HomeMy WebLinkAboutNCC192900_ESC Approval Submitted_20191125ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
November 1, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Corporation
Attention: Mr. Buster Allen, Regional Manager Land Services
6325 Wilkinson Boulevard
Charlotte, North Carolina 28214
RE: Project Name: Mt. Holly Training Building Site Improvements (Express Review)
Acres Approved: 1.3
Project ID: GASTO-2020-009
County: Gaston
City: Mt. Holly
Address: 1900 North Main Street
River Basin: Catawba
Stream Classification: Others
Submitted By: The John R. MCADAMS Company, Inc.
Date Received by LQS: October 29, 2019
Plan Type: New
Dear Mr. Allen:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications
Required for Approval are listed on the attached page. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129,
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing
activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct
questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file
at the job site:
'.KQ
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
�J Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
NORTH CAROUNA
" ^ ,, - — /�� 704.663.1699
Letter of Approval with Modifications
Duke Energy Corporation
November 1, 2019
Page 2 of 3
The approved E&SC plan as well as any approved deviation.
The NCG01 permit and the COC, once it is received.
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan
and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this
land -disturbing activity. This approval does not supersede any other permit or approval,
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: The John McAdams Co., Inc,lCory George, PE 3430 Toringdon Way, Ste 110ICharlotte, NC 28277
Inspection Department
Letter of Approval with Modifications
Duke Energy Corporation
November 1, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Mt. Holly Training Building Site Improvements
Project ID: GASTO-2020-009
County: Gaston
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Additional measures may be required - The applicant is responsible for the control of sediment on -
site. If the approved erosion and sedimentation control measures prove insufficient, the applicant
must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC
4B .0115]
ycryw y
� d E. r.L
Vowe
AWeed
�
ClOd• �' '�
Owe
'-' C
C 0 15lot
¢
A�
M.-W =w� 0% � eq,
rD O n 1J
� ¢ *% l 1
weed
GRE.g7*
c4 owe
tz
li km
�•" /^ owe
o N Ua o a� o N M■d
ft 0-9
0 °• = Z.
a 01
~' •
O.W. mf o
o'
61
ks
Weed
� o
r rep,
J