HomeMy WebLinkAbout20191209 Ver 2_Buffer Impact Table_20191122BUFFER IMPACT TABLE
PING LINE 204 RELOCATION
(ft)
Wetlands
Located in
11
Mitigation
Buffer ImpactImpacts
0- Stream
Perpendicular
Buffer
(ft2)
RIP
(Credits)
ID
Impact ID
Crossing?
Zone 1
Zone 2
Zone 1
Zone 2*
Zone 1
Zone 2*
Crossing Notes/Justification
B1
JD24A
No
3,954
3,097
0
N/A
11,862
N/A
Currently cleared; no clearing required for temporary workspace in buffer. Allowable with mitigation.
B2
JD24
No
1,633
2,304
0
N/A
4,899
N/A
No clearing required for temporary workspace in buffer. Allowable with mitigation.
Crossing to be bored with only 30' of the ROW to be cleared. Easement is 50' wide. Allowable with
B3
S07 (Gum Swamp)
No
3,169
2,099
3,169
N/A
-
N/A
mitigation.
B4
JD28
Yes
3,073
2,048
0
N/A
-
N/A
Currently cleared; no clearing required for temporary workspace in buffer. Allowable.
B5
S09 (JD29)
No
3,689
2,420
3,161
N/A
1,584
N/A
Pipeline routed to follow property boundary. Allowable with mitigation.
Impacts due to permanent landuse converion and temporary construction clearing outside of the
B6
S10 (JD30)
No
4,060
5,212
0
N/A
12,180
N/A
permanent ROW. Allowable with mitigation.
Totals:
19,578
17,180
6,330
-
30,525
-
* Note: Mitigation is not required for Zone 2 impacts because the area will remain a grassed easement.