Loading...
HomeMy WebLinkAboutNCC192201_NOI Application_20191125Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 10/4/2019 7:46:58 AM (NCG01 NOI Submission) Approve by Farkas, Jim J 10/7/2019 10:52:33 AM (Review- Construction NOI 16740) • The task was assigned to EADS\jjfarkas by round robin distribution 10/4/2019 7:47 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 8, 2019 5:00 PM 10/4/2019 7:47 AM Submit by McCoy, Suzanne 11/25/2019 7:11:38 AM (Payment Verification for NCC192201) * Erik Harwich • McCoy, Suzanne assigned the task to McCoy, Suzanne 11/25/2019 7:11 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 18, 2019 5:00 PM 10/7/2019 10:52 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Cole Mill Road Gas Pipeline Extension 2. County* Orange 3. Highway or Street Cole Mill Road and Umstead Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Eno Township 5. State * NC 6. Zip Code * 27712 7. Latitude * Enter the latitude in decimal degrees 36.0670 8. Longitude* Enter the longitude in decinal degrees (M. ST be negative) -78.9860 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/07/2019 Estinated Construction Project Start Date 10. Date to End* 01/31/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Other (0000) Standard Industrial Classification for Ceveloprrent 12. Acres to be 2.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 2.00 (acres) * 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-ORANG-2019-Cole Mill Road Gas Pipeline Extension Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Eno River Wate rbody* Barre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 27-2-(10) Index No.* NCWaterbody Index Nirrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fa sponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Dominion Energy North Carolina Name * 2. First Name* Shaun If Corporation, enter Pbegistered Agent First Barre 3. Last Name* Randall If Corporation, enter Faegistered Agent Last %rre 3b. Title Vice President - Gas Operations 4. Permitee E-mail srandall@scana.com Address * 5. Permittee 7048103350 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box 1398 Address Line 2 city Gastonia Fbstal / Zip Code 28053 Check box if the r Yes street address the same as mailing address State / Ftovince / Faegion NC Country United States 7. Permittee Street Street Address Address* 800 Gaston Road Address Line 2 Building A City State / Rovince / Fbgion Gastonia Gastonia Fbstal / Zip Code Country 29056 United States C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Robert Contact - First Name * 3. Primary Site Schwartz Contact - Last Name * 4. Title Engineer IV 5. Site Contact E- AARON.SCHWARTZ@scana.com mail Address* 6. Site Contact 8032177112 Telephone No.* 7. Organization Name 8. Site Contact Street Address Mailing Address* 220 Operation Way Address Line 2 City Cayce Fbstal / Zip Code 29033-3701 9. Consultant Name (Optional) Liane Morgan First and Last narre 10. Consultant E- Imorgan@smeinc.com mail This person will be copied on all correspondence. 11. Consultant 70435234726 Telephone No. State / Rovince / Fbgion South Carolina Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/03/2019 Approved * 2. E&SC Plan Project ORANG-2020-005 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan ORANG-2020-005 LOA 20191003.pdf 60.08KB Approval Wst be RDFfornat letter/documentation 6. NOI Certification NCG01_eNOICertForm.pdf 92.26KB Form Mist be R7Ffornat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Michael Shaun Randall Title Vice President - Gas Operations Organization Dominion Energy Date * 10/04/2019 F. Tracking and COC Info NOI Tracking No. 16740 NC Reference No. NCG01-2019-2201 Uses 'count number' variable (incremrented by SP) Certificate of NCC192201 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2201 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)