HomeMy WebLinkAbout19980184 Ver 1_COMPLETE FILE_19980225State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
AM" wooomftm
NC ENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
January 6, 1999
Mr. Carey Ayers
Rowboat Dock and Dredge
858 Williamson Road
Mooresville, NC 28115
Dear Mr. Ayers:
Re: Homestead Land and Timber-Windsor Point Subdivision and Marina
Alexander County
DWQ # 980184
On August 18, 1998 the Division of Water Quality sent a letter stating your
project was on hold since seven copies of the PCN application was not received. To date,
we have not received the mentioned information regarding this project.
If we do not hear anything from you within two weeks of the date of this letter, we
will be forced to withdraw the project.
If you have any questions, please contact John Dorney at 919-733-1786.
Si rel ,
R. o
cc: Mooresville DWQ Regional Office
Wilmington District Office Corps of Engineers
Asheville Field Office Corps of Engineers
John Dorney
Central Files
Wetlands/401 Unit 4401 Reedy Creek Road Raleigh, North Carolina 27607
Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
Mr. Carey Ayers
Rowboat Dock and Dredge
858 Williamson Road
Mooresville, NC 28115
Dear Mr. Ayers:
1 ? •
NC ENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
August 18, 1998
Re: Homestead Land and Timber-Windsor Point subdivision marina
Alexander County
DWQ # 980184
The Division of Water Quality has reviewed your submittal for a FERC permit
marina development at Windsor Point subdivision in Alexander County. Your
application was not complete since the enclosed application form was not completed.
This information is needed by DWQ in order for us to decide whether this project is
approvable.
I can be reached at 733-1786 if you have any question. Until this information is
received, I will request (by copy of this letter) that the Corps of Engineers place this
project on hold. Also, the project will be placed on hold for our processing due to
incomplete information (15A NCAC 2H.0507(a)(4)).
cc: Mooresville DWQ Regional Office
Wilmington District of Corps of Engineers
Asheville Field Office Corps of Engineers
John Dorney
Central Files
Sincerely,
+on . Dorne y
Quality Ce tion Program
980184.hld
Division of Water Quality • Non-Discharge Branch
4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper
,-
February 4,1998
NCDEHNR
Division of Environmental Management
PO Box 29535
Raleigh, NC 27626-0535
RE: Lake Hickory-Windsor Point Marina
Gentlemen:
Dock & Dredge
THE ROW BOAT COMPANY, INC.
R
,
1.6
r( _?,
W P ?.? WU P?-1 ? Eft ar?ctr
Nonr?r;?ar9
Our firm is processing this application on behalf of Homestead Land & Timber. This application for a
nine-slip marina is based on Duke Energy and Federal Energy Regulatory Commission guidelines. The
project is to serve the Windsor Point Subdivision, a residential community south of Mountain Creek, Lake
Hickory, Alexander County, North Carolina.
The intent of this facility is to provide nine small boatslips and boat launch designed to accommodate small
recreational watercraft. The primary user of this facility will be homeowners who live in the Windsor Point
community adjacent to the marina.
The nine boatslips will be single loaded, configured in accordance with DRAWING NO. 298-97-4,
attached. There are five finger piers three feet wide by twenty feet long and six finger piers two feet wide
by twenty feet long. The docks will be commercial quality, designed by Floating Docks Manufacturing of
Indianapolis. The galvanized truss docks will be decked with Trex, a premium decking product
manufactured by Mobile Chemical, and will be floated on black encapsulated floatation by Formex. Piles
will be telescopic steel. The boat launch will be cast in place reinforced concrete twelve feet wide, sixty
feet long and six inches thick. We have enclosed drawings and maps pertinent to this project.
To access the project, proceed north on Hwy 16 from Interstate 40 to SR 1135, go west to SRI 137, go west
to SR 1124 turn left and proceed to Windsor Point Subdivision on the right. The project is located to the
rear of lot 48.
We request that your agency review the enclosed plan and advise our firm of any regulatory concerns,
which you may have relative to this application.
We look forward to hearing from you at the earliest time possible.
Sincerely,
THE ROWBOAT COMPANY, INC.
?I
E.Carey Ayres P
L
i
FEB
1998
/l;r-i t ,?
858 Williamson Road • Mooresville, NC 281 15 9 (704) 663-3478 • FAX (704) 663-5298
CD
z_
z
Q O
w
U)
z z
O
w F-
w Q
Z
z
F-
J
N
U
w
c)
cr_
LL
c)
c?
Cl)
C `_) Ill i , ? ,
i
,
(i
a
L
H i..?
ti, t
1
i
V 1. ,? Y I f<.?
i
i
!
I ? ? k.? flt r
' l G+
} '
f. ? ? F'
'F S ?
1
t
? S
s
V
t i
- i
` i
I (
s r 1 ? ??
low
! i
TWO
i
__-
?lr???j to •- - ....
? r r
Nr )
t -?
h? , <J
l- - r
M"),
cp'
D { 16
/ •
'L t,
Gam.
,
n, • `
- J1
? °
ti,
f
4 ?
?-1
A
?
! 1 L. 1
pp
k-
U
V
'
Z 1U ,
C
4,
VG'1
un
p a
r? ?. IUI=? I
"f" 3 "q 2A
•.a
ow3
n
.
ri .n
o
r?
a? v)
x ? :n o
c?
W p o
w Z
? O v
CJ O 0 -?
O .? p c
Q 0. ?
r:•
I
n'!
P•i
n'!
•r••
P?I
U
Z
QC,?
L. p o Z
Lo
CD Lo
v300 0
00
Q LLI