Loading...
HomeMy WebLinkAboutWQ0041136_More Information (Requested)_20191120ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director CHRIS CERVINI - PRESIDENT CERVINI FARMS, INC. POST OFFICE BOX 32660 DETROIT, MICHIGAN 48232 Dear Mr. Cervini: NORTH CAROLINA Environmental Quality November 20, 2019 Subject: Application No. WQ0041136 Additional Information Request Cervini Farms WWTP Reclaimed Water System Henderson County Division of Water Resources' Central and Regional staff has reviewed the application package received August 22, 2019. However, additional information is required before the review may be completed. Please address the items on the attached pages no later than the close of business on December 20, 2019. Please be aware that you are responsible for meeting all requirements set forth in North Carolina rules and regulations. Any oversights that occurred in the review of the subject application package are still the Applicant's responsibility. In addition, any omissions made in responding to the outstanding items, or failure to provide the additional information on or before the above requested date may result in your application being returned as incomplete. Please reference the subject application number when providing the requested information. All revised and/or additional documentation shall be signed, sealed and dated (where needed), with two paper copies and one electronic copy. If you have any questions regarding this request, please do not hesitate to contact me at (919) 707- 3660 or tessa.monday@ncdenr.gov. Thank you for your cooperation. Sincerely, %wv -t A," Tessa Monday, Environmental Engineer Division of Water Resources cc: Asheville Regional Office, Water Quality Regional Operations Section (Electronic Copy) Mark Brooks, PE — Brooks Engineering (Electronic Copy) Permit Application File WQ0041136 D EQ �� North Carolina Department of Environmental Quality Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA DepadmamofEnmran—WQuality /� 919.707.9000 Mr. Chris Cervini November 20, 2019 Page 2 of 3 A. Application: 1. The application forms have the applicant as Cervini Farms, Inc. but the corporation registered is Cervini Farms North Carolina, Inc. Clarify. 2. The property of the proposed facility is owned by Cervini Farm (1993) Inc. Provide documentation verifying that the applicant owns or has rights to the property. 3. For the generation application, Section VII needs to correlate with what is shown on the plans and calculations. The table lists anoxic basins and post flow equalization tank that are not identified on the plans. A grinder pump is referenced in the calculations but not shown elsewhere. Provide clarification so that all units are in the application form, engineering plans, and calculations. 4. On Sheet N-4.3 show the floodplain. 5. Per 15A NCAC 02U .0402(n), a minimum of 30 days of residual storage is required. Address. 6. Address overflow prevention in the proposed greenhouse irrigation setup. 7. Address if a sediment and erosion control permit is required. If so, provide the status. 8. Per 15A NCAC 02U .0801(a), an operational and maintenance plan is required. A draft plan can be submitted with final submitted prior to operation. 9. The engineering plans shall represent a completed design and not be labeled with preliminary phrases that indicate they are not anything other than final specifications. However, the plans may be labeled with the phrase "Final design — not released for construction". 10. For the generation application, Section VIII. Design Information for Earthen Storage Impoundments needs to be completed for the 5-day upset pond. 11. For the generation application, the septic tanks and equalization tank need to be listed in Section VII. Design Information (table a). 12. Address if the calcite filter pod meets the duality requirement per 15A NCAC 02U .0402(c). 13. The effluent sampling and turbidity readings needs to occur prior to mixing with recycle wastewater. B. Calculations (15A NCAC 02U .0401 & .0402): 1. The pollutant loading calculations must include all parameters required for Type 2 reclaimed water per 15A NCAC 02U .030I(a). 2. Clarify the water balance to demonstrate that all wastewater effluent generated can be utilized and that the irrigation tank is sufficiently sized to hold enough wastewater (per the allowable irrigation rate). 3. Provide calculations verifying the backup generator is sufficient to power the proposed treatment and disposal system. Mr. Chris Cervini November 20, 2019 Page 3 of 3 C. 5-Day Upset Pond 1. Address if the bottom of the structure will intersect the seasonal high water table. If so, the applicant must provide a plan to prevent the synthetic liner from floating. 2. Installation of the liner and pond construction should be addressed in the specifications. 3. Address how the pond will handle flood events. Will flooding affect the stability of the embankment?