HomeMy WebLinkAbout20160406 Ver 1_Year 0 As-Built Review_20191121Site Information
Site Information
Date: *
Prepared By:
Meeting Type:*
USACE AID:
11 /21 /2019
Erin Davis
Year 0 As -Built Review
NCDWR ID: 20160406
NCDWR Version 1
Weather:
Degrees North
Coordinates:
Attendees
DMS - Jeremiah, Casey
Wild lands - John, Jason, Chris, Joe
DWR- Erin, Mac
Project Review Checklist
(provide additional detail in notes section on next oaae)
Project Name:* Buckwater Creek
Type of Site:* NCDMS Stream Site
Sponsor/Provider: * NCDMS Stream Site
County:* Orange
HUC and Basin:* Neuse - 03020201
Degrees West
M�a � Mn
NORTH CAROLINA
E-1- f.1 Quuefy
General Site Issues/Concerns
Stream Issues/Concerns:
Wetland Issues/Concerns:
r- Vegetation Composition or
Density
17- Planted Stem Vigor (due to soil,
browsing)
r- Invasive/Exotic Species
17- Beaver/Feral Hogs
(management plan)
r- Soil (manipulation, compaction,
fertility)
17- Livestock Present/Evidence of
Livestock Access
r- Crossings or Utility Lines
17- BMPs or Alternate Approaches
r- Fencing Issues or Fencing
Needed
17- Ponds Within Project Area
r- Incised/Entrenched
17- Headcuts Present/Forming
r- Stream Structures
Failing/Piping
17- Excess Sediment/Aggradation
r- CrosslSections
Missing/Indicate Problems
17- Bank Instability/Failure
r- Bench Rills/Erosion
(constructed bench or P2 valley)
17- Excess Sinuosity (lack of flow)
r- Braided/Anabranch Channel
17- Evidence of Excessive
Hydrology
r- Evidence of Insufficient
Hydrology
17- Hydric Soil Indicators/Soil
Series
r- Surface Roughness or Bedding
17- Channel Relocation/Riparian
Connectivity
r- Hydroperiod Length or
Start/Stop Date
r- Inappropriate Credit Ratio
Proposed
17- JD Needed to Confirm
Approach
r- Continuity/Fragmentation
f- Easement Issues (existing farm,
CE, NRCS funding)
F- Easement Encroachments
(livestock, clearing)
F- Easement Marking/Signage
r- Insufficient Project Size
17- Adjacent Property Owner
r- T&E Species
17- Section 106 (historic
listing/tribal issues)
r- Insufficient Stream Drainage
Area
17- Insufficient Hydrology (if raising
channel bed)
r- Vegetation in Channel (stream
vs wetland)
17- Flow Obstructions (undersized
pipes, fords)
r- Substrate Concerns
(embeddedness, particle size)
17- Live Stakes Absent/Failing
r- Evidence of Water Quality
Issues
17- Inlstream Habitat Weak/Missing
r- Stream Buffer Width Inadequate
17- Missing Gauge Data
(preconstruction or monitoring)
r- Gauge Location/Placement
i- Gauge Maintenance
r- Drainage Ditches/Swales
Present
17- Field Tiles/Subsurface
Drainage
r- Continued Ag Use Adjacent to
Wetland
Page 2--
Notes and Sketches, etc
Soil amendments done near pond
Reseeding recently completed
Juncus plugs along bank toe
Discussion on stream management after 2 years vs 5 years
Container plants not necessarily growing taller faster than bare root
seedlings
Algae present smaller reaches
T5 - sections bare banks jute mesh, some bank cutting out meanders at
least 2 areas, typical P2,
Log sill piping, question about footer if on bedrock, straight slope areas
T6 relocate gauge to riffle, veg in channel
T8 veg in channel
Species to watch - Arthraxin hersbedus small carpet grass, merdania asian
spiderwort
T3 Perched culvert T3 & cow trespass evidence
T4 watch flow & veg in channel
T7 dry at top to restoration, add flow gauge at charge, no footer logs
concerned about piping
Buckwater creek R7 Enhancement 2 bank erosion on bends just jute mesh
cover
Buckwater R3-R4 odd shaping - deep wide pools & short very narrow riffles
Overall concerns - Flow on small tribs, veg in channel, structure piping, E2
repairs planned
Credit Release/Site Closeout Information
(For rronitorina or closeout review only)
Stream Credits
Warm Cool Cold
Requested
Approved*
Wetland Credits
Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal
Requested
Approved*
"The updated credit ledger for the project, which includes this release, rrust be approved by the Project NSnager.
Result of Monitoring Report or Closeout
Signature
��
Date 11 /21 /2019