HomeMy WebLinkAbout19930501 Ver 2_Staff Comments_2009091793-0510v2 Macon County Airport Expansion
AML Comments
September 17, 2009
Per the requirements of GC 3705, this project must comply with Stormwater
Management Plan (SMP) Requirements for Applicants Other Than the North
Carolina Department of Transportation, available at:
http:,'/h2o.enr.state.nc.uslncwetiands/documents/SMPRequirenientsforAI)plicants
otherthanNCDOT pdf. Please provide an SMP that removes a minimum of 85
percent TSS from the stormwater generated by this project. For each proposed
BMP, please provide a completed BMP Supplement Form, with all the required
items. The BMP Supplement Forms are available at the following web site:
http:/'/h2o.enr.state.nc.us/stI./bmp forrns.htm.