From: Winslow, Lancelot D
Sent: Tuesday, November 12, 2019 3:17 PM
To: Barnes, Kyle W CIV USARMY CESAW (US); Ward, Garcy
Subject: FW: Southdock Revised Drawing
Attachments: South_Dock_11.12.19_ps4.pdf, South_Dock_11.12.19_ps3.pdf
Here is the latest drawing for the sheet pile. Please give me call when you can. Thanks.
From: Abel, John S <jabel@ncdot.gov>
Sent: Tuesday, November 12, 2019 11:39 AM
To: Winslow, Lancelot D <Iwinslow@ncdot.gov>; Doliber, Brian C <bcdoliber@ncdot.gov>
Subject: Southdock Revised Drawing
Lance / Brian:
Please find attached the revised drawings that show the wall was shortened between WP 6-7 which allowed us to keep
the length of the original wall between WP 7-8. It is closer to shore now but we did not shorten the sandbag
configuration due to erosion.
Let me know if you have any questions.
Thanks
John S. Abel, Jr.
Marine Maintenance Engineer
NCDOT — Ferry Division
252 482-1850 office
252 482-1851 direct
label ncdot.gov
113 Airport Drive
Suite 100
Edenton, NC 27932
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.