Loading...
HomeMy WebLinkAboutNCC192923_NOI Application_20191126Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/21/2019 2:47:32 PM (NCG01 NOI Submission) Approve by Farkas, Jim J 11/25/2019 11:12:02 AM (Review- Construction NOI 18794) • The task was assigned to Farkas, Jim J by round robin distribution 11/21/2019 2:47 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 25, 2019 5:00 PM 11 /21 /2019 2:47 PM Submit by McCoy, Suzanne 11/26/2019 7:22:40 AM (Payment Verification for NCC192923) * Caroline N DeBruhl • McCoy, Suzanne assigned the task to McCoy, Suzanne 11/26/2019 7:22 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 6, 2020 5:00 PM 11 /25/2019 11:12 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Windy Road Access and Bridge 2. County* Cabarrus 3. Highway or Street 9001 Mooresville Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Concord 5. State * NC 6. Zip Code * 28027 7. Latitude * Enter the latitude in decimal degrees 35.4817 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.7291 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/25/2019 Estimated Construction Project Start Date 10. Date to End* 06/17/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Other (0000) Standard Industrial Classification for Ceveloprrent 12. Acres to be 2.50 disturbed* (including off -site borrow and waste areas) 13. Total site area 15.15 (acres) * 14. Post- 0.62 construction (Estimated) impervious area (acres) * NCC Project NCC-CABAR-2019-Windy Road Access and Bridge Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Coddle Creek Tributary 4 Waterbody * %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 13-17-6-4-(2) Index No.* NCWaterbody Index Nunber Stormwater r No discharges will flow Pf Yes to additional wate rs * 15c. Additional Coddle Creek Receiving Waterbody narre Waterbody 15d. Waterbody 13-17-6-(1.5) Index No. NCWaterbody Index Nunber 15e. Additional Waterbody narre Receiving Waterbody 15f. Waterbody NCWaterbody Index Nunber Index No. 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Flarnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Duke Energy Name * 2. First Name* Mayur IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Patel IF Corporation, enter F3egistered Agent Last %rre 3b. Title Lead Engineer 4. Permitee E-mail mayur.patel@duke-energy.com Address * 5. Permittee 704-382-2381 Telephone No.* 6. Permittee Mailing Street Address Address* 526 S, Church street, EC I- 08Q Address Line 2 City State / F rovince / Faegion Charlotte NC Fbstal / Zip Code Country 28202 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 526 S, Church street, EC I- 08Q Address Line 2 City State / Frovince / Fbgion Charlotte NC Fbstal / Zip Code Country 28202 us C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Neal Contact - First Name * 3. Primary Site Cary Contact - Last Name * 4. Title Lead Environmental Oversight 5. Site Contact E- Neal.Cary@duke-energy.com mail Address* 6. Site Contact 980 373-0826 Telephone No.* 7. Organization Duke Energy Name 8. Site Contact Street Address Mailing Address* 526 S. Church Street, EC 108Q Address Line 2 City charlotte Fbstal / Zip Code 28202 9. Consultant Name (Optional) Caroline Debruhl First and Last narre 10. Consultant E- CDeBruhl@pike.com mail This person will be copied on all correspondence. 11. Consultant 803.835.6147 Telephone No. State / Rovince / Fbgion nc Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/04/2019 Approved * 2. E&SC Plan Project CABAR-2017-090 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Letter of approval_S&E Plan.pdf 622.65KB Approval Wst be RDFfornat letter/documentation 6. NOI Certification Signed NCNOI Form111919.pdf 99.6KB Form Mist be R7Ffon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Mayur T. Patel Title Lead Engineer, CW Organization Duke Energy Carolinas Date * 11 /21 /2019 F. Tracking and COC Info NOI Tracking No. 18794 NC Reference No. NCG01-2019-2923 Uses 'count number' variable (incremrented by SP) Certificate of NCC192923 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2923 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)