Loading...
HomeMy WebLinkAboutNCC192833_ESC Approval Submitted_20191122ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Nicholas S. Harrell P.O. Box 451 Raeford, NC 28376 NORTH CAROLINA Environmental Quality November 15, 2019 LETTER OF APPROVAL RE: Project Name: Hobson Road Concrete Plant Acres Approved: 4.9 Project ID: HOKE-2020-015 County: Hoke, City: McLaughlin, River Basin: Cape Fear Stream Classification: Other Submitted By: 4D Site Solutions, Inc. Date Received by LQS. October 28, 2019 Plan Type: New Dear Mr. Harrell: Address: Hobson Road This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at ded;,nc.govJNCG01. the NOI form to Annette Lucas at Annette.lucas ncdenr. ov or Paul Clark at Paul.clark(@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy. Minerai and Land Resources j��AE PFayetteville Regional Office 1225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301 lm 910.433.3300 Letter of Approval Nicholas S. Harrell ]November 15, 2019 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 1 SA NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other.permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jodi Pace, El Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Scott Brown, 4D Site Solutions, Inc. (electronic copy) Andy Connor, Building Inspector (electronic copy) Fayetteville Regional Office file