Loading...
HomeMy WebLinkAboutNC0036641_SOC (amendment)_20191113 WGLA Engineering, PLLC WGLA 724 5th Avenue West Hendersonville, NC 28739 E i1CCriilg (828) 687-7177 wgla.com November 13, 2019 Mr.John Hennessy NCDEQ—Division of Water Resources RECEIVED 1617 Mail Service Center Raleigh, NC 27699-1617 NOV 1 8 2019 Re: Fletcher Academy SOC Extension Request NCDEQIDWRINPDES WGLA# 17100 Dear Mr. Hennessy: We appreciate the Division's assistance with the Mud Creek Sewer Extension project. As you may know this project will extend public sewer to Fletcher Academy and will allow for abandonment of their wastewater treatment facility (Fletcher Academy WWTP NC0036641). Fletcher Academy has been operating their wastewater treatment facility under a Special Order by Consent (EMC WQ 517- 006) until such time as they can connect to the new sewer extension. Cane Creek Water and Sewer District/Henderson County is under contract with Buchanan and Sons to complete the construction of the Mud Creek Sewer Extension. The contract was executed in 2018, and the Contractor has been working on the project for since late 2018. There were some delays in the contractor's ability to begin work in certain areas due to acquisition of easements and the issuance of the required 404/401 permits for the project. The Corps would not issue the final permit until all easements were in hand. The contract, which included extensions in addition to the sewer line to Fletcher Academy, required that the construction be completed in early December 2019. Several unforeseen conditions have delayed this completion date. As you know, much of the sewer line route is located in the flood fringe areas associated with Mud Creek. This area was inundated due to heavy rains and was flooded for several weeks. The Contractor was able to move the construction operation further along the route and out of the area that was inundated, but this certainly caused a delay. In addition to delays related to weather, the Contractor has encountered significant rock along the route that has to be excavated. This has impacted a roadway bore at North Rugby Road and two separate sections of the sewer line construction. I have attached correspondence from the Contractor outlining the items above and the associated delay timelines. I have also attached their current schedule which projects a completion date of the lineFletcher Academyof March 30, 2020. Asyou know this project has other components sewer to etp beyond the sewer line to Fletcher Academy. Cane Creek has directed the Contractor to focus all efforts on completing the sewer line to Fletcher Academy. All other sections of the project will be delayed until the sewer line to Fletcher Academy has been completed and can be put into service. CIVIL ENGINEERS & LAND PLANNERS Mr.John Hennessy November 13, 2019 Page 2 Based on our review of the delay requests with Cane Creek, we believe these are reasonable requests. The Contractor is on site working toward the completion of the project. They have committed to provide additional resources to try and complete the projects as quickly as possible. Along with this letter and the documentation referenced earlier, please find attached an executed copy of the application for an amendment to a special order by consent and a check from Fletcher Academy for the review fee. If you have any questions or need additional information, don't hesitate to contact our office. Sincerely, WGLA Engineering, PLLC William R. Buie, P.E. CC: Mr. Charles Weaver, NCDEQ Mr. Tim Heim, P.E.; NCDEQ Mr. Marcus Jones, P.E.; Henderson County Mr. Gary Carlson, Fletcher Academy 724 5th Avenue West,Hendersonville,NC 28739 Phone(828)687-7177 wgla.com STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES APPLICATION FOR AN AMENDMENT TO A SPECIAL ORDER BY CONSENT I. GENERAL INFORMATION: 1. Applicant(corporation, individual, or other): Fletcher Academy,Inc. 2. Owner Phone: 828-209-6701 (or) 828-209-6800 3. Owner Email: _GCarlson@FletcherAcademv.com 4. Facility Name (must be the same as name on the original SOC): Fletcher Academy WWTP 5. Original SOC No. /Issuance Date: EMC WQ S17-006 6. NPDES Permit No. (if applicable): NC0036641 5. Application Date: 4/17/17 II. SOC COMPLIANCE HISTORY: Please attach a listing of all violations of the existing SOC. Include any violation of interim dates,relaxed permit parameters, and existing permit limits. III. ADDITIONAL FLOW OR REALLOCATION OF EXISTING FLOW: Only facilities owned by a unit of government may request to add additional flow to the treatment system as part of this SOC Amendment in accordance with NCGS 143-215.67(b). Additional flow may be allowed under an SOC amendment only in specific circumstances. These circumstances may include eliminating discharges that are not compliant with an NPDES or Non-discharge permit as specified in the original SOC. These circumstances do not include failure to perform proper maintenance on treatment systems, collection systems or disposal systems. When requesting additional flow, the facility must include its justification and supporting documentation. If the requested additional flow is non-domestic, the facility must be able to demonstrate the ability to effectively treat the waste and dispose of residuals. The applicant must provide a detailed analysis of all constituents in the proposed non-domestic wastewater. NPDES SOC Amendment Application The total domestic additional flow requested: 0 gallons per day. The total non-domestic additional flow requested: 0 gallons per day. The total additional flow(sum of the above): 0 gallons per day. If a reallocation of existing additional flow is needed the facility must provide justification as to why this reallocation is needed. Any additional flow that may be allowed will be determined by an analysis of projected adverse impacts on the wastewater treatment facility and/or surface waters. IV. WHY AN SOC AMENDMENT IS NEEDED: Please provide a detailed explanation as to why the SOC amendment is being requested. Include actions already taken to avoid noncompliance with the existing SOC. Also provide details on activities that were delayed. THE DIVISION WILL NOT ACCEPT THIS APPLICATION PACKAGE UNLESS ALL OF THE APPLICABLE ITEMS ARE INCLUDED WITH THE SUBMITTAL. Required Items: a. The original, completed and appropriately executed application form, along with all required attachments. • If the SOC Amendment is for a City / Town, the person signing the SOC must be a ranking elected official or other duly authorized employee. • If the SOC Amendment is for a Corporation / Company / Industry / Other, the person signing the SOC must be a principal executive officer of at least the level of vice-president, or his duly authorized representative. • If the SOC Amendment is for a School District, the person signing the SOC must be the Superintendent of Schools or other duly authorized employee. Note: Reference to signatory requirements in SOCs may be found in the North Carolina Administrative Code [T15A NCAC 2H.1206(a)(3)]. b. The non-refundable Special Order by Consent (SOC) processing fee of$400.00. A check must be made payable to NC DEQ. 2 of 3 . NPDES SOC Amendment Application APPLICANT'S CERTIFICATION: (NO MODIFICATION TO THIS CERTIFICATION IS ACCEPTABLE) I, Cq C4-r)lj 1) n , attest this application for a Special Order by Consent (SOCU amendment has been reviewed by me and is accurate and complete to the best of my knowledge. I understand if all required parts of this application are not completed and if all required supporting information and attachments are not included, this application package may be returned as incomplete. (Please be advised that the return of this application does not prevent the Division from collecting all outstanding penalties upon request). Furthermore, I attest by my signature that I fully understand that an upfront penalty, which may satisfy as a full settlement for past violations, may be imposed. {Note: Reference to upfront penalties in Special Orders by Consent may be found in the North Carolina Administrative Code [T15A NCAC 2H.1206(c)(3)].} //,4 _ Date ll ' 13 fo I i ature o Signing Official Ga Coc\ oj Printed Nhrhe of Signing Official THE COMPLETED AMENDMENT APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NC DEQ/DWR/NPDES 1617 MAIL SERVICE CENTER RALEIGH,NC 27699-1617 3 of CON UCTION cl '� ,01, 41111A116k /11%ft., YEARS 2018 W W W.BSI-CONSTRUCTION.COM April 8,2019 William R.Buie,PE Project Manager/Principal WGLA Engineering,PLLC 724 5th Avenue West Hendersonville,NC 28739 RE: Mud Creek Interceptor Project—Request for Time Extension Dear Mr, Buie, As you are aware,this winter has been extremely wet.Due to inclement weather,saturated conditions and delays in approval of 401 and 404 permits,we have faced numerous obstacles in making progress on this project. These issues have resulted in an overall delay of 92 days. Therefore,BSI is requesting a time extension of 92 days to the Contract. This would result in a new Completion Date of January 01,2020 for Lines A and C;and June 1,2020 for the remaining work. Please let me know if you have any questions,or need to discuss this request in greater detail. Sincerely, Buchanan and Sons,Inc. ho),1,64.4 Thomas R.Edge Estimator/Project Manager Buchanan an Sons Inc I Bs" 1 CON -UCTI❑N „„,„,,iii„,5 YEARS 1llill 2019 WW W.BSI-CONSTRUCTION.COM November 01,2019 William R.Buie, PE Project Manager/Principal WGLA Engineering,PLLC 724 5th Avenue West Hendersonville,NC 28739 RE: Mud Creek Interceptor Project—Request for Time Extension#2 Dear Mr.Buie, Please accept the following correspondence as a request for additional time for the Mud Creek Interceptor project. As you are aware,competent rock has been encountered at the beginning of the project. The rock was initially encountered as BSI mobilized a second crew to construct a roadway from station 10+00 to 16+00 to help reduce the excavation depths for the sewer line installation. The proposed rock excavation was approved during our 10/17/2019 meeting by Marcus Jones and the work was scheduled accordingly. Currently,the drilling subcontractor is on-site and performing the required work. I am including our updated schedule with this correspondence. As you will see,the rock that has been encountered will affect project completion. In order to alleviate the impacts of this delay we have moved the sewer line installation crew to start sewer installation at station 20+68,which correlates with manhole#4. McAbee&Associates assisted with elevation control to ensure that grade accuracy is maintained since the line is being placed at minimum grade. Based on the current schedule,the encountered rock has caused a delay of 10 days. BSI,respectfully requests that this time be added to the contract time. Please let me know if you have any questions,or need to discuss this request in greater detail. Sincerely, Digitally signed Christopher by Christopher suchangry yr Buchanan Date: ®2019.11.01 14:35:44-04'00' Christopher Buchanan Vice-President Buchanan and Sons Inc Buchanan and Sons Inc 1 WGLA WGLA Engineering, PLLC Field Observation Report 724 5th Avenue West-Hendersonville, NC 28739 Engineering #7 (828)687-7177-wgta.com Project Mud Creek Interceptor <40 40-49 50-59 60+ WGLA# 17100 Engineer WRB Temp x Date 3/18/2019 3/20/2019 Sunny Cloudy Rain Mist Time gam 5pm Weather x Employee(s) Stephen Watts Other(explain) Met With Mark Buchanan (BSI) Surface Dry Wet Other(explain) Conditions x CONTRACTOR Yes No Specify Companies Working WORKING? x Buchanan and Sons WORK BEING Erosion Ctl Grading Drainage Water Sewer ABC Sidewalk Curbs Paving PERFORMED x MISC Rain Gauge Plans on site Logs Permit Posted Other Contractors On Site Comments Buchanan and Sons have continued working on the Mud Creek Sewer Interceptor. (3/18/19)The installation of the 12"sewer line has continued up to station 32+00.#57 stone is being used during pipe installation. (3/20/19) Rock has been encountered at manhole#44. Test pits have determined the rock rapidly extends up to 6.5+/ feet deep in the trench location. Buchanan and Sons is planning on blasting this area to help remove the rock. The creek crossing was temporarily repaired after clearing was completed. Clearing has started on the other side of 1-26. s ' " , j-e,7-'''' fir -- a�-- f ' . �.. t t �„ riW `Y ?;:. 's. wag „i � . .: .t, r ,Jy .. '.'' 4, -,t: '-'x ,^! 3'_ �§..' „rim. "'f' s-- a WGT L A WGLA Engineering, PLLC Field Observation Report 724 5th Avenue West-Hendersonville, NC 28739 Engineering #23 (828) 687-7177-wgta.com Project Mud Creek Extension <40 40-49 50-59 60+ WGLA# 17100 Engineer WRB Temp x Date 9/17/2019 9/19/2019 EN Cloud Rain Mist Time 1pm 9am Weather x Employee(s) Stephen Watts, Ryan London Other(explain) Met With Tom Edge(Buchanan &Sons) Surface D Wet Other explain Conditions x CONTRACTOR Yes No S•ecif Com•anies Workin• WORKING? x Buchanan and Sons WORK BEING Erosion Ctl Gradin. Draina•e Water Sewer ABC Sidewalk Curbs Pavin. PERFORMED x MISC Rain Gauge Plans on site Logs Permit Posted Other Contractors On Site Comments Work on the Mud Creek Sewer extension has continued. Buchanan &Sons have started removing excess soil in the sewer line right of way so that the sewer line installation depth is not to deep helping the installation go faster. During th- soil removal a large amount of rock was uncovered. It seems explosives will be needed to remove the rock in the areas of manhole#1 through to manhole#2. I have asked Buchanan&Sons to keep a good drill log to help track the depth of the rock. , pry ,. • 1.` . -r8:cc� 4` f 7 y � �' 4¢ 0 rP rpd4 ,. a , _ I .,,••;.'t -,;--.- ;.:-: ''-7 °,.• : 7