Loading...
HomeMy WebLinkAboutNCG140099_COMPLETE FILE - HISTORICAL_20120928STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v DOC TYPE HISTORICAL FILE [],MONITORING REPORTS DOC DATE ❑ '� 01) 0 1 a" e YYYYMMDD THDINAs E. CHANDLER, JR. PRESIDENT September 28, 2012 Corey Basinger Regional Supervisor — Water Quality NC DENR 585 Waughtown Street Winston Salem, NC 27107-2241 Dear Mr. Bassinger, :RECEIVEDk.ENROCWemRece VIA CERTIFIED MAIL By means of this letter I certify that Kenneth E. Waegerle, Environmental, Health & Safety Manager, as the duly authorized representative for Chandler Concrete Company, Inc., and for Chandler Concrete/Piedmont, Inc. He is responsible for the overall environmental operations and has the authority to sign documents and to shut down the operations should an emergency occur for any of our plants in North Carolina. The plants in the Winston Salem.Region include, but not limited to the following locations: Plant County Num. Greensboro Mill St. Guilford 101 Greensboro Swing Rd Guilford 102 Greensboro Chimney Rock Rd. Guilford 103- Reidsville Rockingham 104 Eden Rockingham 105 Madison Rockingham 106 Asheboro Randleman .108 Randleman Randleman 110 Boone Watauga 501 Blowing Rock Watauga 502 West Jefferson Ashe 503 Jefferson Ashe 504 - Sparta Alleghany 505 Burlington 601 Alamance 601 Burlington 605 Alamance 605 Haw River Alamance 609 Thank you for your attention to this matter. Sincerely, T. E. Chandler, Jr. President POST OFFICE BOX 131 • BURLINGTON, NORTH CAROLINA 27216-0131 TELEPHONE:. 336.226.1181 / FAX: 336 - 570.0557 Compliance Inspection Report Permit: NCG140099 Effective: 08/01/04 Expiration: 07/31/09 Owner: Chandler Concrete Co., Inc. SOC: Effective: Expiration: Facility: Chandler Concrete Co., Inc. County: Alleghany 23 Birch Ln Region: Winston-Salem Sparta NC 28675 Contact Person: Ted Greene Title: Phone: 828-964-3032 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 07/20/2010 Entry Time: 11:00 AM Exit Time: 11:45 AM Primary Inspector: Sue White Phone: 336-771-5000 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG140099 Owner - Facility: Chandler Concrete Co., Inc. Inspection Date: 07/20/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NCG140099 Owner - Facility: Chandler Concrete Co., Inc. Inspection Date: 07/20/2010 inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ D ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ D ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ D ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ 0 # Does the Plan include a BMP summary? ■ D D ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ D Has the Stormwater Pollution Prevention Plan been implemented? ®❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Outfalls # is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ D ❑ D ■ ❑ Cl ❑ ■ ❑ ❑ ❑ Page: 3