Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6191101_Plan (Set)_20191120
FOR OFFICIAL USE ONLY FOR OFFICIAL USE ONLY FAST -TRACK 1 100% FINAL DESIGN SUBMITTAL 1 2 9 NOTES: I 1. SEE SHEET C-001 FOR LEGENDS AND ABBREVIATIONS. G ASPHALT NV=238.36' (6 �1 -241.23' q, �%� 1 4?1 L S --�5 F E L_J C ' MWIS, 4 1 FOR OFFICIAL USE ONLY WOODED N AREA 36' � - 21219" 219 � - 2zo N CQ 0001,/ / doo IF—) ` 01671 ,a z 7^CH 18" RCP � 45"CH INV- H&V 8 STANTEC SURVEY LIMITS (TYP) H � 2 8 o / sPHA�T�•. . 73���� 6s cPGP� O& 1/\ T, \ ' oN OR\ A__ -\ 1 PAD \ INV=21 TOP 21 3' CC V L� R 7Eif�QG" „zf'221� 219�� -2'B I :: k X za / /21a� �_ \ Gr Iw 21. ��� " 2 // // 21� ..�,� X 218- ASPHALT N J\ 7.81'-15 �2i s� 2151� �G/>---J / >"' \\ I I AP f!X a TOP z222�'. 72"CHLK 35BW �2 2 .. i .'," / Ea5'i• 23. ad�/� 276 1R SSX J I / � I AS TAPWOODED I o n I CONTFR p .Y L� , . •r: / / SO ::: /� CENTER L W IOH ^� AREA N N V I l I TR r,� / ,.. ... .. O ROOF �) 111 I RAVE ..,..< 1 SS VALV `L .x'•\ TOP=232.41'l TOP=228.50 -^ INV 228.38'-15" RCP � BFP q INV=224.18' INV-228.29 TOP 231.85' 15" RCP INV=228.40 \ 217 FLOW CON N ECTIO p 118E \ Q -� 1.46' •.,".a \ METER ^ \ 1 8,• OTHER END / _220• IQ(i=214. : N�„' , t• Q UNKNOWN 1735 INV�1'r��-� 5" C-1 VF102 FOR ) PROJECT .A OF SITE 7 rn 2 KEY PLAN VF101 SCALE: APPROX 1"=200' ui N� 1.� W \ Q 5FF 0/ / \ •x s / WOODED / / A/ AREA J / aw / N �47' 29 / 235 �M°j w � •a„' 226.8 / / 233, m r" RCP - 29.41' INV=226.40 .a 29 231 � -234 � I/ �235' / / 1234 W06�� 5-3742 PP PS INV 222.06' N i T P429.67' 24' �''' : 240 G zx.o, HVAC �/ 2q� ARE� ON CONC �229 GENERAT0 ON CONC sa3o� �23p 231 0.3 /230 4„ 1PPD V rAR >aa 8'VINLY HAUTE I / S HUT /2/ . `nd,.:..' .- ,�,Wy;, �4 7 ,P 24"\ 1 P 4 I ( \245 _/ ASP ,.,• ,. 11��P�o+_ I6 s1P ` > �V SSX O'WOO \I bo 0000 / g1 13"' 9„P �\ 5„ 4„ 5 233 / / / _ ` 249�_/�0- J1�20.5LTER END D • .," O 10"P . \ 610' 1 I `Lk \ VV _.n_10-.0/N / CC �l1NKNOWN 6„ O g�� 11P � ��i�2'a »,. fix/X / TWO 231 a• »> 1 - ... ,.. �32 ,. 7„� 7„P ry"' �00 NOO O �o ,. 6„G .,P ,P "P a STORY INV 2 . " - 30" 15- WOOD/BRICK ipb;�1 � N 251 x. xa o G ... HUT# b BLDG 3. ._ q I � VS 5-3845 d �.. {�e GG GGN 1 U #RCP-\} 8 _ 4��0 o �. ,._ p il� 5�.� p` P m 1N-224.65 6"TRIO C I � / H` r N h (1976) '� � R - P K>„� AA / FF. 23472 CC DOGK N L1004 p1SE ARE 4„ 4� 7 4 P 233. 12' P • C CH i. L.L / N ASPHALT ANOPY UMPSTER IN 223.57.;,. ••723 �EXER 6 P� / 6„P0"P 0„P O 8 Q I rj/PARKING REA Ltd, „ ., . _ � \ � o TCHLK IN - A 2 g'•VINLYr - . N 6„G 1 , 19"P 235• 6"P / �'q\ 12"P �1\'cd 5" \ JI/ 711 - 24"C&CjNOOD32 INV=227.41' 232 „G • \ 3„p \'K�'P „CH \ 2 W L/S q 4"CON 232 q'a' P - 28.14' /p� 'O 9'O 1, 234 � � � X54 CM - � „G 11 "G 23 8 P • 2,?)U � 12 p I �•, LLS - 3.91 S 15 RCP 23T, b S MHJ� p UP A CH h 3' C 'CH \ INV: SI`N Ssy` sp RIM 234.25' TO _ " N^� 1 G 2 / 6"G '/ Cq \2 & \g'P 0" - O I. I IN 232.42'-18" RCP 2 &G �,9x xV=226. TOP: 233.40' 9"G • 38' 4 fi" \ Y I .;T 4°G • / 1 9•� � TOP=239 1' 1 ' �- (D BOT 226.05' ^WOOD�A / . _ �\ R \ X HAUT g4 6 8"TWIKNNYYY000 2 pq2,�° l/J 2 / RRP SSSP - _\ 40i Z�• H\ \ �(G P NOTO =240� V 23 32' / 11 P WD 9„P 9 P \ • 11 \ (f% CH E TIN GED 1` • ,. "" �-� 2 - �- N " M P 141- A�fE7l ° 3 ", f-158,: R EN1R p 15" «�. JNLL-229.3 / 42- 5 ° 2 REP 4"Vtl66� ��_ OT�iE END �� 243 6� P \6 N 1 -!/ �- UN 15"P 44'- \\„P CH I �17ALL / p45 �1 w \ I 0 H REND INV-23 0/ IPod-23S2 \ / ////�i 2 „O 60 g^p \ `]eN �- 0 �r.cr•rdc . _�-� -_- 0 V 8„P 1 P UN N CNN /� / / 13"P. •5 -255 I I 1\ 15' _260 l� \ \ \ ` /„P ,246•�. ;\p�3` 13 P 5'MAO�_ -� \ OAP „P �- /_ „P \ �VOOD� \ \ N �40 �/� 4" 24T'- 8� AREA \ m \\\o ,LP „P9'�YC-_--_J� 10, „P� 1 6,.GH �/ „P CH �_ a \ -260 Ka,� 4" / -_ \ ° CH ti _ �1 1 �K�1'C o - ONC// ��= �� „P 11" P I UU IOAo� „ '2 x.�> 1 \\ 1 1„P 9„ 4„ 8,0 WI CHI N ti ///�j.� 65 �� 1 2 1 r , B P M TOP=21 OTHER,ES.... a • . ?• :>,-.b INV=216.1 V-12" PVC L!NKf30WN ' ' ; ••_ .t,: ;e.f \\ O / i /\ / \ I 18" OTHER END : d" •}<. , UNKNOWN .V�•RbOF DRAJ��• •'.f`•. .f i W I � / � / / � F 0„ INV DRAT' 6" PVC ROOF DRAIN' ..': • / WOODED f I / TWO STORY ' AREA WOODIMETAL ICE MACHINE '�Z�X' • / > j �ti'�r L' 'f: BLDG 5-4043 ON CONC PAD -.•�,, f . r. d /218 (1968)J' •�•z,5/e•:. �28 •i ! •:! D D�-218 / HVAC ja 12CO"ALLN �." .�►f 4CHlK ��//\ 6'CHLK\ 1R •.'" /O ti \ /,LtiO�V- ..220'.• "I 99� �'L C • N CON° W 1 �� �� .an., N NJI GO�pOF ON ONE STORY / JV<'rpos �21� zzo_ 2: 1 O METAL • 00 �\ BLDG 5-3739/1964 -221- c>No \\ \1 S/W & STE S s ,' 4i ' �( WOODED MATCHLINE SEE SHEET VF104 �\ \ PAD •„d `•'t 00 _ 4� MATCHLINE SEE SHEET VF103 �1 WALL �' „' 11.ONCi..•• �' /� " STANTEC SURVEY LIMITS (TYP) \ \ 1 II III TWO STORYtf• fN. •••. �..f. I I \ \ BRICK/METAL BLDG 5-3743 ,f.''.•.' ..{ .:� "K'.. :•': : .• 222 /1 WOOD / 1OOD FF. 22134, .. .;,�~Q• .. / AR A �XS�ELTERS i•�� /_/ zx �.`. `dv. tLN a.. .�.•..'xz.f �:J / / / � \ O II '., ..:.t•.:..•... i. o• �� 19 WOOD 12"CON SH ERS \ 22 "LL MEDICAL TRAINING FACILITY / J /229 z 12"° N� J /��It / / \ ,P \ \ SOU Nly �N ACCESS DRIVE 23 V, RCH N 10" j m 'BI N "ffi w • � ' c� 13" w "MAP N • �o c� N .�:� • III �I / CHILLER x=r,':. a / .23/ 2 SCHLK `L �6/ / \� 28' 8"CONO ��. : f ry / `LO9"\�\\0 wA ., •cf?': ...: / / B� INN=218.9 I C I LE J / WOOD 2- / •'':.1{ ice 11 EA TOP 30.98' I - �0' . 1': .x>.n / INV'. 2 \\ \ i1g'` ,d 232 ,,� .C� ao INV=225,32' 22203 \\ 1 / TOP 31 N CO / / •- ."'INV-22213" "2`26.81' ,�g V N _.� C, �� INV 22685��' --- 3k FF 130 '-� Pc�SO�V� ,. ., 22823 15 RCP ONE STORY M�O1�PP✓G� �.-., ti 90 GA'E :5 METAL BLDG p\L\�Q o FRCP G • 250 FF: ' all SHACK NO NUMBERS /` \ �264 "SOU 250' "O s71 • w I �2- - A� � S/LV `J 266 SIW g.--` 1"T IPP STRIPLE O _ " � ��� OVERED ="A• ��� �� in� � ` � ,. GAt`N PSO NUMBER COUR�1 N / \ BUDGBASKEIBALL /// JKNOW LOUD \ X / \\ )NC PIT J ` / 25y/'�" \ 1 \ �/IT `\ / )P: 265.90' \\ ` / ///^� )T: 257.88' \\ �/ �� \ \ \ \ RIM.238.2 / Q \ \ \ O BIBLE NRD OT SIBLE MHS E N SSX N SEE °�\\ SSX SSX SS �� \ �O/' W D ITH SjM) /I / X-SSX SSX � G \ 1 I X I I WOODED SSX AREA � A N \\ \ I Il I II I \ \ (-f-) EXISTING CONDITIONS PLAN - OVERALL VF101 SCALE: 1 "=50' FOR OFFICIAL USE ONLY 6 9 I 10 I, BRUCE D. BEAVERS, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% PERCENT CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA, AND THAT THE FIELD DATA WAS COMPLETED ON AUGUST 6, 2019; THAT THE SURVEY MAPPING WAS COMPLETED ON AUGUST 20, 2019; AND ALL COORDINATES ARE BASED ON NC GRID 'NAD 83'/2011 AND ALL ELEVATIONS ARE BASED ON NAVD 88. THIS CERTIFICATION ONLY APPLIES TO THE AREA ON THE MAP NOTED AS "STANTEC SURVEY LIMITS" BRUCE D. BEAVERS PLS L-3451 SURVEY NOTES: 1. THE PURPOSE OF THIS MAP IS TO SHOW TOPOGRAPHIC FEATURES AND INFORMATION ONLY AND IS NOT TO BE USED FOR BOUNDARY OR PROPERTY OWNERSHIP INFORMATION. 2. TOPOGRAPHY SURVEY WAS COMPLETED BY JOYNER KEENY, PLLC ON FEBRUARY 2, 2017 AND WAS FIELD SURVEY VERIFIED BY STANTEC ON AUGUST 6, 2019. ANY TOPO OUTSIDE OF STANTEC'S SURVEY LIMITS WAS NOT VERIFIED BY STANTEC. 3. EXISTING CONTROL POINTS TAKEN FROM JOYNER KEENY, PLLC SURVEY WERE USED TO ESTABLISH SURVEY CONTROL FOR STANTEC SURVEY. STANTEC DID PROVIDE ADDITIONAL CONTROL POINTS IN ORDER TO COMPLETE THE SURVEY. 4. THIS DRAWING REPRESENTS THE EXISTING CONDITIONS AS OF AUGUST 6, 2019. 5. SURVEYED BY: STANTEC CONSULTING SERVICES INC. 6. SURVEY DATE: AUGUST 6, 2019 7. HORIZONTAL DATUM: NAD83/2011 NC STATE PLANE US SURVEY FEET. 8. VERTICAL DATUM: NAVD 88, GEOID 12A. 9. UNDERGROUND UTILITIES SHOWN WITHIN STANTEC SURVEY LIMITS WERE MARKED BY OTHERS AND FIELD SURVEYED BY STANTEC; HOWEVER, ONLY ELECTRIC UTILITIES TO THE NORTH OF MEDICAL TRAINING FACILITY ACCESS DRIVE IN VICINITY OF THE EXISTING WOOD FENCE WERE MARKED. 10. THIS MAP DOES NOT VERIFY THE EXISTENCE OF, NOR CERTIFY THE LOCATION OF ANY JURISDICTIONAL WETLANDS THAT MAY EXIST ON OR NEAR THE PROPERTY. SURVEY CONTROL POINTS: *1 - 60d NAIL 1005 - 60d NAIL 1627 - 60d NAIL N= 501704.42' N= 501965.359 N= 502150.076 E=2003972.69' E=2003392.894 E=2003969.280 EL= 246.63' EL= 235.388 EL= 230.288 *2 - REBAR 1006 - 60d NAIL 1671 - 60d NAIL N= 52083.484 N= 502047.224 N= 502611.817 E=2003962.184 E=2003489.835 E=2003938.320 EL= 232.552 EL= 231.853 EL= 220.388 *3 - REBAR 1086 - 60d NAIL 1680 - 60d NAIL N= 502585.440 N= 501946.672 N= 502410.808 E=2003640.053 E=2003620.954 E=2003260.360 EL= 221.477 EL= 241.186 EL= 234.470 *4 - REBAR 1136 - 60d NAIL 1735 - 60d NAIL N= 502501.906 N= 501885.441 N= 502452.682 E=2003357.462 E=2003749.343 E=2003237.630 EL= 226.366 EL= 246.432 EL= 232.097 *6 - 60d NAIL 1263 - 60d NAIL 1736 - 60d NAIL N= 502022.660 N= 502037.287 N= 502530.191 E=2003394.447 E=2003808.883 E=2003568.704 EL= 231.464 EL= 232.650 EL= 222.479 1001 - 60d NAIL 1590 - 60d NAIL 1737 - 60d NAIL N= 502123.424 N= 502347.228 N= 502573.787 E=2003787.180 E=2003986.927 E=2003718.098 EL= 231.979 EL= 223.657 EL= 221.349 1004 - 60d NAIL 1591 - 60d NAIL N= 502022.568 N= 501869.636 E=2003394.348 E=2003947.971 EL= 231.612 EL= 239.936 0111111111ii// ,``��� r C A ��fi�i * INDICATES SURVEY CONTROL POINTS ���ssio, �r�'•� FROM JOYNER KEENY PLLC SURVEY. _ US Army Corps of Engineers® IIIIIIIII IIIIIIIII M co CD C) CD w OCD ZZCD OX Q 00 m oU�a-Ofa-oX Q� U� Q of w W U N 1z LU X >> U) O �� O� Z� OUP lX UX w Q com } Q z W J_ 0 ( } W p X— W Y J Z_j 0 0 Z 3: 1 Y U X 2i w L WU)of2i=XDU)NZ 2UXcn cnQ W W lV Z U Vi O � Z U- 0O LJ_ � O zQ U O U LL O z OWN i �_ ° 00. 5 J NJ w O z� Q I LL � z Q J U z /�a_ of Z z °o O QLu o z of CO CO O U �2i OU O (D L LL z O W ALL OTHER CONTROL POINTS FROM A.Ai ° STANTEC. L-3451 SHEET ID f V 7 SLj 50' 0 50' 150' f D l 1 "=50' N NOT FOR CONSTRUCTION FAST -TRACK 1 100% FINAL DESIGN SUBMITTAL G F 1 I 2 I 3 I 4 I FOR OFFICIAL USE ONLY I 7 I / 19 WOOS J1 ° S z ° So 223,35 v '° JX sX SHEtTERS , �N,� 22',I lip + IISOU cV N C � ° ° � 6, / o�/ ° 4 C p, \ / 2 \ N �� "BIRCH N I 1 ?7$ t/ a �` :° 223.76 13" \ ..+ 11MA I I II I x co c / , / 8' GA E U U .. P INV=222.06 T P=229.67' 24"C&G «,,/ , 230.8 / / $340 �(/) u% �b co ry� . Li l z 2 \ / / / �330 4�� PAD 11 6 11 P 8-� � 'A+ 16 P 5"CH 7 P� S"0 23�413"P 5 s / 10„P 9 P `'� 6„P I 5„ / / 4„P 15 P s°x + 611 19"P 11 "P 10 O „ I F s°� 231.77 co '�P 7'�P co 301211P ' P � + L ____6„P \ 5„P P 3184 „ + 1 O 2., 6„ „O / P 1011p „\ 7 / ° NL \ 14P �P 4"0 231.37 / / 6 TRI O + „ CO ��lip ��0 / + 0 4"P "P 5 CHx 0� / 411 H \ \ all 4 34 7"P' \ ERC�SE PR / / 6"P 2 / I \ + �35, 12 cn \ "P + "CH D EX 8,10 6„P 0� 0„P + 0 \ 81, 7P ,• l 12 P 6 G h�_* 19 P 35 6 p / � I ./ �, P \ �u' S C + 11 / 8O� „ / +0 9110 5 CH 11CH CH 9 G + 3g 6 G \ \9 3 P \ P Y „ � �23 � \ U F� "G 0f + 2'O �/ 240 WOODED 9,�P �Ilp \ INV-2�432'` / / / + — P \ + "CH 115" — — AREA \ \ \x — o �� 41 _ 7„ / P �2 �� P 1 �0 + �, I I I / / 242, ' \ \15„P ,.� \ ,�0 \ \ \ 5\ ` �"O 1 11 "P I 1I I UN \ /i 15P / / / 44X---OT \\ \ 1 ��P N / ,��"0 �� 6"0 6 O N o 8"P + V A \ P \ /15 \ \ \ \ /5"CH + „P 46,, / „ +\ 5"MACS — — \ \ \ \ �2 8P ,� \ 7p \ „ 13 )0�4"p \ P \ VO DE '�4,1 4i- , 4 — — — \ REA \ \ h 5P 2 — \ i1 „P 11 "P 9" \L Y 2,P \ �12 P „ + + 2 \ x \ I 1 ,P „�— — 6 CH 6" I \ / 1 13 ,� �249 15 P � 0 � C I o I 4" \ I I I I \ „P 11 250' p `� \ 1� 7 0 + "TWI CH \ \ I I 1 P 2 9 P \\ 14" I I18 O I I 6„ 1 2"P \15 / "T``II.. I NQIID I I I \ \ 8 P / 511P „P + I 0' WI \ \ \\ \ SOUR \0 2 5 2"P \ 1 P 3110 � _ 15 1 P� ( / iv �ti ,0 \ \ cr Aj _ EDQ IZ8 TVA, �� 0 �co Aj. o ccoo C — —� 1 "TR IPE LI + _ \ \ \ 5 TRIPLE 0 +' \ A EXISTING CONDITIONS PLAN - SITE Y. 22.78 j� U) e + . 7' �29 �. W N 226.91 °. ° . 0..�, \\moo I Y 15 RCP I V=226.40' i s°X \ \IN2182� I'I II=229.41' °s° 1 .. ' //'� 23� ° INV-218.9 ' \ I"C E4S�IY3 E J \ INV�� 226.40 WOOED / v� \- \ \ / / 15 RCP ' 4 \4 °d 225.64 AREA / , .�� TOP 2 �' �� \ \ I ��2�2 0' J ° 4 / '.,7�6 s� �,a, a a .� ' s ` / 232 — NV�' 22 D$ °'p INV=22�6.32 I I 30 F2 ................... I .03 T / I I \ N / / / 232.8 TOP=22t.62' \ �CC 1 IIIINV=220. 229.84 \ - / �� 231.14 �6.81' �GQ 230.43 + I I� I � g0 I U � I o \�k STANTEC SURVEY LIMITS / s°x r'�� ryti NK Top a ^�� (SEE SHEET VF101 FOR / / / / 23365 LNG U sx INV=226.85" 24"C&G -% \ 31.3p ti1 ENTIRE SURVEY LIMITS) (TYP) — — / /�,\N O� �ssx INV=228.23' �� �, ��.-X22g98 �2J Q Q 230.71 / G �l+P O 230.88 /\ Cq \V \ VA Ne �2321 PG sP , SCALE: 1 "=20' 9 10 M US Army Corps of Engineers® IIIIIIIII IIIIIIIII M o 0 0 CD ui �� CD OU X OX Q W coQ� U� �X 2i w Lu �a- U N fQ� F N �X W X >> O � _� O� Z� 0� �X UX w Q cocoQ } z w J o�} LU W o X wof uj LL Z_j 9635=UX2i Z Y w � W o= 2i X xc5 co U) N Z cnQ w Z U Vi w Lj o O O zQ al al O U O zOf Oil" _O ► Ot z U z J O (2f z a U Z c/) ~� O_ Of OZ U o p z QQ O CO CO �2i (D 0o z LL o U) w SHEET ID VF 102 NOT FOR CONSTRUCTION 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY FAST -TRACK I 1 2 c CIVIL ABBREVIATIONS 4 FOR OFFICIAL USE ONLY LEGEND EXISTING: 7 1 8 1 9 1 10 LEGEND PROPOSED G F 0 F ABC AGGREGATE BASE COURSE FC FACE OF CURB ABS AIR BREAK SWITCH F.D. FLOOR DRAIN A.C. ASBESTOS CEMENT F.D.C. FIRE DEPARTMENT CONNECTION A/C AIR CONDITIONING F.E.S. FLARED END SECTION A.D. AREA DRAIN F.F.E./FF FINISHED FLOOR ELEVATION A.F.F. ABOVE FINISHED FLOOR FG FINISHED GRADE ALT. ALTERNATE FH FIRE HYDRANT ALUM. ALUMINUM FIN. FINISH AMP., A. AMPERES FL. FLOOR A.O. ACCESS OPENING FM FORCE MAIN APPROX. APPROXIMATELY FOC FACE OF CURB ARCH. ARCHITECTURAL FT. FOOT, FEET ASPH. ASPHALT FTG. FOOTING A.T.F.P. ANTI -TERRORISM FORCE PROTECTION G A.W.G. AMERICAN WIRE GAGE GA. GAGE A.W.W.A. AMERICAN WATER WORKS GAL. GALLON ASSOCIATION GALV. GALVANIZED B GC GENERAL CONTRACTOR BFP BLDG. BM. BOC BOL/BL BRG. BVC BVCE BVCS BW C BACKFLOW PREVENTER G.F.E. GOVERNMENT FURNISHED BUILDING EQUIPMENT BENCH MARK GL GAS LINE BACK OF CURB GM GAS METER BOLLARD G.P.H. GALLONS/HOUR BEARING G.P.M. GALLONS/MINUTE BEGIN VERTICAL CURVE GND. GROUND BEGIN VERTICAL CURVE ELEVATION GOV'T GOVERNMENT BEGIN VERTICAL CURVE STATION GV GATE VALVE BOTTOM OF WALL GW GUY WIRE ■ i C&G CURB AND GUTTER HC HANDICAP E CATV CABLE TELEVISION HCP HANDICAP PARKING CAP. CAPACITY HCR HANDICAP RAMP C.B. CATCH BASIN HDW/HW HEADWALL CBL CABLE H&V HORIZONTAL AND VERTICAL CEM. CEMENT HORIZ HORIZONTAL C.F.M. CUBIC FEET/MINUTE HP HIGH POINT C.F.S. CUBIC FEET/SECOND HSS HIGH STRENGTH STEEL CHLK CHAIN LINK FENCE HT HEIGHT C.I. CURB INLET HYD HYDRANT C.I.P. CAST IRON PIPE I CIRC. CIRCULATING C.J. CONTRACTION JOINT ID. INSIDE DIAMETER INTX. INTERSECTION CK'D CHECKERED INV. INVERT CKT. q CIRCUIT CENTER LINE ISL ISLAND D ITL. INDEPENDENT TESTING C.M. CONCRETE MONUMENT C.M.P. CORRUGATED METAL PIPE J LABORATORY C.M.U. CONCRETE MASONRY UNIT J.B. JUNCTION BOX C.O. CLEAN OUT JCT. JUNCTION COL. COLUMN JT. JOINT CONC./CC CONCRETE COND. CONN. CONDENSATE CONNECTION K CONST. CONSTRUCTION K K VALVE CONT. CONTINUOUS KVA KILOVOLT AMPERE COR CONTRACTING OFFICERS KW KILOWATT REPRESENTATIVE C. TO C. CENTER TO CENTER L C C.Y. CUBIC YARD L LENGTH D LF LINEAR FEET DET. DETAIL LGT LIGHT DI DROP INLET LP LIGHT POLE DIA. DIAMETER LP LOW POINT DIFF. DIFFUSER LT LEFT DIM. DIMENSION D.I.P. DISC. DUCTILE IRON PIPE DISCONNECT M MAX MAXIMUM D.J. DUMMY JOINT MED MEDIAN DN. DOWN MH MANHOLE DR. DRAIN MIN MINIMUM D.S. DOWN SPOUT MJ MECHANICAL JOINT DW DOMESTIC WATER MON MONUMENT DWG.(S) DRAWING(S) MTL METAL B E MW MONITOR WELL EA. EACH M.U.T.C.D MANUAL ON UNIFORM E.F. EXHAUST FAN TRAFFIC CONTROL EG. EXISTING GRADE DEVICES E.I.P. EXISTING IRON PIPE N E.J. EXPANSION JOINT N/A NOT APPLICABLE ELEC. EL. ELECTRIC ELEVATION NAD 27 NAD 83 NORTH AMERICAN DATUM 1927 NORTH AMERICAN DATUM 1983 E.M. ELECTRIC METER NBL NORTH BOUND LINE EMBED EMBEDMENT NC NORMAL CROWN EOP EDGE OF PAVEMENT NCDEQ NORTH CAROLINA DEPARTMENT EQUIP. EQUIPMENT OF ENVIRONMENTAL QUALITY EVC END VERTICAL CURVE NC DOT NORTH CAROLINA DEPARTMENT A EVCE END VERTICAL CURVE ELEVATION OF TRANSPORTATION EVCS END VERTICAL CURVE STATION NEMA NATIONAL ELECTRICAL EXH. EXHAUST MANUFACTURES ASSOCIATION E.J. EXPANSION JOINT NIC NOT IN CONTRACT EXT. EXTERIOR NIP NEW IRON PIPE EX. / EXIST. EXISTING N.T.S. NOT TO SCALE O.C. ON CENTER O.D. OUTSIDE DIAMETER OH OVERHEAD OHE OVERHEAD ELECTRIC ONUS. OLD NORTH UTILITY SERVICE OVH OVERHANG P P/A PARKING AREA PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PED PEDESTAL PER. PERIMETER PGL PROPOSED GRADE LINE PI POINT OF INTERSECTION PINC POINT OF INTERSECTION ON CURVE PIV POST INDICATOR VALVE PIV ELEV POINT OF VERTICAL INTERSECTION ELEVATION PLT PLATE PSF POUNDS PER SQUARE FOOT PSF POUNDS/SQUARE FOOT PSI POUNDS/SQUARE INCH PIV STA POINT OF VERTICAL INTERSECTION STATION PT POINT PVC POLYVINYL CHLORIDE PIPE PVMT PAVEMENT R R / RAID. RADIUS RCP REINFORCED CONCRETE PIPE REINF. REINFORCING REQ. REQUIRED REV REVISED R.P.Z. REDUCED PRESSURE ZONE RT RIGHT R/W RIGHT OF WAY RWM RIGHT OF WAY MONUMENT S SAN SANITARY SEWER SB SOIL BORING SCH SCHEDULE SET SETBACK SF SQUARE FEET SHT SHEET SIA SIAMESE CONNECTION SIG SIGNAL SOTF SECURITY OPERATIONS TRAINING FACILITY SP SIGNAL POLE SPECS SPECIFICATIONS SQ. FT. SQUARE FEET SR STATE ROAD SS SANITARY SEWER STA. STATION STD. STANDARD STM STORM STL STEEL SUS. SANDHILLS UTILITY SERVICE S/W SIDEWALK SWM. STORMWATER MANAGEMENT T T TANGENT TBM TEMPORARY BENCHMARK TERR TERRA COTTA PIPE TEL TELEPHONE TOB TOP OF BANK T/C TOP OF CURB TOE TOE OF SLOPE TOP TOP OF SLOPE TOW TOP OF WALL TP TELEPHONE POLE TRANS TRANSFORMER TW TOP OF WALL TYP. TYPICAL U U/C UNDER CONSTRUCTION U/G UNDERGROUND UNO UNLESS NOTED OTHERWISE UP UTILITY POLE v VC VERTICAL CURVE VCP VITRIFIED CLAY PIPE VERT VERTICAL W WL WATER LINE WM WATER METER WSEL WATER SURFACE ELEVATION WV WATER VALVE WTR WATER WWF WIRE WELD FABRIC © GAS METER CT TELECOMMUNICATION MANHOLE 0 OR —EU SIGN • POWER POLE Co-- GUY WIRE CS SANITERY SEWER MANHOLE CD STORM MANHOLE LIGHT POLE C ELECTRIC MANHOLE EB OR ELB ELECTRIC BOX TR TRANSFORMER T❑ TELEPHONE PEDISTAL 0 BOLLARD BORE SURVEY CONTROL C8 FIRE HYDRANT OR X WATER VALVE ® REBAR Q CLEAN OUT EB INLET/CATCH BASIN PINE TREE O HARDWOOD TREE 1011P PINE TREE 1 u u OAK TREE 10"CH BLACK CHERRY TREE 10"MAG MAGNOLIA TREE 10"MAP MAPLE TREE SWEETGUM TREE 10"SYC SYCAMORE TREE 10"SOUR SOURWOOD TREE 10"U UNKNOWN TREE 10"TWIN DOUBLE TRUNK TREE 10"TRI TRIPLE TRUNK TREE 10" BIRCH BIRCH TREE 3SBW 3 STRAND BARBED WIRE J� WOODS —x x x— FENCE RIP RAP SDx STORM DRAIN SDx ssx SANITARY SEWER LINE ssx OHE OVERHEAD ELECTRICAL LINE OHE UE — UNDERGROUND ELECTRIC UE ASPHALT PAVEMENT EDGE CONCRETE . a 220 MAJOR CONTOUR 219 MINOR CONTOUR 255.7' X SPOT ELEVATION SD SD STORM DRAIN LINE SURFACE WATER FLOW DIRECTION ARROW 0 STORM DRAIN MANHOLE CO CLEAN OUT TD TD TEMPORARY DIVERSION DITCH T SF SF SEDIMENT FENCE TPF TPF TREE PROTECTION FENCE ■��MM MM COIR WATTLE x x SECURITY FENCE TEMPORARY WOODEN PRIVACY FENCE OR TEMPORARY TYPE 3 BARRICADE • PROJECT LIMITS LOD LOD LIMITS OF DISTURBANCE TREE LINE ASPHALT PAVEMENT a CONCRETE PAVEMENT a CONCRETE SIDEWALK X XOR DEMOLISH ----- =��= SEDIMENT FENCE OUTLET ►t WATER VALVE WATER POST INDICATOR VALVE GAS GAS GAS LINE ---COMM— TELECOMMUNICATIONS LINE FIRE HYDRANT w w WATER LINE SAN SAN SANITARY SEWER ❑ BLOCK AND GRAVEL INLET PROTECTION lr\ COMPOST SOCK TEMPORARY CONCRETE WASHOUT EXCAVATED DROP INLET PROTECTION • BOLLARD �t FIRE DEPARTMENT CONNECTION CURB AND GUTTER VALLEY GUTTER PITCHED GUTTER C A R D��i��i y� SEAL r• — 32177 ��. F,yGIN'��'�C,Q`�� �S t'SES\ti� 9��� sofa US Army Corps of Engineers° IIIIIIIII IIIIIIIII o O N 0 0 o � ..O LLI ❑ Lz0000 �o zo OX It Q w�X x m a OUX uj w U� �� wX >> �O �� OM Z� OUP UX w a m zm ma❑ z w �} owm}wU ❑2 LL � w Z Z J Y �~ ❑ C� cA U a WU)0 2 ❑C/)NZ ❑�❑ACC❑cn�cna C/) _ w M Z U C a wcz ~n O LL 0❑ Of OU 0 z .� Q cn . co 0 z � w _ J r n V J < J 0 Q z z cz a a U) z 0(.)O �LLI a w mm �o m O U m LLL a 0 J U SHEET ID C-001 NOT FOR CONSTRUCTION 1 — 1 FAST -TRACK 1 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY 1 2 3 4 FOR OFFICI L USE ONLY 7 8 9 10 d°..J de.� d: Q°. e / - -• / / \ ^ \ I J �j I I I I NOTES: °d ` °2 .92 / S 19 WOOS / U) \ Q , � 2 x SHELTERS ���' 0 22" I 1. EXISTING TREES SHOWN ARE PER THE SURVEY BY '.223.35' ° d'sX I N� O V' \ 1 ° / •• / RAGG HARVESTED -� /N 0) / TREES WITHIN STANTEC IN UPROJECT GUST LIMITSBIN SEPT M ER 20 9; d s d 22 - \ SAS d1 J 1 "O\ / ^ - HOWEVER, SOME TREES WITHIN THE PROJECT LIMIT l . 'CobD •• / REMOVE AND REPLACE ��p // cy N cV4&rn� / NOTED TO BE REMOVED MAY STILL NEED TO BE / APPROXIMATELY 260 SF OF \ SOU �// G ° `ter' .d d ' ° '. ° / ASPHALT AND 22 LF OF `J6' "BIRCH /o�/ ' K s v, s \ • PROTECT EXISTING STORM REMOVED AND THE CONTRACTOR SHALL BE ^C A1�� c s. / / • 22�' CURB AND GUTTER 10 N-���'� N DRAIN SYSTEM (TYP) _ RESPONSIBLE TO REMOVE SAID TREES. G 223.76 �w 13" Nrn \E + ,')VIA I / • fill 1 i t1 n 2. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR \ <..�' d \ / / / REMOVE APPROXIMATELY OX I POST TO REMAIN - / SHALL INSTALL THE TEMPORARY 8' TALL WOOD PRIVACY 22$:78 / 275 SF OF CONCRETE c� I I I I ZJ.47' 29, FENCE AS INDICATED. LAND DISTURBANCE SHALL ONLY o �'� / / �' �' 2 o \ SO ` J N / �t - CONSIST OF DIGGING POST HOLES FOR THE TEMPORARY ° °° 0� / PROJECT / \ SOX 6\ �W `\ I I nPRIOR TOTREEREMOVAL WITHIN THIS ?26.40'i2�� / PRIVACY FENCE ONLY AFTER APPROVED BY JSOMTC. _226.91 • d/ O .. d / REMOVE ASPHALT C 1 / ll �' o o DISTURBED AREAS SHALL BE STABILIZED AT THE END OF LIMITS (TYP) SO \ \IN\ =21�82� \ '� AREA ONLY (CONTRACTOR 229 41' / EACH WORK DAY. IF EXISTING TREES NEED TO BE A PAVEMENT °. .. ' ;. �° ��� � \ \ , ��\�. \ ( CONSTRUCTION TRAILER AREA), X � 3. 1 ° CONTRACTOR TO RECORD TREE TYPE ' 30.8 REMOVED TO FACILITATE TEMPORARY PRIVACY FENCE °�s° 23� O INV 18.9 ' U 226.40 INSTALLATION, EXISTING TREES MAY BE FELLED, AND / / WOO ED �- \ \ �/ AND MEASURE DIAMETER (DBH) WITHIN RCP 2 r ROOTS AND STUMPS SHALL BE GRUBBED ONLY IF 225.64 / KE REMOVE AND REPLACE v� TOP 23 8' �" \ \ I ,� 0' .� LIMITS OF DISTURBANCE, SEE 3ABSOLUTELY NECESSARY. THE CONTRACTOR MAY d A EA '�/ APPROXIMATELY 230 SF OF 1 232 - � �' SOX M c(? INV=22�.32' 1 0 0�, 'LANDSCAPE PLAN FOR TREE MITIGATION SLIGHTLY ADJUST THE TEMPORARY PRIVACY FENCE �\ IN 22.03' CALCULATION REQUIREMENTS ALIGNMENT IN ORDER TO FACILITATE INSTALLATION 229.84 (o / ASPHALT AND 110 LF OF 232.8 TOP=29t 62' " 1 I �Ij�I{ I /(�/) WHILE PRESERVING EXISTING TREES AND LIMITING - -- �� 231.14 h/Ni� II L...: . I I�N CURB AND GUTTERF .� � � p�'REMOVE EXISTING SECURITY FENCE � AMOUNT OF DISTURBANCE THE CONTRACTOR SHALL I REMOVE APPROXIMATELY - - ��' s o V 8 AND GATE ONLY AFTER PHASE 2 OF ) INSTALL THE TEMPORARY PRIVACY FENCE WITH THE o 90LF OF CURB AND GUTTER / OX c, I 22.13 T \ I EROSION AND SEDIMENT CONTROL LEAST AMOUNT OF DISTURBANCE AS POSSIBLE, AND ALL I // s �'� ti WORK AREAS SHALL BE STABILIZED AT THE END OF EACH - 1 \ o / 336 NG " UNK SX o \ CONSTRUCTION IS COMPLETE AND 1- / WORK DAY. S INV=226. 24:C&G �NN�� ) _ P ENTIRE NEW SECURITY FENCE AND pD' .�FLP QFZ INV=228.23' N x 9a -23 x 3. TEMPORARY 8' TALL WOOD PRIVACY FENCE DETAIL BY � S �^ ZZ9. o o `AND TILT GATE ARE INSTALLED, x PROTECT EXERCISE EQUIPMENT / P�GN GG�s x `L a 0 REFER TO EROSION AND SEDIMENT �,� CONTRACTOR. COORDINATE PRIVACY FENCE WITH `� �/ M� P 't M 2327 1 G / JSOMTC SECURITY. co TO THE GREATEST EXTENT � Q�p\. N v CONTROL PLAN -PHASE 2, SEE I POSSIBLE FP PS 24"C&G = v NOTES 5, 7-9 4. GATE HARDWARE LOCKING REQUIREMENTS: REMOVE SANITARY SEWER INV=222.06 T P=229.67 EXISTING DOUBLE SWING GATE: CONTRACTOR WILL '�0.8 - V- � 33:40 � � W in p`b � '` ��. BY ASUS REMOVE CURB AND INSTALL ITSOWN LOCK ON ATECONTRACTOR WILL 229 ' / / SAX 233.53 /2 ? 1, 23p _ -GUTTER , PROVIDE THE GOVERNMENT WITH A DUPLICATE KEY AND THE CONTRACTOR WILL HAVE ITS OWN KEY. 233 „ S S XQ �Q 4 PAD W REMOVE RIPRAP , 1111P i 5. THE EXISTING DOUBLE SWING GATE WILL REMAIN FULLY E \ �2 2 OX O �- \ 24"P\ 4„ \ WITHIN RIPRAP AREA, o OPERATIONAL UNTIL THE END OF CONSTRUCTION AND / o _ „ "p / J� ` WILL ONLY BE REMOVED AFTER THE PROPOSED TILT / "� 6" 11 "P8� � 5 O \ 16 P „ a REMOVE BRUSH / spy 3 7"P 5 CH h095�� AND VEGETATION (CLEARING GATE IS INSTALLED AND FULLY OPERATIONAL. 77 5110 X / 13 P,, , _ a"p �li� ONLY_ NO GRUBBING) F_ ASInF FROM TFMPORARY PRI\/ACY FFNr.F INSTAI I ATION_ �� " " �' �'I \ " 10"O "' ' 1 I U KtLUUA1 t (BUY VVIKt J JCUIIVICIN I MINU CKUJIUIN UUIN I MUL IVIC/1JUKCJ JAMM IIV SO 19 P 11 P " BY SUS N `�� �;'^ �� PLACE INSPECTED AND APPROVED BY FT. BRAGG 6 „ 7"P �� „p `L WATER MANAGEMENT BRANCH AND NCDEQ. REFER TO OX 231.77 0 6 0 P P P / CONSTRUCTION SEQUENCE ON SHEET C0003 FOR SZ 231.84 / 3011 12 -6„p \ 5 P P 1 O '� cv ENTIRE CONSTRUCTION SEQUENCE. S# 7� " " „ o U 'T0 6 O / * P 10P „P „ I I o / 0 14 P P co PROTECT ELECTRIC / / ° / " „ o/ 7. ALL EXISTING SECURITY FENCE, TEMPORARY PRIVACY p „ p/ 3 O \ 13 \ \` 6 I POLE �O� 4 / 6"TRI 0 „ „ „ / FENCE AND PERMANENT SECURITY FENCE INSTALLATION, I--,' O „ „P 5 0 „C P / REMOVAL, AND OR DEMOLITION SHALL BE SCHEDULED 4„ \ 4/ �� i'4 P / H \ \ I o -I I / AND COORDINATED WITH JSOMTC SECURITY PRIOR TO / 3 7 P' 'E��SEE / 6„P / I „ \ ��s, 12 R "p "CH ° o 0 o EXISTING RIPRAP TO ; BEGINNING ANY WORK. D EX g��p 0 0„P O \ $� °p REMAIN .�'�� 1 „ I " / 8. CONTRACTOR SHALL NOT REMOVE ANY EXISTING „ 12P \ / 5 6 P 11 6 G � P 23 �� / " � 1 � "p\ \ 11 3 5 C \ � o / I � ��o SECURITY FENCE AND GATE UNTIL APPROVED BY /PGZ / \ 8 0 5"CH TEMPORARY TYPE 35 I o / / JSOMTC SECURITY AND ONLY AFTER THE REPLACEMENT o 236�„p/ /%0 / 9 O �12' \ u__, I SECURITY FENCE AND GATE HAS BEEN COMPLETELY 1 P - /� a BARRICADE TO LIMIT 11 G ❑ 13/ 'p' l � / / \ `� 1 \ ~ ACCESS TO TEMPORARY / / INSTALLED, TESTED, AND FULLY OPERATIONAL. '6"CH - \ / h ,/ �237 / / / �'CH \ \ S CONTRACTOR LAYDOWN = 8.98' I 9. THE CONTRACTOR SHALL PROTECT AND PREVENT � G / I \ \ „ AREA REFER T BAT NE �35.81` o IN\ -23 DAMAGE TO THE EXISTING SECURITY FENCE TO REMAIN 9 G 23g 6 G \ `93 P \ \p o ( O S OG )P IIN PLA E EX EPT WHERE N TED N THE PLAN T BE / , 11"P��8 O 3g.° DRIVE DETOUR PLAN) ,_ (TOF C C O O S Oo g� \ V2 8.98 RC�y REMOVED AND / OR REPLACED, THE CONTRACTOR \ - 8"TWIN -0 ++ / ��23 "G 24�, \ 2°0 \ \ \ - ~ �v - '/ 1 �( SHALL ENSURE THAT THE AREA IS SECURED AT ALL „ �, - V / C� \ I I \ TIMES. INV-23 .32 / / _WOODED P 9 P�"p \ "CH O O O X I15" MP / - - - A�A� ,. \ \ 8 �' S[\ 10.ONLY WITHIN THE PROJECT LIMITS EXISTING SECURITY �� „ 41 - I , 1 7" / / o P 2 _ _ - \ �- \ „� P \ \ 15\0 FENCE SHALL BE CLEANED OF KUDZU, AND FALLEN I I I o / 242, 11"P 15 \ „O \ �3 0 I a 23 O / o o TREES ON THE FENCE SHALL BE REMOVED AND C OT E E D I / ❑ / / 242 - - ; - , \ „ \ \ 16 \ „c �, 1 " o CLEARED. \ i �5"P / ' 4' - - - 6 TR \ P \ \ 1 „p C I w / I I O O k UN / / / 24 ,\ \ \ \ w / 04HER ND = INV=23�f. -12" CID o Q 11.CONTRACTOR SHALL REMOVE THE TEMPORARY 8' TALL o ✓ „ 0 \ 6 O 6 0 „p �' I C'� WOOD PRIVACY FENCE AT END OF CONSTRUCTION ONLY \ - / 8 P \ 14, ` �1 , yNIN WN / AFTER APPROVED BY JSOMTC SECURITY AND THE \ \ / \ P- \ \ ��' \ ~ I I /m / CONTRACTING OFFICER. \ \ 13 P, _ „ "O \ REMOVE EXISTING SECURITY FENCE / \ \ TEMPORARY / 15"P - 511 \ 8"P \ 8110 \ \ O DURING PHASE 1 OF EROSION AND 12. CONTRACTOR TO REMOVE STUMPS AND ROOTMAT. PRIVACY FENCE ❑_ � � \ 0�P � o \ \ ��5"CH „ / \ ��\ \ \ o SEDIMENT CONTROL CONSTRUCTION , o C� ! CONTRACTOR TO REPLACE PINE TREES PER FT. BRAGG P�246 8"P 5 MAGI - \ 7"P \ aM AND ONLY AFTER NEW SECTION OF REPLACEMENT SCHEDULE, COORDINATE ONSITE AND OR O D E N „ � P � 4 P \ \ � �\ / PARALLEL SECURITY FENCE IS � i� OFFSITE LOCATION WITH CONTRACTING OFFICER. REFER \ 0 4 O 47 - _ ** - - REA \ \ c+�j / TO LANDSCAPE PLAN. / 5 P / lip �l \ \ - //��� � cV INSTALLED, REFER TO EROSION AND "p _ 11 P 9 L Y P \ \ 2 \ \ �Iz) I SEDIMENT CONTROL PLAN -PHASE 1, /nod / '2 , 13. ALL PAVEMENT AND CURB AND GUTTER TO BE REMOVED - oil CH„N SEE NOTES 7-9SHALL BE SAWCUT TO LEAVE A CLEAN, NEAT EDGE. "P F� 6 0 236.54 °o CURB AND GUTTER SHALL BE REMOVED TO THE NEAREST 1 \" 1CH I \ JOINT. \ \ / 1 3� 4 " 15P J, I o I M O 11C co a: \ / 4" °o ., " \< 094S� I I \ a I I �v R► I 14.THERE ARE NO WETLANDS, SURFACE WATERS, "p / \1 P " 7"0 I 1 I o / M I _ �` I REGULATORY FLOOD ZONES OR PROTECTED RIPARIAN 250 P 1 \ 1� (�11(0 "TWI CH \ a I N /III'1 PTPP9 J'�Z \14" h \I ,,� N PP o I BUFFERS WITHIN THE PROJECT LIMITS. 251'- P- T PF I T "*IN I I � � � � � LEGEND 8„P 0) \ 1 / 5" p „ _� o \ M �� „ 7 „❑ L 3„� OD D o / 0 LOD OR X PHASE 1 REMOVAL \ \\ \ "SOUR \ \ 250 2„P lip 1 P O / �Op 15 1 P��, �T► /�24o�PHASE 2 REMOVAL \P c5` 3z - 47 A I REMOVE SANITARY CA�ii \* REMOVE TREES, �' `�� SEWER BY ASUS / AFTER PHASE 2 COMPLETE , . , © � LIMITS OF 8"� `��`pQ`�`�ESS1fj ��?.% \ -� \ 1 „TRIPLE SEE NOTES 1 I DISTURBANCE/PROJECT / / s X REMOVAL o AND 12 (TYP) � \ A \ \ = :a 6EAL LIMITS (TYP) / 2177i�3 ;i�,19N S ��S;��� 1 DEMOLITION PLAN NtgtiS� 0 01 SCALE: 1 "=20' 20 0 20' 60 114s- aoiq M US Army Corps of Engineers° IIIIIIIII IIIIIIIII cy) CD N 0O CD :N OU OLLI Oc) QW CO Q �X O � 2 W W to U N D'a cN OX W X C> UZ� O _j o� OUP HX UX w a m z co 0o z J w LU W CO0 U) LLJ Z J Z JYC~-�w� C CUQW � <wu)c0u)No wUU) o u� U cnQ w is Z U O �z W LL 0Ln J °W' 0 0 U OU 0 o' z O .� 2OZ ► 'd < U .r a z � < J W Z J < Z_ U Z =Q z o� U _O Z 0LLI J < T w mm o O U LL W O U) SHEET ID CD101 NOT FOR CONSTRUCTION FAST -TRACK 1 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY 1 ONLY 7 N. 01 10 2 I 3 I 4 I FOR OFFICIAL USE TILT -A -WAY DCM VERTICAL PIVOT GATE (VPG) RIGHT HAND S INSTALLATION WITH CARD READER BY IDEAL MANUFACTURING, INC OR 00� ssx APPROVED EQUAL AS APPROVED BY JSOMTC SECURITY. SEE NOTE 8. Ns, STORMWATER MANAGEMENT 10' I WIDE(MIN.) MAINTENANCE ACCESS 4 VALLEY GUTTER 11 BOLLARD C-506 C-506 TYP. OF 6 1 HANDICAP CURB `o C-507 CUT •� �� E / sOX 2 CONCRETE PAVEMENT co �® c� C-506 vE cn WOODED � � 3 FEATHER CURB _ AREA DETAIL aEDGE OF o 8 24" PITCHED CURB �� // o�/ ASPHALT X C-506 AND GUTTER E �k Spy � 3 FEATHER CURB C-506 DETAIL J-- 10 M ��GPPGG� 1 4 VALLEY GUTTER �0 / 1 0 -- 9 CONCRETE E 8 24" CURB AND GUTTER oC-506 SIDEWALK, SEE C-506 (TYP.) NOTE 3 AND 4 (TYP) J" o 5D* Cn oc\1 r rr X �u m 29' •.s d' • 44 • o� •.' 10' 1'ea °�, RETAINING WALL SEE STRUCTURAL 24' -- - ; • co PLANS -, S r d • ' L9F gp� 4 1 CONCRETE o s RAMP/STAIRS, SEE 0 ARCHITECTURAL PLANS <0 :1 � LO BOLLARD SEE 6'-2" + 411 ARCHITECTURAL PLANS D / E 13"� I LOADING DOCK SEE ,r ARCHITECTURAL AND 1 ASPHALT +-111 STRUCTURAL PLANS C-506 PAVEMENT (TYP.) 1 0 BACKFLOW ; 11 "G ❑ rl10r PREVENTER CONCRETEMECHANICAL0 20'13" PADS BY ASUS• . I . EQUIPMENT • G 9 C-506 CONCRETE CONCRETE PAD, o 817WIN O C-506 WPROPOSED SIDEALK (TYP) SEE NOTE 9 A I �•,rr�s COMBAT MEDIC TRAINING FACILITY 7,r� 28,870 SF 0I o FFE 236.65' ° C ❑ `c' s 15"P 4"P I d 4'-11" s I rl O Il 4"P;%7 O TIE TO EXISTING SECURITY FENCE B ,r \ 13 411 Oa\ TEMPORARY PRIVACY FENCE "P 1311 1 rrF 18"O L O 11 "P 6r, L��_I/0 rrr, �Lrs �o ❑ 15 8"P D _ LO��pp ❑ 5" LOD D � ❑ ❑ Lg ❑ LOD 0— Q\jj �' r rr r, 11 "P' l \ LOD 6 SOUR 2 p 15"P* 1 -P �liP + X g0 LIMITS OF P 1 "0 DISTURBANCE/PROJECT ' LIMITS (TYP) co 1"TRIPLE O i"TRIPLE Ox A+ ri-� SITE PLAN CS101 SCALE: 1"=20' 0 X X 22"P %\1� INFILTRATION BASIN #1 " OUR r + IRCH ' 6 CONCRETE + MA C-509 RETAINING WALL it r Y J O U S X 0 2 oX 00 ..x a 1 0 x 10 0 co C-506 TILT GATE AND CARD READER C 1 "0 CONCRETE PAD F HANDICAP � 1 —� II. II"j \ RSONNEL GATE 12' (5OPENING) .CONCRETE PAD FOR SEE ARCHITECTURAL PLANS TRANSFORMER .tj • - I Nz- P-12 I 1 C-512 . ING RADIUS 0 O J 0 J SECURITY GRATE Li O J 0 O J C-511 0� o 0 O 0 0 0 0 X OSD� o 0 0 c TEMPORARY TYPE 3 BARRICADE TO LIMIT 1 , GT Co ACCESS TO TEMPORARY CONTRACTOR LAYDOWN y AREA (REFER TO TRAFFIC CONTROL PLAN) p + u lo ) ° m -A > m1 0 > OOP cs c m PP 0 C � U00 z m > S x NOTES: 1. ALL DIMENSIONS ARE MEASURED TO FACE OF WALL, FACE OF BUILDING, FACE OF CURB OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 2. ALL RADII ARE MEASURED TO FACE OF CURB OR EDGE OF PAVEMENT OR CONC EDGE UNLESS OTHERWISE NOTED. 3. ALL SIDEWALKS ARE 5' WIDE UNLESS OTHERWISE NOTED. SIDEWALKS ALONG CURB AND GUTTER ARE MEASURED FROM BACK OF CURB. 4. CONCRETE RAMPS HAVE 5'X5' LANDING AREA DEPICTED BY DASHED LINES AT BEGINNING AND END OF RAMPS. 5. ALL EXISTING SECURITY FENCE, TEMPORARY PRIVACY FENCE, PERMANENT SECURITY FENCE, AND GATE INSTALLATION, REMOVAL, AND OR DEMOLITION SHALL BE SCHEDULED AND COORDINATED WITH JSOMTC SECURITY PRIOR TO BEGINNING ANY WORK. 6. THE CONTRACTOR SHALL PROTECT AND PREVENT DAMAGE TO THE EXISTING SECURITY FENCE TO REMAIN IN PLACE EXCEPT WHERE NOTED ON THE PLANS TO BE REMOVED AND / OR REPLACED. THE CONTRACTOR SHALL ENSURE THAT THE AREA IS SECURED AT ALL TIMES. 7. PROPOSED SECURITY FENCE SHALL BE CONSTRUCTED TO JSOMTC PERMANENT SECURITY FENCE STANDARDS. COORDINATE FINAL ROUTING AND CONFIGURATION OF TEMPORARY PRIVACY FENCE, PERMANENT SECURITY FENCE AND PERMANENT PERSONNEL GATE, AND TILT GATE WITH JSOMTC SECURITY. 8. CONTRACTOR TO COORDINATE EXACT CONFIGURATION, LOCATION, ELEVATION, LENGTH, SIZE OF PERSONNEL GATE AND TILT GATE TO INCLUDE FOOTINGS AND REQUIRED MOUNTING HARDWARE AND POLES/POSTS/STANCHION PER MANUFACTURER'S RECOMMENDATIONS WITH JSOMTC SECURITY PRIOR TO INSTALLATION. CONTRACTOR TO SUPPLY AND INSTALL PRESSURE SENSORS, CARD READERS, CONDUIT, ELECTRIC WIRE, MOUNTING POLE/POST/STANCHION, PERSONNEL GATE AND TILT GATE. CONTRACTOR TO PROVIDE AND INSTALL A KNOX SWITCH FOR FIRE DEPARTMENT EMERGENCY VEHICLE ACCESS TO OPEN TILT GATE. SEE ELECTRICAL PLANS FOR POWER REQUIREMENTS AND LOCATION OF KNOX SWITCH. 9. COORDINATE MECHANICAL EQUIPMENT PAD SIZE AND LOCATION WITH MECHANICAL UTILITY CONTRACTOR PRIOR TO INSTALLING CONCRETE PAD. EQUIPMENT PAD EXTENDS BEYOND THE EDGE OF THE EQUIPMENT ON ALL SIDES. THE LENGTH THE PAD EXTENDS BEYOND THE EDGE OF THE EQUIPMENT VARIES FROM EACH PIECE OF EQUIPMENT. 10. CONTRACTOR SHALL USE CAD FILE FOR CONSTRUCTION STAKING TO ENSURE CORRECT COORDINATES; HOWEVER, CONTRACTOR TO REFER TO STRUCTURAL AND ARCHITECTURAL PLANS FOR BUILDING FOOTING LOCATIONS, FLOOR PLANS, BUILDING WALL AND RETAINING WALL LOCATION INFORMATION, DIMENSIONS AND BUILDING DETAILS. 11. SEE LANDSCAPE PLAN FOR LOCATIONS OF SOD AND SEEDED AREAS. .0 1 `�0%111111114, \`,,\,\N C A R 0�/ire r SS/d pry: .. Or . :a SEAL `~ 32177 FyGtNE�'�Q!Z 11--ts � ao�a I 1 US Army Corps of Engineers° IIIIIIIII IIIIIIIII O 0 00 z0 .. CD LSD OO O �Owzv>_x LLI of�ti ~� }X H Q W Qr Ur wX OOX 0 : W W �a U N <a N W X D> L0O J� O� Z� OUP HX UX W a mzm co z w C) C) Z J Z J Y F _ w U Q Cn Q W U) m W W L U) N W 4J U w fQ Z U N z W Cn J 0 z U) OU z O .� 2OZ � ► Ot cz 'd a U .r L J_ Z U Q J OW Q�(D Z U z Z J F- o ~ a U Z W o (D2 U) m m O U W W O U) SHEET ID CS101 NOT FOR CONSTRUCTION 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY FAST —TRACK I 2 I 3 I 4 I FOR OFFIC1 L USE ONLY I 7 N. 10 1 STORM DRAIN SCHEDULE From To Slope Pipe Length Upstream Invert Downstream Invert Upstream Structure Pipe Rim Minimum Minimum (upstream) (downstream) Diameter (From) (To) Material Elevation Depth Cover (Ft/Ft) (In) (Ft) (Ft) (Ft) (Ft) (Ft) (FT) TEMP ES-4 (PH-1) EX CB-3 (PH-1) 0.0250 G EX CB-3 (PH-1) CB-4 (PH-1) 0.0110 CB-4 (PH-1) FES-3 (PH-1) 0.0118 f^k d ♦r 'V co a ° d / \ u LIMITS OF DIS PORTIONS OF PERMANENT STORM \ DRAIN SYSTEM - INSTALLED DURING I 15 11.00 227.25 226.98 HP STORM 230.00 2.75 1.31 PHASE 1 (TYP) N _ 15 15 6.00 226.98 226.91 35.00 226.91 226.50 CLASS IV RCP 229.67 GLASS IV RCP 229.90 2.69 1.26 3.99 1.55 Lju - 1 r BAFFLE / CAUTION' • SHALLOW COVER OVER C-513 (TYP) , 237 PROJECT LIMITS TYP �9O , - EXISTING STORM DRAIN PIPE WITHIN TEMPORARY SKIMMER SEDIMENT BASIN AREA, PROTECT EXISTING STORM DRAIN / PIPE AND STRUCTURE / PROVIDE EROSION CONTROL BLANKET WITHIN TURBANCE/ / SLOPE AREAS (SHADED AREAS) (SEE NOTE 2) � 3 /- J L r - -51D*_n V, 1 SEDIMENT FENCE 502 \OUTLET (TYP) t w \ �y SKIMMER W PROJECT LIMITS (TYP) vv F \ �, REMOVE SEDIMENT AND DEBRIS FROM EXISTING, ', TEMPORARY, AND PROPOSED STORM DRAIN PIPES, INLETS, - E 1 AND RIPRAP CONVEYING DRAINAGE TO TEMPORARY i r) / FOR CONTINUATION SEE j/ PHASE 2 SHEET CG104 % I 3 ° SEDIMENT FENCE _ - C-501 _j (TYP) I\ 7'?9 / I RCP 2 155" RC ' _ COMPOST SOCK INLET C-504 PROTECTION (TYP) =22y)A' S X INV=226.40' - - 15" RCP 3 SEDIMENT FENCE SKIMMER SEDIMENT BASIN WHEN TEMPORARY SKIMMER O `�k 1 SS, - TAP ti3 co C-501 (TYP) / SEDIMENT BASIN IS INSPECTED (TYP) � 1 / P\�\\���\�� / ass 2 `COMPOST SOCK INLET 1 P 5 , CB 30 Y -\� SO C-504 ',,"'PROTECTION (TYP) -2 - I COMPOST SOCK FOR\GP�GG�s O� X TEMPORARILY BLOCK EXISTING co SEDIMENT CONTROL �� / M� \�`(P > _ t O`5 CB STORM DRAIN PIPE (EX CB-3 TO EX PROTECT CB-4 WEEP CB-2) DRAINAGE AT EXISTING INLET HOLES/STONE (SEE NOTE 5) =2 C E FROM BYPASSING TEMPORARY > SKIMMER SEDIMENT BASIN ` / D7� TD 1u> 1u> TDa� TD 29 � / // X 23 CORE DRILL HOLE IN PROPOSED AND 22T 5' p a s Q EXISTING INLETS AND CONNECT `L E �/ 2� 2 �P'0/ % �p TEMPORARY 15" STORM DRAIN PIPES TOfo \ o 0 + INLETS, SEE STORM DRAIN SCHEDULE tp 24"P 16"P 11"P81913' FOR TEMPORARY PIPE INFORMATION + 5" + / o 0 1 TEMPORARY DIVERSION �\ 6ttp 2 ti TEMPORARY SF C-505• DITCH (PROVIDE VEHICLE \ C-514) RIPRAP (TYP) soy CROSSING USING 19"P 1 1UU U / 2 \ p 1 7"T o •,p COURSE AGGREGATE) �P'` F 1 + �� i _ ,t tt SEDIMENT FENCE ' tt s� 30 12 .6"F \ \ 5"P -C-502� 10UTLET (TYP) + 1 01 tt P / " ` � � \ tt / I 'I O O ( 10 P 14"F' P ° + + i % F i / 1 TEMPORARY GRAVEL CONSTRUCTION �� 6"C V " �� DURING PHASE 1 TEMPORARILY W 4 �� 6 TRI O tt0 C-504 ENTRANCE/EXIT � �Op / 4„ \ 4/ ��411P / 4" h TIE EXISTING SECURITY FENCE TO _ "CH ° p / 7 P� �\ REMAIN FENCE TO BE REMOVED o 0ICHD 1D �o 6"P ° v "/1t AFTER PHASE 2 IS COMPLETE T tt \I/a O P _ / _ � I �� n��n 0 �� \ ) 1 G i 3 ;SEDIMENT FENCE + �� NEW SECURITY FENCE I \ ,tp ��-501 TYP 1 / ttP _sSrtn� + I � FOR CONTINUATION SEE , / G / ) /� + „ / \ \ 8"0 6'+ � L5"CH \ � PHASE 2 SHEET CG104 ,t o 236�„p / / O / 9"O �p \ 12"1311 Co A \ 1 �h ,tG 2 / CH x ! ti /n , / ,t / I \ � \ tt NEW SECURITY FENCE 9 G + 23$ 6 G tt 23 tt \ `9 3 F r Y ° / , 11 "P`-�. 8 0 9�\ 6� \ �, � _ A� ,emu ° _ o g + \ x cna ` - 8"TWIN O + __23 ttG 2�0, \ + 2„O tP \ \ 1- t 24 WOODED 9ttp -2�.32 -P �llp C H ' fiTEMPORARY DIVERSION / r tip ' 24�� - - = AREA-- - tip \ + �,� + \ �( C-505 DITCH (TD#2) (SEE NOTE 2) / o / 42, - \15"p `� O \ \ \ 15�0 x tt0 3 A 6 *R P H\ tt \ \ P I° _ 5 8010 \ \ /15"P \ C� 8P \ `\ o - - \ttp �24g_ /8„p +� tt 5"MAG\ -� � � \ 7"F' \ a o I �9 13 P ,t P 4 P \ \ �VO D E \ /4 4i - - - REA \ 2 5.2 TEMPORARY PRIVACY `�' 2TREE PROTECTION tt' + L Y p \ \ 2 \ \ ,� a \ FENCE REFER TO 6 - ,t t, 1 \ \ \ tt ( 1 "P C-501 FENCE 6 CH 1 1 \ 1 DEMOLITION PLAN AND s� \ �„ + I + 6"O I � \ / 1 „ 131 H g I CONSTRUCTION SEQUENCE 1 3 ,� 49 15 P � C 1 o I I' \ 2�5, I - ttn 1 REGARDING TREE REMOVAL 4„ a - \ + 0 I I + C \ \ 1 AND STABILIZATION ( "F� \ 250' P \ \ \ \� 7"O I 1 „ REQUIREMENTS) / 1�' 1"P TPp9" P \ \ f(ob I + TWI CH4 14- 1 \ c 1 \ _ PF ❑ I o C-505� 811p 251'- _p. -�- T 11 SF SF -o FIN 511p + L OD + o \ t, 25 1 P O \ \ S3110 OUR \ I 71 -4- „ END OF TREE / \ 15 1 PROTECTION FENCE / N0 \� _ cg eo O A \\\ �� ���� �� 250 57\RPLEO + EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 SCALE: 1 "=20' 9 SHEET NOTES: 1. REFER TO SHEET CGO01 - CGO03 FOR CONSTRUCTION SEQUENCE AND GENERAL EROSION AND SEDIMENT CONTROL NOTES. 2. TEMPORARY DIVERSION DITCH (TD#1-TD#2), TEMPORARY SKIMMER SEDIMENT BASIN, AND SLOPE AREAS AS SHOWN (SHADED AREAS) SHALL BE STABILIZED WITHIN 7 DAYS FROM LAST LAND DISTURBING ACTIVITY. PROVIDE COCONUT FIBER WITH NET C125BN EROSION CONTROL BLANKET PRODUCT FROM NORTH AMERICAN GREEN OR EQUIVALENT WITHIN TEMPORARY DIVERSION DITCH TD#1-TD#2 AND SLOPE AREAS AS SHOWN (SHADED AREAS). INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 3. TEMPORARY SKIMMER SEDIMENT BASIN WATER MUST 1 ?30PF20POSED RIPRAP OUTLET O O BE WITHDRAWN FROM THE BASIN SURFACE. C-501 PROTECTION (TYP) - uX 1 1v 4. SEDIMENT FENCE IS SHOWN FOR GAS AND WATER 2 o UTILITY WORK (DESIGNED BY OTHERS) AS IF THE COIR WATTLE ENTIRE GAS AND WATER UTILITY CORRIDOR WILL BE "05(ENTRENCHED) (TYP) / OPEN TRENCH EXCAVATION. IF DIRECTIONAL DRILLING / IS USED, SEDIMENT FENCE IS ONLY REQUIRED IN AREAS OF LAND DISTURBANCE. / / 5. CB-4 HAS A 1' DEEP SUMP BELOW STORM DRAIN PIPE INVERT OUT. TEMPORARILY LINE INSIDE INLET WITH PLASTIC LINER PRODUCT TO PROTECT FUNCTION OF I / WEEP HOLES/STONE FROM BEING PERMANENTLY AFFECTED BY SEDIMENT. \ 4 I TEMPORARY SKIMMER SEDIMENT BASIN 2 TREE PROTECTION -513 WITH 10' WIDE SPILLWAY AND BAFFLES (SEE NOTE 2 AND 3) C-501 FENCE DRAINAGE AREA = 1.46 ACRES, DISTURBED AREA = 1.30 ° / o ACRES, 10-YEAR DISCHARGE = 8.31 CFS I I BASIN BOTTOM ELEVATION= 226.50' CONTRACTOR ACCESS POINT CREST OF SPILLWAY= 228 50' ' /I ?3 FOR PERMANENT SECURITY i BASIN TOP OF EMBANKMENT= 230.00' o / FENCE INSTALLATION. EXISTING DEPTH OF STORAGE= 2 FT � RIPRAP TO REMAIN. WITHIN TOTAL DEPTH- 3.5 FT RIPRAP AREA REMOVE BRUSH / SEDIMENT CLEANOUT ELEVATION= 227.50' AND VEGETATION (CLEARING �Q' ��` REQUIRED MINIMUM VOLUME= 2,340 CF ® ONLY, NO GRUBBING) / PROVIDED VOLUME= 4,167 CF ° REQUIRED MIN. SURFACE ARE= 2,702 SF WITHIN BASTOGNE DRIVE PROVIDED SURFACE AREA= 2,808 SF / PAVEMENT AREA ONLY, BASIN BOTTOM DIMENSIONS (AVG) - 48' X 35' P CONTRACTOR LAYDOWN AREA BASIN TOP DIMENSIONS (INSIDE)(AVG) - 78' X 45' (ROAD TO BE CLOSED, REFER 2:1 SIDE SLOPES 0 0 TO BASTOGNE DRIVE DETOUR 4" SKIMMER WITH 0.75" ORIFICE DIAMETER / PLAN), NO LAND DISTURBANCE 0 0 35 � 2 I COMPOST SOCK INLET C-504' I PROTECTION (TYP) TEMPORARY TYPE 'i RARRIrAnF= TO LIMIT ACCESS TO TEMPORARY CONTRACTOR LAYDOWN AREA (REFER TO BASTOGNE DRIVE DETOUR PLAN) Sri\ INV/ 2 )� o o INy=2? % 3 / SEDIMENT FENCE NV= ik. -12" CID o Ok C-501 (TYP) / J co s DISTURBED AREA = 2.95 ACRES ' O 2 RIPRAP TURN PROPOSED DITCH i C-514 INTO FLOW LINE OF TEMPORARY i N DIVERSION DITCH AND LINE PROPOSED DITCH AND TEMPORARY DIVERSION DITCH WITH RIPRAP) n l� I 3 SEDIMENT FENCE C-501 (TYP) M P / Q TEMPORARY DIVERSION \ I \ DITCH (TD#1) (SEE NOTE 2) ,' ' N �240' sX 0 / INV_2 8.98' TOP- 5.81' 11 -228.98 \\N%I I I 11111j CAR0��i� :a SEAL r . i 3 217 7 US Army Corps of Engineers° IIIIIIIII IIIIIIIII CD ..o 0 00 Zo . . CD L 06 0 OW ZU UX Q W Q� U� �X OOX W W �a U N �a N W X D> O 7i Z� 0� HX W co UX w m zm co z w m Z J Z J Y F _ �W� U¢ Cn ¢ W (n m WLu� W o o 2 U 0 U) u N �n< 4J U w fQ Z U N �z W Cn J " o° U) OU z O .� >_ =_z ► U .r J L ¢v JL z O Cl cD T_ w U z Z wCO a oa o~ Z o w U)z ¢ z J 000 m Q w 0° z O LL O U) 0 w SHEET ID CG102 NOT FOR CONSTRUCTION 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY FAST -TRACK I 1 2 3 4 FOR OFFICI L USE na. / 1 � SKIMMER 19 WOOS / cn C-514 \ s °X \ / SHEtTERS , 1 PROPOSED RIPRAP OUTLET a s / PROJECT LIMITS (TYP) �►• \ 22�' C-501 PROTECTION G ° ... ° . ��i•� \ / / / ' 230 _ 2 BAFFLE O - �`s TELECOMMUNICATION LINE TO BE INSTALLED •o CAUTION: SHALLOW COVER OVER 6-513 (TYP) IA USING HORIZONTAL DIRECTIONAL DRILLING, SEE \ EXISTING STORM DRAIN PIPE WITHIN TELECOMMUNICATION AND SECURITY PLAN / TEMPORARY SKIMMER SEDIMENT BASIN / AREA, PROTECT EXISTING STORM DRAIN 237 r' ' PIPE AND STRUCTURE 230 00 �0e / \ �� ox6o MP s 3 TEMPORARY CONCRETE °.°Q <a.° ��� C-502 WASHOUT � INV=218.9 � / 3 HARDWARE CLOTH AND GRAVEL w TO ).98' `° INLET PROTECTION / / -232� Sp* � — i �\ V&2 F \ 1 SEDIMENT FENCE OUTLET / OSsx T = AS LIMITS OF DISTURBANCE/ / �N Sx SEE NOTE 4 INV=22 PROJECT LIMITS (TYP) _ / /� / P�N �c>) � N C S X - CO SD 4 COMPOST SOCKS FOR / / , FPG < . ° S T =22 .UB SEDIMENT CONTROL / / / 50 234 TD > T 22y _ / SOS o -gyp > 23 23 1 ° ° 232 5 23p a OUnP/ 23 2 5 E � 32 E�� o DB234 \ 35 .p S. Sq 2 o G ° 4' co 7i l TEMPORARY DIVERSION 23 • JJJ co C-505 DITCH PROVIDE VEHICLE ` . co / / .D ( soy \�3 D CROSSING USING COURSE AGGREGATE) C g ONLY7 8 • 10 • ��ON I• • -• • A� E WE G •- �' _ Ful PZZ ►,�jr ~ N1l11 Hot SON il's api I III � � �►.7� ��� ��� - ' • - • - ` 1 11 I�gf<-.1 __ 4" SKIMMER WITH 0.75" ORIFICE DIAMETER I1�V�� BASIN TOP DIMENSIONS (INSIDE)(AV(3) - PROTECTION (TEMPORARY) wa 2-1 SIDE SLOPES TEMPORARY GRAVEL CONSTRUCTIO WITHIN BASTOGNE DRIVE /PAVEMENT AREA ONLY, �� . — r ..• . -• .-. . • I o I �.�,� . .��� �_.. t►�` ��. ♦��i. �♦ �i. ��� vim. �� ��� , I�D ..• • ice. ■ 1 • .` - 00 411 w ROAD TO BE CLOSED, REFER FOR CONTINUATION SEE__"�'_ SEDIMENT FENCE PLAN), NO LAND DISTURBANCE PHASE 2 SHEET CG1 04 MAMA 2 (TYP) OUTLET(TYP) its TEMPORARY TYPE 3 BARRICADE PROPOSED PERMANENT GR �SS :+ TOP 2 3.5 CONTRACTOR LAYDOWN AREA DITCH (D#2) (SEE NOTE 2) T P:F=K]rF ((REFER TO BASTOGNE DRIVE 'WIN-10 DETOUR PLAN) L3 I I av PROPOSED i-,,,)TEMPORARY DIVERSION NIP LW mw W ME MIAMI- WN 1 � �• • � • �• SCE INV/ o o 0 IT: 1 " l IO�JR ND Z INV=23'�T. -12 CPS 0 4 M yN N WN iO3 o / � 1 0 /O ° i 2 c'' RIPRAP TURN PROPOSED DITCH C-514 INTO FLOW LINE OF TEMPORARY DIVERSION DITCH AND LINE / PROPOSED DITCH AND TEMPORARY / DIVERSION DITCH WITH RIPRAP) I e Ce ce a E / CO / I R PP I TEMPORARY DIVERSION I DITCH (TD#1) (SEE NOTE 2) ' 240 sX ii� DISTURBED AREA = 2.95 ACRES \` \\k C111rtrji :Q SEAL �-,32177 Ntlsl�y`\�` I 1 US Army Corps of Engineers° IIIIIIIII IIIIIIIII CD ..o 0 00 z L60000 ui O� ZU -x <a LLX OOX W W U N N W X WO Ocl,5 OP HX z co U 0X w a mzm z w 0 m Q W LU Z J Z J Y I- I- _ w U a w co W w W�a T_ mWNZ 0�cn1co 4J U w Z U N z W Cn 0 �� o a OU �_-20 W . J a Z J U Z O LL Q � z Z Lu U Z W cn a oa 0(-) Z W-12 , Q oa mm Z J a� 0° z O W 0 U) Of w SHEET ID CG103 SCALE: 1 "=20' FOR OFFICIAL USE ONLY 20' 0 20' 60' 1 "=20' K N NOT FOR CONSTRUCTION FAST -TRACK 1 100% FINAL DESIGN SUBMITTAL 1 2 3 4 FOR OFFICI L USE ONLY 7 8 STORM DRAIN SCHEDULE �v �• \ I � // V 11 1 'CONCRETE DROP \ Upstream Downstream Upstream Structure A / J / S •• � 19 WOOS INLET From To Slope Pipe Length Invert Invert Pipe Rim Minimum Minimum USX SHELTERS (upstream) (downstream) Diameter (From) (To) Material Elevation Depth Cover < USX • -� I o� 6 \ • 2 PROPOSED CONCRETE (Ft/Ft) (In) (Ft) (Ft) (Ft) (F#) (F#) (FT) ° s ° as. l i 2 C-509 RETAINING WALL DI-2 FES-1 0.0250 15 10.00 224.75 224.50 CLASS IV RCP 228.00 3.25 1.81 DO 1 ' • / �- \ G W ° r2 PROPOSED STORMWATER MANAGEMENTS \ DI-6 DI-5 0.0075 15 105.00 230.00 229.21 HP STORM 232.50 2.50 1.06 \" / DI-5 CB-4 0.0156 15 122.00 229.11 227.21 HP STORM 233.50 4.29 2.95s a ` s< / •• 22�' ^ C-502 INFILTRATION BASIN #1 / • I BASIN BOTTOM = 226.50' PROJECT LIMITSTYP CB-4 FES-3 0.0118 15 35.00 226.91 226.50 CLASS IV RCP 229.90 3.69 1.55 / / ( )� ♦ _ c9 A PONDING EL. - �28;001 ., CO-15 CO-14 0.0100 8 22.00 234.00 233.78 PVC 236.25 2.25 1.50 ° ti / • 00 S ° . `V / • STORMWATER MANAGEMENT 10' CO-14 CO-13 0.0100 8 20.00 233.78 233.58 PVC 236.50 2.72 1.97 / P SO \ WIDE (MIN.) MAINTENANCE ACCESS - rL�b \ / E� CO-13 CO-12 0.0100 8 58.00 233.58 233.00 PVC 236.50 2.92 2.17 a ° / \� 1 SOX CO-12 DB-11 0.0100 8 13.00 233.00 232.87 PVC 235.40 2.40 1.65 / MAINTAIN POSITIVE DRAINAGE \ 229.0' DB-11 CB-4 0.0720 12 59.00 231.50 227.25 HP STORM 235.80 2.93 3.13 �° 0`L / TOINFILTRATIONBASIN =218 9 ' 1 s CO-17 CO-16 0.0100 6 32.00 234.00 233.68 PVC 236.50 2.50 1.92 S-1 3 CONCRETE CATCH _ - o cla CO-16 DB-11 0.0100 6 12.00 233.68 233.56 PVC 236.20 2.52 1.94 l - / / C-510 BASIN 232 SOX INV3 IN 03' c� N - FES INV=22 \ N �� CO-29 CO-28 0.0100 8 22.00 234.00 233.78 PVC 238.25 4.25 3.50 1 CONCRETE DROP INLET F CO-28 CO-27 0.0100 8 20.00 233.78 233.58 PVC 236.15 2.37 1.62 C-510 CONCRETE RAMP/STAIRS _ G \ - CO-27 DB-26 0.0100 8 71.00 233.58 232.87 PVC 235.95 2.37 1.62 SEE ARCHITECTURAL DB-26 CO-25 0.0125 8 12.00 232.77 232.62 PVC 235.50 2.63 1.98 - PLANS X r'0 TIE TO EXISTING CO-25 CO-24 0.0125 8 8.00 232.62 232.52 PVC 235.50 2.88 2.13 I / O/�' "' GRADE, TYP G CO-24 DB-21 0.0125 8 28.00 232.52 232.17 PVC 235.50 2.98 2.23 8 PITCHED �/ �N�N ��� /ss �/ N _ INV 226.85' Q EX CB DB-21 DI-5 0.0500 12 33.00 231.84 230.19 HP STORM 235.50 3.33 2.50 C-506- -GUTTER TYP , �.S �� DI �� �'^ X CO-23 CO-22 0.0100 6 33.00 233.50 233.17 PVC 235.80 2.30 1.72� ti� 233.5 cam) 232.3 a : � _ 3 CO-22 DB-21 0.0100 6 16.00 233.17 233.01 PVC 235.50 2.33 1.75 / / /tee / �p,G� x SID 2D31.50 SD ° a ° n ° .� ' T =22 . TIE TO EXISTING SO 234 232 6' 237 4 _ GRADE, TYP X 234.10'���234.10 � �- ° ° .1 " NOTES: _ _ - F . 129 ". '� . � ��.�232.6' �0 °. ,' °231.9 �o ��HP �.� a . ,� 0 I \ 132.2' , ° 232.25'� . � ° � � �° � �230.65' 234.60 2 230.9' 1. SEE STORM DRAIN SCHEDULE THIS SHEET FOR PROPOSED STORM DRAIN PIPE p� / / S XQ SO r# <� 232.03'- 23 '� E AND STRUCTURE INFORMATION AND INVERTS. / Zip'/ 234.08' CO DB 234.60 ,236 i X 233 TIE TO EXISTING 0X CO 24 235 21 C 236.10' ?32.3 . a1 a ' 235234 \ 231.5' 2. COORDINATE DOWNSPOUT LOCATIONS AND ASSOCIATED ROOF DRAIN / / CURB, TYP `��'' %%� �� D °o �° \ 2 236 ° ° 6' a LOCATIONS WITH ARCHITECTURAL PLANS. REFER TO ARCHITECTURAL PLANS _ 3 " ° 233.83'� 1 \ \ �' 234.55' ° 236.15' 232_45' 232.3 235.8 235.8' A. 3' FOR DOWNSPOUT CONNECTION TO 6" ROOF DRAIN PIPE DETAIL. 1 CONCRETE DROP 236.15' 236.57' / C-510 INLET / 23 ° . ° ° 2 6.b . . 7': <' 236 05'v0 3. CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 3:1 UNLESS OTHERWISE NOTED. #o ,a 233.67' B-2 °Lj HP 234.8'�: D 232.57' ;572' .5 :* ,' ..SOX � /I 2 6.25�. x � 4. GRASS DITCH (D#1-D#2) SHALL BE STABILIZED WITHIN 7 DAYS FROM LAST LAND DI D 2 DISTURBING ACTIVITY. 2 2.5 g 35 2 STORM DRAIN PIPE 36° x 236.3' / - 236.45' 236.45' °° D SIZE x 6 PVC WYE, 35.5' 5. HP STORM SHALL BE DUAL WALL POLYPROPYLENE (PP) PIPE BY ADS OR r'�, 235.75;.: : ^ 236 15' CONNECT 6" PVC 236.65' 0 APPROVED EQUAL. ALL HP STORM PIPE JOINTS FITTINGS CONNECTORS ETC. c� C 236.65,236.35 2 6 5 2 SHALL BE WATER TIGHT (WT) PRODUCTS BY ADS OR APPROVED EQUAL. O� Zoo 235.25' - / ROOF DRAIN TO / LOADING DOCK SEE 173� � \-, / PVC STORM DRAIN ARCHITECTURAL 1 (N 6. UNDERCUT LOOSE SOILS TO A DEPTH OF APPROXIMATELY 2-5' BELOW EXISTING ' X-oD �/ 4„ \ 235.34' 235.46' 236.15' / PIPE, SEE NOTE 1 AND STRUCTURAL \ SJ2 GRADE IN THE BUILDING PAD AREA AND EXTEND LATERALLY 5 FEET OUTSIDE _ X-p0 / 023 � 4 / I AND 2 (TYP) PLANS pB s 4:1 THE BUILDING FOOTPRINT IN VICINITY OF BORING B-4 AND B-8. UNDERCUT / 6 P -- c� / D SOILS CAN BE REUSED AS STRUCTURAL FILL PROVIDED COMPACTION AND 0 11 236.65 MATERIAL COMPOSITION SPECIFICATIONS ARE MET. REFER TO GEOTECHNICAL /� G 911 / I 2 24" DRAIN BASIN WITH 236 65 236.55' 6 G 35 C-510 REPORT DATED 10 SEPTEMBER 2019 PREPARED BY BUILDING AND EARTH / SOLID COVER BY 1 SCIENCES INC � r' , / 235.E 235.72 STORM DRAIN \ / 9 10 BACKFILL SOIL MATERIAL AGAINST EXTERIOR OF RETAINING o I WALL, TYP, SEE NOTE 10 END 12"X12" 0)�/ /� (0 _ ` SHEAR KEY N/cy cV / \ BIRCH CD 5 RETAINING WALL C-509 ,PENETRATION M ,./ OX .. I / I ' III I 1jn_ 226.0' I I , N � J N / 1 RIP RAP OUTLET T, C-501 1PROTECTION, TYP ll o \ 21 82 0 I I gF DI 226.5 ��\ I BEGIN 12"X12"t�?30, X E J IN\ 2 228.0' SHEAR KEY, I01;1 J s^ •32' 0 30" F� ? FLARED END I I C-509 SECTION (TYP) INV=2 Q E I • ..:, ", '/ 5 RETAINING WALL S O I- C-509 PENETRATION �c 4 TRASH GUARD aO- - C-509' --PRETREATMENT DEVICE / STORM DRAIN / C-509 PIPE (TYP) C) / U/ I s . LU 2 HP2319, 231 ° x � o o � M \ N N I �01' i FINISHED GRADE BELOW EQUIPMENT M / CONCRETE PADS / \ LO / 0 X l O 1 STORM DRAIN 35 0 o c��, 36 236.1 NYLOPLAST OR 0 2 I 7. UNDERCUT A FAT CLAY LAYER OF SOILS TO A DEPTH OF APPROXIMATELY 7' 1"G cY - C-509 PIPE �u? \ ° l C-509 PIPE P � M APPROVED EQUAL, SEE � \ I � � � BELOW EXISTING GRADE IN THE BUILDING PAD AREA AND EXTEND LATERALLY 5 GRASS DITCH D#2 S 7,i N \ NOTE 8 236.65 Qo � N FEET OUTSIDE THE BUILDING FOOTPRINT IN VICINITY OF BORING B-5. REFER TO (SEE NOTE 4) / ?,, \ \ / � CO INV=2 8.98' GEOTECHNICAL REPORT DATED 10 SEPTEMBER 2019 PREPARED BY BUILDING / G rn I B-5 SEE NOTE 7 8� / N o - o AND EARTH SCIENCES, INC. _ 23 - *91 B-4 \ o I TOP 235.81 I q� (1 \ INV-228.98 RC � STORM DRAIN PIPE SIZE x �, 23 � \ C o o � I 8. DB-11 SHALL HAVE A TRAFFIC RATED H-20 SOLID COVER. 6" PVC WYE, CONNECT 6" + 6" ROOF DRAIN PIPE, '2S�o, PROPOSED 2,' PVC ROOF DRAIN TO PVC / 2O 40 235.93' 236.06' 236.15' SEE NOTE 2 (TYP) COMBAT MEDIC J1 -: a 9. CB-4 SHALL HAVE A V DEPTH SUMP BELOW PIPE INVERT OUT. 5" STORM DRAIN PIPE, SEE / / 3 24�� - C I \ _ TRAINING FACILITY \ \ \ C `�, i� 0 8 �oD S, 10. CLAYEY AND SILTY SAND SC, SM SOILS SHALL BE USED AS EARTHEN FILL TO NOTE 1 AND 2 (TYP) \ 1 JV ( ) o w 42 / I FFE 236.65 \ I �L3 C BACKFILL ALONG THE EXTERIOR OF THE RETAINING WALL (NOT THE INSIDE OF I / o - 236.20 `.X236.65' \ \ o o / o THE INFILTRATION BASIN #1) PER THE GEOTECHNICAL REPORT DATED 10 / „ 4 ' 236.12' \ �/ \ 236.65' s 4. \ 1 O SEPTEMBER 2019 PREPARED BY BUILDING AND EARTH SCIENCES, INC. i 15 P �0 244� _ 236.25. \ \ 6 FOOTING DRAIN PIPE \ 236.55 _J..1 o �' @INV. = 234.82, SEE / \. w :R ND = INV=23�f. -12" CID C \ _ / o r� �� 38 \ \ \ g 7 ARCHITECTURAL PLANS, \ 236.65' C �`' SEE NOTE 6 I ,I 'N WN k\ . • ,R©0 ,7 \ CONNECT TO ROOF DRAIN co y / o �► PROPOSED SURFACE INFILTRATION BASIN #1 `r.:� yy?' 2 RIPRAP RECONFIGURE PHASE 2 ELEVATION AREA STORAGE CUMULATIVE = . S�A1. `" WATER DIRECTION OF u' \ FLOW SYMBOL, TYP 242 236.15' o C-514 RIPRAP SEE SHEET CG103 RIPRAP (FT) (SF) (CU FT) (CU FT) = 32177 -` I / -Z42. - - ------------- - - - ----------_--_ O ' • ( ) � �Q xHP 146- - - -- --- -- -- - ---- M / FROM PHASE 2 CAN BE REUSED C 226.50 1,800.00 0. as 0.00 %yS�.'�:GINE� ��,Q�� \ \ \ ��Q - / 242.5 242i�� M `v PROVIDED NEW FILTER CLOTH IS 227.00 1,840.00 910.00 910.00 %iON S. sE���` /4�� \ QS� 4i - - - �~�� \x ` Cl) INSTALLED AND RIPRAP MEETS 228.00 1,915.00 1,877.50 2,787.50 0itllrr�� 3 STORM DRAIN 240 \ 235.25 p� �oiq 2" 236 I PROJECT REQUIREMENTS AND ANY 229.00 1,965.00 1,940.00 4,727.50 I� \ C-509 CLEAN OUT (TYP.) 24g 8' _ _ / �- 23 237 \ o N SEDIMENT AND DEBRIS IS REMOVED � 8 + 1 / STORMWATER VOLU ME SU MMARY TAB LE N OTES \ \ \ `247 \ 240 239 N \ \ I I i Q / B INFILTRATION BASIN #1 SIZING IS IN COMPLIANCE WITH 95TH PERCENTILE RAINFALL DEPTH DESIGN STORM EVENT (1.8 INCHES) \ \ / 1 / �248 i - ar 242 241 o I N I O PER UFC 3-210-10 SECTION 2-1.2 AND SUBSEQUENTLY EISA SECTION 438 - 4" `00/ �249 244 243 I \ \ \ I I / N m 24 I o / ^ ' "ADJUSTMENT TO THE TOTAL VOLUME PROVIDED TO ACCOUNT FOR THE VOLUME OF WATER WHICH EXFILTRATES OUT THE \ \ / / 1� P� / / 2500� 2 247 6 2_ GRASS DITCH D#1 \ M / \ BOTTOM OF THE INFILTRATION BASIN DURING THE PERIOD OF TIME REQUIRED TO FILL THE INFILTRATION BASIN IS AS FOLLOWS: J 1 P2 249 , 48_ I18 0 cy PP o - 1 25� + (SEE NOTE 4) I \ \ o / �C VOLUME = INFILTRATION RATE (FT/HR)' FILLING TIME (HRS.) * SURFACE AREA OF INFILTRATION BASIN 6 „ LOD USE FILLING TIME = 2 HOURS �S \ / 8 P 5 P j�OD 3 D WI 250'� �l` 0 TO BE CONSERVATIVE ADJUSTED LOWER OBSERVED INFILTRATION RATE OF 16.43 IN/HR FROM THE GEOTECHNICAL REPORT „SOUR \ \ 2„P 1 P / I / SHWT =SEASONAL HIGH WATER TABLE _rS' 15" 1 "P�7/\"I X�240 \ \ _ LIMITS OF 4�11 d ti 2 ti ti / / \ IMPERVIOUS AREA TREATING: 27,990 sf c5` v 'A A A . ►V ' o / -\ \ DISTRUBANCE/PROJECT S. NEWLY - 1�� Q c,, �, Q A n, NEWLY CREATED IMPERVIOUS AREA: 27,500 Sf \\ LIMITS (TYP) �+ o - - o c`' W �' 1.0" WATER QUALITY VOLUME REQUIRED: 2,273 cf i \�. / „ \ ( (0 O0 u1\ S x 1.0" WATER QUALITY VOLUME PROVIDED: 5,188 cf -� / 8 -� \ 1 „TR21P1(1 \ 1 A STORMWATER VOLUME SUMMARY CALCULATIONS INFILTRATION SURFACE DEPTH OF VOLUME '``INFILTRATION VOLUME TOTAL **APPROX. BOTTOM OF TOP OF TOP OF IMPERVIOUS PROVIDED BY SHWT OVERFLOW EMBANKMENT AREA BASIN # AREA PONDING PONDING RATE VOLUME BASIN INFILTRATION ELEVATION INLET PONDING TREATING (SF) (FT) (CF) (IN/HR) (CF) (CF) (FT) (FT) (FT) (FT) (SF) 1 1 1,800 1 1.50 1 2,788 1 8.00 1 2,400 1 5,188 1 222.25 1 226.50 1 228.00 1 229.00 1 27,990 1 GRADING PLAN �10 SCALE: 1"=20' US Army Corps of Engineers® IIIIIIIII IIIIIIIII M o 0 0 CD CD ui �� O0 OX Q uJ m Q� 0� Q LX 00X 2i w W �2i UN <2i �N wX >> U O �� O� Z� 00� �-X 3X w Q co} Z coQo o0 z LU - } U LU w m>- LU w Z Z J Y j~ C) W o I � NZ 0 0 ° U) U)< U w fQ Z_ ° N of Z W 0 LL o ° zQ 00 0 z ( .� 2iO ► J_ Q Z ° Q J LL < Z Q ° Z J I Q a O U Oz 0 Z 0 0 � Q m C� m C) Of 0 ° 0 U) SHEET ID CG106 NOT FOR CONSTRUCTION 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY FAST -TRACK I G F E FBI C 0 1 2 3 4 FOR OFFICIAL USE ONLY 2" WEEP HOLES x #4 BAR _ _ N = L= 6" Y' DOWEL PLAN WITH GRATE & FRAME REMOVED GENERAL NOTES: 1. USE CLASS "B" CONCRETE THROUGHOUT. 2. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. -MONOLITHIC POUR 2" KEYWAY OR #4 3. OPTIONAL CONSTRUCTION BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. 4. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 5. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. 6. CONSTRUCT WITH PIPE CROWNS MATCHING. 7. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. 8. INSTALL 2" WEEP HOLES AS DIRECTED BY THE ENGINEER. 9. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. 10. CHAMFER ALL EXPOSED CORNERS 1 ". 11. DRAWING NOT TO SCALE. BACK OF CURB - r► X mm PLAN `-► X SECTION Y-Y RISER HT. VARIES 6„ ° o WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES 6" p A 7. WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION Y SECTION X-X FRAME SEE nnir+i� COPING (INCIDENTAL) TOP ELEVATION STD. 840.16 FRAME AND GRATE (SEE NOTE) SECTION X-X 7 I 8 I 9 I 10 TRAFFIC LOADS: 4,000 PSI CONCRETE SLAB (REQUIRED FOR DB-11 ONLY, OTHER DRAIN (1, 2) INTEGRATED DUCTILE IRON BASINS SHALL HAVE SOIL MATERIAL FRAME & GRATE TO MATCH BASIN O.D. AROUND GRATE/SOLID COVER) 18" MIN WIDTH o 611 B 6 0 0 c a (3) DEPTH 8" MIN THICKNESS = (SEE STORM DRAIN TABLE) I MINIMUM PIPE BURIAL DEPTH PER PIPE 0 MANUFACTURER (5) ADAPTER RECOMMENDATION ANGLES (MIN. MANUFACTURING VARIABLE 00 - REQ. SAME AS MIN. SUMP) % 3600 MAX. PIPE THIS SIDE - 18" ,",,,-,ACCORDING TOE 0 PLANS SECTION Y-Y j DIMENSIONS AND QUANTITIES FOR DROP INLET (BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT. HT. TOTAL CONC. FOR MIN. HT, H C.M. C.M. 1211 3 -0't 2 -0't 2 -0't 0.222 0.222 0.592 0.015 0.026 15" 3'-0" 2'-0" 2'-3" 0.222 0.222 0.648 0.023 0.036 18" 3'-0" 2'-0" 2'-6" 0.222 0.222 0.703 0.033 0.049 24" 3'-0" 2'-0" 3'-0" 0.222 0.222 0.814 0.059 0.085 30" 3'-0" 2'-0" 3'-6" 0.2227 0.222 0.925 0.092 0.127 CONCRETE DROP INLET 12" TO 30" PIPE NOT TO SCALE o ch� 6" Tp ° E- 4 I o• 6' ° C GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. aura oiu. TOP ELEVATION B 17 T SECTION J-J WHERE 30" TO 36" PIPE IS USED SEE NOTE of B o.' Q 01 Q LL a1 PLAN J STEPS STD. NO. 840.66 Z O U) H >_ Q Q Hp~C�U LLJ�HZ 00U)= W Q Q W S Q U 0 (D H U)HLLOJ 0 cr 0 O CC Z I --I � W 0 --- A E 0 Z c� Vi ° Z Q W 6" G 6" a D 0- 0 0�"t QLO < V cc .' z W F- SECTION M-M C/) W - WHERE 42" TO 54" PIPE IS USED } = N T � Z V r M L PLAN 840.02 CONCRETE CATCH BASIN NOT TO SCALE S� 6 E 6" #4 BARS "V" @ EQUAL SPACES 1 %2 " 3" R co _ R U Q cc m Q w �0 �t w co S S PLAN OF TOP SLAB 6"� E� #8 "W" BARS #4 BARS "V" @ EQUAL SPACES #4 BARS "U" SECTION R-R 6" 1 /2 „ Lu U CL Q c)U) LLm v o 4t w o °� c SECTION S-S #4 BAR N "6- DOWEL (3) SUMP DEPTH (4) VARIOUS TYPES OF INLET & (6" MIN. BASED ON OUTLET ADAPTERS AVAILABLE: 4" - MANUFACTURING REQ.) 18" FOR CORRUGATED HDPE (ADS 4" MIN N-12/HANCOR DUAL WALL THE BACKFILL MATERIAL SHALL BE ADS/HANCOR SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35), PVC CRUSHED STONE OR OTHER DWV (EX: SCH 40), PVC C900/C905, GRANULAR MATERIAL MEETING THE CORRUGATED & RIBBED PVC REQUIREMENTS OF CLASS I, CLASS II, OR CLASS III MATERIAL AS DEFINED IN WATERTIGHT JOINT ASTM D2321. BEDDING & BACKFILL FOR (CORRUGATED HDPE SHOWN) SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. NOTES- 1. PROVIDE STANDARD ROUND GRATE AND SOLID COVER WHERE SHOWN ON GRADING - ---=-f -__-= PLAN. STANDARD ROUND GRATE AND SOLID COVER SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05. GRATE AND SOLID COVER SIZE TO BE THE SAME AS THE DRAIN BASIN DIAMETER. ONLY DB-11 IS REQUIRED TO BE TRAFFIC RATED H-20. 2. FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05. 3. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS. 4. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL), HP STORM, & PVC SEWER. 5. ADAPTERS CAN BE MOUNTED ON ANY ANGLE 00 TO 3600. TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-012. 2 NYLOPLAST 24" DRAIN BASIN DETAIL C-510 NOT TO SCALE I-_ 6'- 0 " PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP 6„ USE ON FLAT ELEV. EXPANSION JOINT GRADES 2% AND UNDER 3' 0"I 13, O , DEPRESSED GUTTER LINE EXPANSION JOINT IMI 0, Ivl ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT 6 8 TOP USE ON GRADES OVER 2% ELEV. DEPRESSED GUTTER LINE 10" 6'-0" EXPANSION JOINT 1 O I I MAX. Ij 111 ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER) DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU.YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS- U N0. LENGTH BARS-V N0. LENGTH BARS-W N0. LENGTH TOTAL LBS. TOP SLAB BOTTOM SLAB TOT.CONC. FOA MINIMUM A0.772 D A B C G H E F 12" 3'-0" 2'-2" 2'-9" 0.235 0.015 0.026 15" 3'-0" 2'-2" 3'-0" 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" 0.235 1.001 0.059 0.085 30" 3'-0" 2'-2" 3'-4" 4'-3" 1'-2" 4'-0" 4 1'-5" 2 3'-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 36" 3'-0" 2'-2" 3'-10" 4'-9" 1'-8" 4'-0" 4 1'-11" 3 3'-9" 3 3'-9" 43 0.161 0.358 1.714 0.132 0.178 42" 3'-0" 2'-2" 4'-5" 5'-3" 1'-5" 3' 2" 4 1'-8" 2 2'-11" 3 2'-11" 32 0.112 0.318 1.738 0.180 0.243 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-2" 4 2'-3" 3 2'-11" 3 1 2'-11" 35 1 0.145 0.352 2.052 0.235 10.317 54" 3' -0" 2'-2" 5'-7" 6'-3" 2'-7" 3'- 2 1 4 2'-10" 5 2'-11" 3 12'-11"1 41 10.180 0.386 2.387 0.297 10.401 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT NOTES: 1. INSTALL (2) 2" WEEP HOLES AT BOTTOM OF CATCH BASIN (CB-4) AND INSTALL STONE DRAINS OF A MIN. 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP AT EACH WEEP HOLE. 2. DURING CONSTRUCTION, PROTECT FUNCTION OF WEEP HOLES AND STONE FROM SEDIMENT BY TEMPORARILY INSTALLING PLASTIC LINER PRODUCT INSIDE CATCH BASIN (CB-4). Z O � Q Q H_q 0 LLJOH 00U) W Q Q W 2 Q U O H H 2 ~ Z W cA H - _j cr 0 0 (f) z H � dH 1 Lu i 0 0 Z LL H C'3 Vi H COW Q H cr _ o�aLO V D z °C Q W c~n ~ W ; >. W N T Z 0 0 a v O 840.02 �01�r►�i//��� 10 •4 SS p a� �ti•9' SEAL r - 32177 9A► ( S' 1 S�5` ll�� ao►a US Army Corps of Engineers® IIIIIIIII IIIIIIIII rco CD No..Lz - Hw 00000 Oo Zo OX �m �� �0- U- Q �X OOX � UJ Cr0_ Z_ >> LnO _� O� OUP �X UX Lu Q m }zm m<0 z w o �m o w � U- w w >- w co P w Z J Z W Y J~ _ O w U Q � �nuj<2iuj mujw�n N V d 4J U) _ 0-1 f6 Z U Vf O Z_ LL U7 J LLo� U) OU O z 0� .;4 zz Ot pt Q U) rm Z • H Q Z U LL J O z Q Q U Z_ = Q W 0 O U W z o _j U 2 < J > mm U �o O U LL O U7 SHEET ID C-510 NOT FOR FOR CONSTRUCTION 100% FINAL DESIGN SUBMITTAL FOR OFFICIAL USE ONLY FAST -TRACK 1