Loading...
HomeMy WebLinkAbout20190061 Ver 1_U-4700A Final Design Field Inspection_20191122Carpenter, Kristi From: Sowell, Bryan K Sent: Friday, November 22, 2019 2:26 PM To: Carpenter, Larry S; Poe, Michael L; McSwain, Jacqueline; Jordan, Travis R; Eller, Douglas W; Conner, Eric W; Drewery, Chad W; Anderson, Warren M; Tuttle, Patrick L; Hiatt, Todd M; Engle, Byron K; Steskal, Randy D; Beam, Patricia; Wanucha, Dave; Beckwith, Loretta A CIV USARMY CESAW (USA); Cheely, Erin K; Bassette, Tim; Angel, James D; Setzer, William A; Babb, Herman H; Macarthur, Noel A; Woods, Larry S; Panicker, Anil T; Gackstetter, Brian E Cc: Stafford, Mark E; Skeens, Brian C; Argabright, Van; Pilipchuk, John L; Parker, Cyrus F; Morrison, Clark S; Lacy, Kevin; Muse, Carey C; Goodwin, Jeremy A; AI-Ghandour, Majed N; Kuse, Jessica D; Paugh, Leilani Y; Moore, Byron G; Fulghum, Heather L; Gray, Jared S; Jordan, Kelvin L; Mcgowan, James R; Brandon McInnis (bmcinnis@rkk.com); Matthew Lamy; Kelvington, Joe Qoseph.kelvington@stantec.com); Koshy, Tharu Subject: U-4700A Final Design Field Inspection Attachments: U-4700A Final Design Field Inspection 2.pdf, U-4700 Green Sheets.pdf All, We have completed the preliminary plans for the above project south of the Catawba river and would like to review them in the field with all personnel involved. In accordance with Larry Carpenter, Jr. PE, Division Construction Engineer, the field inspection will begin at 1:00 pm on Wednesday December 11, 2019 at the Western Piedmont Council of Governments located at 1880 2nd Ave NW, Hickory, NC 28601. I request that each of you attend this meeting or have a representative attend for you. Electronic plans and Planning Documents, in PDF format, are available on the Project's Preconstruction site at: U-4700A Final Design Field Inspection #2 If you have specified a preference for paper plans on past projects we have mailed a set to you. Thank you for your help with this project. Bryan Sowell, PE Project Engineer Division 12 North Carolina Department of Transportation 980-552-4221 office bksowell@ncdot.gov PO Box 47 Shelby, NC 28151-0047 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ROY COOPER GOVERNOR Memo To: FROM DATE: SUBJECT ST�7E�. 05 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMEs H. TROGDON, III SECRETARY Larry Carpenter, Jr. PE Trish Beam Michael Poe, PE Dave Wanucha Jackie McSwain Loretta Beckwith Travis Jordan, PE Doug Eller Eric Conner Chad Drewery Warren Anderson Patrick Tuttle, PE, PLS Todd Hiatt, PE Byron Engle, PE Randy Steskal, PE, PLS Bryan K. Sowell NCDOT Division 12 — Project Engineer November 22, 2019 Erin Cheely Tim Bassette David Angel Will Setzer Howard Babb Noel MacArthur Scott Woods Anil Panicker Brian Gackstetter IBDocu Signed by: V,0 . ewe& 79EABDC0D6EA4D1... Project U-4700A (35993.1.7) Burke, Caldwell, and Catawba Counties Final Design Field Inspection We have completed the preliminary plans for the above project south of the Catawba river and would like to review them in the field with all personnel involved. In accordance with Larry Carpenter, Jr. PE, Division Construction Engineer, the field inspection will begin at 1:00 pm on Wednesday December 11, 2019 at the Western Piedmont Council of Governments located at 1880 2nd Ave NW, Hickory, NC 28601. I request that each of you attend this meeting or have a representative attend for you. Electronic plans and Planning Documents, in PDF format, are available on the Project's Preconstruction site at: U-4700A Final Design Field Inspection #2 This field inspection is a critical step in the Plan & Permit Review Process. It is imperative that design and construction issues be discussed and finalized during this meeting (see attached checklist). These issues include construction limits, drainage, right of way, and utilities. Any design features that affect slope stakes, especially in environmentally sensitive areas (ESA), should be finalized at this meeting. No revisions will occur in the ESAs once the permit review meeting (4C meeting) takes place. If this project contains any new or unique construction techniques, processes, and / or products that are unfamiliar to the Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION 12 PO BOX 47 SHELBY. NC 28151-0047 Telephone: (980) 552-4200 Fax: (704) 480-5401 Customer Service: 1-877-368-4968 Website: www.nedot.gov Location: 1710 EAST MARION STREET SHELBY, NC 28152 Department, Division, or the assigned Resident Engineer, please notify us so that special provisions, details, technical bulletins, etc. can be provided prior to the field inspection. Attached is a list of the environmental commitments that were developed during the planning stage of the project. Review these commitments to ensure all construction -related commitments can be properly executed. Attachment Ec: Mark Stafford, PE Jessica Kuse, PE Brian Skeens, PE LeiLani Paugh Van Argabright, PE Byron Moore, PE John Pilipchuk, LG, PE Heather Fulghum Cyrus Parker, LG, PE Jared Gray Clark Morrison, PhD, PE Kelvin Jordan Kevin Lacy, PE, CPM Jim McGowan Carey Muse Brandon McInnis, PE Jeremy Goodwin, PE, CPESC, CPSWQ Matthew Lamy, PE Majed Al-Ghandour, PhD, PE, CPM Joe Kelvington, PE Project Commitments Proposed US 321 Widening From US 70 in Hickory to Southwest Boulevard in Lenoir Catawba, Burke, and Caldwell Counties NCDOT Divisions 11, 12 & 13 WBS Element35993.1.2 Federal Aid Project NHF-0321(25) STIP Project No. U-4700 Project Commitments The following special commitments have been agreed to by the North Carolina Department of Transportation (NCDOT): Hydraulic Unit — FEMA Coordination The Hydraulics Unit will coordinate with the NC Floodplain Mapping Program (FMP) to determine the status of the project with regards to applicabilityof NCDOT'S Memorandum of Agreement, or approval of a Conditional Letterof Map Revision (CLOMR) and subsequentfinal Letterof Map Revision (LOMR). Division Construction — FEMA Coordination This project involves construction activities on or adjacent to FEMA-regulated streams. Therefore, the Division shall submitsealed as -built construction plans to the Hydraulics Unit upon completion of project construction, certifyingthat the drainage structures and roadway embankmentthat are located within the 100-year floodplain were builtas shown inthe construction plans, both horizontallyand vertically. Division Construction On US 321, intermediate contact times will be included in the construction contract and traffic management plan to minimize the disruption to the travelling public. Specific access to the L.P. Frans Stadium will be considered in more detail during final design. NCDOT will coordinate with the stadium staff prior to construction. Roadway Design and Hydraulic Design Units As part of the Concurrence Point 2A agreement to narrow the 46' median option, NCDOT committed to treat storm water in designated places throughout the project. These locations will be identified duringfinal design. Environmental Analysis Unit —Dwarf-Flowered Heartleaf Construction authorization will not be requested until ESA compliance is satisfied for dwarf -flowered heartleaf. TI P No. U-4700 Finding of No Significant Impact Page 1 of 2 Community Studies Team Pedestrian accommodations and access for pedestrians across U.S. 321 at the proposed 2nd Avenue SW interchange will be maintained to address the concerns and needs of area residents. Division Project Development — FERC Coordination The proposed project crosses Lake Hickory, which is a Federal Energy Regulatory Commission (FERC) site operated by Duke Energy. This crossing of Lake Hickory will require FERC coordination through Duke Energy. NCDOT Division 12, in conjunction with the NCDOT Environmental Analysis Unit, will coordinate with Duke Energy during final design to provide designs and ensure compliance with Duke Energy's FERC commitments. TIP No. U-4700 Fi nding of No Significant Impact Page 2 of 2