Loading...
HomeMy WebLinkAboutNCG140116_COMPLETE FILE - HISTORICAL_20110119STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE CAI HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE YYYYMMDD City of Winston-Salem Stormwater Division Surface Water Inspection for Industrial Sites A. Official Company Name: Ready Mixed Concrete Plant # 71 B. Physical Address: 1590 Williamson Street, Winston-Salem, NC 27107 C. Telephone Number: 336-785-7575 Ext: 212 D. Mailing Address, If different from above address: P.O. Box 12397, Winston-Salem, NC 27117 E. Primary contact who is authorized to represent company in environmental regulatory issues: a. Name: Danny Rathbone b.Title: Division Manager c: jContact Number(s): 336-785-7575 Fxt: 212 Cell: 336-345-8304A : P� -0 r H. Fax: f336.785_7571 sl.�� .}t 11 J_ d . Email: danny.rat.hbone@rmcc com— F "SIC Code,number of business: 3273 G-NC Stormwater NPi7ES Permit Number. NCG0140116 �)p F ra ;;Faality;�fype: Ready -Mixed Concrete:Corimpany: - n.. a H.j;Any other control.authority Permit(s) (air quality control, wastewater, hazardous waste)& --numberii)'No e ' F * [ I.P. I BriefYdescnption of industrial activities that.occur on -site: Ready Mixed Concrete Company is a "".ready mix concrete:batching plant. Which is a type of concrete that is manufactured in a batchi plant; according to a set recipe, and then delivered to a work site, by truck mounted transit -mixers . This results in a precise mixture, allowing specialty concrete mixtures to be developed and implemented on construction sites. J. Receiving Water(s) / MS4: Salem Creek Watershed and The City of Winston-Salem MS4 Pa1t,i St6CCnW1t r;COClt1'OIS 1. Best management Practices A. List the non-structural and structural controls employed by the facility: 1.A sediment basin is used to collect water from the truck washing and pavement wash off area. 2. A berm north of the loading unloading area is used to divert wash out water to the sediment basin. 3. A berm on the west side of the site is used to divert water to a second sediment pond. 4. Dust collection system is in uses during loading and unloading of vehicles. B. Are the BM Ps reasonable & appropriate for the facility: xxxx Yes No C. Are BMPs installed correctly, maintained, and effective operation condition: xxxx Yes No 2. Provide a brief description of other controls that manage/prevent/minimize stormwater runoff (e. g., erosion and sediment controls, inlet protection/control at storm drains, diversion structures): 1. Hand held brooms and devices are used to sweep dry sand, aggregate and cement off the mixer trucks, and then moved into waste piles which is placed into bin for disposal/rouse. Use of drip pans, absorbents, and observation to insure spills are managed. Paft-I'-M iscellaneous 1. Any evidence of discharge to receiving waters/MS4? (e.g., stormwater runoff, dry weather discharge, co -mingling of process wastewater): Yes xx No i. Ready Mix uses a multi part closed recirculation system for their used water. 2. Does the stormwater outfalls on -site correspond with those listed on the site map and in SWPPP? xxx Yes No N/A4 4 _ � 7Yf. •.! ., t � � ' 1 f ii '� 'fie .:"d -}.:.• t � � s. -� � y .,:.i 11''f i. There are 4 outfalls # 1; 2, and;3.are no K;incontact withi plant operation Outfail I'}J_A4'rY' %: # 4 is the only outfall that has contact to the operations aspect,of:piant . operation.� ' r ALI sr- PartJ3 SWPPP Revie►ni (carp be'(ompleted'ln offlcej General-=,- 1) Is there a°S1IVPPP?�'r Yes No 2) Does SWPPP identify a specific position(s) for responsible party purposes (e.g. overall coordination, development, implementation & revision) Yes I No 3) Does SWPPP designate facility personnel responsible for implementing SRP? I s No 4 Does SWPPP include a certification statement? Y No Only the plant 5) Are employee training records regarding stormwater pollution manager has prevention topics included in SWPPP? Yes No been trained. Comments: Ensure that the rest of the plant personal are trained and up to date on the SWPPP. Site Map NOTES 1 Is there a site map? Yes No 2 Drainage atternsloutfalls Yes No 3) Identification of potential pollutants likely to be discharged from each drainage area? Yes No 4 Narrative description and locations of check if present): 1. Storage practices XX 2. Unload in /Load ing activities XX 3. Outdoor processes XX 4. Particulate generating/control processes XX 5. Waste Disposal XX 5 Name of receiving waters or MS4's listed? gYes No 6) Locations of significant materials exposed to stormwater? _�*_ ; - , Yes No Moil 7) Locations Aj and,cIescri tions of maors ills occurring _within theN _ previous 3 ear's V corrective action, p 9 s`to~ "Vent futLrrre spills)" max.._ � � �n Yes ,'No... � 1- �•�- . Y �1 T Storm water_Contr(5ls' NOTES 1) Does the'SWPP.P describe"the non-structural controls that willAbe used.toPpreventlreduce discharge of pollutants in stormwater. runoff? ,Yes No 2) Does the SWPPP describe the structural controls that will be used to prevent/reduce discharge of pollutants in stormwater runoff? Yes No 3) Does the SWPPP describe other controls that will be used to prevent/reduce off -site tracking or blowing of sediment, dust, and raw, final, or waste products, or other solid materials and floating debris? Yes No 4) Does the SWPPP incorporate the 8 baseline controls (good housekeeping, BMP summary, feasibility study, PM, SRP procedures, facility inspections, and comprehensive site evaluations, employee training, seconds containment, and sediment control? Ytes No 5) Does the SWPPP describe the pollutant or activity to be controlled by BMPs and assessed the need of implementation through data collected? Y s No 6) Does the SWPPP describe the pollutant or activity to be controlled by BMPs and assessed the need of implementation through data collected? YeE s No Non-stormwater Discharges NOTES 1) Certification that the facility has been tested for non- stormwater dischar es from the site? Y s No 2) Description of testing method, drainage points, observed results, date, and signature? Yes No Monitoring P. 1) Are samples collected within 30 minutes of measurable wea her events occurring 72 hours after , , 41 ; s No �t.�► previous measurable weather event? t :'r r L� 0 s'.{ k3'7,'skP,. y Were sam les,,collected and reservedaccordancew`ith''40'CFR-1�36? p; C G Ls2 ; :j Y s � ...._..'-r-- 3 Was ro enchain-of=cu=-,stod procedures followed? Yes----=i No %,r r : t0 lit" +, 4) Was analyti al a d c balitative monitoring complete? i �` Yes No 5} Any exceeden�ces of:allutant parameters in regards to benchmark values? Yes No Paint 4 - Required Actionsuto°becompketediby Faecilttyy 1. Update SWPPP to reflect permit requirements (i.e. feasibility studies, training records). 2. Conduct Training and document training. 3. Conduct a Feasibility Study for sheet flow out of the yard area. 4. Fix erosion in outfall # 2 S. Clean up scrap area insuring that items do not come into contact with rain water. 6. Remove grease drum from contact with rain water. 7. Ensure all of the spill kits are replenished and placement is annotated in the spill response. 8. Replace dumpster that has no lids and no drain plug. 9. Remove hose that leads to stream. 10. Install sign or establish an SDP that nothing but scrap metal is placed into the Scrap Metal dumpster. 11. Conduct Sampling to ensure that you remain in compliance with your permit. The City of Winston-Salem Stormwater Division is requiring that Items # 1-10 be completed on or before March 30, 2011 and Item # 11 after the next rain event. Ready Mix Concrete Company shall keep the Stormwater Division updated on milestones and activities completed in its progression to comply with these required actions. The Stormwater Division may conduct follow-up inspections in orderto ensure completion of mandated activities. Educational Resources: 1. NC Stormwater Manual for Industrial Users: a. http://h2o.enr.state.nc.us/su/storm water.htmI. b, .http://portal.rLcdenr.org/web/wq/ws/su/bmp-manual Company Representatives) that participated in inspection name and title(s): Danny Rathbone.,Division� Manager r tk a Startof nspection 10':00 am F It '1 � -ter t Completion ope f Insc#ion:-11:15am . C." Date of inspecctio6t'01/19/2011 Signature of Stormwater Inspector and title: �� William D. Baugher, Stormwater Inspector . � \ \� _ � �• � � � z y d � -� . j out! y`? , Was / \ f: Permit: NCG140116 SOC: County: Forsyth Region: Winston-Salem Compliance Inspection Report Effective: 08/01/09 Expiration: 06/30/11 Owner: Ready Mixed Concrete Effective: Expiration: Facility: Ready Mixed Concrete Co - Winston Salem 1590 Williams St Contact Person: Kenneth Combs Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Regional Manager Certification: Winston Salem NC 27107 Phone: 336-785-7575 Phone: Inspection Date: 01/1912011 Ent Time: 10:00 AM Exit Time: 11:15 AM Primary Inspector: Ron Boone Phone: / 704-663-1699 y r 2r Ext.2202 Secondary Inspector(s): I Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete StormwaterlWastewater Discharge COC Facility Status: ® Compliant fl Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG140116 Owner - Facility: Ready Mixed Concrete Inspection Date: 01/19/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection actually conducted by Winston Salem Stormwater Division inspector Bill Baugher. Please refer to his attached report. Page: 2 l Ll Permit: NCG140116 owner - Facility: Ready Mixed Concrete Inspection Date: 01/19/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M n n Cl # Does the Plan include a General Location (USGS) map? n n n # Does the Plan include a "Narrative Description of Practices"? ® n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ®n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n n n # Has the facility evaluated feasible alternatives to current practices? ®n n n # Does the facility provide all necessary secondary containment? n n n # Does the Plan include a BMP summary? ® n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® n n n # Does the facility provide and document Employee Training? ® n n n # Does the Plan include a list of Responsible Party(s)? m n n n # is the Plan reviewed and updated annually? ® n n n # Does the Plan include a Stormwater Facility Inspection Program? ® n n n Has the Stormwater Pollution Prevention Plan been implemented? ® n n n Comment: Please refer to the attached inspection summary report from Winston Salem Stormwater Division, Bill Baugher. lualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Il n n Comment: Please refer to the attached inspection summary report from Winston Salem Stormwater Division, Bill Baugher. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ® [)0 n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ® n n n Comment: Please refer to the attached inspection summary report from Winston Salem Stormwater Division, Bill Baugher. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? n n n ER # Were all outfalls observed during the inspection? ® n n n # If the facility has representative outfall status, is it properly documented by the Division? n n ® n # Has the facility evaluated all illicit (non stormwater) discharges? m n n n Page: 3 M Permit: NCG140116 Owner -Facility: Ready Mixed Concrete Inspection Date: 01/19/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Please refer to the attached inspection summary report from Winston Salem Stormwater Division, Bill Baugher. Page:4