Loading...
HomeMy WebLinkAbout20190827 Ver 2_Design/Maps/Site Plans Revised_20191112Carpenter, Kristi From: Winslow, Lancelot D Sent: Tuesday, November 12, 2019 3:17 PM To: Barnes, Kyle W CIV USARMY CESAW (US); Ward, Garcy Subject: FW: Southdock Revised Drawing Attachments: South_Dock_11.12.19_ps4.pdf, South_Dock_11.12.19_ps3.pdf Here is the latest drawing for the sheet pile. Please give me call when you can. Thanks. From: Abel, John S <jabel@ncdot.gov> Sent: Tuesday, November 12, 2019 11:39 AM To: Winslow, Lancelot D <Iwinslow@ncdot.gov>; Doliber, Brian C <bcdoliber@ncdot.gov> Subject: Southdock Revised Drawing Lance / Brian: Please find attached the revised drawings that show the wall was shortened between WP 6-7 which allowed us to keep the length of the original wall between WP 7-8. It is closer to shore now but we did not shorten the sandbag configuration due to erosion. Let me know if you have any questions. Thanks John S. Abel, Jr. Marine Maintenance Engineer NCDOT — Ferry Division 252 482-1850 office 252 482-1851 direct label ncdot.gov 113 Airport Drive Suite 100 Edenton, NC 27932 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.