Loading...
HomeMy WebLinkAbout20191507 Ver 1_Riparian Buffer Authorization_20191121State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources 1sA NCAC 02B .0233 (8)(b), .0243 (S)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) -- Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: Lot 4131 1 b. County- Wake 1c. Nearest municipality: Garner 1d. Subdivision name: Eagle Fridge le. Is the project located in any of North Carolina's twenty coasial counties? If Yes, answer 1f below. ❑ Yes x® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? I ❑ Yes No 2. Owner Information 2a. Name on Recorded Deed: i JLS Homes LLC 2b. Deed Book and Page No. 17532 1884 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2d. Responsible Party for Cor rations : 2e. Street address: 121 Holyoke Ct 2f. City, state, zip: Raleigh, NC 27603 2g. Telephone no.: 9194227306 2h. Fax no.: NA 2i. Email address: I lclark@jlshomes.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name:-.-- 3c. Business name ii a iicabie : 3d. Street address: 3e. City, state, zip: 3f Telephone no.: 3g. Fax no.: _ 3h. Email address: 4. Agent/Consultant Information (it applicable) 4a. Name: 4b. Business name if a licable : 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: i 4g. Email address: FORM: BA 10-2013 Page 1 of 4 113. Project information and Prior Project History 1. Property identification 1a. Property identification no. (tax PIN or parcel 10): 1609190299 1b. Site coordinates (in decimal degrees): Latitude: 35.670953 1 Longitude: 78,659373 1 c. Property size: .28 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Swift Creek 1 Lake Benson 2b. Water Quality Classification of nearest receiving water, WS ill; NSW; CA 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Wooded 3b. Attach an 8 Y2 x 11 excerptfrom the most recentversion of the USGS topographic map indicating the location of the site 3c. Attach an 8'/ x 11 excerpt from the most recent version of the published County NRCS Sail Survey Map depicting the project site 3d. List the total estimated llnear feet of all existing streams (intermittent and perennial) on the property: 3e. Explain the purpose of the proposed project: 3f. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this roe I project(including all priorphases) in thepast? 0 Yes No xZ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (i€ known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project. History 5a. Have permits or certifications been requested or obtained I for this project (including all priorphases) in thepast? Yes No 0 Unknown 5b. if yes, explain and detail according to "help file" instructions. 8. Future Project Plans 6a. is this a phased project? Yes No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed impacts inventory I - Buffer Impacts 1 a. Project is in which protected basin? Neuse ❑ Randleman Tar -Pamlico ❑ Jordan Catawba ❑ Goose Creek 1 b. individually list all buffer impacts below_ If any Impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Lnumber— Permanent (P) or Temporary Reason for impact i Type of impact (exempt, allowable, allowable wJ mitigation) Stream name Buffer mitigation required? Zone i impact (sq ft) Zone 2 impact (sq ft) i 61 P ❑ T House Allowable Swift Yes M No 1360 132 P OT Yes No B3 ❑ P ❑ T ❑ Yes ❑ No 34 ❑ P ❑ T 85 P T ❑ Yes ❑ No Yes ❑ No B6 ❑ P ❑ T 11 ❑ Yes No t Total buffer impacts ic. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization f 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Silt Fencel Light grading Ib. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Buffer Mitigation 22. Will the project result in an impact within a protected riparian btrf€er that Li Yes ® No requires buffer mitigation? 2b. If yes, then identify the square feet of Impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. if buffer mitigation is required, is payment to a mitigation bank or NC DMS IL proposed? I Yes ED No 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. if no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of Diffuse love stormwater treatment. Include a plan that fully documents how diffuse flow will be Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 3 of the NC Stormwaier DIVIP i%Jhiiliai and attach a BMP Supplement Form. F. Supplementary information 1, Environmental Documentation [ la. Does the project involve an expenditure of public (federallstate/focal) funds or the Yes No use of public federalistate land? 1b. 1f you answered "yes" to the above, does the project require preparation of an ❑ Yes fX-1 No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act NEPA/SEPA ? 1 c. If you answered "yes" to the above, has the document been finalized by the State 0 Yes ® No Clearing House? (if so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated ❑ Yes ' No Wetland Rules (I5A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules 15A NCAC 0213.0200 ? 2b. Is this an after -the -fact permit application? Yes Na {{ 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): _Les Clark Applicant/Agent's Printed Name Applicant/Agent's Signature Date e:ure is valid erdy if an authorization lalier f. m theappiicant is provided.) Send 3 complete sets of this farm and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service. NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class i tid via the US Postal Service For government transportation projects sent by delivers service (UPS, FedEX, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, Fed Ex, etcj: Karen Higgins Karen Higgins NCD"IR-441 & Buffer Permitting Branch OR NCDWR-401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4 STnGECREST DR Course Bearing Distance LY I S 89°18'36- E 51.73' 6 SITE O° Curve Radius Length Chord Chord Be.,. �+ Cl 50.00' 41,17' 40.02' N 23-0Y'26' W TEN -TEN RD VICINITY MAP (NTS) LEGEND NTS NOT TO SCNiF BP EI=NG IRON PPE PP POWER POLE W/M WATER METER TB TELEPHONE BOX UPS IRON PPE SET A'hL TRANSIHXd R CAN CPBLE TV BOX L POLE LIGHT POLE ONPL OVERHEAD POWER LINE TES. FLARED ENO =ON (PIPE) RCP RUNFORCED CONO PIPE B.O.C. BACK OF CURB FSi. FIRE HYDRANT C\O SEWER CLEAN OOT E6 EXiMNG RON STAIa MTV MANHOLE ECM EXISRNG CONCRETE MONUMENT PX- PARKER KALAN NAIL 397 \ .O.M.2013, PG.99\ DISTURBANCE 315 SQ.Fl-. Z N 400 � rn B.O.M.2014, PG.773 — \COI s B.O.M.2013, PG_990 ti ry °a A � CECK L PROPOSED HOUSE h PROPOSED DRIVE & WALK HOLYOKE COURT (55 - PUBLIC R/W) NOTE: SHOWN IS LOT 401 OF EAGLE RIDGE SID - PHASE 6B REF: B.O.M.2014 PG.772-773 AREA = 0.280 ACRES 121 HOLYOKE COURT i 50' CREEK BUFFER 402 B.O.M.2014, PG.773 E \ 10' PUBLIC STREET TREEEASEMENT \ 1 1 NOTE: DECK WILL BE OVER 8' OFF OF FINISHED GRADE. 30 0 30 60 90 GRAPHIC SCALE - FEET THIS G TO CERTIFY THAT TINS MAP WAS PRELIMINARY PLOT PLAN FOR: SURVEYSU o THE P E AN MY JLS HOMES M THAT THERE ARE NOT ANY BICROAM111MENT5, EXCEPT AS NOTED TD THE BEST OF MY KNOWLEDGE. THAT THE RATIO OF PROD" AS CALCULATED BY PANTHER CREEK TWSP., WAKE CO., N,C. LATITUDES AND DEPARTURES IS 1:10,ODO. SCALE 1" = 30' JUNE 13, 2019 TENS MAP WAS PWA3ED FOR THE COMPANY USE REVISED: NOVEMBER 8, 2019 (PER CLIENT EMAIL) AND E NOT NITENOFD FOR RECORDATION OR CONVEYANCES WUTIOUi WWTTEN AUTHORIZATION IfAUlDIN — WATxm SUR raw, P.A. OF THE SURVEYOR AND OTHER APPROPRATE OFFICws P.O. BOX 444 / 1301 W. BROAD ST. PROFESSIONAL LAND SURVEYOR PRELIMINARY PLAT FIXMY VAMNA, NORTH CAROUNA 27526 L-3247 NOT FOR RECORDATION (919) 552-9326 z7ss-aa1