Loading...
HomeMy WebLinkAbout20191209 Ver 2_Buffer Impact Table_20191122BUFFER IMPACT TABLE PING LINE 204 RELOCATION (ft) Wetlands Located in 11 Mitigation Buffer ImpactImpacts 0- Stream Perpendicular Buffer (ft2) RIP (Credits) ID Impact ID Crossing? Zone 1 Zone 2 Zone 1 Zone 2* Zone 1 Zone 2* Crossing Notes/Justification B1 JD24A No 3,954 3,097 0 N/A 11,862 N/A Currently cleared; no clearing required for temporary workspace in buffer. Allowable with mitigation. B2 JD24 No 1,633 2,304 0 N/A 4,899 N/A No clearing required for temporary workspace in buffer. Allowable with mitigation. Crossing to be bored with only 30' of the ROW to be cleared. Easement is 50' wide. Allowable with B3 S07 (Gum Swamp) No 3,169 2,099 3,169 N/A - N/A mitigation. B4 JD28 Yes 3,073 2,048 0 N/A - N/A Currently cleared; no clearing required for temporary workspace in buffer. Allowable. B5 S09 (JD29) No 3,689 2,420 3,161 N/A 1,584 N/A Pipeline routed to follow property boundary. Allowable with mitigation. Impacts due to permanent landuse converion and temporary construction clearing outside of the B6 S10 (JD30) No 4,060 5,212 0 N/A 12,180 N/A permanent ROW. Allowable with mitigation. Totals: 19,578 17,180 6,330 - 30,525 - * Note: Mitigation is not required for Zone 2 impacts because the area will remain a grassed easement.