Loading...
HomeMy WebLinkAboutNCC192900_ESC Approval Submitted_20191125ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality November 1, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Corporation Attention: Mr. Buster Allen, Regional Manager Land Services 6325 Wilkinson Boulevard Charlotte, North Carolina 28214 RE: Project Name: Mt. Holly Training Building Site Improvements (Express Review) Acres Approved: 1.3 Project ID: GASTO-2020-009 County: Gaston City: Mt. Holly Address: 1900 North Main Street River Basin: Catawba Stream Classification: Others Submitted By: The John R. MCADAMS Company, Inc. Date Received by LQS: October 29, 2019 Plan Type: New Dear Mr. Allen: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: '.KQ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources �J Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NORTH CAROUNA " ^ ,, - — /�� 704.663.1699 Letter of Approval with Modifications Duke Energy Corporation November 1, 2019 Page 2 of 3 The approved E&SC plan as well as any approved deviation. The NCG01 permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval, Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: The John McAdams Co., Inc,lCory George, PE 3430 Toringdon Way, Ste 110ICharlotte, NC 28277 Inspection Department Letter of Approval with Modifications Duke Energy Corporation November 1, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Mt. Holly Training Building Site Improvements Project ID: GASTO-2020-009 County: Gaston Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Additional measures may be required - The applicant is responsible for the control of sediment on - site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] ycryw y � d E. r.L Vowe AWeed � ClOd• �' '� Owe '-' C C 0 15lot ¢ A� M.-W =w� 0% � eq, rD O n 1J � ¢ *% l 1 weed GRE.g7* c4 owe tz li km �•" /^ owe o N Ua o a� o N M■d ft 0-9 0 °• = Z. a 01 ~' • O.W. mf o o' 61 ks Weed � o r rep, J