Loading...
HomeMy WebLinkAboutSW3191104_Supp EZ Form - SIGNED_11/19/2019SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION Project Name The Learning Experience Waxhaw Project Area (ac) 1.54 4 1 Surface Water Area ac N/A 5 Its this pr9ject High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Sean Coldren, PE / Civil Project Manager 28 Organization: CES Group Engineers, LLP 29 Street address: 274 N. Hwy 16, Suite 300 30 City, State_Zip: Denver, N_C_28037 31 — Phone numbers : 704.489,1500 32 Email: scoldren@ces-group.net Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CAROSEAL ti 041342 r � � '� ,� •••GINS Q- Signature of Designer to 2III Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Sand Filter 5 Total BUA in project (sq ft 37439 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft) N/A 7permitting) New BUA outside of subdivided lots (subject to s JOffsite - total area (sq ft 37439 sf 8 sf 9 Offsite BUA (sq ft sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 15700 sf Sidewalk (sq ft 824 sf Roof (sq ft 10584 sf Roadway (sq ft) sf Future (sq ft Other, please specify in the comment box below (sq ft 10331 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft N/A 12 New infiltrating permeable pavement outside of Isubdivided lots (sq ft N/A 13permitting) Exisitng BUA that will remain (not subject to s ft N/A 14 Existing BUA that is already permitted (sq ft N/A 15 Existing BUA that will be removed (sq ft N/A 16 Percent BUA 85% 17 Design storm inches 1 in 18 1 Design volume of SCM cu ft 2243 cf 19 lCalculation method for design volume Runoff Treatment DDITIONA NFORMATION 11111111F- 20 Please use this space to provide any additional information about the drainage area(s): Synthetic Turf playground area BUA area is 10,331 sf. Design volume is 75% of water quality volume since we are using a sand filter. SAND FILTER 23 Volume that can be retained in the sediment chamber (cubic feet) 1134 cf 24 Will there be a permanent pool in the sediment chamber? Yes 25 Bottom of the sediment chamber (fmsl) 651.00 26 Area of the sediment chamber (square feet) 315 sf 27 Physical depth of the sediment chamber (inches) 72 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) 43 in 29 Elevation of top of weir between chambers (fmsl) 652.5 Sand Filter 1 2:34 PM 10/23/2019