Loading...
HomeMy WebLinkAboutNCG140100_COMPLETE FILE - HISTORICAL_20170630STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V C& Hoo a DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ � 0 )I O � 3L) YYYYMMDD Compliance Inspection Report Permit: NCG140100 Effective: 07/01/16 Expiration: 06/30/17 Owner: Chandler Concrete Co., Inc. SOC: Effective: Expiration: Facility: Chandler Concrete Co., Inc. County: Watauga 3612 Blowing Rock Rd Region: Winston-Salem Boone NC 28647 Contact Person: Roger Church Title: Phone: 336-226-1181. Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s). On -Site Representative(s): Related Permits: Inspection Date: 0811012016 Primary Inspector: Paul Williams Secondary Inspector(s): Entry Time: 10:37AM Certification: Exit Time: 1 t:08AM Reason for Inspection: Routine Inspection Type: Permit inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant Not Compliant Question Areas: E Storm water (See attachment summary) Phone: Phone: 336-776-9650 Compliance Evaluation Page: 1 } Permit: NCG140100 Owner - Faclllty: Chandler Concrete Co., Inc, Inspection Date: 08/10/2016 Inspection Type: Compliance Evaluation Reason for Malt: Routine Inspection Summary: Page: 2 Permit; NCG140100 Inspection Date: 08110/2016 Analytical_Monitoring Has the facility conducted its Analytical monitoring? Owner - Faculty: Chandler Concrete Co., Inc. Inspection Type : Compliance Evaluation . Reason for Visit: Routine # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The most recent analytical monitoring events were conducted on Mav 15, 2015. January 30 Yes No NA NE ® ❑ ❑ ❑ ❑❑■❑ 2016 "No Flow" and July 29, 2016. Permit and Outfalls Yea No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? M ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfalt status, is it property documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: The facility contact stated that the process water (truck wash area) retention basin is cleaned out on a weekly basis, when the plant is in operation. The facility maintains an onsite rain gauge and keeps rain event records which date back to November, 2011. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: The most recent qualitative monitoring events were conducted on May 15, 2015, January 30, 2016 'No Flow' and July 29, 2016. Y@s No NA NE B❑❑❑ Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? E ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ! ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? E ❑ ❑ ❑ Page: 3 permlt NCG140100 Owner - Facility: Chandler Concrete Co., Inc. Inspection Date: 0811012016 Inspection Type; Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Facility resented records that indicated the most recent employee training had occurred on January 30, 2016. The most recent SWPP plan was dated August 9, 2016, Yea No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ Page: 4 x is�r S•v t, y�y + 1!P E` qq ab THOMAs E. CHANDLER, JR. PRESIDENT September 28, 2012 Corey Basinger Regional Supervisor — Water Quality NC DENR 585 Waughtown Street Winston Salem, NC 27107-2241 Dear Mr. Bassinger, RECFIVED ,N.C. Dent. of ENR OCT Winston-Salem Regional Omca VIA CERTIFIED MAIL By means of this letter I certify that Kenneth E. Waegerle, Environmental, Health & Safety Manager, as the duly authorized representative for Chandler Concrete Company, Inc., and for Chandler Concrete/Piedmont, Inc. He is responsible for the overall environmental operations and has the authority to sign documents and to shut down the operations should an emergency occur for any of our plants in North Carolina. The plants in the Winston $alem.Region include, but not limited to the following locations: Plant Count Num. Greensboro Mill St. Guilford 101 Greensboro Swing Rd Guilford 12 Greensboro Chimney Rock Rd. Guilford 103 Reidsville Rockingham 104 Eden Rockingham 105 Madison Rockingham 106 Asheboro Randleman 108 Randleman Randleman 110 Boone Watauga 501 Blowing Rock Watauga 502 West Jefferson Ashe 503' ,%efrerson Ashe 504 Sparta Alleghany 505 Burlington 601 Alamance 601 Burlington 605 Alamance 605 Haw River Alamance 604 Thank you for your attention to this matter. Sincerely, T. E. Chandler, Jr. President POST OFFICE BOX 131 • BURLINGTON, NORTH CAROLINA 27216-0131 TELEPHONE: 336 ° 226 ° 1181 / FAX: 336 o 570.0557 Compliance Inspection Report Permit: NCG140100 Effective: 07/01/11 Expiration: 06/30/16 Owner: Chandler Concrete Co., Inc. SOC: Effective: Expiration: Facility: Chandler Concrete Co., Inc. County: Watauga 3612 Blowing Rock Rd Region: Winston-Salem Boone NC 28607 Contact Person: Roger Church Title: Phone: 336-226-1181 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/19/2011 Entry Time: 09:00 AM Exit Time: 09A0 AM Primary Inspector: Sue White Phone: 336-771-5000 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG140100 Owner • Facility: Chandler Concrete Co., Inc. Inspection Date: 10119/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NCG140100 Owner - Facility: Chandler Concrete Co., Inc. Inspection Date: 10/19/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? e ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ Cl ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ Cl ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? I■ 0 # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ Cl ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ Cl ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ D ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ■ ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ■ ❑ ❑ ❑ # Has the Facility evaluated all illicit (non Stormwater) discharges? ■ ❑ ❑ ❑ Comment: Page: 3