Loading...
HomeMy WebLinkAboutNCC192781_ESC Approval Submitted_20191120ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Silverstone Investments, LLC ATTN: Rich Levert, President 2309 Old US 1 South Apex, NC 27502 NORTH CAROLINA Environmental Quality October 30, 2019 LETTER OF APPROVAL RE: Project Name: Angier Plaza - Phase 2 Acres Approved: 2.3 Project ID: HARNE-2018-025 County: Harnett, City: Angier Address: SR 1415 River Basin: Cape Fear Stream Classification: Other Submitted By: Enoch Engineers, P.A. Date Received by LQS: October 23, 2019 Plan Type: Revised Dear Mr. Levert: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform land -disturbing activity has been adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas ncdenr. ov or Paul Clark at Paul. clarkOncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. �� North Carolina Department of Environmental Quality I Division of Energy, Minerai and Land Resources Fayetteville Regional Office 1 225 Green Street. Suite 714 1 Fayetteville, North Carolina 25301 NCR Cf�ROL1IJA + oepmbnmtu�EMmn_.1ihm\ / 910.433.3300 Letter of Approval Silverstone Investments, LLC October, 30, 2019 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved_ plan._ North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jodi Pace, EI Regional Engineering Assistant Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Fleet Temple, Enoch Engineers, P.A. (electronic copy) Sean Johnson, Building Inspector (electronic copy) Fayetteville Regional Office file