HomeMy WebLinkAbout20191595 Ver 1_Percussive Activities_20191120Lakeview Drive Bridge - Percussive Activities
Type of Percussive Activity: Potential percussive activities would be those typically associated with
equipment used for road and bridge construction included jackhammers and mechanized pile drivers.
Purpose: The percussive activities will be generated by equipment necessary for the removal of existing
asphalt and the installation of the bridge footings.
Duration: Approximately 1 year.
Specific Location: The location of the percussive activities will be within the Study Limits area as shown
on the attached Impacts and Delineation Maps.