Loading...
HomeMy WebLinkAbout20191605 Ver 1_PCN Form Submission_20191120DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned * Version#* 20191605 1 Is a payment required for this project?* r No payment required What amout is owed?* r Fee received r $240.00 r Fee needed - send electronic notification IT $570.00 Reviewing Office * Winston-Salem Regional Office - (336) 776- Select Project Reviewer* 9800 Sue Homewood:eads\slhomewood Information for Initial Review 1a. Name of project: Emperor Lane Stream Stabilization 1a. Who is the Primary Contact?* Wendi Hartup 1b. Primary Contact Email:* wkhartup@toknc.com Date Submitted 11 /20/2019 Nearest Body of Water Abbott Creek Basin Yadkin -Pee Dee Water Classification WS-III Site Coordinates Latitude: Longitude: 36.097336-80.082501 A. Processing Information County (or Counties) where the project is located: Forsyth Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Primary Contact Phone:* (336)564-1613 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 27 - Restoration le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Fieldcrest Subdivision Homeowners' Association, LLC 2b. Deed book and page no.: 2886; pages 1179-1180 2c. Responsible party: Curtis Swisher, Town Manager 2d.Address Street Address 134 East Mountain St Address tine 2 PO Box 728 City Kernersville Postal / Zip Code 27285 2e. Telephone Number: (336)992-0305 2g. Email Address:* CSwisher@toknc.com 3. Applicant Information (if different from owner) 3a. Name: State / Ptmime / R3gion NC Country USA 2f. Fax Number: r Yes r No r Yes r No Wendi Hartup 3b. Business Name: Town of Kernersville 3c.Address Street Address 509 Michael Street Address Line 2 Cib Kernersville Postal / Zip Code 27284 3d. Telephone Number: (336)564-1613 3f. Email Address:* whartup@toknc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (d appropriate) Fieldcrest Subdivision 1c. Nearest municipality/ town: Kernersville 2. Project Identification 2a. Property Identification Number: 6885-05-2756 2c. Project Address Street Address O Emperor Ln Address Line 2 City Kernersville Postal / Zip (bde 27284 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Abbott Creek 3b. Water Resources Classification of nearest receiving water:* WS-III 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401030202 4. Project Description and History State / Province / Region NC Country USA 3e. Fax Number: 2b. Property size: 1.78 State / Province / Fagion NC country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Stream erosion has occurred following several recent storms, resulting in an unstable stream channel with ongoing bed and bank erosion. The 48-inch RCP culvert under Emperor Lane is threatened by undermining. Two residential properties downstream of Emperor Lane are also threatened by erosion. Land use in the watershed is residential homes. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes G No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS Map Emperor Lane.pdf 254.24KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soil Survey Emperor Lane.pdf 280.8KB O 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 181 4h. Explain the purpose of the proposed project:* Reduce stream erosion and improve water quality and natural stream functions by extending the culvert 70 feet downstream of Emperor Lane and restoring 111 feet of stream to natural stable conditions. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Extend the 48-inch culvert under Emperor Lane 70 feet downstream and establish a stable outfall. Restore 111 feet of stream channel using natural channel design techniques. The restored stream will have a stable channel dimension, rock steps and riffles, pools, floodplain benches, and native riparian vegetation. Equipment will include trackhoe excavators and off road trucks. 4j. Please upload project drawings for the proposed project. REACH6_EMPEROR_LANE_CONSTRUCTION_PLAN_10092019.pdf 3.03MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* �3�name* ��3e. Stream Type* 3f. Type of F�� 3h. Impact (?) Jurisdiction* length* 81 Stabilization Permanent Culvert UT Abbotts Creek Perennial Both 6Ave age (feet) 7(0 �rfeet) S2 Stabilization Permanent Stabilization —] LIT Abbotts Creek Perennial Both 6 Aver�ge(feet) 111 (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 181 31. Total stream and ditch impacts: 181 3i. Total temporary stream impacts: 0 3j. Comments: Stream impacts are required to achieve erosion control and water quality objectives. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Stabilization as described in the construction plan is necessary to achieve water quality and erosion control objectives. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: During construction, stream flow will be pumped around the active construction zone until the site is stabilized with in -stream structures and erosion control matting. Following construction, the site will be planted with native riparian vegetation to establish a natural stream buffer. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The project will produce a natural functioning stream system to replace the unstable eroding stream. F. Stormwater Management and Diffuse Flow Plan (required by DWR) V 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: No buffer rules are in effect in this watershed. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No Comments: No new impervious surface will be added in this project. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes f No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * t^ Yes r No Comments:* Town of Kernersville funding will be used for implementation. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This project will not result in additional development in the watershed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes a No C' WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes f• No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? hftps://www.ft-&.gov/raleigh/es Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes f• No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.fisheries. noaa. gov/natio na I/habitat-conservation/essential-fish-habitat 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* http://gis.ncdcr.gov/hpoweb/ 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* https://msc.fema.gov/portal/search#searchresultsanchor Miscellaneous Comments Miscellaneous attachments not previously requested. Signature * W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Wendi Hartup Signature Date 11/20/2019 MUSGS u.5 o[t,f11xl iR'p iX[YlebalGrEpa II[bKMt%5[WWpNiMXfi[ + xcxrr.ar�iu: Project Area o 3T'4rn Sod Map —Forsyth County, North Carelina (Emperor Outfall and Strearn Ste b1l"llon) I Ss �q 7@'S51•q a M1tp"dr: 1354f pI e A p-b (8.5 z 117sti[ M N_ lAl 6 5 10 2D 90 Fog rY 0 tl 30 6a 90 4ppm 1milm: Vltb Hamb Cann ccurdrm6m: F•135ID4 Edge M3. UTM 21 a 1711 VA3584 IK� Natural Resources Web Sail Survey IGIM 019 Canservallvn Service flatrorral Cooperative Sall Survey Page T of 3 z 0 4 f� 0 I.L. 2 a x W 0 W J IL 4 Fg q<< N gg g � E � z 02 $ � �' r7f S N l $ _ a � m E S E g ao $ .2 i . 3 s►� og LL L2 aE gg m Swig C. aE vf5c8i �n�a rz 7i OW, gg w _ n F r e & 5 os a 43 4> a � t ■ d s F e d � a a` Map Unit Legend Map tlnit Symbol Map tlnit Name Acres In A01 Pm%mnt of A01 FoD2 Fairview clay loam, 10 to 15 0.3. N 2% percent slopes, moderately eructed Ha4 Halboro loam. 0 to 2 percent 0.0 1A.% slopes. "uenfly lloodcd Totals for Area of Frterost 0.3. 100.0% a _I BEESON CREEK REACH 6: EMPEROR LANE STREAM STABILIZATION KERNERSVILLE - FORSYTH COUNTY, NORTH CAROLINA PROJECT DIRECTORY OWNER TOWN OF KERNERSVILLE Wendi Hartup Stormwater Manager 336.564.1613 whartup@toknc.com ENGINEER JENNINGS ENVIRONMENTAL Greg Jennings, PhD, PE President 919.600.4790 greg@jenningsenv.com CONSTRUCTION NORTH STATE ENVIRONMENTAL Brandon Spaugh Project Manager, Business Development 336.793.8997 b.spaugh@nsenv.com SHEET INDEX COVER SHEET 1.1 NOTES, SPECIFICATIONS, MATERIALS 2.1 - 2.2 EROSION AND SEDIMENT CONTROL PLAN 3.1 - 3.5 STREAM STABILIZATION PLAN 4.1 - 4.2 STREAM STABILIZATION DETAILS 5.1 - 5.6 SOIL STABILIZATION AND RE -VEGETATION 6.1 VICINITY MAP r � F n En-EXE.. 14. .II Vr 1hEFRWKTP X1. En.q.. YETG CONSTRUCTION PLAN 10.09.2019 N_ J m Q J Lz ~ J O 0 Q:� LU Z U g� 0 O wz w C w U OU w �z �Q w O w U Z 0 Ln w w m Of w 0 CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" SCALE: 1 " = 20' H.D.: NAD83 (NCSP) V.D.: NAVD88 JE PID: 3302 1.1 GENERAL PROJECT SPECIFICATION AND NOTES 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE PLAN SHEET(S), DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. THE TOWN: TOWN OF KERNERSVILLE 1.3. ENGINEER: JENNINGS ENVIRONMENTAL 1.4. CONTRACTOR: NORTH STATE ENVIRONMENTAL 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEQ'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DOT'S "2018 STANDARD PROVISIONS" 2.3. NC DOT'S "2018 SPECIFICATIONS AND SPECIAL PROVISIONS" 2.2. TOWN OF KERNERSVILLE "DESIGN AND CONSTRUCTION SPECIFICATIONS" (2016) 2.3. UNITED STATES ARMY CORPS OF ENGINEERS NATIONWIDE PERMIT NUMBER 27 2.4. THE CONSTRUCTION DOCUMENTS 3. NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. THE CONTRACTOR SHALL ADHERE TO THE PROVISIONS OF THE 1985 UNDERGROUND DAMAGE PREVENTION ACT, NORTH CAROLINA GENERAL STATUTES 887, CHAPTER 785, SENATE BILL 168, ARTICLE 3. TO ASSIST THE CONTRACTOR AND UTILITY OWNERS IN MEETING THE REQUIREMENTS OF THIS LAW, THERE IS A "ONE -CALL SYSTEM" CALLED "NC ONECALL." MOST MAJOR UTILITIES WITH UNDERGROUND FACILITIES IN THE STATE SUBSCRIBE TO THIS SERVICE. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY MC S&WCD. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY AND SHALL BEAR ALL RISK OF LOSS OR DAMAGE. THE CONTRACTOR WILL FURNISH ALL NECESSARY EQUIPMENT, TOOLS, LABOR, TRANSPORTATION, AND SUPERVISION TO CLEAR THE RIGHT-OF-WAY ACCORDING TO THESE SPECIFICATIONS AND APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT TO THE TOWN. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK UNDER THIS SPECIFICATION. 7. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE TOWN OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE TOWN, SO AS TO ASSURE COMPLIANCE WITH THE TOWN'S SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9. SEE SHEET 3.1 FOR DETAILED EROSION AND SEDIMENTATION CONTROL PLAN, SEQUENCE AND DETAILS. 10. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE TOWN, THE ENGINEER AND NC DEQ PRIOR TO USE. 11. NO FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STREAM STABILIZATION AND CHANNEL WORK SHALL BE DISPOSED OF IN OLD STREAM CHANNEL TO OTHER AREAS APPROVED BY THE THE TOWN AND ENGINEER. 12. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY AND WORK WEEK. TOPOGRAPHIC SPECIFICATIONS AND NOTES 13. ELECTRONIC SURVEY DATA, BASE DRAWINGS AND SITE DATA WERE CURATED BY LDSI INC. AND PROVIDED TO JENNINGS ENVIRONMENTAL PLLC. 14. HORIZONTAL DATUM IS NAD83(2011) . VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 15. EXISTING GROUND SURFACES ARE BASED ON A SURVEY COMPLETED IN MARCH 2O19. SOME CHANGES MAY HAVE OCCURRED SINCE THE SURVEY WAS COMPLETED, PARTICULARLY IN AREAS EXPERIENCING CHANNEL DEGRADATION AND BANK EROSION. 16. THE PROPOSED ELEVATIONS AND GRADES SHOWN HEREIN ARE BASED ON THE LDSI INC. SURVEY THAT ENCOMPASSES THE EXISTING GROUND SURFACE FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. SLIGHT DISCREPANCIES BETWEEN THE EXITING GROUND AND DIGITAL SURFACE AND FIELD CONDITIONS CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THUS, QUANTITIES OF MATERIAL EXCAVATED SHOULD BE COMPARED TO THOSE SHOWN ON THE PLANSHEETS TO MANAGE THE MOVEMENT OF MATERIAL ACROSS THE SITE. 17. THE INTENT OF THE CHANNEL AND FLOODPLAIN GRADING PLAN IS TO MAINTAIN A "LIVE SURFACE THAT CAN BE ADJUSTED QUICKLY DURING CONSTRUCTION AND INCORPORATED INTO A 3D SURFACE FOR CONSTRUCTION USING SURVEY GRADE GPS EQUIPMENT. STREAM RESTORATION SPECIFICATIONS AND NOTES 18. FIELD CONDITIONS AND PROJECT VARIABILITY MAY REQUIRE ADAPTATION OF THE PLANSHEETS AND/OR DETAILS PROVIDED IN THE CONSTRUCTION DOCUMENTS DEPENDING ON SITE CONDITIONS OR PROJECT NEEDS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN ON THE PLANSHEETS AND/OR DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. 19. WHERE PRACTICABLE, EXISTING TREES AND VEGETATION SHOULD BE LEFT IN PLACE TO FACILITATE NATURAL REGENERATION AND SOIL STABILIZATION. 20. THE CONTRACTOR SHALL STAKE OUT THE PROPOSED STREAM CENTERLINE USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. DEPENDING ON ENCOUNTERED CONDITIONS SOME SHIFTING OF THE STREAM ALIGNMENT MAY BE NECESSARY. STAKING MAY BE OMITTED FOR PORTIONS OF THE STREAM WHEN SURVEY -GRADE GPS IS USED TO CONSTRUCT THE CHANNEL. 21. PRIOR TO CLEARING AND GRUBBING, THE CONTRACTOR SHALL MARK THE LIMITS OF CLEARING NEAR TREES FOR VERIFICATION OF INTENT BY THE ENGINEER. SOME MINOR ADJUSTMENT OF CHANNEL ALIGNMENT MAY BE REQUIRED TO PRESERVE TREES OR MINIMIZE IMPACT TO TREES. 22. ANY HARVESTING OF TREES FROM ONSITE MUST BE APPROVED BY THE MC S&WCD AND THE ENGINEER. 23. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO THE ADJACENT TREES. 24. CONSTRUCTION EQUIPMENT TRACKS AND ACCESS PATHS SHALL BE GRADED AND RE -CONTOURED AFTER CONSTRUCTION TO PREVENT RILL AND GULLY EROSION. 25. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL IN -STREAM STRUCTURES. 26. ELEVATIONS OF TRIBUTARIES AT CONFLUENCES MAY NEED TO BE ADJUSTED TO MEET CONSTRUCTED CONDITIONS. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 27. PROFILES MAY NEED TO BE ADJUSTED TO AVOID ABRUPT CHANGES IN ELEVATION. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 28. CHANNEL REALIGNMENT WORK SHALL BE COMPLETED AND STABILIZED PRIOR TO ALLOWING FLOW TO ENTER INTO THE NEWLY CONSTRUCTED STREAM CHANNEL. THE CONTRACTOR SHALL NOT OPEN UP MORE THAN 200 FEET OF CHANNEL WITHOUT EROSION CONTROL MATTING IN PLACE OR BY APPROVAL OF THE ENGINEER. IF THE CHANNEL REALIGNMENT WORK IS NOT COMPLETED PRIOR TO ABANDONING THE OLD CHANNEL, A TEMPORARY SYSTEM SHALL BE USED ACCORDING THE APPROVED E&SC PLAN AND DETAIL. IN -LINE CHANNEL WORK SHALL UTILIZE THE TEMPORARY PUMP AROUND SYSTEM AT ALL TIMES. 29. STREAM RESTORATION WORK SHALL BE IMPLEMENTED BY FIRST GRADING THE FLOODPLAIN ADJACENT TO THE CHANNEL TO THE ELEVATIONS AND GRADES SPECIFIED IN THE PLANSHEETS. THE PROPOSED STREAM CHANNEL SHALL THEN BE EXCAVATED TO THE CHANNEL CROSS-SECTION GEOMETRY AND LONGITUDINAL PROFILE IN THE CONSTRUCTION DOCUMENTS. THIS CHANNEL WORK SHALL BE DONE WITH LOW GROUND PRESSURE TRACK EQUIPMENT. PLANSHEETS PROVIDE DIMENSIONS, ELEVATIONS AND SLOPES TO AID IN CONSTRUCTION OF THE CHANNEL. THE THALWEG CAN FIRST BE EXCAVATED TO THE ELEVATION SPECIFIED IN THE LONGITUDINAL PROFILE AND EXCAVATION AND FINE GRADING OF THE CORSS-SECTIONS SHALL THEN BE PREFORMED. ANY TEMPORARY STOCKPILING OR DOUBLE HANDLING OF EXCESS EARTH NECESSARY TO BUILD THE CHANNEL SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 30. BANKFULL CHANNEL DIMENSIONS WILL BE HELD TO THE DIMENSIONS SHOWN ON THE TYPICAL CROSS-SECTION PLANSHEETS. ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE PLANSHEETS. CHANNEL CROSS-SECTION DIMENSIONS SHALL BE WITHIN 0.2' (HORIZONTAL). 31. IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 32. IN -STREAM STRUCTURES SHALL BE INSTALLED AS THE CHANNEL IS BEING CONSTRUCTED. INSTREAM STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE CONSTRUCTION DOCUMENTS. THE FINISHED STRUCTURE SLOPES AND PROFILE ELEVATIONS SHALL BE WITHIN 0.1' (VERTICAL) OF THE CONSTRUCTION DOCUMENTS. 33. ALL FILTER FABRIC INSTALLED AS PART OF THE INSTREAM STRUCTURE SHALL BE A NONWOVEN GEOTEXTILE UNLESS OTHERWISE SPECIFIED IN STRUCTURE DETAILS OR SPECIFICATIONS. FILTER FABRIC SHALL BE TRIMMED TIGHT TO THE SURFACE OF THE STRUCTURE AND SHOULD NOT BE OBSERVED BY VISUAL INSPECTION. 34. BOULDER STRUCTURES SHALL BE CONSTRUCTED FROM BOULDERS THAT ARE CUBICAL OR RECTANGULAR IN SHAPE AND SIZED ACCORDING TO THE STRUCTURE DETAILS. 35. AFTER THE STRUCTURE IS COMPLETE AND FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 36. THE CONSTRUCTED CHANNEL SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING FROM THE TOE OF THE BANKFULL CHANNEL TO 4' BEYOND THE BANKFULL STAGE. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOSSENING 3 - 6" OF SOIL OR APPLING 3 - 6" OF TOPSOIL TO THE PROPOSED ELEVATIONS AND APPLY SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OF THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF FLOW. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE CONSTRUCTION DOCUMENTS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 37. IF THE TIMING OF CONSTRUCTION IS SUCH THAT PERMANENT RIPARIAN SEED CANNOT BE PLACED IN THE FALL, THEN THE CONTRACTION SHALL SEED WITH TEMPORARY WINTER COVER AND RETURN THE FOLLOWING SPRING TO INSTALL THE PERMANENT RIPARIAN SEED. 38. THE HARVESTING AND INSTALLATION OF LIVE STAKES SHALL BE PREFORMED ONLY DURING THE DORMANT SEASON, TYPICALLY BETWEEN DECEMBER 1 AND MARCH 1. THE CONTRACTOR SHALLE NOTIFY THE TOWN AND ENGINEER 7 DAYS PRIOR TO HARVESTING TO REVIEW AND APPROVE ALL HARVESTING SITES AND SPECIES. 39. LIVE STAKES SHALL BE INSTALLED ALONG THE TOE OF SLOPE ON OUTSIDE MEANDER BENDS OF POOLS AND IN RIFFLES WHERE SHOWN ON THE RE -VEGETATION PLAN. LIVE STAKES SHALL BE INSTALLED THROUGH THE EROSION CONTROL MATTING TO A DEPTH THAT REACHES THE WATER TABLE. 40. EXCESS EARTH MAY BE USED TO BACKFILL THE OLD CHANNEL OR SPREAD IN OTHER LOCATIONS WITHIN THE PROJECT AREA THAT ARE APPROVED BY THE PROJECT OWNER AND ENGINEER. 41. TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR EXCAVATION AND GRADING AND RE -APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4" OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE CONSTRUCTION DOCUMENTS. 42. FILL AREAS SHALL BE SEEDED WITH TEMPORARY VEGETATION WITHIN 14 DAYS OF GRADING. THE PLACEMENT OF STRAW MULCH SHALL OCCUR WITHIN 48 HOURS OF SEEDING. MULCH SHALL BE SPREAD TO COVER DISTURBED CHANNEL AND FLOODPLAIN AREAS. MULCH SHALL BE KEPT OUT OF THE CROWNS OF SHRUBS AND GROUND COVER. NGGI f , fflllllll��� N_ J_ m Q J J Q LL O Lu z g O w Lu CL Lu U Q Lu Lu Lu w U z O Ln Lu Lu m N _J Q w 0 _J O Z O U I- Z w 2 0 w N 0 Z a Z O O Of w CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D. NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 2.1 QUANTITIES AND MATERIALS SPECIFICATIONS 1. THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS OR TO A LOCATION SPECIFIED BY THE TOWN OR ENGINEER. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS OR ON THE QUANTITIES AND MATERIALS LIST. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 2. COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE GENERAL SPECIFICATIONS, CONSTRUCTION DOCUMENTS, OR CONSTRUCTION SPECIFICATIONS, SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 3. THE EROSION CONTROL MEASURES DEPICTED ON THE PLANS ARE TO BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE PLANS AND ON THE QUANTITIES AND MATERIALS LIST) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER AND NC DEQ PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 4. ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE TOWN AND THE ENGINEER. ANY ADDITIONAL AREAS OF DISTURBANCE (CHANGES IN ACCESS, GRADING, CLEARING, ETC.) WILL REQUIRE APPROVAL FROM THE TOWN AND NCDEQ. 5. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE TOWN OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL TOWN, LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE TOWN. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE TOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEGUARDING OF MATERIALS AND EQUIPMENT AGAINST FIRE, THEFT AND VANDALISM AND SHALL NOT HOLD DEP RESPONSIBLE IN ANY WAY FOR THE OCCURRENCES OF SAME. FOR MATERIALS AND EQUIPMENT STORAGE AREAS THE CONTRACTOR SHALL FURNISH AND ERECT, AT NO ADDITIONAL COST, WHATEVER WORKS MAY BE NECESSARY FOR THE PROTECTION OF THE PUBLIC, INCLUDING BUT NOT LIMITED TO BARRICADES, FENCES, ETC. PRIOR TO FINAL PAYMENT BEING MADE, THE CONTRACTOR SHALL OBTAIN A RELEASE FROM THE PROPERTY OWNER OF THE STORAGE AREA UTILIZED FOR THE PROJECT. 7. THE CONTRACTOR SHALL ESTABLISH, PROVIDE AND MAINTAIN AN EFFECTIVE QUALITY CONTROL PROGRAM THAT DETAILS THE METHODS AND PROCEDURES TO BE TAKEN TO ASSURE THAT ALL MATERIALS AND COMPLETED WORK, REQUIRED FOR THE PROJECT, CONFORM TO THE CONSTRUCTION DOCUMENTS. ALTHOUGH GUIDELINES ARE ESTABLISHED AND CERTAIN MINIMUM REQUIREMENTS ARE SPECIFIED HEREIN AND ELSEWHERE IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR IS FULLY RESPONSIBLE FOR DEVELOPING AND EXECUTING THEIR OWN QUALITY CONTROL PROGRAM. THE CONTRACTOR SHALL PERFORM INSPECTION, TESTING, AND MEASUREMENT OF ALL ITEMS OF WORK REQUIRED BY THE CONSTRUCTION DOCUMENTS AND TECHNICAL SPECIFICATIONS, INCLUDING THOSE PERFORMED BY SUBCONTRACTORS. REVIEW OF THE MATERIALS AND COMPLETED WORK BY THE TOWN AND ENGINEER DOES NOT RELIEVE THE CONTRACTOR OF PERFORMING QUALITY CONTROL INSPECTIONS/REVIEW OF THE CONTRACTOR'S AND/OR SUBCONTRACTOR'S WORK. 8. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE TOWN AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE TOWN. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE TOWN OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY THE TOWN. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. LIST OF MATERIALS AND QUANTITIES ITEM # DESCRIPTION QTY UNIT EROSION AND SEDIMENT CONTROL 1 CONSTRUCTION ENTRANCE 1 EA 2 TEMPORARY SILT FENCE 50 LF 3 CONSTRUCTION SAFETY FENCE 400 LF 4 TEMPORARY PUMP AROUND SYSTEM 100 HR EXCAVATION AND GRADING 5 CHANNEL AND FLOODPLAIN EXCAVATION AND GRADING 240 CY 6 FURNISH AND INSTALL ADDITIONAL FILL FOR PIPE COVER 60 CY 7 FURNISH AND INSTALL TOP SOIL 20 CY STORMWATER INFRASTRUCTURE 7 REMOVE AND DISPOSE OF EXISTING 48" FES 1 LS 8 FURNISH AND INSTALL 48" RCP 70 LF 9 FURNISH AND INSTALL 48" FES 1 EA 10 FURNISH AND INSTALL OFFSET BOULDER STEP 1 EA 11 FURNISH AND INSTALL CLASS B, C LASS 1 RIPRAP FOR STORMWATER 0UTFAILL 50 TN STREAM RESTOTRATION 13 FURNISH AND INSTALL CONSTRUCTED RIFFLE WITH BOULDERS 3 EA 14 FURNISH AND INSTALL 20" COIR LOG TOE PROTECTION 40 LF 15 FURNISH AND INSTALL EROSION CONTROL MATTING (70) GRAM COIR FIBER) 200 SY FURNISH AND INSTALL EROSION CONTROL BLANKET (ECC2B) 450 SY PLANTING AND VEGETATION 16 FURNISH AND INSTALL TEMPORARY SEED MIX, MULCH AND SOIL PREP 1,90D SY 17 FURNISH AND INSTALL PERMANENT STABILIZATION SEED MIX 1,700 SY 18 FURNISH AND INSTALL PERMANENT RIPARIAN SEED MIX 200 SY 19 FURNISH AND INSTALL TUBLINGS, LIVE STAKES, BAR EROOF STOCK 40❑ EA FINISHING, REPAIR AND REPLACE 20 FURNISH AND INSTALL CONCRETE CURB AN GUTTER 30 LF 21 22 FURNISH AND INSTALL CONCRETE SIDEWALK FURNISH AND INSTALL ASPHALT SURFACE CDURSE 30 10 LF TN = i i= i i oF EXISTING PARCEL BOUNDARY - —315— - EXISTING MAJOR CONTOUR -314- EXISTING MINOR CONTOUR — SW - EXISTING STORMWATER PIPE El EXISTING STORMWATER STRUCTURE — SS - EXISTING SEWER PIPE SS EXISTING SEWER MANHOLE LOD— LIMITS OF DISTURBANCE STANDARD LINES AND SYMBOLS —315— PROPOSED MAJOR CONTOUR - - - - - - - PROPOSED COIR LOG TOE PROTECTION 314 PROPOSED MINOR CONTOUR to PROPOSED PUMP AROUND SYSTEM PROPOSED CHANNEL BANKFULL , ■ ! PROPOSED 48" RCP PIPE N_ J_ m Q J J Q LL 0 Lu z g 0 w Lu CL Lu U Q Lu Lu Lu w U z 0 Ln Lu Lu m J 0 U 0 z z 0 U Ln 0 u- — - — PROPOSED CHANNEL CENTERLINE PROPOSED GRADING LIMITS - — — - PROPOSED FLOODPLAIN TOE OF SLOPE PROPOSED OFFSET BOULDER STEP PROPOSED CONSTRUCTED RIFFLE WITH BOULDERS PROPOSED CONSTRUCTION ENTRANCE / CROSSING ® PROPOSED STAGING AREA — SF — PROPOSED SILT FENCE PROPOSED CONSTRUCTION SAFETY FENCE (� PROPOSED PUMP AROUND SYSTEM +� CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11"x 17" NTS H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 2.2 FIELDCREST SUB. HOMEOWNERS ASSOC LLC �I 0 EMPEROR LANE PIN: 6885-05-2756 2.55 AC \, I PARKER, GARY ELWOOD; PARKER, CINDY HARVE 1279 EMPEROR LANE PIN: 6885-06-2093 CONEY, ANDREW; CONEY, BECKY 07 0.31 AC 1223 UNION CROSS ROAD PIN: 6885-06-8134 52.45 AC WORKAREA SEE SHEET 3.2 FOR SITE E&SC PLAN O z TEMPORARY �.. STAGING AREA /P r \ LOD LOD ................. :i:'i:(;'i'� LOD LTD \ m r D. TEMPORARY ACCESS PATH FROM IVEY N " p REDMON SPORTS COMPLEX TO WORK PEGG PROPERTY HOLDINGS LLC v AREA AT 0 EMEROR LANE. _ '. r 1291 EMPEROR LANE O PIN: 6885-05-1956 O LOD = 1.57 AC 0.33 AC ° v SILT FENCE BETWEEN STREAM TOP OF BANKAND TEMPORARY ACCESS PATH FIELDCREST SUB. HOMEOWNERS ASSOC LLC 0 0 0 EMPEROR LANE PIN: 6885-05-2756 2.55 AC o e goo Flat SCALE: 1 " = 100' SITE EROSION AND SEDIMENTATION CONTROL NOTES 1. THE TOTAL LOD OF THE PROPOSED STREAM STABILIZATION PROJECT IS 1.57 AC. THE CONTRACTOR SHALL KNOW AND UNDERSTAND THE PROJECT EXTENTS AND LOD BEFORE STARTING CONSTRUCTION. 2. HARD COPIES OF ALL APPLICABLE PERMITS SHALL BE KEPT ON -SITE IN THE PERMITS BOX OR POST ON SITE. ANY PROJECT REVISIONS THAT RESULT IN ADDITIONAL LAND DISTURBANCE OR CHANGE IN DRAINAGE PATTERNS SHALL BE SUBMITTED TO TOWN STAFF FOR APPROVAL. 3. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY TOWN STAFF (919.546.2974) 48 HOURS IN ADVANCE TO SCHEDULE AN ON -SITE PRE -CONSTRUCTION MEETING WITH THE ENGINEER AND TOWN STAFF. 4. NO LAND DISTURBING ACTIVITIES SHALL TAKE PLACE OUTSIDE THE PROJECT LIMITS WITHOUT TOWN APPROVAL. 5. SENSITIVE AREA BUFFERS INCLUDING WETLANDS, STREAMS, RARE PLANTS, AND ARCHAEOLOGICAL SITES, SHOULD BE MARKED IN BLUE FLAGGING PRIOR TO START OF CLEARING/CONSTRUCTION. 6. NO DEMOLITION, CONSTRUCTION, OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL ALL APPLICABLE EROSION CONTROL MEASURES HAVE BEEN INSTALLED. IF CLEARING IS REQUIRED FOR INSTALLATION OF A GIVEN MEASURE, ALL OTHER MEASURES SHALL BE INSTALLED FIRST. THE NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE MAY THEN PROCEED. 7. UTILITIES ARE SHOWN IN APPROXIMATE MANNER ONLY. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO BEGINNING DEMOLITION, CONSTRUCTION OR LAND DISTURBING ACTIVITIES. 8. THE CONTRACTOR SHALL MAKE EVERY PRACTICAL EFFORT TO LIMIT DISTURBANCE TO BEESON CREEK REACH 6 DOWNSTREAM OF THE PROJECT AREA. 9. THE CONSTRUCTION ENTRANCE OF THE EXISTING GRAVEL DRIVE AT IVEY REDMON SPORTS COMPLEX SHALL BE USED FOR ACCESS TO THE SITE. ALL VEHICLES, TRUCKS AND EQUIPMENT SHALL USE THE CONSTRUCTION ENTRANCE AND TRAVEL SOUTH FOR ACCESS TO THE SITE. 10. A TEMPORARY STAGING AREA SHALL BE ESTABLISHED SOUTH OF THE CONSTRUCTION ENTRANCE WITH TEMPORARY SILT FENCE ALONG THE SOUTHERN EDGE. 12. CONSTRUCTION MATERIALS AND EQUIPMENT SHALL BE STORED AND / OR STAGED IN THE DESIGNATED STAGING AREAS SHOWN ON THE APPROVED El TOWN OF KERNERSVILLE 502 BEESON ROAD PIN: 688-15-5398 28.60 AC CONSTRUCTION ENTRANCE w.......... TEMP. ACCESS PATH BOO....... LUIJ TEMPORAR STAGING AREA ardwSILT FENCE DOWNSLOPE OF STAGING AREA EXISTING GRAVEL DRIVE AT IVEY REDMON SPORTS COMPLEX E&SC PLAN. 13. THE ACCESS AREA SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK. N_ J_ m J J Q LL O Lu Qz NJ I.NL w Lu CL Lu Q Lu Lu Lu w z O Ln Lu Lu m z Q J z 0 I- z LJJ 2 0 LJJ Ln 0 z Q z O Of LJJ to to LJJ U U Q CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x U" SCALE: 1" = 100' H.D. NAD83 (NCSP) V.D.: NAVD88 JE PID: 3302 3.1 v rf1 z m Z EXISTING STORMWATER INLET PARKER, GARY ELWOOD; PARKER, CINDY HARVE Pw 1279 EMPEROR LANE HOUSE PIN: 6885-06-2093 Off/ STAGING 0.31 AC , C,� AREA t �' as 1 � Im /, _ OD SS 1 CLOD DLO CF - SS / +� 1 s 1 OD DLO = LO � CF CF SS S 1 11 i LQ�� CF CF SS FIELDCREST SUB. HOMEOWNERS ASSOC LLC �; Olp CF �_6F q�- SS 0 EMPEROR LANE[ D , CF / � S CONSTRUCTION _ PIN: 6885-05-2756 E - p �� CAS _ SAFETY FENCE i 2.55 AC D S EXISTING 48" RCP FES / GRADING LIMITS _ 930 q� 'q79 q-2$ q�2q q26 / 11k8 1 O, 0T 925 q2R923 �0+00 q2922 0 6o O*n,, A0 1+20 1+40 o /� 2 \ +60 1 922 Y 5 _ U TEMPORARY PUMP _ g :924 \ ~ �q26 / I ---AROUND SYSTEM _ 28 92j 926. �925 / \ O p1 \ CONSTRUCTION 0 J \ SAFETY FENCE 4 / I > ' v � � 7�' \ � � � FLOODPLAIN TOE - -\OF SLOPE ®O GF `O' ®LOp- LOD \`�` GRADING LIMITS / `p LOD \ D LOD - = \ ♦ \ \ -PEGG PROPERTY HOLDINGS LLC LOD J1 1291 EMPEROR LANE LOD- L-t9D PIN: 6885-05-1956 LO e' 0.33 AC LOD = 1.57 AC HOUSE o ,o zo Flat SCALE: 1 " = 20' SITE EROSION AND SEDIMENTATION CONTROL NOTES 1. THE TOTAL LOD OF THE PROPOSED STREAM STABILIZATION PROJECT IS 1.57 AC. THE CONTRACTOR SHALL KNOW AND UNDERSTAND THE PROJECT EXTENTS AND LOD BEFORE STARTING CONSTRUCTION. 2. HARD COPIES OF ALL APPLICABLE PERMITS SHALL BE KEPT ON -SITE IN THE PERMITS BOX OR POST ON SITE. ANY PROJECT REVISIONS THAT RESULT IN ADDITIONAL LAND DISTURBANCE OR CHANGE IN DRAINAGE PATTERNS SHALL BE SUBMITTED TO TOWN STAFF FOR APPROVAL. 3. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY TOWN STAFF (919.546.2974) 48 HOURS IN ADVANCE TO SCHEDULE AN ON -SITE PRE -CONSTRUCTION MEETING WITH THE ENGINEER AND TOWN STAFF. 4. NO LAND DISTURBING ACTIVITIES SHALL TAKE PLACE OUTSIDE THE PROJECT LIMITS WITHOUT TOWN APPROVAL. 5. SENSITIVE AREA BUFFERS INCLUDING WETLANDS, STREAMS, RARE PLANTS, AND ARCHAEOLOGICAL SITES, SHOULD BE MARKED IN BLUE FLAGGING PRIOR TO START OF CLEARING/CONSTRUCTION. 6. NO DEMOLITION, CONSTRUCTION, OR LAND DISTURBANCE ACTIVITIES SHALL BEGIN UNTIL ALL APPLICABLE EROSION CONTROL MEASURES HAVE BEEN INSTALLED. IF CLEARING IS REQUIRED FOR INSTALLATION OF A GIVEN MEASURE, ALL OTHER MEASURES SHALL BE INSTALLED FIRST. THE NECESSARY LAND DISTURBANCE ACTIVITIES REQUIRED FOR INSTALLATION OF THE GIVEN MEASURE MAY THEN PROCEED. 7. UTILITIES ARE SHOWN IN APPROXIMATE MANNER ONLY. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO BEGINNING DEMOLITION, CONSTRUCTION OR LAND DISTURBING ACTIVITIES. 8. THE CONTRACTOR SHALL MAKE EVERY PRACTICAL EFFORT TO LIMIT DISTURBANCE TO BEESON CREEK REACH 6 DOWNSTREAM OF THE PROJECT AREA. 9. A TEMPORARY STAGING AREA SHALL BE ESTABLISHED EAST OF THE CONSTRUCTION TEMPORARY ACCESS PATH EAST OF THE WORK AREA. 10. CONSTRUCTION MATERIALS AND EQUIPMENT SHALL BE STORED AND / OR STAGED IN THE DESIGNATED STAGING AREAS SHOWN ON THE APPROVED E&SC PLAN. 11. CONSTRUCTION SAFETY FENCE SHALL BE INSTALLED ALONG THE SITE'S EMPEROR LANE ROAD FRONTAGE AND ADJACENT RESIDENTIAL PROPERTY BOUNDARIES TO DETER PEDESTRIAN ACCESS TO THE SITE. 12. ALL CHANNEL AND STORMWATER INFRASTRUCTURE WORK SHALL OCCUR IN DRY WORKING CONDITIONS. A TEMPORARY PUMP AROUND SYSTEM SHALL BE UTILIZED TO MAINTAIN DRY WORKING CONDITIONS. 13. THE WORK SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY/WEEK. CONSTRUCTION SEQUENCE 1. OBTAIN EROSION AND SEDIMENTATION CONTROL PLAN APPROVAL AND ALL OTHER APPLICABLE PERMITS. 2. NOTIFY INSPECTOR FROM WINSTON-SALEM REGIONAL DEQ OFFICE PRIOR TO DISTURBANCE. 3. POST CERTIFICATE OF APPROVAL FOR LAND DISTURBANCE AT SITE. 4. INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS. 5. FLAG THE WORK LIMITS AND STAKE OUT THE EXTENTS OF THE PROJECT. 6. LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORKSITE. 7. HOLD PRE -CONSTRUCTION MEETING PRIOR TO STARTING CONSTRUCTION. 8. INSTALL CONSTRUCTION ENTRANCE, TEMPORARY STAGING AREA, SILT FENCE AND CONSTRUCTION SAFETY FENCE PER THE ATTACHED PLAN SHEETS AND DETAILS. 9. INSPECT EROSION AND SEDIMENTATION CONTROL PRACTICES DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. 10. STOCKPILE MATERIALS NEEDED TO COMPLETE THE WORK. 11. INSTALL PROPOSED STORMWATER INFRASTRUCTURE AND BACKFILL TO THE WORK AREA TO THE ELEVATIONS AND GRADES SHOWN ON THE PLANS. 12. COMPLETE CHANNEL WORK AND FLOODPLAIN GRADING TO THE ELEVATIONS AND GRADES SHOWN ON THE PLANS. 13. FOLLOW NCDEQ GUIDELINES FOR GROUND COVER AND SOIL STABILIZATION TIMEFRAMES ON SHEET 3.3. INSTALL TEMPORARY AND PERMANENT VEGETATION SHOWN ON SHEET 6.1. 16. AFTER THE WORK SITE IS STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUNDCOVER IS NOT ADEQUATE. EROSION AND SEDIMENT CONTROL MEASURES SHALL ONLY BE REMOVED AFTER FINAL INSPECTION AND WRITTEN APPROVAL BY THE ENGINEER AND TOWN STAFF. 17. ONCE SITE IS STABILIZED, REMOVE AND DISPOSE OF ALL NON -BIODEGRADABLE EROSION CONTROL DEVICES. 18. NOTIFY INSPECTOR FROM THE WINSTON-SALEM REGIONAL DEQ OFFICE AFTER STABILIZATION. N_ J_ m J J ILL O Lu g w W CL W U W W W w z O Ln W W m Z g J Z 0 I- Z w w N 0 Z Q Z O Of w ILL] CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" SCALE: 1 " = 20' H.D. NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 3.2 50' MIN. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE 0 0 0000 0 0 2" - 3" STONE TO BE USED EXISTING a ROADWAY oo (SURGE STONE OR sll RAILROAD BALAST ) DI ANI NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BYTHE VEHICLE TRAVELING 25' OR FULL WIDTH OF PROPOSED STREET OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE OR ENTRANCE, WHICHEVER IS PUBLIC ROAD. GREATER. 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON TO THE PUBLIC ROAD, THE GOVERNING AUTHORITY WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL RESPONSIBILITY FORM. EXISTING ROADWAY � • 35' MIN. 6" MIN. ''�11=IIIII= IIII= FABRIC UNDER STONE STEEL POST ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) WARNING SIGN _ = 1--W-ueu, W111 I51 ���lull FIEIII=I' I gITm CROSS SECTION CONSTRUCTION ENTRANCE NEW CONSTRUCTION - 15' MIN. oo� p I 0o I 1 2 MIN. o l�oo� III ''��I—IIII=IIIII- 11111 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER IIIII HIGHV- TENSILE STRENGTH = IIIII IIIII IIIII POLY BARRICADE FABRIC (TYPICAL) IIIII IIIII 'IIII = "III PLASTIC OR APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE.:, FRONT VIEW 40 NOTES: 1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. CONSTRUCTION AREA 2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 18 3. PLACE A SIGN AT EACH END OF LINEAR SAFETY FENCING AND 50'ON CENTER THEREAFTER. DO NOT ENTER 4. FOR CONSTRUCTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 5. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 6. MAINTAIN SAFETY FENCE THROUGHOUT DURATION OF PROJECT. WARNING SIGN DETAIL CONSTRUCTION SAFETY FENCE FLOW..— SEDIMENT DI KE STREAM DIVERSION PUMP INTAKE HOSE DEWATERING PUMP STREAMBANK - FLOW — TAKE CLEAN WATER HOSE DIKE SUMP -HOLE FOR POOL (12"TO 18" DEEP, 2-FT DIAMETER) WORK AREA LENGTH NOT TO EXCEED THAT _ WHICH CAN BE COMPLETED IN ONE DAY NOTES: 1. SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK. 3. THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 4. STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. STEEL POST WOVEN WIRE FABRIC FILL SLOPE GRADE " w=u 6" 1-III=IIII MIN II4'. \ �E III - IITI MIN � - CIfIF TEMPORARY PUMP AROUND SYSTEM MIN. 10 GA. LINE WIRES -IIIII- SILT FENCE GEOTEXTILE FABRIC 8' MAX. PLASTIC OR VARIABLE AS DIRECTED BYTHE ENGINEER Z WIRE TIES SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP III m IIIII =IIII -IIIII = =IIIII=IIIII =IIIII=IIIII=IIIII=IIIII= FRONT VIEW III =IIIII= IIII=IIIII-IIIII = IIII=IIIII I IIII lu III IIIII MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE NOTES: 1. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATIONS & DESIGN CRITERIA. r _ SEAL SILT FENCE �5� "' GIHQ� N_ J_ m J uz � J O� Lu Z U g� OO wz Lu CL I G LU z �6 U O w Lu Lu 0 w Li- u Z O Ln Lu Lu m to J Q LLI 0 J Of z 0 z LLI 2 0 LLI 0 z Q z 0 0 Of LLI CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D. NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 3.3 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER �_ A Lres.APLEs vOrlrvo DEHCE tie xea MlrvJ I111 LICAoory DETERMINED IN IIIELD PAN CLE_ reEDWTH,G_END.INLL_CE BELOW GRADE WASHOUT STRUCTURE NOT TO ICALE CONCRETE WASHOUTS 11 Lo, oI�LEreM 7 LININGoI�BERM YP 11 *SE il Na OR ITAPLE NOTING D-CE (11.21 MIN, , A .DA D A.IDN DETERMINED IN D CONCRETE D STRUCTURES CAPACITY TO P OVD PAN BE DwTRUITH DE EEDS ABOVE GRADE WASHOUT STRUCTURE 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas c Vii,ditr W2. Place hazardous waste containers under cover or in �contain 3. Do not store hazardous chemicals, drums or bagged a the N_ ry_J W Q J J Q LL 0 LU Z g 0 W LU CL LU U Q LU W LU LU W U Z 0 Ln LU LU m J U 0 z r z 0 U 0 U_ CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 3.4 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site Inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) 1 At least once per 1. Identification ofthe measures inspected, Measures 7 calendar days 2. Date and time ofthe inspection, and within 24 3. Name ofthe person performing the inspection, hours ofa rain 4. Indication ofwhetherthe measures were operating event> 1.0 inch in properly, 24 hours 5. Description of maintenance needs forthe measure, 6. Description, evidence, and date of corrective actions taken. (3) Starmwater At least once per 1. Identification ofthe discharge outfalls inspected, discharge 7 calendar days 2. Date and time ofthe inspection, outfalls (SDOs) and within 24 3. Name ofthe person performing the inspection, hours ofa rain 4. Evidence of indicators ofstormwater pollution such as oil event> 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication ofvisible sediment leavingthe site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per Ifvisible sedimentation is found outside site limits, then a record site 7 calendar days ofthe following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours ofa rain the site limits, event> 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. 5 Streams or f) At least once per Ifthe stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record ofthe following shall be made: (where hours ofa rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records ofthe required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) ofthis permit ofthis permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter i stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will he provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. yM PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage underthis permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. (40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence ftepnrtingTimeframes (After 6iscovery) and Other Requirements (a) Visible sediment ■ Withilhi hours, an al or electronic notification. depasiiian In a • Wiihirr 7calerrdor days, a report thatcontains a description of the stream rr wetland sediment and actions taken to address the cause of the dcpcsition- Divisian staff meywaive the requirement for a written report an a case -by -rase li - If the stream Is named on the PIC_303(d] IEs_t as impaired Far sediment - related causes, the permitter maw be required taper -form additional 1`101[hitorli irupaciiana or apply more stringent prdctice.s ill determine that additlonal requrrprnen[s are needed to a4sura compliance with the federal 4r state i mpai red.w a tern cond i tloi (b) Oil spills and Within 24 fwurs, an oral a electronic notification. The notification release of shall include information abautthe date, time, nature, volume and hazardous location of the spoil or release. substances per Item 1(h]-(c) above (c) Anticipated • A report of least ten days before She dote of the bypass, if possible. bypasses 14C CFR The report shall include art evaluation of thearmci. ied quality and 122.41(l elfect of the l7ypass- (rs) Unanticipated • Within 24 hours, art araI 9r eleuTom nt.7ttil ion- bYpaSSe514C CFO • Within 7colandardays, a re port that iiie5 anevaluationaf the 122.41cmj(3lJ quality and affect of the bypass. (e)Noncompliance • Withirr24hotrrs,anoralorelectronic notification. With the condltions • Within 7CQlend0r days, a report that contains a description of the of this permit that noncompliance, and its cabaQg; the pQried of nQncompllanra, may endanger Including exact dates and times, and if the noncompliance ha=_not health orttie been corrected, the anticipated time noncompliance Is eNpected to envlronment(40 continue; and steps taken Or planned to reduce, eliminate, and CFR 122.41(1}(7)1 prevent reoccurrence of the noncompliance. [40 CFI; 127-41(1)1 • Division staff maywatve the requirement For a written report on a Case-by-ia5e ba515. N_ J_ m Q J J Q ILL 0 LU Z g 0 li LU i2 LU U Q LU LU LU li U Z 0 fn LU LU m J 0 Q' U 0 z I z 0 U 2 0 U_ CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NITS H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 19 3.5 07 07 U ./HOUSE EXISTING SSMHC 'so' LO07 RIM ELV = 938.91' . I � I I � , I � I � I I CLOD DLO CF / +� l i on sm SOD DLO �CF CF CF SS - o 1-00' I �Qp ii LQ� CF � CF Ste- SS SS 6 CF ___SS — — — �/ �_SS C 48" RCP FES /o INV ELV = 922.2' -�T I '0 �• J (f� I I I 2C JI I BEGIN PIPE WORK AT \ EXISTING 48" FES U; . -0 STA 0+00 p J ELV 923.3' EXTEND 48" RCP _ FROM STA 0+00.0 TO 0+70.2 ' OFFSET BOULDER STEP O BELOW FES _ CF SOD j 1 LOp �OD11101 ARMOR OUTFALL WITH 50% CF u-N SOD NCDOT CLASS B 50% NCDOT CLASS 1 10 (,,O)l o zo 930 Faa, SCALE: 1 " = 20' 925 920 941, 915 EAL 6!1 co �. 9 GIN�f' 910 � ���fflltlllt��� SS ------ � SS — SS SS COIR LOG TO PROTECTION - CONSTRUCTED RIFFLE LOD— �� �� AL_ _ -WITH BOULDERS LOD— LOD LOL*--- iE , O LOD` o� 0 0 0 I u 0 LOD LOD - PROPSED LOD = 1.57 AC 'PROPOSED mmmmmm PROPOSED 72 LF 48 RCP 10 ■_ ■_■■■m 0 mf� _riZIA.� m®rire immmmmm EXISTING GROUND,—/ _____ I ■ . ■_■■■■■==1■ m m ■ _______ 930 925 920 915 910 N_ J_ m v I J J ILL D O Lu g w w CL W U Lu w w w U O Ln Lu W m LL.I __J I-L Of a_ Q z Q Z g z O Q N J m Q N w N CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" SCALE: 1 " = 20' H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 4.1 Q. PROPOSED 700 GRAM COIR EROSION CONTROL MATTING SEE DETAIL PROPOSED GRADE BEESON CREEK REACH 6 RIFFLE CROSS-SECTION PROPOSED 700 GRAM COIR EROSION CONTROL MATTING SEE DETAIL WIDTH VARIES PER PLAN - TARGET ER = 2.5 WBKF DmAx / TIE TO EXISTING GROUND PER j� \ BKF WSE j GRADING PLAN / PROPOSED GRADE BEESON CREEK REACH 6 POOL CROSS-SECTION PROPOSED CENTERLINE ALIGNMENT WIDTH VARIES PER PLAN - TARGET ER = 2.5 PROPOSED CENTER LINE ALIGNMENT WPOOL BKF WSE DMPOOL RIFFLE CROSS-SECTION SUMMARY PARAMETER BC R6 START STA (FT) 0 + 70 END STA (FT) 1 + 81 ABKF (FT) 4.0 WBKF (FT) 7.7 DBKF (FT) 0.5 DMAX (FT) 0.6 W/D (FT) 15 DMAX/DBKF 1.2 So (FT/FT) 0.027 POOL CROSS-SECTION SUMMARY PARAMETER BC R6 START STA (FT) 0 + 70 END STA (FT) 1 + 81 ApOOL 8.8 WPOOL 10.1 DPOOL 0.9 DMPOOL 1.8 APOOL/ABKF 1.9 WPOOLANBKF 1.2 DMPOOL/DBKF 3.5 •�' NC,ARp�•�• cc §�'f 411 < _ EA- Cary NOT TO SCALE TIE TO EXISTING GROUND PER GRADING PLAN NOT TO SCALE N_ J_ m H J ILLz ~ J O OQ:� w Z U �g LL OO wz w C wz �6 U O w LuLp Lu O w Z O Ln Lu m CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" SCALE: 1 " = 20' H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 5.1 IAGARav''-% Pow `o r D- 111111 "llo HIG LN EXTEND VANE ARM INTO STREAMBANK MIN. 6.0 FT OFFSET BOULDER STEP DETAILED PLAN HEADER BOULDER PROPOSED BANKFULL WSE FLOW SCOUR POOL 1 FT OFFSET NON -WOVEN FILTER FABRIC / COARSE BACKFILL MATERIAL FOOTER BOULDER L VD BOULDER SILL INTO 4MBANK MIN 6.0 FT NOT TO SCALE OFFEST BOULDER STEP J-HOOK VANE NOTES 1. ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS DIMENSIONS SHALL BE 2.5 FT X 3.5 FT X 1.5 FT +/- 0.5 FT. 2. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TO FIT CONDITIONS ONSITE. 3. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. 4. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY ENGINEER. 2. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1.0 FT UPSTREAM OF THE FOOTER. 3. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 4. NON -WOVEN GEOTEXTILE SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. SELECT BACK FILL MATERIAL SHALL BE PLACED UPSTREAM OF THE GEOTEXTILE MATERIAL. 5. SELECT BACKFILL MATERIAL SHALL BE FILL MATERIAL GENERATED ON -SITE WITH A MINIMUM D50 OF 2.5" OR A GRADATION SUBMITTED IN WRITING AND APPROVED BY THE ENGINEER. A WELL -GRADED BLEND OF NCDOT CLASS A RIP -RAP AND ASTM #57 ROCK MIXED WITH EARTH WILL BE AN ACCEPTABLE SUBSTITUTE. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 6. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 7. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. KEY BOULDERS INTO STREAMBANK MIN. 6.0' OR TWO FULL BOULDER LENGTHS KEY BOULDERS INTO STREAMBANK @ZTO 3 BKF STAGE P.C. ELEVATION PER PROFILE BANKFULL WSE BASEFLOW WSE SLOPE OFFSET BOULDER STEP NOT TO SCALE OFFSET BOULDER STEP FIT BOULDERS TIGHTLY TOGETHER PLACE BOULDERS INTO STREAMBED A MINIMUM OF THE BOULDER DIAMETER NOT TO SCALE N_ J_ m Q J J U- O Lu z g O w Lu 0- Lu U Q Lu Lu Lu w U z O Ln Lu Lu m J Q Lu 0 a_ Lu N Lu 0 J D O m Lu LL LL O O N J m Q Q Lu CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 SECTION A - A' CROSS-SECTION 5.2 o� NGARp ?off � 6,A Y[ loll W w CONSTRUCTED RIFFLE WITH BOULDERS DETAILED PLAN RIFFLE WITH BOULDERS SLOPE VARIES PER PROFILE BOULDER STEP GLIDE OFFSET HEADER rELV=0.2'-0.3' STREAMBED BOULDERS 1.0' U/S RUN / MICROPOOL RIFFLESUBSTRATE BELOW STEP DEPTH = 1.5' RIFFLE SUBSTRATE NON -WOVEN 20% NCDOT CLASS A GEOTEXTILE 30% NCDOT CLASS B 50% NCDOT CLASS 1 CONSTRUCTED RIFFLE WITH BOULDERS NOT TO SCALE CONSTRUCTED RIFFLE WITH BOULDERS NOTES 1. ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE. BOULDERS DIMENSIONS SHALL BE 2.5 FT X 3.5 FT X 1.5 FT +/- 0.5 FT. 2. DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TO FIT CONDITIONS ONSITE. 3. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOT CLASS A ROCK OR CHINKING STONE APPROVED BY ENGINEER. 4. HEADER BOULDERS SHALL BE UNDERLAIN BY FOOTER BOULDERS TO PROVIDE A FOUNDATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. HEADER BOULDERS SHALL BE OFFSET 1 FT UPSTREAM OF THE FOOTER BOULDERS WHERE MICROPOOLS ARE ANTICIPATED TO FORM AS SHOWN IN THE DETAIL. SET BOULDER INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. NO ELEVATIONS OF THE BOULDERS MAY VARY FROM THE PLAN SHEETS WITHOUT DIRECTION FROM THE ENGINEER. 5. THE BOULDER ARM SHALL EXTEND UP TO THE STREAMBANK AT A 1% SLOPE AND INTO THE STREAMBANK A MINIMUM OF 6.0' OR TWO FULL BOULDER LENGTHS. 6. MAXIMUM ELEVATION DROP OVER EACH BOULDER IS STEP IS 0.3' - 0.4'. 7. ON THE UPSTREAM SIDE OF THE BOULDERS, NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED ON THE ENTIRE LENGTH OF THE STRUCTURE. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. RIFFLE MATERIAL SHALL BE USED AS BACKFILL MATERIAL AROUND THE OFFSET BOULDER STEPS AND MICROPOOLS SHALL BE ESTABLISHED BELOW EACH STEP. 8. CONSTRUCTED RIFFLE MATERIAL SHALL EXTEND A MINIMUM OF 3.0 FT U/S OF THE P.T. INTO THE GLIDE AND A MINIMUM OF 3.0 FT D/S OF THE P.C. INTO THE RUN. 9. RIFFLE MATERIAL SHALL BE PLACED AT A UNIFORM THICKNESS SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. RIFFLE MATERIAL SHALL BE COMPACTED USING AN EXCAVATOR BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 10. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED. 11. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 12. SEE TYPICAL RIFFLE CROSS SECTION FOR DIMENSIONS. EROSION CONTROL MATTING BANKFULL BOULDER STEP RIFFLE SUBSTRATE RIFFLE SUBSTRATE 20% NCDOT CLASS A DEPTH = 1.5' 30% NCDOT CLASS B BOULDER SILL 50% NCDOT CLASS 1 EXTEND INTO STREAMBANK MIN 6.0' OR TWO FULL BOULDER LENGTHS NOT TO SCALE CONSTRUCTED RIFFLE WITH BOULDERS NOT TO SCALE N_ J_ m Q J J Q LL O Lu Z g O w Lu CL Lu U Q Lu Lu Lu w U Z O Ln Lu Lu m J O U O z I z O U O U- CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D. NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 DETAILED CROSS-SECTION A - A' DETAILED CROSS-SECTION B - B' 5.3 COIR LOG TOE PROTECTION NOTES 1. ALL OUTSIDE MEANDER BENDS WITH RADIUS OF CURVATURE RATIO LESS THAN 4.0 SHALL BE PROTECTED WITH BANK REVETMENTS. 2. PLACE COIR ROLLS ALONG THE STREAM BANK AS DESIGNED. TIE THE ENDS OF ADJACENT COIR ROLLS TOGETHER WITH COIR TWINES. 6MM TWINE IS RECOMMENDED. USE EXTRA LOOPS OF COIR TWINE THROUGH THE OUTER NETTING OF ADJACENT COIR ROLLS. 3. COIR LOGS USED FOR STREAMBANK TOE PROTECTION SHALL BE A MINIMUM OF 20" IN DIAMETER. 4. EMBED COIR LOGS AT THE BANK TOE SUCH THAT 12 OF THE COIR LOG IS SUBMERGED BELOW THE BASE FLOW WSE. 5. SECURE COIR LOG AT THE STREAM BANK TOE WITH A WOODEN STAKE AND NAIL. TIE COIR LOG TO EROSION CONTROL MATTING WITH COIR TWINE OR OTHER NATURAL MATERIALS. 6. WOODEN STAKES (2"X4") WITH A 3-4" NAIL AT THE TOP IS RECOMMENDED FOR COIR ROLL INSTALLATION. IN GENERAL, 36" LONG WEDGES ARE RECOMMENDED FOR 20" DIAMETER COIR ROLLS. 7. BEND THE ENDS OF THE FIRST AND THE LAST COIR ROLL TOWARDS THE STREAM BANK AND TIE THEM INTO THE BANK. THIS AVOIDS WATER GATHERING BEHIND THE COIR ROLLS AND PREVENTS PULLING THE COIR ROLL OUT. 8. ONCE THE COIR ROLLS ARE INSTALLED PROPERLY, PLANT SUITABLE NATIVE LIVESTAKES AND CONTAINERIZED PLANTS ON AND AROUND COIR ROLLS WHERE WATER IS AVAILABLE FOR THE YOUNG PLANTS. COIR LOG TOE PROTECTION NOT TO SCALE DETAILED PLAN LIVE STAKES AND BARE ROOTS TIE EROSION CONTROL MATTING TO COIR LOG WITH COIR TWINE OR OTHER SUITABLE NATURAL MATERIAL SECURE WITH WOODEN STAKE MIN. 3' LONG COIR LOG MIN. DIAMETER = 20" / BASE FLOW WSE EMBED COIR LOG INTO STREAM BANK SUCH THAT OF THE COIR LOG IS SUBMERGED BELOW THE BASE FLOW WSE COIR LOG TOE PROTECTION DETAILED SECTION A - A' NOT TO SCALE N_ J_ m Q J Lz ~ J O OQ:� Lu Z U g� OO wz w C I wz U OU Lu w O w Li- U Z O Ln w w m J a Lu 0 Z O U Lu Lu O O J ry O z 0 N_ I m a a LLJ CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D.: NAD83 (NCSP) V.D. NAVD88 BE PID: 3302 5.4 SE, 6!1 rI off EROSION CONTROL MATTING DETAILED PLAN 6" MIN. HORIZONTAL - OVERLAP 6" MIN. VERTICAL OVERLAP 2' /TVD% Jn O ■ O 2.5' (TYP) --■ ■ ■ in d O N E O ■ O O SUPPLEMENT WOODEN STAKES WITH 12" ECO-STAKES 700 GRAM COIR FIBER MATTING 6" MIN. HORIZONTAL — OVERLAP 2' LONG x 2" WOOD STAKES w/ 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING EROSION CONTROL MATTING EROSION CONTROL MATTING NOTES A' 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAMBANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING COIR FIBER MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, FERTILIZER, LIME AND MULCH. 3. 700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 4.0' BEYOND THE BANKFULL ELEVATION. NOT TO SCALE 4. SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 700 GRAM COIR MATTING -\ NOT TO SCALE EROSION CONTROL MATTING 3 w/ 3'. GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING NOT TO SCALE N_ J_ m Q J J Q LL O Lu Z g O w Lu CL U Q Lu Lu Lu w U Z O Ln Lu Lu m J O U 0 z 0 U O U— CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" NTS H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 DETAILED STAKING PLAN DETAILED CROSS-SECTION A - A' 5.5 ARMORED STORMWATER OUTFALL DETAILED TOP VIEW ARMORED STORMWATER OUTFALL DETAILED SECTION A - A' NOT TO SCALE NOT TO SCALE TOP OF FILL/ FINISHED GRADE ADDITIONAL SUITABLE LOCAL FILL MATERIAL GROUND LINE MIN. 1.0'- SELECT BACKFILL MATERIAL NCDOT 48" RCP CLASS III OR CLASS 11 TAKE CARE TO FULLY COMPACT HAUNCH ZONE OF PIPE BACKFILL. I.D./6 LOOSELY PLACED SELECT MIN. 0.5' MATERIAL NCDOT CLASS III OR CLASS 11 TYPE FOR PIPE BEDDING. LEAVE SECTION DIRECTLY BENEATH PIPE O.D. + 3.0' UNCOMPACTED AS PIPE SEATING AND BACKFILL WILL ACCOMPLISH COMPACTION COMPACT EDGES AFTER PIPE IS PLACED AND PRIOR TO PLACEMENT OF FILL CULVERT PIPE DETAILED CROSS-SECTION 0 I U 0 Z 0 D 0 o NOT TO SCALE PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE 11 x 17 NTS H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID 3302 5.6 � � C f ,s m z ' m o ,o zo Flat SCALE: 1 " = 20' GENERAL RE -VEGETATION PLAN NOTES 1. SOIL PREPARATION ELEMENTS, TEMPORARY AND PERMANENT SEED AND GROUND COVER SHALL BE SPREAD OVER ALL AREAS WITHIN THE LOD THAT ARE DISTURBED DURING CONSTRUCTION. 2. LIVE STAKES, BARE ROOT STOCK AND CONTAINERIZED PLANTS SHALL BE LOCATED WHERE SHOWN ON PLAN. 3. ADJUSTMENTS TO THE VEGETATION PLAN SHALL BE MADE ONLY IF APPROVED BY THE TOWN OR ENGINEER. BARE ROOTS 4. ALLOW BARE ROOTS TO SOAK IN WATER AN HOUR OR TWO BEFORE PLANTING. DO NOT SOAK THE ROOTS FOR MORE THAN 24 HOURS. 5. DIG A PLANTING PIT THAT IS THREE (3) TIMES WIDER THAN THE TREE'S CURRENT ROOT SYSTEM. SPREAD OUT ROOTS TO ENCOURAGE OUTWARD GROWTH. 6. KEEP THE TREE VERTICAL IN THE PLANTING PIT (PERPENDICULAR TO THE GROUND) SO THAT IT GROWS STRAIGHT. 7. REFILL THE PIT WITH NATIVE SOIL (WHAT WAS REMOVED AT DIGGING TIME), AND ANY OTHER SOIL AMENDMENTS. 8. GENTLY TAMP OUT ANY AIR POCKETS FROM THE SOIL ONCE THE PLANTING HOLE IS FILLED. LIVE STAKES 9. LIVE STAKES MUST BE DORMANT WHEN CUT. KEEP LIVE STAKES MOIST UNTIL PLANTING. THE STAKE SHOULD BE PREPARED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE GROUND. 10. LIVE STAKES SHOULD BE PLACED WITH 3 TO a OF THE LENGTH OF THE STAKE BELOW GROUND AND ANGLED DOWNSTREAM. ENSURE THE BASE OF THE LIVE STAKE WILL REACH THE WATER TABLE. 11. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURING INSTALLATION. 12. INSERT LIVE STAKES POINTED END FIRST INTO THE STREAMBANK. CONTAINER STOCK 13. STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. 14. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. 15. THE DIAMETER OF THE PLANTING PITS FOR EACH PLANT SHOULD BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. 16. SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. 17. PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. RE -VEGETATION AND PLANTING SPECIFICATIONS DISTURBED STREAMBANKAND RIPARIAN ZONE - 1,800 Ff(200 SY) SCIENTIFIC NAME COMMON NAME TYPE RATE/SPACING QTY ----- MMF RIPARIAN MIX SEED 1.0 LBS / 1000 FT 2 LIVE STAKES, BARE ROOTS, TUBLINGS 0.5" - 1.0" 3 FT O.C. 200 + + + + DISTURBED UPLAND ZONE - 15,000 Ff (1,700 SY) L + + + + SCIENTIFIC NAME COMMON NAME TYPE RATE/SPACING QTY ----- MMF STABILIZATION MIX SEED 1.0 LBS / 1000 FT 15 BARE ROOTS, TUBLINGS, CONTAINTER 0.5" - 1.0" 10 FT O.C. 200 TEMPORARY SEEDING, MULCHING AND SOIL PREP - 16,800 Ft(1,900 SY) SCIENTIFIC NAME COMMON NAME TYPE RATE/SPACING QTY Secale Cereale RYE GRAIN SEED 5 LBS / 1000 SF 85 LBS ------ GROUND AG. LIMESTONE PELLET 45 LBS / 1000 SF 750 LBS ------ 10-10-10 FERTILIZER PELLET 17 LBS / 1000 SF 280 LBS ------ WHEAT STRAW MULCH STRAW 1 90 LBS / 1000 SF 1,500 LBS N_ J_ m Q J J Q LL 0 Lu z g 0 w Lu CL U Q Lu Lu Lu w z 0 Ln Lu Lu m J U 0 z z 0 U O CONSTRUCTION PLAN REVISIONS DATE: 10/09/2019 PLOT SIZE: 11" x 17" SCALE: 1 " = 20' H.D.: NAD83 (NCSP) V.D. NAVD88 JE PID: 3302 6.1