA RCP J F I F / F F F \F / / F F F F \ ` 1✓ F / F F F / F \ F / f— F _F - \' � \�� \1J�--- /—%.��—F—.--_— F _� �= �— F— � -�F �/jam/tl i F _ J - - - -- F F-r;F F/ — L F/ �\ �I`B /' —�+oo= r -F - F _/ - =`WLB 6 F F F F F F - _ UO \\ F 'F F F F F F F I F F F F F F\ mF F F �7F/ ^ \ \ » �o �I F F F 4 � \�F �FJ V �� � F SOLUTIONS, LLC \ O � � F B�GINI CONSTRUCTION UT2 (WEER) F F TER AND AND STATION e+00.00 F \ F F 427, PG. 65 END CONSTRUCTION UT2 (UPPER) . / A V F F F F F F k \/ F (� F /E. / F .I.N.: 3507-13-2313 BEGIN CONSTRUCTION UT2 (LOWER) F F F F ` F F / I ! STATION 15+86.50 F F ! F F F F F /F F � F P WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, INC 27615 (919)614-51 1 1 wat2rlar�dsolutions.com PROJECT ENGINEER ,�•`����CAR���,1;�. ..... `�� .�O��SS�0�9� , = SEAL l ' 36916 •' ••.....• ` .� .�NER ENGINEERING SERVICES BY IN , Pl480 FIWILS RM LICENSE REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 22-19 NO. I DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION w W w W d W PROJECT w W WAYNE COUNTY, NC F n F BANI FUL EXISTING GF OUND a a ii n a a a r~n a a DRAWING INFORMATION 60 =77 -7 .09 7 — - Log 1 r \ 60 PROJECT NO.: 17-003 FILENAME : BB 2- 5NR30R0UGH NITATIOIV BANK PLAN M PROFILUM DESIGNED BY: KMV DRAWN BY: APL DATE: 1 1 -22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : 1" = 6' NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT2 (UPPER) & LOWER PLAN AND 40 40 PROFILE SHEET NUMBER 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17 (� I \ / N/F l WATER AND LAND SOLUTIONS, LLC \ Ir D.B. 3427. PG. 65 \ / P.I.N.: 3507-13-2313 9+00 / - • - - - �2+00 INSTALL CONSTRUCTED LOG RIFFLE (TYP.) / CHANNEL BLOCK (TYP.) \ , V ' �''��� A,�� co \ - WATER & LAND SOLUTIONS 4 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER CA • • ROC[ p��i pF % . 0;1 SEAL 36916 ' , i!1111 I �iR►®� ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. I DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION W PROJECT W 11 W W W W W W W IS WAYNE COUNTY, NC a 1 �,, a F � i � F _ a i, F F DRAWING INFORMATION 60 a — a 60 PROJECT NO.: 17-003 FILENAME : IB 4- SC1R30ROUGH Idl➢GPil01V BPNK Pl4V 1ND PROFlIEAVrG DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : 1" = 6' NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT2(LOWER) PLAN AND PROFILE 46 40 SHEET NUMBER 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 18 WATER & LAND SOLUTIONS W N/F WATER AND LAND SOLUTIONS, LLC D.B. 3427, PG. 65 � '� F.LN.: 3507-13-2313 � 7721 Six Forks Rd., Suite 130 _� Raleigh, NC 27615 \ 1 (919)614-5111 �VZ CO watern dso uti aons.com PROJECT ENGINEER CARP f,i,� Q i � 24' P4% °o —' y • ' l •_ 2s+00 00 — • SEAL 36916 —. o- 27+00 G E . •o�,�. ER ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 / INSTALL CONSTRUCTED LOG F¢ cl)' REVISIONS A DRAFT FAIT PLAN 6-14-19 RIFFLE (TYP.) N B FINAL MIT PLAN 11-22-19 / �W < W\ ca \ _ Q W NO. DESCRIPTION DATE co PROJECT NAME 70 70 SCARBOROUGH MITIGATION cq PROJECT w W w w W G WAYNE COUNTY, NC F n F n a 1i 1i ¢ DRAWING INFORMATION m a PROJECT NO.: 17-003 FILENAME :18 2- SNRKROUGH NITATIOIV WIP Pl4V M PROFILUM 60 _ DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : ) NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT2(LOWER) PLAN AND PROFILE 46 40 SHEET NUMBER 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 19 N/F ' WATER AND LAND SOLUTIONS. LLC \ D.B.3PG. 65 P.I.N.:3507507-13-2313 / INSTALL NSTRUCTED —/ LOG RIFFLE P.) PROPOSED HEADWATER VALLEY BOTTOM WIDTH(TYP.) 'TALL GEOLIFTWITH WOOD (TYP.) p +o0 31 Ti� �0 CHANNEL BLOCK (TYP.) + F` , C) CONSTRUCT GRADUAL TRANSITION BETWEEN HEADWATER VALLEY AND SINGLE THREAD CHANNEL I Z W J W = S END CONSTRUCTIONUT2(LOWER) STATION 32+98.10 1� INSTALL LOG 1 I CONSERVATION EASEMENT (TYP.) I r I I LLI 'o \ I o I , BEGIN CONSTRUCTION UT1A w I STATION 10+00.00 I \ I ' INSTALL CON RUCLED i / INSTALL GEOLIFT WITH LOG RIFFL P.) I / TOE WOOD (TYP.) 7 ' / UT1A REMOVE EXISTING♦�'• 15' DIA RCP I, I I aII( a l /� N/F WATER ANNDL3 2D SOLUTIONS, LLC END CONSTRUTION UT1A \ I lD.B. PG. G STATION 12+41.04 P.I.N.:35D7-13-2313 = UT-R1 \ STATION 30+06.29 •III n I III II I I \ \ xO WATER &LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-51 1 1 waterlandsolutions.com PROJECT ENGINEER ,FLOW ♦ OF•�q•<OE E JJ/D♦� i''•9 36916 F,�//� `C`:� y5\� ♦j�/ � ;Vl7 � N `` • �'` , ER ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT FAIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 \ Q VANE (TYP.) III I I III III t \ NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION Ic PROJECT ow W W w W W wWw W WAYNE COUNTY, NC a r ana n r a i a a u ¢ i a a w a a d a d a a s DRAWING INFORMATION 60 rn \ a 60 PROJECT NO.: 17-003 FILENAME : 88 2- SNR30ROUGH NITATION WIP Pl4V M PROFILUM DESIGNED BY: KMV J DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT2 (LOWER) & UT I A PLAN AND PROFILE 40 40 SHEET NUMBER 31+00 32+00 33+00 10+00 11+00 12+00 13+00 20 e z a a a a DITTHPLUG (TYPO a WATER & LAND SOLUTIONS / a a a a a a a a 7721 Six Forks Rd., Suite 130 a a Raleigh, NC 27615 (919)614-5111 \ ox BEGIN CONSTRUCTION UT3 .rI 10+00.00 N/P —� WATER AND LANK Se U I ION � N' >,PROPOSED F-EADWATiR D42 _-- B-OTTOM IDTHYP.) ,-2313 4 P- a a a ' /a a 1-7 00 a 1\1 Wat2CICIY1dSOIUtI0Y1S.G01Y1 PROJECT ENGINEER a aVaALLEY a a a �.� a a. CARD`/�i, INST-)iLL CONSTRUCTED LO a a 6+0ff I a a p� .+''•' ��®� RIFFLE(TYP.) a a ��� \•• �. Il a a a\ a77, a a a a a a o a _ a a a !�% a�%a � �— a a a s a pFESS�O,y'..9 = • 9' SEAL \ r a� a a s a a a�� a 4+a . a— a a a a s a a = - 36916 \ \ a 2+ oo �a s 1 `'-a a aaaa —a—� aa a a a a a �• ;�� 4 �aa NG I � a a ._aa �r'f ;a ._ ._�. — a aaa a aNSTALL a 'i�PER \\ aaaa • a LOG)VEIR (TYP. a a a 0B ► v.��n►®. 1 aaa a >/ � � ENGINEERING SERVICES BY WLS ENGINEERING, PLLC a In' a >/ `ICI a VV�g�-� y FIRM LICENSE NO. P-1480 REVISIONS a a VV a a `I�Ia L9 4 A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 1 a a a a a/ NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT W LJ J W J W w w W w W WAYNE COUNTY, NC DEit IGN i n n n n n n a rq ~ EXI TIN GROUND DRAWING INFORMATION a a a PROJECT NO.: 17-003 FILENAME :18 4- SCaR30R0UGH Idl➢GPil01V BPNK Pl4V aND PROFlIEAVrG 60 N 60 -0.2 % 010 7— — _3 2� 9 -0' % '$ S DESIGNED BY: KMV DRAWN BY: APL \ DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' DE 3IGN THA-WEG VERT. SCALE : NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT3 PLAN AND PROFILE 40 40 SHEET NUMBER 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 2 1 '' 9 \ > > >1 �� >\ >\ �„\ END CONSTRUCTIONUT3 >\ >\ � v /F STA. 24+82.53 > >\ >\ % >\ >\ 4ATER Xr D LAND SOLO4IONS', LLC >l ✓ _ I I � dB.3427PG.65 � — _ i m � � P.I.N.: - � M '� 3507413-2313 , ,y Cy - ,\ ,� FFS <7�F o 9 >\ > >\ FFT23`924xO j `O / U 00 9 yam\ I PROPOSED HEADWATER WL �l� �Y VALLEY BOTTOM WIGT�TYP.�_ E O G ll\ \ J N •�\ 15" DIA RCP 00 23+00 / / 9+00 00 �l' I� �• //� % I _ �_ �\ � l /� �� /J /�/> INSTALL LOG I LB IR(TYP.) A \ � � III SY UCTED � j >\ >\ \�LOGRIFFILE .) B WATER &LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-51 1 1 waterlandsolutions.com PROJECT ENGINEER ����\�1111►/I .'�� CAR '*. �H 0�/ �i� �� �y = Q : SEAL 36916 �i • c ° 5 ENGINEERING SERVICES BY WILS ENGINEERING, LLC FIRM L CENSE NO. P-Pl4 0 REVISIONS A DRAFT MIT PLAN 6-14-11 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT W W J w w J J W WAYNE COUNTY, NC n n ESI N n n n F FNUF m n F n ¢ a F DRAWING INFORMATION 60 a a a a a 60 PROJECT NO.: 17-003 FILENAME : 08 2- SNRKROUGH NITATIOIV WIP PA M PROFILUM ,3 S .02 0_q 03o g5olo -0. 5% -0.2�% _ _23% _ 2 - / DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : ill= 60' DE IGN THA WE VERT. SCALE : A NORTH 50::F 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT3 PLAN AND PROFILE 40 40 SHEET NUMBER 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 22 y 1 `✓ END CONSTRUCTION UT3 STA. N 24+82.53 IV y oN k w oy zIW \ = S wSTA. y Q W �y IV y y W. y +83/ y� — �— IV y y y IVA\ IV. IVv1' y / y F�-IV / y y / IV/ y \ IVTRUTION UT1-R1 -- `V / IV B ONSTRUCTION UT1-R2 • y STATION 38+22.87 IV y / `V IV �V \ y � LO / WEIR (TYP.) \ ° 00 ' --\ ` /\ J ^ \ Q BEGIN CONSTRUCTION UT113 N 10+00.00 z W NSF Z■w _ WATER AND LAND SOLUTIONS, LLC --- U„==cl) LLIA/� 3427, LLI P.I.N.:3507-13-2313 �I(n B "LO '—•—•---'—•---'— 5+0 �� �� 11 4, v ; 13+00— 14+00 _ E12 —r I INSTALL CONSTRUCTED LOG RIFFLE (TYP.) _ PROPOSED HEADWATER i — VALLEY BOTTOM WIDTH(TYP.) � IINSTALL _ WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 Wa terlandsolutions.com PROJECT ENGINEER ��,,�Q` �'S'SO<9®1� ;• l • = SEAL 36916 �? E •e�`�e• / G ° • ®g�, p °°°••�0,� ER ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION PROJECT DE IGN WAYNE COUNTY, NC GR UND A K ULL n n n B DESI NKF N ILL_ DRAWING INFORMATION 60 -0. 5% 11° 60 PROJECT NO.: 17-003 FILENAME : IB 4- SC1R30ROUGH Idl➢GPil01V BPNK Pl4V M PROFlIEWrG DESIGNED BY: KMV DRAWN BY: APL DE IGN DATE : 11-22-19 HORIZ. SCALE: ill 60' E ISTI G ROU D VERT. SCALE : A NORTH 50 1 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME UT3&UT1B PLAN AND PROFILE 40 40 SHEET NUMBER 24+00 25+00 10+00 11+00 12+00 13+00 14+00 15+00 �� cDi J C111)M ��---���J Lu N Iz F- Lu Lu S = (A 1. -- — — Q � LU — — — — — FLOW I / �—�---- / v WATER AND LANDFSOLUTIONS, LLC INSTALL CONSTRUCTED LOG / RIFFLE (TYP.) — — — — - _. -- — D.B. 3427, PG. 65 P.I.N.: 3507-13-2313 END CONSTRUCTION UT1BPROPOSED VALLEY BOTTOM WIDHEADTH(TYPR STA.21+66.60 — — — — 8+00 19+00 00 +Oo +� — — 1 f` t (? t �� 21+0� INSTALL LOG WEIR(TYP.) ` j j�� 00 / ' O�L i i " r 25 f WATER & LAND SOLUTIONS 7721Six Forks Rd.,Suite 13O Raleigh, NC 27615 (919)614 51 1 1 Wat2EICI Y1dSOlUtI0Y1S.G01'Y1 PROJECT ENGINEER CAROp[�A,i,� ,, O •..,. ,y I : Q 9l SEAL = 36916 pj ,,,,'1IIj11\\®�®,,® PHER ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. I DESCRIPTION DATE 70 70 PROJECT NAME SCARBOROUGH MITIGATION J W PROJECT WAYNE COUNTY, NC BAWFULL E ISTI G G OU D F F a DRAWING INFORMATION 60 3% �/ 60 PROJECT NO.: 17-003 FILENAME:882-S1RKROUGHNITATIOIV WIP PA M PROFILUM 0 O _ _ DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 60' VERT. SCALE : A NORTH 50 50 30 15 0 30 60 GRAPHIC SCALE SHEET NAME Urfa PLAN AND PROFILE 40 40 SHEET NUMBER 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 24 PLANTING NOTES 1. THE FOLLOWING TABLES LIST THE PROPOSED VEGETATION SPECIES SELECTION FOR THE PROJECT REVEGETATION. THE TOTAL PLANTING AREA IS APPROXIMATELY 150 ACRES AND WILL VARY BASED ON SITE CONDITIONS AND AREAS DISTRURBED DURING CONSTRUCTION. 2. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING. SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE PROCUREMENT OF PLANT/SEED STOCK. 3. IN GENERAL, WOODY SPECIES SHALL BE PLANTED AT A DENSITY OF 597 STEMS PER ACRE AND IN LOCATIONS SHOWN ON THE REVEGETATION PLANS. EXACT PLACEMENT OF THE SPECIES WILL BE DETERMINED BY THE CONTRACTOR'S VEGETATION SPECIALIST PRIOR TO SITE PLANTING AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS AND PER APPROVAL OF THE ENGINEER. 4. SUPPLEMENTAL PLANTING ACTIVITIES SHALL BE PERFORMED WITHIN THE CONSERVATION EASEMENT USING NATIVE SPECIES VEGETATION DESCRIBED IN RIPARIAN BUFFER PLANT MIXTURE. 5. ANY INVASIVE SPECIES VEGETATION, SUCH AS CHINESE PRIVET (LIGUSTRUM SINENSE) AND MULTIFLORA ROSE (ROSA MULTIFLORA) WILL BE INITIALLY TREATED AS DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS PRIOR TO PLANTING ACTIVITIES TO ALLOW NATIVE PLANTS TO BECOME ESTABLISHED WITHIN THE CONSERVATION EASEMENT. 6. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE CHANNEL STABILIZATION, COVER AND/OR NESTING HABITAT. 7. ALL DISTURBED AREAS WILL BE STABILIZED USING MULCHING AND SEEDING AS DEFINED IN THE CONSTRUCTION SPECIFICATIONS AND THE APPROVED SEDIMENTATION AND EROSION CONTROL PLANS. PLANTING SCHEDULE % Proposed Botanical Name Common Name for Planting Wetland by Species Tolerance Riparian Buffer Bare Root Plantings — Overstory (Proposed 9' x 12' Planting Spacing @ 403 Stems/Acre) Betula nigra River birch 7% FACW Fraxinus pennsylvanica Green ash 4% FACW Platanus occidentalis American 8% FACW sycamore Quercus nigra Water Oak 4% FAC Liriodendron tulipifera Tulip tree 8% FACU Quercus alba White oak 4% FACU Quercus michauxii Swamp chestnut 4% FACW oak Nyssa biflora Swamp black 4% OBL gum Quercus bicolor Swamp white 4% FACW oak Taxodium distichum Bald cypress 4% OBL Quercus phellos Willow oak 7% FACW Riparian Buffer Bare Root Plantings — Understory (Proposed 15' x 15' Planting Spacing @ 194 Stems/Acre) Clethra alnifolia Sweet pepperbush 6% FACW Carpinus caroliniana Ironwood 6% FAC Persea palustris Red bay 6% FACW Eubotrys racemosus Swamp doghobble 6% FACW Magnolia virginiana Sweetbay magnolia 6% FACW Cyrilla racimiflora Titi 6% FACW Itea vir_ginica Sweetspire 6% FACW Riparian Buffer Live Stake Plantings - Streambanks (Proposed 2'-3' Spacing @ Meander Bends and 6'-8' Spacing @ Riffle Sections) Cephalanthus Budonbush 20% OBL occidentalis Salix sericea Silky willow 30% OBL Salix nigra Black willow 30% OBL Sambucus Elderberry 20% FACW- canadensis TEMPORARY SEEDING SCHEDULE Planting Dates Botanical Name Common Name Application Rate (Ibslacre) September to Secale cereale Rye Grain (Cool 130 March Season) April to August Urochloa ramosa Browntop Millet (Warm Season) 40 PERMANENT SEEDING SCHEDULE Botanical Name Common Proposed for Planting Seeding Rate Wetland Name by Species (lb/acre) Tolerance Permanent Herbaceous Seed Mixture — Streambank, Floodplain, Wetlands and Riparian Buffer Areas (Proposed Seed Rate @ 15 Ibslacre) Andropogon gerardii Big blue stem 10% 1.50 FAC Dichanthelium Deer tongue 15% 1.50 FACW clandestinum Carex vulpinoidea Fox sedge 10% 2.25 OBL Carex lupulina Hop sedge 5% 2.25 OBL Elymus virginicus Virginia wild rye 15% 1.50 FAC Juncos effusus Soft rush 15% 2.25 FACW+ Panicum virgatum Switchgrass 5% 1.50 FACW+ Schizachyrium Little blue stem 10% 0.75 FACU scoparium Tripsacum Eastern dactyloides gamagrass ° 5% 0.75 FAC+ Sorghastrum nutans Indiangrass 10% 0.75 FACU WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER ci 3r,,', l 6 ,���IJI111►®\��® ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 No. DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 25 P9 SCARKROUXHITIWONMIK K.ECEA➢TRA4O'A,G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: NIA VERTSCALE: NIA SHEET NAME REVEGETATION PLAN SHEET NUMBER 25 \ I PLANTING ZONES WATER & LAND I RIPARIAN PLANTINYj \\ \\ \ \ \\ \ 1 ` \— �^ ®, \� \v� \ ( J \\ /� bQ �\ \\� ` SOLUTIONS < EllI �\ y \ \ \ \ \ \ v \ to wF \ ' \ 7721 Six Forks Rd., Suite 130 \) ��,,� \ \ \\ COUNTY OF 1NAYNE (I �l \ r Raleigh, INC 27615 z I RIPARIAN SUPPLEMENT �LANT�NG ` \ \1 1 \ \ y \ l ` \ 1 1 (919)614-51 1 1 D.B. 1660, PG. 847 c P.I.N.: 3507-15-8117 < I l N\/ 7 \ \ \ \ N/F \\ / \ \ \ �\ > waterlandsolutions.com Go \ q \ CID B.0�487LPS60R0 \ \ N/F w \ \ I \ h \ /j / I � I I PROJECT ENGINEER ,\J 1 \ P.LN.:307-05-75 8 \ \ I \ Z COUNTYOF Ll ` ` \ \ \ T��D f L `J Dt,, 184EG 5 AYNE I,.277� i v ` ✓� ) ; '� 1 3 o a �`' oG S I 7 \ P I N.: 358�-14-9748 7\ �.� �H C ARC , I� 1 \�^ `\ G'ON�\ERVATION ^� l 1.� '� �\�', �\ JDr ,���\Q� 'c'�.','. '� �•�j�, �/ ✓f' % 1 �� V V \ ` \ EASEAAENT(TYP.) -� 1 r ` , h i �/ v J \ • �J \ Z o �vi 1 ACCESS RQ) VYP.) \mow I J 1 V Y ti O f<=; �� •-F;�G I NE� ���J \,+ +"� :4: °<� v�`'• �pHER \ ' *,* \ 1> ,�, * * ` \ �� ENGINEERING SERVICES BY +++� _. ' ' \ MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1 480 \ \ REVISIONS + /• y i l � +` o y*+1+++ + , + ++++!!�i i + ( � � � � \++++++a+i+++'++1++ \\+ -� +,\++ .+ + + , "+T\ A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 22-19 +++i* + + , + + , NO. DESCRIPTION DATE � (1 PROJECT NAME /:,V ":+1 SCARBOROUGH 1++ +�++ MITIGATION `++GICSTfZIJGtIDN UT3 PROJECT N/F"i\J-++�I �1 /\• t '+++)NAT1 tANdL hSO TIOf�6,LLC \ \ " \ a �" + ++, , + , + J+*+*+*+*+* WAYNE COUNTY, NC +[3.8i,+3 aiP� r 1,++ +*+* + + + , + + + + , , + ++t.++++ i o� + + + + + + ++"+*+++1,*++++++,+,"•+• DRAWING INFORMATION \+',+\+ \+, ,0+++ +"\ \ ti +\.., ++5+ �, +%�+ O * ''+\+" +1+ PROJECT NO.: 17-003 ',' LLI FILENAME:2SPS SCAR3CROU,HI.IITIIS4TIONBPIIK2ElECETAIO0IP-7ID'I,G DESIGNED BY: KMV �+ * *+ I+ 1 * DRAWN BY: APL t \+ +�s +Is1 ` ++�+ /+ +� *I DATE: 11-22-19 ' \ + `i\: +! ' `` + , , + ," +++++ + , +" \ + � � ," * * HORIZ. SCALE: V" 200' `ry,+++, \ \ \+++'' VERT.SCALE: NIA /Ns- V/�+++, +'.\,' +"\ NORTH v �� ' {"+++"+"+" + * it*�* i )+'++++"+�+++ c ,++'+"*'*+* oo so 0 00 zoo \++ 4+' \ �v %+ +,�\+ + ` GRAPHIC SCALE .._. ' ' " * SHEET NAME ✓ �+ -�* ¢,:,��'` +++i + \\° 1�i' + �.' REVEGETATION BEGIN S,FRU ION 1 + , + + + PLAN STATION \ +++ \fit ,-, >\ +i, � �+ +4� +�++ it ;*.*+'"*. SHEET NUMBER \ \ \+ LLaLELSFgETZ9+,++++' 26 III � \\ >/A��--\_�\1i i WATER & LAND — r /I I�� \��, II(( o�� / —' _ _ /\_� SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 r \ \ �_ ��\— ✓ / -�—/ ='� „ 1 �1 (919)614-51 1 1 _L' c— V > / \ �,,\� < f ✓` / �� Fp&D COVSTRUCTION UT1. R —�— I i waterlar�dsolutions.com */ * STATI 72+44.68 PLANTING ZONES \\ �, / PROJECT ENGINEER I� �NIF CON ERVATION —AS G. RB�,iT \ 1 \ 1 EASE ENT(TYP.)=I,� �,�•.�� CAR,,,-�,i a�.0 1720.4G. `'�9 r`>1 o �> < > _ I \ / / \ / r ♦♦,�0�' �•` �'`/ `••®�. F.I.N.:350 M1�44T2� �� ' \� �� N/F N+ *' */* I RIPARIAN�LANTING I ♦ ' ��5�' l L �i v SLgEPY CREEK F RMS, INC. / T, / / \ : • O Off,' , l A. / ( (➢�,/� f (/c\ \ 1\ D.B. 3020, P�. 381 / p / l+ '/ / ( : Q� ;j P.I.N.: 3507-32-�710 if /+ ✓1 ACCSRO �.) J L \� + + + Ekk� N .S J.11 V ( RIPARIAN S�PPLEM TAL PL NTI G \ :r*� I 1 �..4r .; ;GENE,. `Deb` PHE R ENGINEERING SERVICES BY t*LLC ,+ !� *6,+ ' 1 FIRM LICENSE CENSE NO. PF14 0 ' REVISIONS A DRAFT MIT PLAN 6-14-19 I NN B FINAL MIT PLAN 11-22-19 * * �� I \ * '2 T/, WATER ANiJ LPjND SOLUyIbNS. LLC \ �- I «'' c\ ' 1 '4 +','+*+'+ i+%' f 3464, P 54 ` NO. DESCRIPTION DATE P.I.N.f3507-33302 ':U * 1 ',*,',' * '+ + ✓ J _ J �- \ PROJECT NAME 'I+ �. SCARBOROUGH �.+ ''':y; :*,'* ` I MITIGATION I '+ I \ JN/F'.1.' .'..++ -{'1 / \ PROJECT « '\NAT RANDL�NDIS'+'+'+'+ « + +,� / `� "\ + + + + \ % + ++� D.C`�342 + + + «''f% ` / / + + + \,�,' \ \ ti P.I.N.:350-13 3 �'+'+'+'+', 1+' Q \ + +'{i+ + + +'+ / Ly '+ WAYNE COUNTY, NC 11 DRAWING INFORMATION *\*�BE�NC N TRUC 10 T *R3+'+ c� +�.'�+'+','+' / / �,�+'+ + \ \STATI 7±6Q,0,5*,*+','+'+'+'+'(k ✓+'+'+'+'++« I / I I '.` '+ + I PROJECT NO.: 17-003 '+ '\,* * * J + , FILENAME:IS PS SCARiGROU,HI.Ili1;4ilONBPIIK 2ElECEiP11011 P.74G'i,G + , , '6f+, ONSTRUCYION*UT4-R2+ 1. ,SAT N 56+84,53* ,I OQ \ / / / + 1r/ + / DESIGNED BY: KMV $ *+4\'++ f"! 1�I , + ' '+''+* x ) ((( \1., I` DRAWN BY APL LI �\' f \ '1 , '�+�', .� *** max* ,/,'`\ \. * T* DATE: 11-22-19 +'+'+.,','+'+' '*� +"i+'I-+'1','+'+',','+',*, \ HORIZ. SCALE: 1"-200' '+'+'+','+'+', VERT.SCALE: NIA ++++ + + +T,,' '� 1. .,+\ ' �r \ s i::l'' ;':':';':':':*:':' \ li*'*'*'*'*'T'*'T'1'*' t / �i+ , + + , + + e, p + '(+ fN*'CONS + *ON' T OW R« ,O� + \ , \ / \ -J' I l ,i�i+'+'Tip STATI,GNJ3+98 , \*+*.'/ .' 1+.''+'''+' / \ I \ \ \\ ^<' i \+, ,+++ \ ` NORTH v .*, +Ti,�+ .' ,. I l \ \ \ \:\ \ \ a° 50 o a° Zoa '':' :�+iT TT iTTTTTiT ii,+' l 1 \ f l \ l Ti'T. T-I \ + ... + / GRAPHIC SCALE +TTT�+ '''' *T'+'+'*'*`*'*'','�'','''''.', 1) +%+'+'+', + , *= * +'i' Ob+ ' ' / „'' Ill\ \ 1 \ \ \ \ '+�+','+'+' SHEET NAME �. C ✓*')'*'*r.iiTTT*; \ I \ \ \\ \ ., r+' +:+ / \ \ ; REVEGETATION ,QO' I SITE .Y CREEK INC.\ > I .B. 02%PG�81\\ \ ^ PLAN +\+ +� I I \\ P.I.N..r3507-3�2716\ \ \ \ + . + + +'...i iiT:i.i.�\. ' SHEET NUMBER ' ',r..�.'� �..rr■ + AT.CJHL E�- E SIi� 2 \ WATER *NC1i14NDS'OL'uTIO 471 E`NL�C,ONSTRUC/rlON'U+4 % \ SIVION 21 +Ef6.60f CONSRVATJIZN \ / �' EASEMENT(TYP ( \ pJEND CO�S�r�uTION l t r� J \ \ , , +4J10.4',','.',' ','''* millr 1 ti ''�•'.'; \\ ''STATN 12Q11 , , , It :�:,'� I , . / /' ,� -�:•:� , r 0 v Nl r \ " ^ ��� �\ BEGIN 1V3TR CTION M1A C�f �' — — —S ATIO+ Ll � 'L' C3� PLANTING ZONES \ 0\\ RIPARIAN PLANTING \ \ F/71 RIPARIAN SUPPLEMENTAL PLANTING WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-13 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 25 H SCARKROUCHIURRWONMIK K.E ETA➢ONP.A4O'!,G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 HORIZ. SCALE: V=200' VERTSCALE: NIA i NORTH 100 50 0 100 200 GRAPHIC SCALE SHEET NAME R EV EG ETATIO N PLAN SHEET NUMBER O 7C,L +yA1S E . HEET27. �*'''*'r WATER & LAND a +O1SR 'TIONIUT3SOLUTIONS TI 124+82.� , , ND . + + ✓ S ��uoT€R ANDSND SOLUTIONs, LL\7721 Six Forks Rd., S 3 ! 1Z 3464, PG.54 uite 1 0 / — I.-4-7: 1U�3 '342 jo�. Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER ,,, + + , + + + + + �+ + /+ '� I /r''► U �*'+++ �' +' iell,• N/F / '�� \•:0��5�'��`'.,e ��' SLEEPY CR K FARMS. INC. / / ) (+ ,/1 l /. \ D.B. 3020, PG.381 P.I. 3507U2-2710 Fes' :)*x+ c - + , + RUTION UT1-R,*. 'I �.: BEGIN CONSTRUCTION 'f '+3,'+ ( �' J� (� I � * l \ \ l \ � � LL � • ,'++T \TATION36+22.67 ,�1++ J ' 1 , + L� I n� \ \ �'i`'.`', a \♦ ; !T :> '+ ' is 'I f m _ '•. Lr; ; .GINE�[•' e��,`� \ ••°` • �T 4 4i JT a+*1�pHER ++i,T,i ill 1111il, ENGINEERING SERVICES BY +'.j Ck+ LLC FIRWILS M LICENSE CENSE NO. P�140 ;; ( REVISIONS V\/ * �* I ` I 1 `1 \ ` \ \ A DRAFT MIT PLAN 6-14-13 [��+,i,�T +`+^++,�I*.�I��*+l B FINAL MIT PLAN 11-22-19 ( CONS RVATION R ',v+ +1, r\ SE( ENTTYP. \ \ y'„ '1 —, O� \ \ +' +*'*' ✓ l {+/+ / ( ) � — rl NO. DESCRIPTION DATE \ I t'� � f - � � +pf*, + + + + + r < { I (1 D\ \ \ 1-zz PROJECT NAME �+ ' �'+�°+ .+ *+i+ *!*+* I 1 \ ATERANDLAN{SOLUTI NS�LC,`� m 61.B. 28`'PG.65 ✓ 1) \ �� (— 1 \ v 'i* \' + + ++ l'+T+S /t S P.I.-3507-13-2313 SCARBOROUGH **'*+''*'+'TT�TT,°+°++,�+ / l� :+1+')' *,C' ` Z / L \ \ !N r +1f� / J IV 1 )1 S MITIGATION +� + +T+T+ E D�8 S R TION T2 UP ER' T ,++/ \ 1 1 I L Q �\ \ (�,J( \ \ �CITYOFGOLTi�BORO / — B GIN O ST UCT N UT2 LOW y / \ \ 0 \ L p0.IBN\3507-20-2G07 `v / �(� S ATIONI +g.50 ^� •i �\ 'Z o i \\ PROJECT +I+ S -y + T� / L• a !� `��\ \' \ �% \ I // WAYNE COUNTY, NC cej� '�' ° I�, � 1`� < < [� % c �l / DRAWING INFORMATION \ �✓' �...\\ \' \ �rvn��l "� \ �^ -/ / * di %+J I I ` Z L. \ \\✓� r f PROJECT NO.: 17-003 \\� tea/ I \ + ,° +�, ( \ �1a� � Q ^^ ` 1 '� ^�� / j ` + \ (( �, �- \ �� / FILENAME:4S P9 SCBRiGR0U5H V.IIi134ilONBPNK 2PlEAEiP➢ONP.441'!,G DESIGNED BY: KMV DRAWN BY : APL o�o`�s l', \ s�` ^� J•' r'1~��r-�,.�1 ?l • DATE : 11-22-19 \ L ` \ r,� / 1 A ' e c I\,. � � � t \ l HORIZ. SCALE: 1`200' LIJ LIJ VER l+l C+�+ * -ram ► 4 \ o J r s q T.SCALE: NIA lco uWi \�\\\\\ _\ r � `' /'Sli' `` NORTH �\\� \ o� l �� ^ �(� i, Q(�o_ 0o so 0 10o zoo Jam✓//\�\ \\\\\\�\\\ \ �� �O 1 Z ��. ° A, Z�2 \ GRAPHIC SCALE SHEET NAME ��`` `�� v REVEGETATION PLANTING ZONES �\\� ` ��� \\`-z��- PLAN E1:1 RIPARIAN PLANTING BEGIN CONSTRUCTION UT2 (UPPER) \ STATION 10+00.00 / SHEET NUMBER RIPARIAN SUPPLEMENTAL PLANTING \ / 29 \ \ \ WATER & LAND \ \ SOLUTIONS 7721 Six Forks Rd., Suite 130 \ I Raleigh, NC 27615 (919)614-51 1 1 \ 1% waterlandsolutions.com PROJECT ENGINEER CARk �z ENGINEERING SERVICES BY WLS ENGINEERING, PLLC \ ` FIRM LICENSE NO. P-1 480 f /i 1 )/ �� �" \ ` �\ v \� REVISIONS A DRAFT MIT PLAN 6-14-19 �'/ FINAL MIT PLAN 11-22-19 Qj S V �/ \ \� \\ \\\\\ \ \ �'///��-�) �� /���� �/� �✓ )f /ter �,,, l APPROXIMATE LOCATION OF 100 FP C NO. DESCRIPTION DATE YEAR FEMA FLOOD ZONE'AE' ^ 1 J J /// / \�� PROJECT NAME (FIRM PANEL 2548) SCARBOROUGH `-7r MITIGATION PROJECT wWAYNE COUNTY, NC w� G / J / —� \ J 7 / / / & / DRAWING INFORMATION N/F PROJECT NO.: 17-003 FQ / // ✓ / / / / / /I // w WATER AND LAI�IU SOLUTI01)'S, LLC � FILENAME: 30 48SCSRBDROUCHNIFIGA➢MB4 GRADING PLANS.NG / ^✓ �%� / 1 / / / \ / / / \ / / D.B. 427, PG. 6`, v —� , DESIGNED BY: KMV P.IX:3507-13-2313 / w DRAWN BY APL DATE FP / ` �/' 1 / \ / / / / 1 I /� l // •I / / / // / = 1 -19 HORIZ. SCALE: 11��2260' VERT. SCALE : NIA — \ ./ , EASEMENT (TYP.) NORTH J / / \ CONSERVATION /" ` / / / / G� / / / ao 20 o ao eo 1z�� / —�// GRAPHIC SCALE SHEET NAME 17 GRADING PLAN SHEET NUMBER < l �TCHILI NE -SEE SH�T�3-----/- -�/--- 30 7 / �/ F4 WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER ARC SSci 3rj'il6 v'•'• �PHER••P ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS / A DRAFT FAIT PLAN 6-14-1! B FINAL MIT PLAN 11-22-1 EXISTINGPP/ / INV.IN=60. 5 / / INV.OUT- 0. B — — — CD LIJ W I =— / UJ / Icf) / e W / I~/ REMOVE EXISTING 15" RCP PIPE T H PECAN ROAD _ G \ �\ CE -,� f - \ \ CONSERVATION- \ EASEMENT (TYP.) REMOVE EXISTING / 1-1_ \1 / / 30"CMP PIPE / N/F— LI IT FD B.O 2487, PG. 14 O N/P-- J / P.I.N.: 3507-05-7518 / WATER AND LA415 SOLUTIONS, LLC c) J D.B. 3427, PG. 65 _ m P.I.N 507-13-2313 1 / / a I zi 5 MATCHLINE - SEE SHEET 34 — — — — �z — — — T — v T —� — — MEN* �—/ — \ J y> / ri NO. DESCRIPTION PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 30 48CARBOROIIGHNI➢GA➢MB4 GRADING PLANS.NG DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER ■ 31 /L FP APPROXIMATE LOCATION OF 100�— YEAR FEMA FLOOD ZONE'AE' / (FIRM PANEL 2548) �! .�/ / / / // �" \ \ , / ,r0i 1 �� / / \ ) / /! \ LU / // ( // > c - / / / W "LU / LU (t / `14\ WATER AND LAND SOLUTIONS. LLC \\�- D.B. 3427, PG. 65 P.I.N.:3507-13-2313 CONSERV4TION EASEMENT (YyP.) \ \ J— `, (III /.ice— / / di L� NO GRADING SHALL OCCUR WITHIN TREE PRCQECTION AREA I ` O \ o 0 MATCHLIN SEE SH/ ar7 77, / WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER 3r,,', l 6 e ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME:3048 SCARBOROUCHNII➢CA➢ONB{NKGRP]INGPL1NS.0'i.0 DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE' 1" = 80' VERT.SCALE: N/A NORTH 40 20 a 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 32 MATCHLIN,E-SE-ESHEET 3b WATER &LAND SOLUTIONS CONSERVATI / i i k / / / 4 401 J EASEM / �/ / / �� / / / 7721 Six Forks Rd., Suite 130 �� _ JA_ f Raleigh, NC 27615 (919)614-51 1 1 waterlandsolutions.com �, �� BEGIN CONSTRUCTION UT1-R1 / / I PROJECT ENGINEER STATION 10+15.18 �l q 77 / / n, I� �� � \\ I (/ � \ \ \ ,/'/ / �� \/ 1. / � ` -\ :� • .•O� l" . / ;� ; �® a . ° HER►®��®�� /, / ENGINEERING SERVICES BY b WLS ENGINEERING, PLLC / FIRM LICENSE NO. P-1 480 REVI � > J T / A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 o / \ \ WATE� AND LAND SOLUTIONS, LLC ( / / / / \P.B. 3427, PG. 65 i NO. DESCRIPTION DATE / / P .N.: 3507-13-2313 / 1 / PROJECT NAME / ILL SCARBOROUGH / / / / // �� / J• / �/ �� ILLMITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 30 48CARBDROIIGHNI➢GA➢MB4 GRADING PLANS.NG DESIGNED BY: KMV DRAWN BY: APL -ERE&A CONSTRUCTION UT1B ,/ / / / / /� DATE: 11-22-19 STATION10+00.00 �G \ f / / HORIZ.SCALE: ill =80' CAI VERT. SCALE: NIA s y r NORTH 40 80 GRAPHIC SCALE SHEET NAME � GRADING /J PLAN SHEET NUMBER 33 �ATCHILINE - SEE SHEET 3� / NiATCHLINE - SEE SHEET 31 T T \ �-7 / / n / �/ / / / / / J/ \ \ \ ' CONSERVATION 2 / �/ / J \ \ % EASEMENT (TYP.) W W / / / r / / \\ \ v/ oN/F 000* WATER AND LAND SOLUTIONS, LLC D.B. 3427, PG. 65 / / / ✓ P.I.N.: 3507-13-2313 / / / N/F / CITY OF GOLDSBORO D.B. 2487, PG. 145 / 7 / P.I.N.:3507-05-7518 n 1- / / J-z/ /J / / r / /` JArc SS ROAD(TYP.) / r / / / HL�- SEE SHEET 7 pp / I / WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER C ARC "O/ v'•'• OPHER••P 11110'k ENGINEERING SERVICES BY N/LS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 30 48CARBDROIIGHNI➢GA➢MB4 GRADING PLANS.NC DESIGNED BY: KMV DRAWN BY: APL DATE: 11-22-19 H ORIZ. SCALE : 1" = 80' VERT. SCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 34 r7 ` (` MATCHLINE - SEE Sf-I EE T 32 / / j/) \ WATER &LAND SOLUTIONS 1 I 7721 Six Forks Rd., Suite 130 ( Raleigh, NC 27615 y �rti� 7 f J / / �f / (919)614-5111 1� ))-7/ waterlandsolutions.com (' PROJECT ENGINEER �o CARID .., I l \ � Xoo OpHE R •• ��`. ENGINEERING SERVICES BY \AILS ENGINEERING, PLLC CONSERVATION A-/� / / FIRM LICENSE NO. P-1480 \ I \\ \\ EASEMENT (TYP.) Iv — /�� REVISIONS cv / / / A DRAFT MIT PLAN 6-14-19 / B FINAL MIT PLAN 11-22-19 / \� END CONSTRUCTION UT1)�' / / / STATION 21+66.60 / NO. DESCRIPTION DATE I I / \I/� / - /� -7 PROJECT NAME wI SCARBOROUGH � MITIGATION wI PROJECT aIWAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 \ N/F/ / I FILENAME: 3048oCSRBDR011GHh111GA➢MB4 GRADING PL1NS.NG fl WATER AND LAND OLUTIONS, LLC / DESIGNED BY: KMV r \ / \� ` ✓l / D.B. 3427CL5� J DRAWN BY: APL 1 \ P.I.N.: 3507-13-2313 DATE : 11-22-19 IHORIZ. SCALE: 1"=10' 1 / I�, VERLSCALE: NIA � 1 11 < � , // � / / d�\v� J /I NORTH <o Zo o <o ao / / GRAPHIC SCALE SHEET NAME GRADING A� - I PLAN I( f SHEET NUMBER \� T �TCHL- SEE SHEET �r I 35 \\ ■ / /mommIIIIIIIIIIIIIIIIIIIII� Illllllllllllf� �- ,� MATCHYNE - SEE SHEET 33 "No 1 \ ,/ L1 r J� WATER AND LANDFSOLUTIONS, LLC 1',- T-LLI / l / D.B./3427, PG.65 / J / PfAV.: 3507-13-2313 / / / _ cn S / L / u) W \ / / /' J'I / /' / W LLI ! / / / , / / / LIJ KAI 01 r/ i // I 101//i - MATCHL�IN�E--S& S�IE-ET- WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER ,,��o��H CAR: 3rj'il6 v'•'• ER••P 1fjua1n►11W# ENGINEERING SERVICES BY MILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 3048 CARBDROIIGHNI➢GA➢MB4 GRADING PLANS.H.0 DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 80' VERT. SCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 36 'SEE �y "MAT E - SHEET 34 I^' J / r ✓ I / / J I i CONSERVATION EASEMENT (TYP.) 40 ^ / / N/F CITY OF GOLDSBORO D.B. 2487, PG. 145 P.I.N.: 3507-05-7518 � � 1 �w I (n / / / w �' / /� / m rn /J /✓ ///� N/F WATER AND LAND SOLUTIsP1S, LLC D.B. 3427, P6'"65 L) _ H / / P.I.N.: 350-r'13-2313 J\s`�n N/F COUNTY OF WAYNE D.B. 1660, PG. 847 < P.I.N.:3507-15-8117 / .0iijiMATCHLINE - SEE SHE"T O / / I� 1 / // II WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER ARC 3rj'il6 lit v'•'•" ER ••P .�® "'mill��® ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT FAIT PLAN 6-14-19 B FINAL MIT PLAN777 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 3048 SCARBDROUCHNIFIGAIMB4 GRADING PLANS.NG DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 37 f� �\\\ .,✓ ■ � o> IIIIIIIIIIIIIIIIIIIIIIII� � � � � � � � r IIIIIII� I I� / � � � MATCHLPE - SEE SHEET 35 WATER & LAND +oo SOLUTIONS q _ �END STARuc I� /u�V1 TON 1 �� \ \� \ how 2+00 / / — — L 7721 Six Forks Rd., Suite 130 ` ` p Raleigh, 7615 (919)614 52j 1 — / waterlandsolutions.com END C NSTRUCTION UT1A l / / / / PROJECT ENGINEER F`TATION 12+41.04 UT1-R1 �,�•`� ,--., (1 STATION30+00.29 CARS \ \ /\ / / �� Q`�, .....,. �•�® i so ol)� �-7 ENGINEERING SERVICES BY MILS ENGINEERING, PLLC / J / / \ \ O FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 / 1 \ 11 o r NO. DESCRIPTION DATE f / \/ \ PROJECT NAME 1J o J f J m SCARBOROUGH (� l ��x \ FRIm MITIGATION O° \ � PROJECT / 1 \ S/ / ✓ \ l / / `I / ` �� J�� \ WAYNE COUNTY, NC L DRAWING INFORMATION.: 17-003 J \ O / OO PROJECT NO `/ � FILENAME:30 48 SCaRBOk011GH NI➢GP➢ON 6INK GRADING PLINSA'i'G DESIGNED BY: KMV DRAWN BY: APL 1 CONSERVATION DATE : 1 1 -22-19 f/ / n � �- � ( o°j a \/ HORIZ. SCALE: 1"=80' EASEMENT (TYP.) J N/F �/ \ WATER. AND LAND SOLUTIONS, AVERT. SCALE: NIA D.B. 3427, PG. 65 / P.I.N.:3507-13-2313 F 0p OD NORTH 40 20 0 40 90 END CRNSTRUCTION UT1-R1 r GRAPHIC SCALE BEG CONSTRUCTION UT1-R2 I STA ION 3B+22.57 END CONSTRUCTION UT3 / SHEET NAME / l / S ATION 24+82.53 GRADING PLAN SHEET NUMBER / MATCHLINE - SEE SHEET 42 \ 41 0 38 �\ "NICE —� m _IIIIIII(� M77� H7J - SEE SHEET 36 �\ I ° BEGIN CONSTRUCTION UT3 I STATION 10+00.00 Ico co Lu LuTZ �x W' � c \ / / I 1� k f LuLu CJ Lu � \ \ \ I W / fn f - ✓ 'A r \ / J\� / — _ — ✓ WATFR AND LAND SOLU1IONIS-1LLC— — ✓ / ) D.B. 3427, PG. 65 P.I.N.: 3507-13-2313 / \ I / / / N \ 0 f 43 00 MATCHLINE - SEE SHEET 43 I l� �I / moon --air / o WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER CAR: 3rj'il6 v'•'• �PHER of ••P 4Ui 11 a l's ENGINEERING SERVICES BY \AILS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 S FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 30 48CARBOROIIGHNI➢GA➢ONB4 GRADING PLANS.NG DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 061 ——� _-MATCHLINE — STE'ESHEET37 WATER & LAND Z> ^ II r ���I\-' \� SOLUTIONS 7721 Six Forks Rd., Suite 130 < Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER s I I � � l � ����\1111y►�._ CAR: WATER AND LAND SOLUTIONS. LLC ( 4 / / -� / I� / ✓— N/Fv �''L'(7 <-; G i N `�. �• ,` 4� ` D.B. 3427, PG. 65 \ COUNTY OF WAYNE •>,rt ••••• P.I.N.:3507-13-2313 D.B. 1$45, PG.277 �� HER P' / �p �® `1 P.I.N.: 3507-14-9748 1 '14u1111111k -� COP�BERVATION ENGINEERING SERVICES BY WLS ENGINEERING, PLLC EASXENT (TYP.) FIRM LICENSE NO. P-1480 m I 1 \ �i REVISIONS � \ M / A DRAFT MIT PLAN 6-14-19 �.� B FINAL MIT PLAN 11-22-19 EU) f" ILL A LIJ „✓ ��—� \ / r — ✓ ( �\ / NO. DESCRIPTION DATE PROJECT NAME SCARBOROUGH — � MITIGATION — f — ' — / I \ \ v \ \ — \ j PROJECT 30 _ L < — WAYNE COUNTY, NC 1 ( \ L 30 \ I �` L \ — Jr �\ ^ — \ l /� DRAWING INFORMATION r �J ^ \� \ /v / , / `L PROJECT NO.: 17-003 ) FILENAME: 30 48 SC�IRBJROIICHNI➢GPI➢ONBaNK GR�I]ING PLINSA'i'G CC �" o DESIGNED BY: KMV 1 DRAWN DY: APL DATE: 11-22-19 C \ HORIZ. SCALE: 1"=80' C L VERLSCALE: NIA J /\ �/ NORTH —� — — f�Tl I / f WE I I I � / 40 20 0 40 80 THgMApG. EST I / / J 1 I ° D.B. �20,1�. 596 / % / r GRAPHIC SCALE / ` \ P.I.N.: 3507- J) �4472 r / / SHEET NAME I o � / I I\o• \ —� � �f� ��\// � � / � GRADING --�----_---------� �J `�� IV/ li / PLAN SHEET NUMBER — —' — / / MATCHLINE -SEE SHEET 44 \ / , i� r — �J — — — -�- — — — — �� — o = — — II — �-T — —� 40 / 1 l / WATER & LAND SOLUTIONS l / //,�� l/ 1 f� / f 11 I I I J //� 7721 Six Forks Rd., Suite 130 f / ( �/ 1////III (�/ IJllll�� / / /// / // �/ / // f�/�r Raleigh, NC 27615 / waterlandsolutions.com c \\ I I I J�((f /lr l // / f l/ / 11 / % / / JJJ I / / / / /� // /�/ f i 1 �� �/ / PROJECT ENGINEER 1 I \\\ I //J (f // // / ' 'j,„11111ro, II cAR�, �� kNA GON RUUTIO\N 2 (UPF� "Ok\\` \� \\ \ \ \\ \\\ \ \\\\ \\\ kIII/o/ / /`BE �C �CTI`� LOWEx\\\\/l� S,_7�_TI 15+�_6_0j _> > \1 II`>)IIl 11\�I 1 I I I I � / f Ilf 111 /ll � /� // � I ii..'� — J �� — ✓ /� � �,,, : �,; /j / / 1 ..L ._F�.� _. /J/ / / �Q t I / ;�� ► NE�.� HER P.� A. //// ///// / 00 ///l —� / �� ENGINEERING SERVICES BY ///ram / // / / / /// f / \A LS ENGINEERING. PLLC FIRM LICENSE NO. P-1480 Cj REVISIONS A DRAFT MIT PLAN 6 14 19 LIJ W B FINAL MIT PLAN 11-22-19 yj /i `✓� i/ // / /// /// ///// // / //// /�/ �j��//LIJ —LIJ ////////� // NO. DESCRIPTION DATE � � / / // // / l� PROJECT NAME L) lV / / / / ���/ r SCARBOROUGH l rr l / /, , / MITIGATION PROJECT WAYNE COUNTY, NC /if l ( / J o I L / ///� i// / / / / '� // � / ) / �) J DRAWING INFORMATION /j// /, %/ /j/ P S / bbbSSS S 1 ll wF I PROJECT NO.: 17-003 / /� ^ W�ctER AND LAND SOL�l1TIONS, LLC ����// —��� // �/J ,/(/ D.B. 3427, PG. 5 FILENAME :30 48 oCaRBOk011GH hll➢GP➢ONBaNK GRP]IIVG PLINSA'i'G // /�/��/� ` �/ / 1 / / I \ I P.I.N.: 3507-13-23 DESIGNED BY: KMV ////// DRAWN BY : APL DATE 11-22-19 HORIZ. SCALE: 1"=80' VERT. SCALE : NIA ✓�/i//iV %j/ T J II RUCTIO f uP EP R (r l%>✓� //// \ �7 �� �' ��� d �� 00 NORTH APPROXIMATE LOCATION OF 100f ( / 1 / / l% / /� t ^l / / ( ao zo o ao eo YEAR FEMA FLOOD ZONE'AE' / Lam` (FIRM PANEL 2548) � � //// / f \ �� O � / 1 \\, 1 J- 1 L ,�L f 1 �1� \ I GRAPHIC SCALE SHEET NAME X/) J \J , \N / CITY OF GOLDSB 1l\ < D.B. 3126,PG.434� \ \ `l 0 1 L1 �� GRADING P.I.N.:3507-20-2607 l \ L O �� p o�/_/- PLAN / �' 4 J I I1 I� �� I \ � I / '� J ✓ f SHEET NUMBER 41 _MA \ HLINE -SEE SHEET 38 1 / CONSERVATION f / ' T (TYP EASEMENT / \ r /- uT 2(LCvv,,,R) \ I1 � r 1 I �I 1ak0o r_I — —� / —\ 00 LOW \ \ \x00 \ 23 00 \ 1 4;� 14 WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 ' (919)614-5111 waterlandsolutions.com \ 2g+ 00 _ ' LL✓ _ \ 2 +00 \ co LIJ ILL D? \r-7 — Lu z ///� IW r ' ` c) \ \ ter` N/F WATER AND LAND SOLUTIONS, LLC / \ Q D.B. 3427, PG. 65 \ I P.I.N.:3507-13-2313 CE E \Cc CE / I� Ll Cc PROJECT ENGINEER C ARn , 0 33'116 v'•'• ER••P ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 30 48CARBOROIIGHNI➢GA➢ONBANKGRADINGPLANS.L'i'G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER WA Illllllllllllli /� f 43+ 0000 p 6 f i i I I U72(LOWER) T I F`�- - / 00 28+00 � I MATCHLINE - SEE SHEET 30 /tea 7 END CONSTRUCTION UT2(LOWER) STATION 32+98.10= UT1-R2 STATION 49+28.79 i 0 WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER 3rj'il6 Cj v'•'• �PHER••P VN' 1fjIJ1111►11W# ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 L 7 1 / Lu LW DESCRIPTION DATE / mm W PROJECT NAME 2 / (1) i W /to SCARBOROUGH MITIGATION / / _ / PROJECT / acn W 1/�—\ �/ ( �—�\^—\ �< \1 /� �J WAYNE COUNTY, NC zLL, \r—\\ J �1 \ ,� ^ \ \ f�f \ -� DRAWING INFORMATION C) H 1 \ \ WATER AND LAND�OLUTIONS, LLC 1 \ \ D.B. 3427. PG-- _ \ \ \ \ \ P.I.N.: 3507-13-2 'L3_ \ \ \ 1 CE \ .-' HLINE -SEE SHEET 45 \ \ CONSERVATION I EASEMENT (TYP.) ' 1 PROJECT NO.: 17-003 FILENAME: 30 48CARBOROIIGHNI➢GA➢ONBANKGRADINGPLANS.L'i'G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 43 7,-- f — — MATCHLINE - SEE SHEET 4al \ WATER & LAND SOLUTIONS 7721 Raleigh,Six Forks Rd., Suite 130 NC 27615 (919)614-5111 / / \ �-✓ Li _ �' waterlandsolutions.com PROJECT ENGINEER CONSERVATION , �. �-./ f� '�. / ,�� EASE) ENT J \ I / \ ♦�� �•.O��S�,���,.. ,,i _— LI I ACCESS ROAD(TYP.I _ ., /'HER t / 1 `� � ram. // ��ua�n►®��� ENGINEERING SERVICES BY `\ NGINEERING, LLC FIRM LICENSE CENSE NO. PF14 0 I� \ r / / — / l I \I — \ / l / REVISIONS 0 A DRAFT FAIT PLAN 6-14-13 ILL \ �, \ — / \ I / / (� O B FINAL MIT PLAN 11-22-19 Lu NO. DESCRIPTION DATE jr- G. PROJECT NAME qT 120 'PG EI \ — ^ - — � — � �� \ I ✓ 1 � P'h�3507-24-4A�2 = r� �^ SCARBOROUGH MITIGATION N,F _ , PROJECT WATER AND LAND SOLUTIONS, LLC D.B. 3427, PG. 65 — — / — J / >r / 1 �^ \ WAYNE COUNTY, NC / — P7N.:350113-2313 �'� v / ✓ DRAWING INFORMATION PROJECT NO.: 17-003 rl I FILENAME: 30 48CARKROIIGHN11GA➢MB4 GRADINGPLAKNG V DESIGNED BY: KMV \ // I I DRAWN BY: APL DATE: 1 1 -22-19 H ORIZ. SCALE : 1" = 80' s �/� / I VERT. SCALE : NIA NORTH I \ SEv JN / �Qi�i I I GRAPHIC SCALE _ /1 I SHEET NAME �Ij GRADING PLAN F WATER AND LAND SOLUTIONS, LLC D.B. 3464, PG. 54 / P.I.N.: 3507-33-3302 / I > ' I\ SHEET NUMBER MATCHLINE - SEE SHE`ET 46 — - - - - - - - - 44 IIIIIIII— / END CONSTRUCTION11Ta4R2 S A UdN 56+84.52'NiF WATER AND LAND SOLUTIONS, LLC CONSERVATION D.B. 3427, PG. 65 \ EASEMENT P.I.N.:3507-13-2313 `—�� — �P.) END CONSTRUCTION UT1-R3 \ STATION 57+60.05 \ �)) WAj4R AND LAND SOLUTIONS, LLC ACCESS ROAD(TYP) / D.R. 3464, PG. 54 P.I.N.: 3507-33-3302 LIJ LIJ _ \ cl) N/F \ G N SLEEPY CREEK FARMS, INC. / — \ W C � � D.B. 3020, P 3J 81, — 7 / \ /� \ \ Z_ 32-2710 I All MAYCHLI E I/IE�7 177/ WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, INC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER Z Q [� 331,16 e �'�'• �PHE R ..P` 0.v` ����UI 111►®A� ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. I DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY. NC DRAWING INFORMATION PROJECT NO.: 17-003 FILENAME: 3048 aCRB9RO11CHMl➢G'➢ONB KGRA]INGPLINS.Gi.G DESIGNED BY: KMV DRAWN BY: APL DATE : 11-22-19 H ORIZ. SCALE' 1" = 80' VERT.SCALE: N/A i NORTH to zo a to eo GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 45 SS I r \ \\ N/F \ \ \ WATER AND LAND SOLUTIONS, LLC \ +00 D.B. 3464, PG. 54 \ \ \ P.I.N.: 3507-33-3302 I � CONSERVATION EASEMENT j \ tTYP.1 - I 0 ILu w 7 Ile WATER & LAND I SOLUTIONS l 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 I I (919)614-5111 \/ waterlandsolutions.com ( I PROJECT ENGINEER I I ����\1111y►�._ C ARC °s ';,;pHER v.1a1►1 / ENGINEERING SERVICES BY Q \ MILS ENGINEERING, PLLC Q FIRM LICENSE NO. P-1480 O REVISIONS (if A DRAFT MIT PLAN 6-14-19 \ I..I..I B FINAL MIT PLAN 11-22-19 CD PROJECT NAME SCARBOROUGH MITIGATION a PROJECT WAYNE COUNTY, NC DRAWING INFORMATION 69 \ L PROJECT NO.: 17-003 FILENAME: 3048oCSRBDR011GHh111GA➢MB4 GRADING PLANS.NG \ \\ Ill _ DESIGNED BY: KMV DRAWN BY: APL l B3 \\ \\ \ ^ DATE: 1 1 -22-19 HORIZ. SCALE: 1"=80' VERT. SCALE: NIA ` � O NORTH i EX INg60" CMP PIPE ao eo \ \ GRAPHIC SCALE SHEET NAME — 3 /-- I ,---- , -- GRADING PLAN \ -E�N19.CONSTRUCTION UT1-R3 / \ 3�ATLQN 72+44.68 \ — J S SHEET NUMBER Nmfm=MATCHLINE - SEE SHEET 48 �"— t 77 \ \ \ 46 ''/ \ M LI lE - EF SHEET A N/F SLEEPY CREEK FARMS, INC. D.B. 3020, PG. 381 P.I.N.:3507-32-2710 / / CONSERVATION --'9ASEMENT (TYP.) IACCESS ROAD (TY .) / / / / FA / IIIIII \ IIII1II I � /III III I \ 111 III `III III r I _ I - \ N/F I WATER AND LAND SQLUIIDNS, LU-- — D.B. 3464, PG. 54 — J / PJX:r'507-33-3302 / / D nl 2 r Z m m m m m 41 co I WATER & LAND SOLUTIONS 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 waterlandsolutions.com PROJECT ENGINEER CAR:' 0 ;Q 3 3,,16 PHER A� 11juaun®Ak ENGINEERING SERVICES BY WLS ENGINEERING, PLLC FIRM LICENSE NO. P-1480 REVISIONS A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 NO. DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION I PROJECT NO.: 17-003 FILENAME: 30 48 SCARBOROIIGHNI➢GA➢ONBANK GRADING PLANS.NC DESIGNED BY: KMV DRAWN BY: APL DATE: 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA I NORTH 40 20 0 40 80 IGRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER 47 J � IIIIIIIIIIIIII` I / < N/F \� WATER AND LAND SOLUTIONS, LLC D.B. 3464, PG. 54 \ P.I.N.: 3507-33-3302 I I \ / \ ei� 6 .l / 'GI \ \ NOT CH E SHEET A � n / III j I I Al Imo{ jl � CONSERVATION /- \ EASEMENT (TYP.) - Lu COtu ILU z T/ \\ \ I \ @ n i \ WATER & LAND SOLUTIONS 1 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 (919)614-5111 I waterlandsolutions.com PROJECT ENGINEER CAR: S v'•'• �/'HER••P I ENGINEERING SERVICES BY WLS ENGINEERING, PLLC \ \ \ FIRM LICENSE NO. P-1480 REVISIONS \ A DRAFT MIT PLAN 6-14-19 B FINAL MIT PLAN 11-22-19 \ \ 1� D/ I — / i I _—---7 /\\ f I I I I V� � I\mil it I \\ I IIIII / / / i NO. DESCRIPTION DATE ME PROJECT NA SCARBOROUGH MITIGATION PROJECT WAYNE COUNTY, NC DRAWING INFORMATION PROJECT NO.: 17-003 Ell ENAME:3048 CARBOROIIGHNI➢GA➢ONBANKGRADINGPLANS.L'i'G DESIGNED BY: KMV DRAWN BY: APL DATE: 11-22-19 H ORIZ. SCALE : 1" = 80' VERTSCALE: NIA NORTH 40 20 0 40 80 GRAPHIC SCALE SHEET NAME GRADING PLAN SHEET NUMBER W