Loading...
HomeMy WebLinkAbout19930501 Ver 2_Staff Comments_2009091793-0510v2 Macon County Airport Expansion AML Comments September 17, 2009 Per the requirements of GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http:,'/h2o.enr.state.nc.uslncwetiands/documents/SMPRequirenientsforAI)plicants otherthanNCDOT pdf. Please provide an SMP that removes a minimum of 85 percent TSS from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http:/'/h2o.enr.state.nc.us/stI./bmp forrns.htm.