Loading...
HomeMy WebLinkAboutNCC192805_NOI Application_20191121Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/15/2019 11:08:04 AM (NCG01 NOI Submission) Approve by Clark, Paul 11/15/2019 1:01:11 PM (Review- Construction NOI 18524) • The task was assigned to Clark, Paul by round robin distribution 11/15/2019 11:08 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 19, 2019 5:00 PM 11/15/2019 11:08 AM Submit by McCoy, Suzanne 11/21/2019 12:20:33 PM (Payment Verification for NCC192805) * Caviness and Cates Building and Development Co • McCoy, Suzanne assigned the task to McCoy, Suzanne 11/21/2019 12:19 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 27, 2019 5:00 PM 11/15/2019 1:01 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Holden Creek Preserve Phase 4 ( Lots 47- 49, 53, 54, 68, 69, 72, 73, 77, 78, 80-82 ) 2. County* Franklin 3. Highway or Street Richlands Cliffs Drive Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Youngsville Township 5. State * NC 6. Zip Code* 27596 7. Latitude* Enter the latitude in decimal degrees 36.0229 8. Longitude * Enter the longitude in decimal degrees (MJST be negative) -78.4912 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/14/2019 Estirrated Construction Project Start Date 10. Date to End* 11/14/2020 Estinated Construction Project End Cate 11. SIC (Primary) * Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Development 12. Acres to be 2.87 disturbed* (including off -site borrow and waste areas) 13. Total site area 2.87 (acres) * 14. Post- 1.26 construction (Estirrated) impervious area (acres) * NCC Project NCC-FRANK-2019-Holden Creek Preserve Phase 4 ( Lots 47- Tracking ID 49,53,54,68,69,72,73,77,78,80-82) Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Richland Creek Waterbody* Narreof waterbody into which stormwater runoff will discharge 15b. Waterbody 27-21-(0.5) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Caviness & Cates Building and Development Company Name * 2. First Name* Christopher IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Cates IF Corporation, enter Registered Agent Last %rre 3b. Title Vice President 4. Permitee E-mail pam@cavinessandcates.com Address * 5. Permittee 910-778-7902 Telephone No.* 6. Permittee Mailing Street Address Address* 639 Executive Place, Suite 400 Address Line 2 city Fayetteville Fbstal / Zip Code 28305 Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 639 Executive Place, Suite 400 Address Line 2 City Fayetteville Fbstal / Zip Code 28305 State / Frovince / Region NC Country us State / Frovince / Fbgion NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration ........................................................................................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Pamela Contact - First Name * 3. Primary Site Geddie Contact - Last Name * 4. Title Starts Coordinator 5. Site Contact E- pam@cavinessandcates.com mail Address* 6. Site Contact 910-778-7902 Telephone No.* 7. Organization Caviness & Cates Building and Development Name Company 8. Site Contact Street Address Mailing Address* 639 Executive Place, Suite 400 Address Line 2 City State / Rovince / Region Salemburg N.C. Fbstal / Zip Code Country 28385 us 9. Consultant Name (Optional) Johnny Glenn Tew First and Last narre 10. Consultant E- JohnnyT@eclsglobalinc.com mail This person will be copied on all correspondence. 11. Consultant 910-897-3257 Telephone No. D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/14/2019 Approved * 2. E&SC Plan Project FRANK-2020-004 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Holden Creek Phase 4 ( Lots # 47-49 etc. ) Erosion Approval 262.4KB Plan Approval.pdf letter/documentation Mist be R7Fforrrat 6. NOI Certification Holden Creek Preserve Lots 47- Form 467.85KB 49, 53, 54, 68, 69, 72 , 73, 77, 78, 80-80. pdf Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Christopher E. Cates Title Vice President Organization Caviness & Cates Building and Development Company Date * 11 /15/2019 F. Tracking and COC Info NOI Tracking No. 18524 NC Reference No. NCG01-2019-2805 Uses 'count number' variable (incremrented by SP) Certificate of NCC192805 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2805 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)