Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG140081_MONITORING INFO_20190509
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v C& Jy 0'DY DOC TYPE ❑HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ CidJVV)C2* YYYYMMDD PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 PERSON COLLECTING SAMPLES: RECEIVED CERTIFIED LABORATORY:Pace Analytical Lab #633 MAY 0 8 2019 LIMIT VIOLATIONS? YES ❑ NO ® CENTRAL FILES DVVR SECTION Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2019 SAMPLE QUARTER: ®Jan -March COUNTY: ROCKINGHAM PHONE NO. (336) 226-1181 1 QTR 0 { Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File ❑April -June ❑Jul -Sept ❑Oct -Dec ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-III, NSW OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MDJ z pH {standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease using method 16545GT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow {gallons/day) - 6-93,4 303,5 53 (15)6 - - 2 NO FLOW VE RM MD N/A N/A 3 NO FLOW VE RM MD N/A _N/A No Discharge this Period - ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD), Report more than one type if the waste -stream is commingled. 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TS5limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. a Process wastewater discharges shall only be monitored forTPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 1SA NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE „COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties Wsubmitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Perm ¢ z 7 (Date) Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 4 QTR 0' Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 0 0 81 SAMPLE COLLECTION YEAR: FACILITY NAME: Chandler Concrete Piedmont- Reidsville Pit #104 SAMPLE QUARTER: ❑Jan -March ❑April -June ❑Jul -Sept ®Oct -Dec PERSON COLLECTING SAMPLES: COUNTY: ROCKINGHAM CERTIFIED LABORATORY:Pace Analytical Lab #633 REC,EIV HONE NO. (336) 226-1181 ADD TO LISTSERVE? []YES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ® JAN 2 3 2019 DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-II}, NSW Part A: Wastewater Monitoring Requirements CENTRAL FILES OPTIONAL INFO: DWR SECTION Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD) z pH (standard) TotalSuspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil &Grease using method 16645GT-HEM6 (m9/L) Discharge Duration (minutes) Total Flow {gallons/day) - - 6-934 3435 53 (15)6 - - 2 12/21/18 VE RM MD 7.8 24.5 ND N/A 180 N A 3 12/21/18 VE RM MD 8.1 18.2 ND N/A 180 N/A Discharge was result of rain event. - SW comingles with Process Water If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles I RMj, Mixing Drum Cleanout (MD). Report more than one type 4 the waste -stream is commingled. 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifiesyou to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg1L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 rng/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shalt obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee skull notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLUOR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW') TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED; "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant Pena (ties f or submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of i(P-Aittee) Permit Date: 8/1/2017-06/30/2022 J-�-- o ( te) Last Revised 07/27/17 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO] - Semi -An GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 U U 81 FACILITY NAME: Chandler Concrete Piedmont - Reidsville #104 PERSON COLLECTING SAMPLES: Philip Motsinger CERTIFIED LABORATORY:Pa-ce_Analytical Lab #633 OPTIONAL INFO: Part A. Stormwater Monitoring Requirements al MONITORING FORM NOV 062018 SAMPLE COLLECTION YEAR: 2018 CENTRAL FILES �Jci ;Y SAMPLING PERIOD: ❑July-Decembenr R � ❑Jainnuar�' ry-June COUNTY Rockingham PHONE NO. (336) 226-1181 Orig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File ADD TO LISTSERVE? DYES ®NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-111 / NSW Date Sample cl Collected pH 7SS Total In Tier 2 ft of Months in Outfall No. /lest m (Standard Units) (mg/L) Rainfall' Monthly Monitoring? Tier 2 NO FLOW)1 (in) (y/n) Sampling - - 6-92 1002,3 _ 1 8/1/18 7.2 11.0 3.25 N N/A Discharge due to storm event. - 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring, 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwater 5 TSS limits are 20 mg/Lfor wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 5C% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date:8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Non -Polar Oil & In Tier 2 Outfall Date Sample PH Grease using Total Suspended Event Total New Motor Oil Monthly # of Months in No. Collected (Standard method Solids Duration Rainfall' Usage Monitoring? Tier 2 (mo/dd/yr)l Units) 1664 SGT-HEM (mg/L) (minutes) (in) (gal/month) (y/n) Sampling2 (mg/L) 6-9Z 151 100", - - - N/A *Vehicle Maintenance Not Performed at this Locatio HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine Deriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "l certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penotZs for submitting false information, including the possibility of fines and imprisonment for knowing violations." v re of Permittee) Permit Date: 8/1/2017- 6/30/2022 /a /" A { ate} Last Revised 7/27/18 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 SAMPLE QUARTER: ❑Jan -March PERSON COLLECTING SAMPLES: COUNTY: ROCKINGHAM CERTIFIED LABORATORY:P_ace Analytical Lab #633 PHONE NO, (336) 226-1181 ADD TO LISTSERVE? DYES ®NO LIMIT VIOLATIONS? YES [:]NO Part A: Wastewater Monitoring Requirements 3QTR Orig - State 0 Copy -- State 0 Copy - Winston 0 Copy - Plant 0 Copy - File ❑April -June ®Jul -Sept ❑Ott -Dec EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-III, NSW OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD}z pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease usingmethod .16645GT--HEM6 (mg/L) Discharge Duration (minutes) Total Flaw (gallons/day}' - - 6-93 a 303,5 5a (15 )6 - 2 8/1/18 i VE RM MD 7.2 11.0 ND N/A 125 N/A 3 NQD VE RM MD - - - N/A - N/A Discharge was result of rain event. - SW comingles with Process Water If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. ' TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date:8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: W Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for sWbmitting false information, including the possibifity of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:8/1/2017-06/30/2022 /a Zf ( te) Last Revised 07/27/17 Page 2 of 2 f, AV" STORMWATER DISCHARGE OUTFALL SDO - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG14 008 1 FACILITY NAME: Chandler Concrete Piedmont - Reidsville #104 PERSON COLLECTING SAMPLES: Philip MOtsinger CERTIFIED LAaORATORY:Pace Analytical Lab #633 OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2018 SAMPLING PERIOD: ®July -December ❑ January -June COUNTY RockinRh_am PHONE NO. (336) 226-1181 0 Orig -- State 0 Copy — State Copy — Winston 0 Copy — Plant 0 Copy — File ADD TO LISTSERVE? [:]YES. ®NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW [JPNA ❑Trout ®Other: WS-Ill / NSW Date Sample Collected Collected pH TSS Total In Tier 2 # of Months in Outfall No. m rOR (Standard Units) (mg/L} Rainfalla Monthly Monitoring? Tier 2 NO FLOW)' (in} {y/n} Sampling 6-92 1001.3 1 8/1/18 7.2 11.0 3.25 N N/A Discharge due to storm event. 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here, Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue rnonitorirrg. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwater TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water, classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If tt permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the �l• C discharge location, the permittee shall notify DEMLR, and the DEMLR Regionai Office may require an annual flow repo case by case baSi j ' Per mit Date: 8/1/2017-06/30/2022 G) 4"_"' ::J Last Revised 07/27/17 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year, �'.. "Non -Polar Oil & In Tier 2 Outfall Date Sample PH -,Grease using Total'Suspencled -Event .. ' Total New Motor Oil Monthly # of Months in No. Collected (Standard � method ' Solids Duration Rainfall4 Usage Monitoring? Tier 2 , .(mo/dd/yr)' Units) 1664 SGT=HEM (mg/Lj (minutes) (in) (gal/month)., (y/n). Sampling z (mg/L) N/A *Vehicle Maintenance Not Performed at this Locatio HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penoths for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 8/1/2017- 6/30/2022 /a A ( ate) Last Revised 7/27/18 Page 2 of 2 l I PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 H 1 FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements 3QTR 0 Orig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: SAMPLE QUARTER: []Jan -March ❑April -June ®Jul -Sept []Oct -Dec COUNTY: ROCKINGHAM PHONE NO. (336) 226-1181 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑Haut ❑PNA ❑Trout ®Other: WS-111, NSW OPTIONAL INFO: Outfall No. Date Sample Collected � (mm/dd/yr) Type of Wastewater (VE, RM, MD) z pH {standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease using method 1664SGT-HEM6 (mg/L) Discharge Duration (minutes) 'Total Flow (gallons/day)' - - 6-93,4 303'5 53 (1�j)6 - 2 8/1/18 VE RM MD 7.2 11.0 ND y �:' N A - ' 125 VA , 3 NQD VE RM MID - - - ,.N A..... - N/A' Discharge was result of rain event. - SW co -mingles with Process Water If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM, Mixing Drum Clearoout (MD). Report more than one type if the waste -stream is commingled. if an effluent Iirnit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 'TSS limits are 20 mg/L for wastewater discharges to HOW waters, 10 mg/1, for Trout and PNA waters, and 30 mg/L for all other water classifications. Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HOW waters shall beset to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HOW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Per rn it Date: 8/1/203 7-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CFRTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for Wbmitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:8/1/2017-06/30/2022 (te) Last Revised 07/27/17 Page 2 of 2 NC Departmentcf Environmental Quality Received AUj' 0 i 2PUT Winston-Salem PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: FACILITY NAME: Chandler Concrete Piedmont - Reidsville Plt #104 SAMPLE QUARTER: []Jan -March PERSON COLLECTING SAMPLES: COUNTY: ROCKINGHAM CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181 LIMIT VIOLATIONS? YES []NO Part A: Wastewater Monitoring Requirements 2 QT R 0 Orig — State 0, Copy — State Copy - Winston 0 Copy — Plant 0 Copy - File ®April -June []Jul -Sept ❑Oct -Dec ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HOW ❑PNA ❑Trout ®Other: WS-III, NSW OPTIONAL INFO: Outfall No. Date Sample 1 Coliected (mm/dd/yr) Type of Wastewater 2 (VE, ftM, MD) pH (standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease using method 16645GT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow 7 (gallons/day) - - 6-93,4 303,5 53 (15)6 - 2 4/24/18 VE RM MD 7.8 3.2 'AID ;` iN A„"'`''. 180 N/A 3 4/24/18 VE RM MD 7.8 5.7 ND ''; ; `' ' , N A `.. 240 N/A Discharge was result of rain event. - SW comingles with Process Water 'If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR Ro staff notifies you to continue monitoring. 4 pH limits are 5-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 rng/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Process wastewater discharges shall only be monitored for TPH when commingled with storrowater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part N, Section A, including the Tiered Response Actiun. 'Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224, Permlttees who discharge wastewater to HQW waters shall obtain a 5ummer 7Q10 flow and report this Information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Per mit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (WCLUDING ALL "NO FLOW', "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW`) TO: Division of Water Resources Attn: DWR Central Files 1617 Mall Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the formation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for sulj ting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permi Permit Date:8/l/2017-06/30/2022 Last Revised 07/27/17 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 2 QTR Orig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 SAMPLE QUARTER: []Jan -March ®April -June []Jul -Sept ❑Oct -Dec PERSON COLLECTING SAMPLES: RE EI 1f EiJUNTY: ROCKINGHAM CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181 AUG 03 20VADD TO LISTSERVE? ❑YES ®NO EMAIL: LIMIT VIOLATIONS? YES [-]NO ® CENTRAL FILE DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other: WS-III, NSW LWR SFCTIOI\ PTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater Z (VE. RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease using method 1654SGT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' - - - 6-93•4 303.5 53 (15), - 2 4/24/18 VE RM MD 7.8 3.2 ND NIA 180 N/A 3 4/24/18 VE RM MD 7.8 5.7 ND N/A 240 N/A Discharge was result of rain event. - SW comingles with Process Water If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saitwaters. TSS 1}mit5 are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. c Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provislons of Part IV, Section A, including the Tiered Response Action. 'Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 509/6of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HOW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. if the permittee cannot obtain a Summer 70.10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: S/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS_ANNUAL SUMMARY INCLUDING ALL NO FLOW", NO DISCHARGE) WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering theJ' formation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for sut�r } sting false information, inciucl;ng the possibility of fines and imprisonment for knowing violations." (Signature of Permi Permit Date:8/1/2017-06/30/2022 /2,5 //�' (D e) Last Revised 07/27/17 Page 2 of 2 PROCESS WASTEWA, TER,; Quarterly Discharge Monitoring Report AGES ERAljPERMIT No. NCG140000 CENTRAL FILES CERTIFICATE OF COVERAGE NO. NCG14 0 0 81 OWR SECTION SAMPLE COLLECTION YEAR: FACILITY NAME: Chandler Concrete Piedmont-- Reidsville Plt #104 SAMPLE QUARTER: ®Jan -March PERSON COLLECTING SAMPLES: COUNTY: ROCKINGHAM CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements 1 QTR !� Orig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File ❑April -June ❑Jul -Sept ❑Oct -Dec ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-III, NSW OPTIONAL INFO: Outfall No. Date Sample Collected 1 (mm/dd/yr) Type of Wastewater (VE, RM, MD) z pH (standard) Total Suspended Solids -(mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease using method 1664SGT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow {gallons/day) ' - - - 6-93,4 303,5 53 (15)6 - - 2 2/7/18 VE RM MD 7.5 17.3 ND N/A 240 N/A 3 2/7/18 VE RM MD 7.5 15.4 ND N/A 240 N/A Discharge was result of rain event. - 5W comingles with Process Water If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. ' Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicie and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. "pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 'TSS limits are 20 mg/i_ for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW",,.`.NO DISCHARGE") WiTHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Resources Attn: DWR Central Files 1617 Maid Service Center Raleigh, !North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED.' "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penaltiet6r submitting false information, including the possibility of fines a nd imprisonment for knowing violations." �G (Signature of Permi e) (Da e) Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 2 of 2 PROCESS WASTEWATER = Quarterly `Discharge Monitoring' Report .. GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 02 81 FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 PERSON COLLECTING SAMPLES: REOEI ' CERTIFIED LABORATORY:Pace Analytical Lab #633 FEB 0 5 2013 LIMIT VIOLATIONS? YES ® NO ❑ CENTRAL FILES DWR SECTION Part A: Wastewater Monitorinp, Requirements 4QTR ; ., -0) Orig - State Copy - State 0 ' Copy ; Winston 0 Copy - Plant 0 Copy' File SAMPLE COLLECTION YEAR: SAMPLE QUARTER: ❑Jan -March []April -June ❑Jul -Sept ®Oct -Dec COUNTY: ROCKINGHAM PHONE NO. (336) 226-1181 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-I11, NSW OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD) z pH (standard) Total Suspended Solids (mg/L) Settleable Solids _ (mL/L), Non -Polar Oil & Grease using method 16645GT-Hr=M6 (mg/L) Discharge Duration (minutes) Total Flow (gallons/day) - J - - :6793.4 .3035 53 2 10/18/17 VE RM MD 8.2 38.6 ND: - N A 60 N A M 3 NO FLOW VE RM MD _ _ „,;,. - .` : 'N/A _ NIA High T55 - Driveway/Parking lot regraded just prior to rainfall event o.. 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mlxing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/Lfor wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/Lfor all other water classifications. 'Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDIN G ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: -= - 'Division of Water Resources Attn: DWR Central Files 1617 Mail.Service-Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under.penalty of law,•that this document and all attachments were prepared.under my.direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and.belief, true, accurate, and complete. I am aware that there are significant penaltie or submitting false information,,including the possibility of fines and imprisonment for knowing violations." Z � (Signature of Permitt4w Permit Date; S/1/2017-06/30/2022 Last Revised 07/27/17 Page 2 of 2 STORM WATER DISCHARGE OUTFALL (SDO] Semi -Annual MONITORING FORM GENERAL PERMIT NOACG140000 CERTIFICATE OF COVERAGE NO. NCG14-0 0 8-1 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Chandler Concrete Piedmont-�teidswil)e tR1Q4-�SAMPLING'PERIOD: ®July -December. ❑ Jan uary-June PERSON COLLECTING SAMPLES: Philip Motsinger l.a {�— COUNTY Rockinaham CERTIFIED LABORATORY:Pace Analytical Lab #633 FEB 0 6 20i3 PHONE NQ: { 336j 226-1181. :__0J Orig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File OPTIONAL INFO: ADD TO LISTSERVE? ❑YES ®NO EMAIL: _ CENTRAL FILES DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other; WS-III / NSW Part A: 5tormwater Monitoring Requirements DWR SECTION Date Sample t, , Outfall No. Collected pH TS5 Total ° Rainfall' In Tier 2 � Monthly Monitoring? s # of Months in (mm/dd/yrOR (Standard Units) (mg/L) - (in) (in) (Y/n) Tier 2' NO FLOW)' Sampling - 6-91 10013 1 10/16/17 7.6 32.3 .6 = ' -N - N/A - Discharge due to storm event. - r 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. j 2 Report the abbreviation far the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw MaterialStockoiles (RM), Mixing Drum Cleanout (MD), Report more than one type if the waste -stream is commingled. ' 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoringfor that parameter for six months, unless DEMLR RO staff. notifies you.to continue , monitoring, - 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwater 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. t, 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1'of 2 Part B: Vehicle Maintenance Activitv Monitoring Reauirements for facilities using > 55 sal of new motor oil/month- averaeed overa calendar near. '. pH Non -Polar Oil & Grease using Total Suspended 'Event Total New Motor Oil In Tier 2 # of Months in Outfall Date Sample, r � (Standard method Solids Duration Raihfa11a Usage Monthly Tier 2" No. Collected,. Units) 1664 SGT-HEM (mg/L) (minutes) (in) (gal/m4onth) Monitoring? 2 Sampling., (mo/dd/yr)1 (mg/L) (Y/n) 6-92 152 1001•3- N/A , *Vehicle Maintenance Not Performed at this ILocatio HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES []NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: " Mail -Original and one coov of this DMR-iincludina all "No Flow" &-"No Discharge" -reports) within 30 days of receipt of sarnole (or at end of monitoring period in case of "No Flow") to: Division of Water Quality - - - •- Attn: DWQ Central Files - 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments'were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true; accurate, and complete. I am aware that there are significant pel t' s for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7�� of Permittee) Permit Date: 8/1/2017- 6/30/2022 Last Revised 7/27/18 Page 2 of 2 PROCESS, WASTEWATER— Quarterly Discharge Monitoring Report-, GENERAL PERMIT NO. NCG140000 3QTR id , Orig - State -.0-- Copy - State. 0 Copy - Winston 0 Copy -- Plant 0 Copy- File CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: FACILITY NAME: Chandler Concrete Piedmont - Reidsville Pit #104 SAMPLE QUARTER: ❑Jan -March ❑Apri#-June ❑Jul -Sept ❑Oct -Dec PERSON COLLECTING SAMPLES: COUNTY: ROCKINGHAM CERTIFIED LASORATORY:Pace Analytical Lab #633 PHONE NO. (336) 226-1181 RECEW: JV ff LAD TO LISTSERVE? ❑YES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ® DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-111, NSW NOV 0 2 2017 OPTIONAL INFO: CENTRAL FILES Part A: Wastewater Monitoring Requirements 01AIP crzr^rinei OutfallNo. Date Sample t Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD} z - pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) Non -Polar Oil & Grease using method 16645GT-HEMI (mg/L) , Discharge Duration (minutes) Total Flow 7 igalfons/day) 6-93.4 303.5 53 (15)fi 2 NQD VE 'RM MD - . - N/A - 3 NQD VE RM' MID - - N/A NQD - No Qualifying Discharge this period - Discharge Observed -Qualified sample unobtainable 'If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifiesyou to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANN OF MONITORING PERIOD IN CASE OF "NO FL{ Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 - MARY (INCLUDING ALL "N( a. 4 E") WITHIN 30 DAYS OF RECEIPT -OF SAM YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in.accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person o`r persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties f submitting false information; including the possibility of fines and imprisonment for knowing violations." - - _ (Signature of Permitt — ( te) - -- Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring [Repotal.rt`,;! GENERAL PERMIT NO. NCG140000 Receivi .4- CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete_ Company - Reidsville #104 PERSON COLLECTING SAMPLES: Philip Motsinger CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements - 0 Orig — State f 0 Copy — State it+i V Copy - Winston 0 Copy — Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2017 Winston-.Sa)e,, SAMPLE QUARTER: []Jul -Sept ❑OctLDecai QJ -March ®April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yi) Type of Wastewater (VE,-RM, MD)Z : pH (standard) Total Suspended solids (mg/L) Settleable 'Solids'', (mL/L)- TPH using method 1664A 5GT-HEM (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' - 6-93.4 .303,5 53 (15)67 - - 1 04/24/17 VE RM MD 8.1 9.6 ND N/A 45 200 2 01/23/17 RM 7.8 8.9 ND N/A 45 200 Discharge was result of rain event. - SW comingles with Process Water 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. S TSS limits are 20 mg/L for wastewater discharges to HOW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HOW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am awar hat there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -zerl (Signature of Pe -21,ioln [date] i Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 F PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 04XOrig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Chandler Concrete Company - Reidsville #104 SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June PERSON COLLECTING SAMPLES: Philip Motsineer COUNTY: Rockingham CERTIFIED LABORATORY:Pace Analytical Lab #633 _ PHONE NO. (336) 634 - 1845 t �iVE�L'ADD TOLISTSERVE? [_]YES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ® JUL 2 4 2017 DISCHARGING TO CLASS: []SA ❑HQW ❑PNA [-]Trout ®Other: C Part A: Wastewater Monitoring Requirements CENTRAL FILES OPTIONAL INFO: DWR SECTION Outfall No. Date Sample Collected 1 (mm/dd/yrj Type of Wastewater VERM {, , MDjZ pH {standard) Total Suspended Solids (mg/Lj Settleable Solids {mL/L) TPH usingDischarge method 1664A -HE SGT-NEMb Duration (minutes] Total Flow gallons/day]' - - - 6-93,4 303,5 53 (15)6 - - 1 04/24/17 VE RM MD 8.1 9.6 ND N/A 45 200 2 01/23/17 RM 7.8 8.9 ND N/A 45 200 Discharge was result of rain event. - SW comingles with Process Water 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to marls the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.S S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the hest of my knowledge and belief, true, accurate, and complete. I am awar hat there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." _ 71 (Signature of Permit Date:7/1/2010-06/30/2015 -71zloln {date) i Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER —Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG 14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Philip MotsinSer RECEIVED CERTIFIED LABORATORY:Pace Analytical Lab #633 APR 2 4 LIMIT VIOLATIONS? YES [:]NO CENTRAL FILES DWR SECTION Part A: Wastewater Monitoring Requirements Orig - State 0 Copy - State 0 Copy - Winston 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2017 SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VERMMDj , , pH (standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A S (mg/L) 6 mg/L} Duration (minutes) Total Flow (gallons/day} - - - 6-93,4 303,5 53 (15)6 - - 1 01/23/17 VE RM MD 8.1 10.0 ND N/A 45 200 2 01/23/17 RM 7.8 5.0 ND N/A 45 200 Discharge was result of rain event. - SW comingles with Process Water 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware,*at there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of "1" (b te) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 Orig —State 0 Copy — State CERTIFICATE OF COVERAGE NO. NCG14 O O H 1 _ _ _ _ RI�ED SAMPLE COLLECTION YEAR: 2017 0 Winston -Office 0 Copy - Plant FACILITY NAME: Chandler Concrete Co. _- Reidsvill��itz#_ IPA 17 SAMPLING PERIOD: El July -December January -June 0 Copy �- File PERSON COLLECTING SAMPLES: Philip Motsing�er COUNTY Rockingham CERTIFIED LABORATORY:Pace Analytical Lab #633 CENTRAL. FILES PHONE NO. (336j 634 - 1845 OPTIONAL INFO: DWR SECTION ADD TO LISTSERVE? []YES []NO EMAIL: _ DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other: C Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH {standard Units) TSS (mg/L) Event Duration (minutes} Total A Rainfall {in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-92 100 2,3 - - - - 1 01/23/17 8.1 10 45 Min. •65 N 0 2 01/23/17 7.8 5.0 45 Min. •65 N 0 Discharge due to storm event, PW commingles w/ SW 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > SS gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample p Collected {mo/dd/yr)r pH (Standard Units) TPH using method 1664A SGT NFM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {Y/n) # of Months in Tier 2 Z Sampling 6-92 15 100 ' - - - - - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring- period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware th re'g ' icant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Signature of Permittee (Date) Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 81 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Philip Motsinger CERTIFIED LABORATORY:Pace Analytical Lab #6�ECEVE❑ LIMIT VIOLATIONS? YES []NO ® NOV C t L0% CENTRAL FILES Part A: Wastewater Monitoring Requirements DWR SECTION Orig - State 0 Copy - State 0 Copy - Winston 0 Copy -- Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample 1 Collected {mm/dd/yr} Type of Wastewater z RMMD} {VE, , pH (standard) Total Suspended Solids (mI/L) Settleable Solids (mL/L) TPH using method 1664A 6 SGT-FILM (mg/L) Discharge Duration (minutes) Total Flow , {gallons/day} - - - 6-93,4 303'S 53 (15)6 - - 1 10/7/16 VE RM MD 7.3 3.1 ND N/A 180 +/- 1800 2 10/7/16 RM 7.3 4.7 ND N/A 180 1800 Discharge was result of rain event. - SW comingles with Process Water 1 If wastewater systems have not discharged in this quarter- report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.9-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/I, for atl:6the wr a` er clas�sific`aati ns. 6 ♦- - I III 1I — Fi WA I I I*W , Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges.from. VMA-areas�fPH does not%ave a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date- 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT „OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN TH15 CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that t`hh are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." J !/ ` _ - (D,dte) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 81 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: ReeovED CERTIFIED LABORATORY:Pace Analytical Lab #633 Nov 0 2 2016 LIMIT VIOLATIONS? YES ❑ NO CENTRAL FILES DWR SECTION Part A: Wastewater Monitoring Requirements .A/ Orig — State 0 Copy - State 0 Copy — Plant 0 Copy - File 7 SAMPLE COLLECTION YEAR: 2010 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? OYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD) PH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT HEM (mg/L) Duration (minutes) Total Flow (gallons/day)7 - - - 6-93.4 303,5 53 (15)6 - - 1 NQD* VE RM MD N/A 2 NQD* RM N/A *No Qualifying Discharge this period - Evidence of discharge -sample unobtainable 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or, calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." /d Z 7 //z (Signs ure of Permittee)(D e) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — QuarterlyDischarge Monitoring Report 0 Copy State g g p Copy —State GENERAL PERMIT No. NCG140000 0 Copy —Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 O O 8 1 SAMPLE COLLECTION YEAR: 201A 7 FACILITY NAME: Chandler Concrete Company- Reidsville #104 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec Dian -March ❑April -June PERSON COLLECTING SAMPLES: Philip Motsinr;er RECEIVEDPHonNTY: Rockingham iE NO. [ 336) 634 - 1845 CERTIFIED LABORATORY:Pace Analytical lab #633 - - NOV 0 2 2016 ADD TO LISTSERVE? DYES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ® CENTRAL FILES DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [:]Trout ®Other: C DWR SECTION OPTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater 2 (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A a SG (mg/L/L)T-HEM Duration (minutes) Total Flow (gallons/day) - - - 6-93'4 303,5 53 (15)6 - - 1 10/7/16 VE RM MD 8.6 3.1 ND N/A 120 +/- 280 2 10/7/16 RM 8.1 ND ND N/A 95 +/- 190 Discharge was result of rain event. - SW comingles with Process Water 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/l/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE IOR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �/� 1 (Signature of Permit Date:7/1/2010-06/30/2015 /b 2 ( ate) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Chandler Concrete Co. - Reidsville Plant #104 SAMPLING PERIOD: ®July -December ❑January -June PERSON COLLECTING SAMPLES: Philip Motsinger COUNTY Rockingham Ong - State 0 Copy - State 0 Winston -Office 0 Copy - Plant 0 Copy - File CERTIFIED LABORATORY:Pace Analytical Lab #633 RECEIVED PHONE LO. (; RVE634 - 1845 TO OPTIONAL INFO: ADD ❑YES []NO EMAIL: _ NOV 02 2016 DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW} PH (Standard Units} � DWR SECTION TSS (mg/L} Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 1 10/7/16 8.6 3.1 120+/- Min. 1.5 N 0 2 10/7/16 8.1 ND 95 +/- Min. 1.5 N 0 Discharge due to storm event, PW commingles w/ SW 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. A For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected {mo/dd/yr)1 PH (Standard Units TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids {mg/L} Event Duration (minutes) Total a Rainfall (in) New Motor pit Usage (gal/month) In Tier 2 Monthiy Monitoring? {y/n) # of Months in Tier 2 2 Sampling 6-9 152 1001, - - - - - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" resorts) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of I w, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified per nnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dire sponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware ther re sig ' is nt enalties for submitting false information, including the possibility of f' es a d imprisonment for knowing violations." 17e, 2. {Signature of Permittee} (q te) Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 81 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Philip Motsinger CERTIFIED LABORATORY:Pace Analytical Lab#M _1VED LIMIT VIOLATIONS? YES []NO ® AUG 0 1 Rl'!j CENTRAL FILES DWR SECTION Part A: Wastewater Monitoring Requirements Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA []HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Date Sample Total Suspended Settleable TPH using Di cs harge! l Outfall No. Collected) Type of Wastewater (VE, RM, MD) PH (standard) Solids Solids method 1664A S Duration �� al (gallons/ddy) (mm/dd/yr) (mg/L) (mL/L) �mHlM' (minutes) - - - 6-93,4 303.5 53 (15)6 - - 1 NO FLOW VE RM MD *** *** '"** N/A *** *** 2 NO FLOW RM r% ll /� NO QUALIFYING DISCHARGE THIS PERIOD - V 1 If wastewater systems have not discharged in this quarter -- report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. S TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg1L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware tha here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." , - / ., (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 (gate) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14.0-0-81--'`. FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Philip Motsinger CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES [:]NON Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: [_]Jul -Sept ❑Oct -Dec COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW OPTIONAL INFO: 0 Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File �Aln March ❑April -June ❑PNA ❑Trout Oth"r , Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow gallons/day)' - - - 6-93'4 303.5 53 (15)6 - - 1 2/3/16 VE RM MD 6.5 ND ND N/A 75+ ! ;l1Ci 300.1% „ 2 2/3/16 RM 6.5 ND ND N/A 75+ —j3 5 ' %1 I AY hnnr,nM Z)t1v {10N Discharge was result of rain event. - 1 If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saitwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. s Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 l� .'G (1Nli Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WiTHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)507-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly respon ble far gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that t ere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ature of Z7/l4 (Date) Permit Date. 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG14-0'0"81--\ SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: Chandler Concrete Co. — Reidsville Plant #104 SAMPLING PERIOD: ❑ July -December PERSON COLLECTING SAMPLES: Philip MOtsinger COUNTY Rockingham CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 634 - 1845 OPTIONAL INFO: ADD TO LISTSERVE? ❑YES ❑NO EMAIL DISCHARGING TO CLASS: ❑SA ❑HQW Part A: Stormwater Monitoring Requirements FORM 0 Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File ® January-J�`� YZ,,.o ❑PNA ❑Trout MOtiter C Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW) pH {Standard Units) TS5 (mg/L) Event Duration (minutes) Total Rainfall , (in) In Tier 2 Monthly Monitoring. (y/n) # of Months in Tier 2 Samplingz - - 6-9 101) ' - - - - 1 2/3/16 6.5 ND 75+ Min. 2.1 N 0 2 2/3/16 6.5 ND 75+ Min. 2.1 N 0 P' Discharge due to storm event, PW commingles w/ SW 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l., For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. FC'1�11��U MAY - 3 2fl 16 Arl,Ocrssrrf�; v11117 Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfali No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 2 Sampling 6-92 15 100 ' - - - - - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR {includinp- all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons direct�l r soon 'ble fir gathering the information, the information submitted is, to the best of my -knowledge and belief, true, accurate, and complete. am aware thath�re �sig ifi�nf penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Ricky Wilson CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements Ong - State 0 Copy - State 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec Dian -march COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW OPTIONAL INFO: ❑April-Junel ❑PNA ❑Trout ®Other: C Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater 2 (yE, RM, MD} pH (standard) Total Suspended - Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGr-HE) (mg/L Discharge Duration (minutes) Total Flow 7 �Ballans/days - - - 6-93.4 303,5 53 (15)6 - - 1 NO FLOW VE RM MD N/A 2 NO FLOW RM N/A 1!5115 .P% Me" t r L . E_. NO QUALIFYING DISCHARGE THIS PERIOD - L FILES �3EC-Tlulsi 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ` pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"] WITHIN_30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN OF "NO FLOW) TO: Division of Water Quality Attn: DWQ Central Files n4� 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANYINFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware re are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." I iture of Permit Date:7/1/2010-06/30/2015 z /G ate} 1 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING F GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 2 FACILITY NAME: Chandler Concrete Co. — Reidsville Plant #104 PERSON COLLECTING SAMPLES: Ricky Wilson CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: Part A- 5tormwater Mnnitnrinp Renuirements 6 Orig — State 0 Copy — State 0 Copy - Plant SAMPLE COLLECTION YEAR: 2016 0 Copy -File SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Rockies PHONE NO. (336) 634 -1845 ADD TO LISTSERVE? DYES ❑NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units] TSS (mg/L) Event Duration (minutes] Total a Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - 6-92 100 ' - - - - 1 8/11/15 6.9 ND 30 Min. 1.25 N 0 2 8/11/15 6.9 6.5 30 Min. 1.25 N 0 I Discharge due to storm event, PW commingles w/ SW VL_ "l `'°' Nov 0 2 zolb PPNITRAI P CWR SECTION ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. ate,• Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 1 of 2 Part 13: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample p Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall° (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling 6-9 152 100 ' - - - - - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES []NON HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to. - Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directl responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware th are ignificant p nalties for submitting false information, including the possibility of fines a d imprisonment for knowing violations." a '�a S (Sign ture of Permittee) (Da, ) Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsviile #104 PERSON COLLECTING SAMPLES: Ricky Wilson RECEIVED CERTIFIED LABORATORY:Pace Analytical Lab #633 ,; LIMIT VIOLATIONS? YES []NON n L 1=lLES , :SECTION Part A: Wastewater Monitoring Requirements Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File 5 A - SAMPLE COLLECTION YEAR:.20�� [ 1rr SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 184S ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA []Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)x pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L} TPH usingDischarge method 1664A SGT HEMS (mg/L) Duration (minutes} Total Flow (gallons/day) - - - 6-93'' 303,5 53- 1 8/11/15 VE RM MD 6.9 ND ND N/A 45 30 2 8/11/15 RM 6.9 6.5 ND N/A 45 30 Discharge was result of rain event. - SW comingles with Process Water If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/l/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE fOR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW"} TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: 'Tcertify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware t a ere are signif cant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ' c Signature of Permittee} (D (te} Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 Orig — State 0 Copy — State 0 Copy — Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Chandler Concrete Company - Reidsville #104 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June PERSON COLLECTING SAMPLES: Ricky Wilson VE rC�OUNTY: Rockingham CERTIFIED LABORATORY:Pace Ana_ytical Lab #633 R I V ��pHONE N0. [ 336) 634 - 1845 JUL 31 2u1]ADD TOLISTSERVE? ❑YES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ® DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other: C CENTRAL FILES DWR SECTION' OPTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall No. Date Sample 1 Collected (mm/dd/yr} Type of Wastewater x (VE, RM, MD) pH {standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A 6 SG /L) (mgg/ L} Discharge Duration (minutes) Total Flow , {gallons/day} - - - 6-93'4 303'5 53 (15)6 - - 1 NO FLOW VE RM MD N/A 2 NO FLOW RM N/A NO QUALIFYING DISCHARGE THIS PERIOD - 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 arr■ C3 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality _ Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that ere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." J ---j/ A (Signature of Pe Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FOR GENERAL PERMIT No. NCG140000 / Ong - State f 0 Copy - State 0 Copy - Plant CERTIFICATE OF COVERAGE NO. NCG 14 0 0 8 1 SAMPLE COLLECTION YEAR: 2015 0 Copy- File FACILITY NAME: Chandler Concrete Co. - Reidsville Plant #104 SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES: Ricky Wilson COUNTY Rockingham CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 634 - 1845 OPTIONAL INFO: ADD TO LISTSERVE? ❑YES [-]NO EMAIL: ^ DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other. C Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH {Standard Units) TS5 (mg/L) Event Duration (minutes) Total A Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) i# of Months in Tier 2 Samplingz - - 6-9 100 , - - - - 1 03/05/15 7.6 4.4 90 Min. .60 N 0 2 03/05/15 8.1 21.4 go Min. .60 N 0 Discharge due to storm event, PW commingles w/ SW 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period ab 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the Gener Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they a re 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge, Permit Date: 7/1/2011-60/30/2016 0 b 4 Last Revised 7/13/11 Page 1 of 2 r� CL. LAJ �J a LAM Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n} # of M:,nths in Tier 2 2 Sampling 6-9 15 1002.3 N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:]NON HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharee" reoorts) within 30 days of receiot of sample for at end of monitorinP oeriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified pers nel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dir I onsibl for ga ring the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware he sig ca pe I es for submitting false information, including the possibility of fi es a d imprisonment for knowing violations." y ( ig ature of Permittee)(D e} Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG14 0 0 81 FACILITY NAME: Chandler Concrete Co. - Reidsville Plant #104 PERSON COLLECTING SAMPLES: Ricky Wilson CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December COUNTY Rockingham FORM �0/ 06g -State Copy - State 0 Copy - Plant 0 Copy - File ® January -June PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? [-]YES [-]NO EMAIL: DISCHARGING TO CLASS: []SA❑HQW ❑PNA -]Trout ®Other: C Outfall No. Date Sample Collected {mo/dd/yr OR NO FLOW)1 PH (Standard Units) TSS {mg/L) Event Duration (minutes) Total . a Rainfall (in) In Tier 2 Monthly Monitoring) (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 1 03/05/15 7.6 4.4 90 Min. .60 N 0 2 03/05/15 8.1 21.4 90 Min. .60 N 0 Dischargedue to storm event, PW commingles w/ SW 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall ' No, Date Sample Collected 1 (mo/dd/yr) pN (Standard Units) ' TPH usingrmethod 1664A SGT-HEM (mg/L) Total -Suspended Solids (mg/L)' Event , . Duration (minutes) Total, , Rainfall, (in) New Motor Usage. (gal/month) In Tier 2 l Monthly Monitoring? (y/n) tt of Months -in Tier 2 Sampling 6-9 15 100 . N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES ATANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified pers nel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dir I onsibl for ga ring the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware he sig ' ca pe I es for submitting false information, including the possibility of fi es a d imprisonment for knowing violations." y [ i ature of Permittee) (D e) Permit Date: 7/1/2011-60/30/2016 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Ricky Wilson CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements 0 Orig - State 0 Copy - State 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®3an-March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA []HQW ❑RNA ❑Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater x {VE, RM, MD} pH (standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A 6 SG (mg/L�/L)! Discharge Duration {minutes} Total Flow {gallons/day} - - - 6-93'4 303,5 53 (15)6 - - 1 03/05/15 VE RM MD 7.6 4.4 ND N/A 90 120 2 03/05/15 RM 8.2 21.4 ND N/A 90 112 Discharge was result of rain event. - l if wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saitwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 LAJ Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQCentrai Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 . _ •� CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Com an - Reidsville #104 PERSON COLLECTING SAMPLES: Ricky Wilson CERTIFIED LABORATORY:Pace Analytical Lab ##633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements 0 / Orig - State Copy - State 0 Copy - Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEMS (mg/L) Duration (minutes) Total Flow (gallons/day) - - - 6-93,4 303,5 53 (15)' - - 1 03/05/15 VE RM MD 7.6 4.4 ND N/A 90 120 2 03/05/15 RM 8.1 21.4 ND N/A 90 112 Discharge was result of rain event. - 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with starmwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 Orig - State PROCESS WASTEWATER — Quarterly Discharge Monitoring Report 0 Copy - State GE14ERAL PERMIT NO. NCG140000 0 Copy - Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Chandler Concrete Company - Reidsville #104 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June PERSON COLLECTING SAMPLES: COUNTY: Rockingham CERTIFIED LABORATORY:Pace Analytical Lab #633 PHONE NO. (336) 634 - 1845 RECEI®® VEVbDTOLISTSERVE? []YES ®NO EMAIL: LIMIT VIOLATIONS? YES [:]NO ® FEB 0 3 2015 DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C Part A: Wastewater Monitoring Requirements CENTRAL FILES OPTIONAL INFO: DWR SECTION Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater 2 (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method1664A 6 SG (mglL)/L) Discharge Duration (minutes) Total Flow (gallons/day) - - - 6-93'4 303s 53 (15)6 - - 1 10/15/14 VE RM MD 7.4 ND ND N/A 75 90 2 10/15/14 RM 7.9 2.7 ND N/A 75 75 Discharge was result of rain event. - 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gatheri?g the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thatVere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." nature of Permitteej Permit Date:7/1/2010-06/30/2015 / /36 f (D,tej Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements Orig — State 0 Copy — State 0 Copy — Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec Dian -March ❑April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA [—]HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample i Collected (mm/dd/yr) Type of Wastewater Z (VE, RM, MD} pH (standard} Total Suspended Solids Solids Settleable Solids (mL/L) TPH using method 1664A a SGT HEM (mg/L} Discharge Duration (minutes) Total Flow 7 (gallons/day} - - - 6-43'4 303,5 53 (15)6 - - 1 07/15/14 VE RM MD 6.5 6.6 ND N/A 60 75 2 07/15/14 RM 7.2 7.4 ND N/A 60 60 Discharge was result of rain event. - 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. b Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifint penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." . 1 i1 _ , . /, re Permit Date: 7/1/2010-06/30/2015 (DdteV Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FOR GENERAL PERMIT NO. NCO140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Co. -- Reidsville Plant #104 PERSON COLLECTING SAMPLES: Philip MotsinRer CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: Part A: Stormwater Monitorine Requirements 2f Orig - State 0 Copy - State 0 Copy - Plant SAMPLE COLLECTION YEAR:2014-2015 I 0 Copy -File SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Guilford PHONE NO. (336) 634 -1845 ADD TO LISTSERVE7 DYES ❑NO EMAIL: _ DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA [-]Trout ®Other: C Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 1 7/15/14 6.5 6.6 75Min. .75 Y 0 2 7/15/14 7.2 7.4 60Min. .75 Y 0 Discharge due to storm event, PW commingles w/ SW 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 RECE/viz MARS CENTR,gL FILES OIA/R SECTIOr'! Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. RECEIVED �� ��1 /CCD ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. V MAR 1 1% 5 CENTRAL FILES DWR SECTION Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 8: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected {mo/dd/yr}1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids {mg/L} Event Duration (minutes) Total Rainfall° (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 2 Sampling 6-92 15 100 , - - - - - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Orisinal and one coov of this DMR (includine all "No Flow" & "No Discharp-e" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly re nsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that t i scan enalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (5ignat a of Permittee) ( te) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2of2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY:Pace Anall(tical Lab #633 LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements Orig — State 0 Copy — State 0 Copy — Plant 0 Copy - File SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June COUNTY: Rockingham PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (uE, RM, MD) pH [standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A 6 S (mg/L) mg/ Discharge Duration (minutes) Total Flow 7 (gallons/day) - 6-93,4 3035 53 (15)6 NO FLOW VIE RM MD N/A _ NO FLOW RM N/A A D L LU 14 NO QUALIFYING DISCHARGE THIS PERIOD - DWQ/ 30113 ' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE-) WITHIN_30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that therp are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." . --\ re of Permittee} Permit Date:7/1/2010-06/30/2015 Z.7 r-'— (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 81 FACILITY NAME: Chandler Concrete Co. — Reidsville Plant #104 PERSON COLLECTING SAMPLES: Philip Motsinger CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR:2013-2014 SAMPLING PERIOD: ❑ July -December FORM Orig -State 0 Copy - State 0 Copy - Plant 0 Copy - File ® January -June COUNTY Guilford PHONE NO. (336) 634 - 1845 ADD TO LISTSERVE? ❑YES []NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑trout ®Other: C outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t PH (Standard units) TSS (mg/L) Event Duration (minutes) Total Ralnfali (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling - - 6-9 10()2,3- - - - 1 2/5/14 7.6 ND 18o Min. •5 Y 0 2 2/5/14 7.9 ND 15o Min. S Y 0 Discharge due to storm event, PW commingles w/ SW I If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value Is In excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. for each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}' PH (Standard Units} TPH using method 1664A SGT-HEM (mg/L) Total Suspended ' Solids (mg/L) Event Duration (minutes) Total Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 i Sampling 6-9 is - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR f includine all "No Flow" & "No Discharee" reoorts) within 30 days of receiot of samole (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly res sible for athering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that t scant nalties for submitting false information, including the possibility of fines an imprisonment for knowing violations." Z f (Sign ture of Pe ittee) (Da ) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG14 0 0 8 1 FACILITY NAME: Chandler Concrete Company - Reidsville #104 PERSON COLLECTING SAMPLES: Philip Motsinfer CERTIFIED LABORATORY:Pace Analytical Lab #i633 LIMIT VIOLATIONS? YES [:]NO Part A: Wastewater Monitoring Requirements 0 Orig — State 0 Copy — State 0 Copy — Punt 0 Copy - File SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March []April -June COUNTY: Rockingham PHONE NO. (136) 634 - 1845 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other: C OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEA-f (mg/L) Duration (minutes) Total Flow 7 (gallons/day} 53 (15 f - - 1 2/5/14 VE RM MD 7.6 NO 2.7 N/A 180 2870 2 2/5/14 RM 7.9 ND 2.5 N/A 150 2650 Discharge was result of rain event. - SW comingies with Process Water ' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type If the waste -stream is commingled. 3 If an effluent limit is exceeded twice In a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. S TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. c Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead Is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR G PERIOD IN CASE OF "NO FLOW") TO AT END OF MONITORING _ �' -' •_ .. _ : Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 High Total Suspended Solids - sample taken during initial storm sure we have cleaned catch basins and have made other corrective actions. YOU MUST SIGN THIS CERTIFIC4TION FOR ANY INFORMATION REPORTED. - "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that theXae sigr scant penalties for submitting false information, including the possibility of fines and imprisonment for knowing ..� violations." ��%'' Pe Permit Date; 7/1/2010-06/30/2015 .? / (D.-We) Last Revised 07/13/11 Page 2 of 2 TCRE-r-ErjC-0MPA-.N.-Y' CO. December 3, 2009 Mr. Steve W. Tedder Water Quality Regional Supervisor NC DENR Winston-Salem Region 585 Waughtown Street Winston-Salem, NC 27107 Subject: Notices of Violation for: Reidsville Plant 4104, NCG140081 & Eden Plant # 105, NCG 140080 Dear Mr. Tedder: RECEIVED oof =w� DC0l 009E2 Winston-Salem Regional OY,'ice I was surprised and appalled with the issues discovered during the inspection by Mr. Ron Boone on November 18, 2009. We at Chandler Concrete take all environmental issues very seriously. Today I met with Mr. Donnie Brady, Production Manager, Mr. Dan Goley, Area Manager, Mr. Donnie Manring, Reidsville Plant Manager and Mr. Dewey Pruitt, Eden Plant Manager today at each of their plants to discuss your letter dated November 19, 2009. First of all, both of these plant managers have just been promoted to these positions and were not fully familiar with the location of some of the documents and their responsibilities. 1 will respond to each of the compliance evaluation issues starting with the Reidsville Plant ##104. Item 2 — The name of the receiving waters form this site is identified in the permit cover sheet as being an unnamed tributary to Wolf Island Creek in the Roanoke River Basin. Item 3 -- After searching the files at the plant we found a copy of the SP3 that was revised on 08/04/04, 01/12/06, and 08/15/07. In addition I have revised the plan again on 11/24/09. There is a copy of this document enclosed and a copy at the plant. The revisions made in 2007 are highlighted in blue and the revisions made in 2009 are highlighted in red. These revisions address the issues stated in your letter. Since we do Quarterly Housekeeping Inspections (form QHI) we thought that an annual inspection was not necessary. These completed forms are contained in the SP3 handbook behind tab QM. There are secondary containment drainage inspections for the past five years in the SP3 Handbook behind Tab labeled SCR. POST OFFICE Box 131 • BURLINGTON, NORTH CAROLINA 27216-0131 TELEPHONE: 336.226.1181 / FAx: 336.570.0557 F� H Mr. Steve W. Tedder Water Quality Regional Manager Reidsville Plant #104 Eden Plant #l05 Page 2 of 3 Item 4 — There are analytical monitoring records for the past five years. The only one missing form the plant during my visit today was for 2007. Copies of these reports are also kept here in my office of which I have made copies and are enclosed. These reports do show the results for settleable solids on the backside of the report. I will agree that all of the qualitative records were not in the handbook. I don't know if they were not done or have been misplaced, but they will be done and filed from this time forth. I do agree that there are three stormwater discharge outfalls (SDO) at this site and instructed the former plant manager that he should be collecting samples at all three. The new plant manager is now aware of this and will be sampling at all three on the next round. Item 5 — It has been my understanding that the drain valves on the secondary containment vessels are considered locked if they have no operable handle, which was the case at the time of the inspection, but as of today these valves have been replaced with a pad lock handle. Eden Plant #105 Item 6 — The same is the case with the identification of the receiving stream form this plant. On the cover sheet to the permit it identifies that site discharges as flowing into an unnamed tributary to Dry Creek in the Roanoke River Basin. Item 7 — Again as explained in Item 3 there have been revisions to the SP3 on 08/04/04, 01/12/06 and 08/15/07 and in addition it was just revised on 11/24/09. A copy of this plan is enclosed and is at the plant. The same is true for the annual facility inspections and secondary containment drainage inspections as explained in Item 3 for Reidsville. Item 8 — I did not find a copy of the analytical reports for 2008 and prior years at the Eden Plant, but had copies in my files. I have made copies of these and they are now at the Eden Plant. A copy is also enclosed, and at the plant. I was not able to locate the qualitative records for all of the necessary inspection intervals, but they will be done at the proper times in the future. The question of a second stormwater outfall has been corrected. The pit mentioned will be filled and the water from this area will be directed into the existing sediment ponds. The water from these ponds is recycled to the truck and drum wash area which in turn flows in a closed loop. During a significant storm event this water will co -mingle with the process water and be discharged at outfall 001 as indicated on the site plan. The results of the settleable solids are reported on the back of the Discharge Monitoring Report, as you will note on the enclosed forms. Item 9 - The secondary containment vessel's valve had the handle removed and was considered locked. This valve has as of today been replaced with a pad lock type of valve. The form oil used for the "sego" blocks is a biodegra4able product and poses as no threat to the environment. Even though this area will be cleaned this week. I trust that the information provided is satisfactory and will exhibit our sincere concern to apply with all environmental issues. If there are still questions I will be most happy to meet with Mr. Ron Boone at these locations at a time that is convenient with him to address any concerns or questions. I further request that any possible monetary penalties be waved. Mr. Steve W. Tedder Water Quality Regional Manager Reidsville Plant 4104 Eden Plant 4105 Page 3 of 3 As stated in the opening paragraph our company is very serious about being an environmentally friendly company. In fact we are in the process of having all of our plants certified as Green -Star plants. Green -Star certification is an industry wide program that is recognized by a joint venture with the National Ready Mixed Concrete Association (NRMCA) and the Federal EPA. Our Salisbury facility has already achieved this designation and we are presently working at five other locations. Thank you for your time and the positive comments about these two facilities made by Mr. Boone. Sincerely, ames J. Woody Environmental Manager Enc. Reidsville Plant 104 Eden Plant 105 (16 RECEIVED N.C. Deot. of ENR DEC 0 7 2009 Winston-Salem, Regional Office CHANDLER CONCRETE CO., INC. REDISVILLE PLANT # 104 STORMWATER POLLUTION PREVENTION PLAN (SP3) 1. SITE Y FORMATION A. Site Location: This site is located at 7699 NC 87 North near Reidsville, NC. This property is located in an industrial section that is bordered on the north and east by a quarry operated by Martin Marietta. On the west side is a heavy vegetative and wooded area. To the south is NC 87 and a residential area. Water is discharged from this site into an unnamed tributary to Wolf Island Creek that is in the Roanoke River basin. B. Site Plan: A copy of the site plan is on the next page. C. General Location Map: A copy of a portion of the USGS map identifying the surrounding area follows on the page after the site plan. (This part of the page is left blank intentionally) Revised 08/16/04, Revised 01/12/06 Revised 08/15/07, Revised 1 1/24/09 SP3 Reidsville Plant # 104 D. List of Potential Pollutant Sources: The most likely sources for contaminates are listed below: ■ Parked vehicles ■ Paved and unpaved areas ■ Aggregate stockpiles ■ Truck mixer loading area ■ Admixture storage area (contained) ■ Truck wash area Acid storage area ■ Fuel storage and fueling area (contained) ■ Left -over concrete washout area The following table lists a complete inventory of materials at this plant along with a risk assessment of polluting storm water: MATERIAL LOCATION EXPOSED TO STORM WATER? Portland Cement Silo No Fly Ash Silo No Sand Stockpile Yes Stone Stockpile Yes Motor Oil Storage BId'g No Transmission Fluid Storage Bld'g No Hydraulic Fluid Storage Bld'g No Fuel Oil AST (contained) No Truck Washing Liquid Wash Rack Yes Form Oil (Biodegradable) Block Forms Yes ADMIXTURES: Daravair 1000 AST (contained) No Daracem 19 AST (contained) No Daratard 17 AST (contained) No Calcium Chloride AST (contained) No WRDA 35 AST (contained) No Lubricon AST (contained) No Delvo Stabilizer AST (contained) No Revised 08/04/04, Revised 01/12/06 Revised 08/15/07, Revised 11/24/09 2 SP3 Reidsville Plant # 104 E. Description of Storage Practices: a) Coarse and fine aggregate is received via dump truck and stored on the ground. They are separated and contained by concrete walls on three sides. b) Cement and fly ash are received via closed tanker trucks. This material is pneumatically unloaded and stored in closed steel silos. c) Liquid admixtures arrive at the plant in closed tanker trucks and pumped into AST's located next to the plant in a contained area. d) Diesel fuel is received from the fuel distributor and unloaded into an AST in a containment vessel. e) All other oils and petroleum products are stoked in AST's inside the storage building. f) Truck washing liquid (acid solution) is in an AST located at the truck wash area for daily use. F. List of Significant Spills: There have been no significant spills or leaks at this location during the years of 2005, 2006, 2007, 2008 and 2009, or since this plant was purchased in 1991. Should a leak or spill occur it would be duly noted on the proper form located behind tab labeled Spills. G. Storm Water Outfalls: There are three point source storm water outfalls at this site and they are indicated on the site plan. One is to the southeast of the property next to the Martin Marietta property, the second is at the southwest corner of the property and the third is on the west next to the truck wash area. The water form number one and two outfalls flows into a ditch along the side of NC 87. That water flows to the northwest into a series of ponds offsite. The water from outfall number three leaves the property to the west and is discharged into the same location. These waters flow into an unnamed tributary to Wolf Island Creek that empties into the Roanoke River basin. Storm water at these outfalls will also be co -mingled with process water during storm events. Any other storm water leaves the property in a sheet discharge. lI. STORMWATER MANAGEMENT PLAN A. Feasibility Study: When this site was originally designed there were no regulations regarding water discharges. Planning continues on a better way to control the discharge of process water within economic constraints. Secondary containment to enclose the liquid admixtures and diesel fuel has been constructed. The aggregate is transferred to in -plant storage bins via conveyor. There is a below grade hopper that allows the aggregate to be transferred directly to the plant storage bins. At other times a front-end loader transfers the aggregate from the on the ground storage area to the bins via conveyor. Cement and fly ash is being unloaded, stored, and discharged via a closed system. All vehicles are fueled on -site. B. Secondary Containment Schedule: The secondary containment vessel for the liquid admixtures and diesel fuel has been constructed. The pumps and dispensing bottles are located in a closed structure inside this vessel. This vessel is equipped with a manually control drain valve that is secured with a locking mechanism. This valve is to be closed Revised 08/04/04, Revised 01/]2106 Revised 08/15/07, Revised 11/24/09 R1 .-tat i.i.- .'� .. - ., •r'. .. , - r .. _ .. 'F , . .rs :} ; .. is .. .. .t i i.s� ., i' .. M•` �. i. '� _' 'lt: �. r .e• a ... .. ,'° - • � . , • fF SP3 Reidsville Plant # 104 and locked at all times except when cleaning the vessel. Prior to release the storm water will be visually observed and noted on the "Secondary Containment Release Report" for color, foam, stain and visible sheen. If uncontaminated it will be released. If contaminated it will then be properly contained and disposed. The truck wash liquid is a mild acid solution, which is of little concern since it will mix with the process/storm water that is usually alkaline. As previously mentioned all other possible contaminates are stored inside and not exposed to storm water. Records of the releases from the containment vessel are kept at this site for a period of five years. C. Best Management Practices (BMP) Summary: Best management practices are physical, structural or management practices that prevent or reduce pollution of waters of the state. The following is a description of the BMP and storm water controls that are in place at the Reidsville facility. a) Some process water is being discharged at three outfalls. Most of the drives and parking area is unpaved. Work needs to be done to eliminate the process water that flows offsite. Planning continues on the planning and construction of sediment basins. b) Drivers are assigned specific parking locations for their trucks. Should any kind of leak or spill occur it is to be reported to the plant manager and maintenance for proper repair. Spills are to be cleaned up immediately and properly disposed. c) Rinsing out of the truck mixer drums is kept to a minimum. When necessary at the end of the day a maximum of 150 gallons of water is used. The trucks empty this water offsite. d) A log is maintained in the plant manager's office for inspections, service and maintenance performed on the dust control system. e) Some of the water from the stockpiles discharged in a sheet flow through vegetation filter strips. f) The berms and swales need to be constructed in order to better control the flow of the process water. III. Spill Prevention and Response Plan A. Potential Pollutant Sources: This site meets the EPA requirements for a Spill Prevention Control and Countermeasure Plan (SPCC) Plan. This plan is located in the office at this plant. The actions to be taken for the spill prevention and response are based on a proper assessment of potential pollutant sources of the materials in inventory. Liquid admixtures, cement, fly ash and diesel fuel pose the greatest potential for a large spill either by rupture of one of the tanks, a severed supply line, or by overfilling. In the event of a failure of one of these materials plant personnel have been trained on the proper way to contain the spill and properly dispose of this material. A complete list of potential pollutants is listed in Section I -- Site Information paragraph D. B. Facility Response Team: The response team is made up of the following people: • Donnie Manring --- Plant Manager • Dan Goley — Area Manager • Employees assigned to this site. Revised 08/04/04, Revised 01/12/06 Revised 08/15/07, Revised 11/24/09 4 SP3 Reidsville Plant # 104 The Plant Manager and Production Manager are responsible for maintaining the proper operational procedures according to this Plan and the NC DENR Permit NCG 140081. They are responsible for sampling, reporting, and maintaining all necessary forms according to this Plan and Permit. They also will assign special housekeeping and preventative maintenance tasks to the employees that are assigned to this plant. Employees are instructed to follow the provisions of the above referenced permit. They also are instructed on the proper truck wash locations and procedures. Should they observe any potential violations they are to report such to their supervisor. C. List of Contacts: Following is a list of contacts to notify in case of an emergency. Inter -Company Name Title Office Phone James Woody Environmental Mgr. (800) 694-2929 x 120 Donnie Brady Production Mgr. (800) 694-2929 x 123 Steve Jones HR Mgr. (800) 694-2929 x 102 Jeff Hinkle Fleet Maint. Mgr. (800) 694-2929 x 110 J.C. Tuttle Plant Maint. Mgr. (800) 694-2929 x 216 Peter McDaniel Dispatch (800) 694-2929 x 141 Others Company Phone Emergency 911 A & D Environmental (800) 434-7750 NC DENR Division of Water Quality (336) 771-5000 NC DENR Division of Air Quality (336) 771-5000 Ray Harris Towing/Hauling (336) 273-3475 IV. Preventative Maintenance Plan Cell Phone (336) 260-2416 (336) 516-2657 (336) 516-3219 (336) 516-2656 (336) 516-2658 (336) 516-2662 A. Schedule of Inspections: An effective Preventative Maintenance Program (PM) is an important aspect of any BMP control system. Well -maintained and inspected equipment is less likely to cause problems that result in accidents and spills. The Reidsville Plant has a preventative maintenance program that satisfies the overall needs of the SP3. The purpose of the PM is to locate and correct equipment problems before they occur or cause major problems. PM will reduce truck and plant breakdowns in addition to reducing the risk of pollution of storm water. A list of items to be checked and the frequency is located under the heading of Action List in Section VIII. B. Good Housekeeping: Proper housekeeping is maintaining an orderly work environment in order to contribute to the overall facility pollution control effort. Good housekeeping is achieved through a combination of periodic employee training, motivation, and significant manatr•mant tit t}tq r'1F-tails nima�rintY ciira cinwanv and urnrlr arr�a� arr r_1Pan anri nrrir�rly Good housekeeping contributes to prevention of accidents, but also supports worker health and cafPttr nrnrrramc aliminatr•c uraetr+ aura r�f.nr�railtr rtr,�trcntc �lr'tNrrnra�inn of Revised 08/15/07, Revised 11/24/09 SP3 Reidsville Plant # 104 company property and equipment. The Reidsville facility shall adopt a standard of good housekeeping in all of its work and storage areas. The following steps will help minimize any potential for storm water pollution in addition to promoting safety and a sense of well being at work. a) Trash and other waste will be picked up regularly. A covered trash receptacle will be strategically located inside and outside and emptied on a regular basis. b) Maintain clean, dry floors and paved surfaces by using brooms, mops, shovels, vacuum cleaners, or other cleaning equipment. c) All liquid containers exposed to the weather will be kept in a secondary containment vessel or inside the storage building. d) All containers stored inside will be placed on pallets or shelves to prevent corrosion or deterioration from exposure to moisture on the floor. c) Empty drums and used pallets will be properly disposed. f) The Good Housekeeping Checklist will be completed as part of the Quarterly Housekeeping Inspection Report and retained in this book behind tab labeled QM. V. Employee Trainin Training of employees is essential to the success of any program. The following training will be conducted: A. Initial and annual training for all employees will include: a) An introduction to Chandler Concrete Company's SP3, the Storm Water Discharge permit, and what their responsibilities are. b) Spill response and cleanup procedures. c) Preventative maintenance requirements. d) The role that good housekeeping plays in the plan. B. Follow-up training at the plant will deal with specific problems and problem areas to include the implementation of any new BMP. C. A copy of all training activities will be kept in this manual behind the Training tab. Vl. Responsible Party The Environmental Manager shall be responsible for the overall coordination, development, implementation and revision if this plan. Ultimately every employee assigned to this plant has a responsibility to maintain this site in accordance to the Storm Water Permit. Other responsible parties are listed in Section III paragraph C. VII. Plan Amendment This plan will be amended whenever there is a change in design, construction, operation, or maintenance that has significant effect on the potential for the discharge of pollutants to surface waters. At a minimum the plan will be reviewed and updated on an annual basis. Revised 08/04/04, Revised 01/12/06 Revised 08/15/07, Revised 11/24/09 Gol SP3 Reidsville Plant # 104 VHI. Facility Inspection Program The plant manager or his designee will conduct visual inspections and monitoring of the outfall and other areas as per the Action List on page 8. The forms can be found behind the tabs as indicated below. After the forms have been completed they are to be filed behind the properly marked tab and kept for at least five years. A. Discharge Outfall Monitoring Report (DOMR): This is the form that is to used when you actually take a sample of the storm water. This is required to be done once a year between August 1 and July 31. Upon completion of initial data this form is to be sent to the Environmental Manager (EM) to be completed. The EM will then submit to the State and also send a copy back to the plant to be filed in this book. B. Storm Water Discharge Outfall (SDO): This form is to be filled out when the DOMR is performed and again approximately six months later. C. Quarterly Housekeeping Inspection (QHI): This form is primarily a good housekeeping checklist that is to be completed during the quarterly inspection. D. Secondary Containment Release (SCR): This form is to be completed every time the water is released from the secondary containment vessel. E. Dust Collection System (DCS): This inspection is required as per the Air Quality Permit and these forms are maintained in the Environmental Handbook. Visual inspections are made daily and physical inspections are recorded weekly. There is also an annual inspection form. F. Spills and Releases: Anytime there is a significant spill or release it will be documented indicating the date, time, material, amount, location, corrections made and who was notified. This information will be filed behind the tab marked Spills. (This part of page left blank intentionally) Revised 08/04/04, Revised 01/12/06 Revised 08/15/07, Revised 11/24/09 SP3 Reidsville Plant # 104 IX. ACTION LIST Report Form Activity Responsibility Required ID Daily: Inspect vehicles for fuel, oil & other fluid leaks Drivers/Open. Yes MVR Visual inspection of dust collectors Plant Mgr, No Weekly: Inspect vehicles hoses and clamps Drivers/Oper. Yes MVR Inspect admixture lines, clamps, and tanks Plant Mgr. No Inspect wash out area Plant Mgr. No Inspect dust collection system Plant Mgr. Yes AQ 101 Quarterly: Good Housekeeping checklist Plant Mgr. Yes QHI Inspect secondary containment structures Plant Mgr. Yes QHI Semi -Annually: Visually monitor all outfalls in spring & fall Plant Mgr. Yes SDO Analytical Monitoring of Representative Storm Plant Mgr. Yes QHI Inspect secondary containment structures Plant Mgr. Yes QHI Storm Drainage Inspection Checklist Plant Mgr. Yes QHI Annually: SP3 training James Woody Yes TRAIN Inspect dust collection system Plant Mgr. Yes AQ 102 Annual Facility Review Plant Mgr. Yes A R Analytical Monitoring of Representative Storm Plant Mgr. Yes QHI SP3 Review James Woody Yes SP3 Analytical Data Submittal Plant Mgr. Yes DOM As Needed: Document Significant Spills Plant Mgr. Yes Spills Release of rain/snow water from secondary containment Plant Mgr. Yes SCR Revised 08/04/04, Revised 01 / 12/06 Revised 08/15107, Revised 11/24/09 NCDENR .: y . Na1xN u�w�. od.�s,cxs or [rvllOxMM uip Nc�.wK �Mca DISCHARGE OUTFALL MONITORING REPORT GENERAL PERMIT NCGI40000 (All sample data shall be reported no later than 30 days after receipt of lab results) Certificate of Coverage NCG14 /J 7 Facility Name �li '�� 6-t covr .;rn- tue. t+& .Pig l Countyc =Fhoneumber Certified Laboratory # Person Collecting Sample(s) Collectors Signature Sample ,Information Part A:-Stormwater Discharge Monitoring Data (For stormwater not combined with process wastewater) Storm Event Characteristics Stormwater Dischar e Mo itorin t Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new mot -oil per rnanth? ❑ Yes ❑ No If yes, complete information below. Stormwater Discharge Monitoring from Vehicle Maintenance Areas 7 Outfall Date Sample Total Flow ' Total Event Event New pH. ' Total Oil and No. Collected Precipitation Duration Motor Oil Suspended Grease Usage Solids (titoldd/yr) (MG) (inches) (hours) (aaf/ma) (Std:.Ui�its} (mZII) (mz/l) Part B: Process wastewater discharge monitoring data Sample # Effluent Source(s) for this sample ,/ Vehicle / Equipment CIeanin ❑ Raw Material Stock -pile Wetting ❑ Mixing Drurn Clean -out' ❑ Recycle S stern Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours PH Std. units TSS mg/1 Settleable Solids MI/1 Sample # Effluent Sourcff(s2 for.this sarisple Vehicle /Equipment Cleaning Raw Material Stock-pile_Wettihp, ❑ ❑ Mixing Drum Clean -out ❑ Rec cle $ stem Overflow Parameter, Unit Data Collection Date mo/dd/yr Total Flow MG . Event Duration hours PH Std..units TSS mg/l Settleable Solids ml/1 Mail original and one copy to: Attn:. Central Files Division of Water Quality DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Sample # Effluent Source(s) for this sample Vehicle / Equipment Cleaning ❑ Raw Material Stock -pile Wetting ❑ Mixing Drum Clean -out ❑ Recycle System Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. units TSS mg/I Settleable Solids HIM Sample # Effluent Source• s .f©r tihis ganx le ❑ Vehicle / Equipment Cleaning Raw Material Stock -pile Wetting ❑ Mixin Drum Clean -out ❑ ❑ Recycle S stem Overflow Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours PH Std. units TSS Mel Settleable Solids mlh1 "I certify, under penalty -of law, that this document and all attachments were .prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted: Based on my ing6iry of the person or persons who manage the system, or those persons directly responsible for gathering the information, .the information submitted is. to the best of my knowledge and belief, true, accurate, and complete. r am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee or Designee) (Date) NO NR � CM�16�[�'f ��0 ,ACtA/l �ilOL�CB DISCHARGE OUTFALL MONITORING REPORT GENERAL PERMIT NCG140000 (All sample data shalt be reported no later than 30 days after receipt of lab results) Certificate of Coverage NCG14�®© Facility Name County �� c c iti1 Cfxkc. Phone Number 3 _ 9 uS- Certified Laboratory # Person Collecting Sample(s) CoIIectors Signature Sample Information Permit Term Year Year-Stast/End Dates Place check mark to indicate applicable sampling period Discharge--T-yg .(check as appropriate) Storniiwili r .: '. ' . Wastewater 1 August 1, 2004 to July 31, 2005 ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2 August 1, 2005 to July 31, 2006 3 August 1, 2006 to J61y 31, 2007 4 August 1, 2007-to July 31, 2008 5 August 1, 2008 to July 31, 2009 ::Fart A: St4t'znWater Discharge Monitoring Data (For stormwater not combined with process wastewater) Storm Event Characteristics Total Event Precipitation (inches Evrnt Duration hours Q t NQ O �E2 tlCo lt1 ' ff-. L E 1Q%Z n� � B ✓L ' Stormwater Discharge Monitoring Outfall Date_Saniple Total Flow Total Event Event Duration No. Collected Precipitation mo/dd/ 'r (MG) (inches) (hours) pH Total Suspended Solids Stci.:;Units . (m 1) Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new motor of 1 per month? ❑ Yes ❑ No if yes, complete information below. Stormwater DischaLge-Monitoring from Vehicle Maintenance Areas Outfall Date Sample No. Collected (mo/dd/ Total Flow Total Event Precipitation (MG) (inches) Event New Duration Motor Oil Usage (hours) gal/mo) pH Total Suspended Solids (Std.Units) (m f Oil and Grease (mg 1 Part B: Process wastewater discharge monitoring data Sample # Effluent Sources for this sample ,/ Vehicle / E ui ment Cleaning ❑ Raw Material Stock -pile Wettin ❑ Mixing Drum Clean -out ❑ Recycle S stem Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours PH Std. units TSS mg/I Settleable Solids ml/1 Sample # Effluent Sources for -this saris le Vehicle /. E ui ment Cleaning ❑ Raw Material Stock -pile Wetting. ❑ Mixipy, Drum Clean -out ❑ Recycle System Overflow ❑ Parameter. Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours PH Std. units TSS rng/1 . Settleable Solids rrzl/l Mail original and one copy to: Attn: Central Files Division of Water Quality DENR. 1617 Mail -Service Center Raleigh, NC 27699-1617 Sample # Effluent Source(s) for this sam le Vehicle / Equipment Cleanin ❑ Raw Material Stock -pile Wettin ❑ Mixing Drum Clean -out ❑ Recycle System Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration . hours pH Std. units TSS mg/1 Settleable Solids ml/1 Sample # Effluent Sources for! this•$arni le 4 Vehicle /Equipment Cleaning ❑ Raw Material Stock -pile Wettin ❑ Mixing Drum Clean -out ❑ Recycle System Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. units TSS mg/l . Settleable Solids ml/I "I certify, under penalty of law,, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Print Name of Permittee for Designee) (Signature, oe-i-mittee or Designee) (Date) sw U-241-080104 Page 2 of 2 t 1FtS u1 As ac; A otsct-M"e- PAU-i, F P"t Tlk& rt- +oj1-0 PG�+A «ten is �a��rlrsr� lt5inr] .l ni rac Cc ucit6{ec . DISCHARGE OUTFALL MONITORING REPORT NCDENR GENERAL PERMIT NCG140000 (All sample data shall be reported no later than 30 days after receipt of lab results) Certificate of Coverage NCG14 ®®®0 Facility Name " County C7 Phone Number Lj 6, qS- Certified Laboratory # Person Collecting Sample(s) Collectors Signature Sample Information Permit Term Year Year Start/End Dates Place check mark to indicate applicable sampling period Discharge Type (check as appropriate) Stormwater. Wastewater 1 August 1, 2004 to July 31. 2005 Lj❑ Of ❑ 1 ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2 August 1, 2005 to July 31, 2006 3 August 1, 2006 to July 31, 2007 4 August 1, 2007 to July 31, 2008 5 August 1, 2008 to July 31, 2009 'Part A: Stormwater Discharge Monitoring Data (For stormwater not combined with process wastewater) Storm Event Characteristics Date Total Event Precipitation (inches) Event Duration (hours) Stormwater Discharge Monitoring Outfall No. Date Sample Collected mo/dd/ r) Total Flow (MG) Total Event Precipitation (inches) Event Duration (hours) pH (Std. Units Total Suspended Solids mg I P N Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new motor oil per month? 0 Yes po If yes. complete information below. Stormwater Discharge Monitoring from Vehicle Maintenance Areas Outfall No. Date Sample Collected (mo/dd/ r) Total Flow (MG) Total Event Precipitation (inches) Event Duration (hours) New Motor Oil Usage (gal/mo) pH Std. Units) Total Suspended Solids (mg I) Oil and Grease mg l SWLI-241-080104 Page lof 2 Part S: Process wastewater discharge monitoring data Sample # —L—. Effluent Sources for this sample ❑� Vehicle / E ui ment Cleaning Raw Material Stock- ile Wettin Mixina.Drum Clean -out ❑'� Recycle System Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr a(i (a4; Total Flow MG Ijp Event Duration hours S PH Std. units TSS mg/I ?1 9 Settleable Solids mul �! D Sample# Effluent Source(s) for this sample ❑ Vehicle 1 Equipment Cleaning Raw Material Stock- ile Wettin ❑ Mixing Drum Clean -out ❑ Recycle System Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours .pH Std. units - TSS mg/l Settleable -Solids I rnl/I Mail original and one copy to: Attn: Central Files Division of Water Quality DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Sw U-24 t-080104 Sample # Effluent Sources for this sample ❑ Vehicle / E ui ment Cleanin Raw Material Stock -pile Wettin ❑ ❑ ❑ Mixing Drum Clean -out Recycle System Overflow Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. units TSS mg/I Settleable Solids txtl/1 Sample # Effluent Sources forthis:sam le 4 ❑ ❑ ❑ ❑ Vehicle / Equipment Cleanin Raw Material Stock -pile Wettin Mixing Drum Clean -out Recycle System Overflow Parameter . 'Uriit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. units TSS mg/I Settleable Solids ml/1 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision.in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the passibility of fines and imprisonment for knowing violations." �jj rr (Print Name of Permittee or Designee) l'05-k G (Signature of P • r tttee or Designee (Date) Page 2 of 2 4 0 :Mnalyfical www.pacelabs.com June 28, 2006 Mr. James Woody Chandler Concrete Co. PO Box 131 Burlington, NC 27216 RE: Lab Project Number: 92121350 Client Project ID: Plant 104 Reidsville, NC Dear Mr. Woody: Pace Analytical Services, Inc. 9800 Kincey Avenue, Suite 100 Huntersville, NC 28078 Phone: 704.875.9092 Fax: 704.875.9091 Pace Analytical Services, Inc. 2225 Riverside Drive Asheville, NC 28804 Phone: 828,254.7176 Fax: 828.252.4618 Enclosed are the analytical results for sample(s) received by the laboratory on June 15, 2006. Results reported herein conform to the most current NELAC standards, where applicable, unless otherwise narrated in the body of the report. Inorganic Wet Chemistry and Metals Analyses were performed at our Pace Asheville laboratory and Organic testing was performed at our Pace Charlotte laboratory unless otherwise footnoted. If you have any questions concerning this report please feel free to contact me. Sincerely. Bonnie McKee bonnie.mckee@pacelabs.com (704) 875-9092 ext. 234 Project Manager Enclosures Asheville Certification IDs NG Wastewater 40 NC Drinking Water 37712 SC 99030 FL NELAP E87648 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, inc. nelac,4 harlotte Certification IDs NC Wastewater 12 NC Drinking Water 37706 SC 99006 FL NELAP E87627 aceAnalyfical www.pacelabs.com Lab Sample No: 927091488 Client Sample ID: 104A Pace Analytical Services, Inc. 9800 Kincey Avenue, Suite 100 Huntersville, NC 28078 Phone: 704.875, 9092 Fax: 704, 875.9091 Pace Analytical Services, Inc. 2225 Riverside Drive Asheville, NC 28804 Phone: 828,254.7176 Fax, 828.252.4618 Lab Project Number: 92121350 Client Project ID: Plant 104 Reidsville. NC Project Sample Number: 92121350-001 Date Collected: 06/14/06 15.32 Matrix: Water Date Received: 06/15/06 11:18 Parameters Results Units Report Limit_ Analyzed By CAS No. Qual RegLmt Wet Chemistry Total Suspended Solids Method: EPA 160.2 Total Suspended Solids NO mg/l 3.3 06/16/06 07:45 TMR Date: 06/28/C6 Ash eville-Qortificati on IDs REPORT OF LABORATORY ANALYSIS NC Wastewater 40 NC Drinking Water 37712 This report shall not be reproduced, except in full, SC 99030 without the written consent of Pace Analytical Services, Inc. FL NELAP E87648 nelac_,= Page: 1 of 3 Charlotte Certification IN NC Wastewater 12 NC Drinking Water 37706 Sc 99006 FL NELAP E87627 R ace Analytical www.pacelabs.com Lab Sample No: 927091504 Client Sample ID: 104E Pace Analytical Services, Inc. 9800 Kincey Avenue, Suite 100 Huntersville, NC 28078 Phone: 704.875.9092 Fax., 704.875.9091 Pace Analytical Services, Inc. 2225 Riverside Drive Asheville, NC 28804 Phone., 828.254.7178 Fax., 828,252.4618 Lab Project Number: 92121350 Client Project ID: Plant 104 Reidsville, NC Project Sample Number: 92121350-002 Date Collected: 06/14/06 15:35 Matrix: Water Date Received: 06/15/06 11:18 Parameters Results Units Report Limit Analyzed By CAS No. Qual RegLmt Wet Chemistry Total Settleable Solids Method: EPA 160.5 Total Settleable Solids ND ml/l/hr 0.10 06/15/06 22:00-CD1 Date: 06/28/06 Asheville Certification IN NC Wastewater 40 NC Drinking Water 37712 SC 99030 FL NELAP E87648 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in fuli, without the written consent of Pace Analytical Services, Inc. ,p ACCOR melac,,= Page: 2 of 3 Charlott. Certification EDs NC Wastewater 12 NC Drinking Water 37706 SC 99006 FL NELAP E87627 u aceAnalyical® www.pacelabs.com PARAMETER FOOTNOTES Method 9071B modified to use ASE. Pace Analytical Services, Inc. 9800 Kincey Avenue, Suite 100 Huntersville, NC 28078 Phone: 704.875.9092 Fax: 704.875.9091 Pace Analytical Services, Inc. 2225 Riverside Drive Asheville, NC 28804 Phone: 828.254.7176 Fax: 828.252.4618 Lab Project Number: 92121350 Client Project ID: Plant 104 Reidsville, NC All pH, Free Chlorine, Total Chlorine and Ferrous Iron analyses conducted outside of EPA recommended immediate hold time. Depending on the moisture content the PRLs can be elevated for all soil samples reported on a dry weight basis. 2-Chloroethyl vinyl ether has been shown to degrade in the presence of acid. ND Not detected at or above adjusted reporting limit NC Not Calculable J Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit MDL Adjusted Method Detection Limit Date: 06128106 Asheville Certification IDs REPORT OF LABORATORY ANALYSIS NO Wastewater 40 This report shall not be reproduced, except in full, NO Drinking Water 37712 SC 99030 without the written consent of Pace Analytical Services, Inc. u N 1LCagQ{ FL NELAP E87648 Page: 3 of 3 Charlotte Certification IDs NO Wastewater 12 NO Drinking Water 37706 SG 99006 FL NELAP E87627 ti nnn /ln�h rlin�l L;MAIN-Ul--C:US I UUY 1 Analytical Kequest Document . The Chain -of -Custody is a LEGAL DOCUMENT. All relevant fields must be completed accurately. Page: of Section A Section B Section C c Required Client Information: Required Project Information: Invoice Information: 0967411 Company , r� 7 • ' '` Report To: Attention; REGULATORY AGENCY i - 'r7,. r ❑ NPDES ❑GROUND WATER ❑DRINKING WATER Address Copy To: Company Name: � ❑ UST ❑ RCRA p Other Address: ❑GA ❑IL ❑IN ❑MI OMN ONC Email To: Purchase Order No.: Pace Quote Reference: DOH ❑SC ❑ WI ❑OTHER Phone Fax Project Name: ; ; Pace Project Manager; "i 6 '.q - Filtered (YIN) Requested Due DatefTAT: Project Number: , Pace Profile' s] r- Requested Analysis: - Section D Required Client Information Valid Matrix Codes MATRIX COnF _ d ' Preservatives _ DRINKING WATER DW w UJ2 0- SAMPLE ID WATER WT WASTE WATER WW o O o w L z s` SOIU ODD SL x am COLLECTED d u M m Ur One Character per box. OIL OL E o z z , _ o (A_Z, 0-9 AIR L qR g <t7 COMPOSITESTART CCMPD5ITE ENDIGRAB o ¢ O = O = `m y, Pace Project Number W Samples;Ds MUST BE UNIQUE ~ OTHER OT DATE TIME DATE TIME c N z Q m m G- �° TISSUE TS > _ _ = z z E Lab LD 1 i f is " • • • + ■ 13Y I AFFILIATION• SAMPLE CONDITION Additional Comments: �a z - r z z z z z z � r r z z z } r } ,..Isi AMPLER NAME AND SIGNATURE`m U o PRINT Name of SAMPLER: °� o y Q i E ° R SEE REVERSE SIDE FOR INSTRUCTIONS SItnTLIRE of SAMPLER: - DATE Signed (MM r DD r YY) 9 ai i nron—,n tiKA .nF 2 /") - /(-/- I)'/' .�� : .1 + WY �piw NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary 19 November 2009 Chandler Concrete Co., Inc. Attn: Mr. James Woody P.O. Box 131 Burlington, NC 27216 Subject: Compliance Evaluation Inspections & Resulting Notices of Violation for NPDES General Stormwater Permit NCG140000 at Chandler Concrete Plant #104, Reidsville, NC, COC — NCG140081, NOV-2009-PC-0935; & Chandler Concrete Plant #105, Eden, NC, COC — NCG140080, NOV-2009-PC-0934 Rockingham County Dear Mr. Woody: 1. Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Quality (DWQ or the Division) conducted compliance evaluation inspections (CEI) at the subject facilities on 18 November 2009. Inspection checklists are attached for your records and the inspection findings are summarized below. Reidsville Plant #104, NCG140081, NOV-2009-PC-0935 2. This facility is located at 7699 NC Hwy 87 North, in Reidsville, Rockingham County, North Carolina. Although the receiving stream is not specified on the Certificate of Coverage (COC), it appears that the site discharges to an unnamed tributary to Wolf Island Creek, which is currently classified as Class C waters in the Roanoke River basin. Chandler should update this information during the next permit renewal process. Documentation & Monitoring Review 3. The Stormwater Pollution Prevention Plan (SP3) was last revised in August 2004, and documentation of annual reviews was not found. Several items are out of date including the list of facility response personnel, the responsible person(s), the list of spills, and DWQ phone numbers for spill reporting. Additionally, records for annual facility inspections, secondary containment drainage inspections, etc., were incomplete or do not exist. 4. Review of analytical and qualitative (A&Q) monitoring records revealed that A&Q monitoring has only been done at outfall 001; however, there are three stormwater discharge outfalls (SDO) on the site, numbered 001, 002 and 003. Additionally, there were A&Q monitoring records for the North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 One Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877.623-6748 NorthCarolina Internet: www.ncwaterquality.org J/ a ura � An Equal Opportunity 1 Affirmative Action Employer Chandler Concrete Co., Inc. Attm Mr. James Woody Compliance Evaluatson Inspections & NOVs NCG140080 — NOV-2009-PC-0934 & NCG140081 — NOV-2009-PC-0935 11/19/2009 Page 2 of 3 years 2005 and 2009 only; there were no records for the years 2006, 2007 and 2008. Finally, it appears that waters draining to all three SDOs are a mixture of stormwater and wastewater, which would require that you perform the analytical monitoring for wastewater, yet results for settleable solids were not found. Site Review 5. The site appeared quite clean and well maintained. However, the valve for the secondary containment for the admixtures was not locked in the closed position as required. Please correct this as soon as possible. Eden Plant #105, NCG140080, NOV-2009-PC-0934 6. This facility is located at 234 North Main Street, in Eden, Rockingham County, North Carolina. Although the receiving stream is not specified on the Certificate of Coverage (COC), it appears that the site discharges to an unnamed tributary to Dry Creek, which is currently classified as Class C waters in the Roanoke River basin. Chandler should update this information during the next permit renewal process. Documentation & Monitoring Review 7. The Stormwater Pollution Prevention Plan (SP3) was last revised in August 2004, and documentation of annual reviews was not found. Several items are out of date including the list of facility response personnel, the responsible person(s), the list of spills, and DWQ phone numbers for spill reporting. Additionally, records for annual facility inspections, secondary containment drainage inspections, etc., were incomplete or do not exist. Finally, annual training has either not been conducted or not been documented as required. 8. Review of analytical and qualitative (A&Q) monitoring records revealed that A&Q monitoring has been done for 2009, but records for 2008 and prior either don't exist or have been misplaced. Also, there is a sedimentation cell near the northeast corner of the facility, north of the series of concrete sedimentation cells. This cell is constructed of concrete Jersey barriers and earth, and a small cut has been made in its southeast corner to facilitate drainage of the cell when it gets to that depth. The drainage from this cell may be considered wastewater because it receives waste concrete and possibly drum washes. This cell discharges completely separately from the site's single identified SDO 001. However, Chandler has not been monitoring it as an SDO. Finally, just as with the Reidsville plant, the waters draining to the series of concrete sedimentation cells and subsequently to SDO 001, are a mixture of stormwater and wastewater, which requires that you perform the analytical monitoring for wastewater, yet results for settleable solids were not found. 9. The site appeared quite clean and well maintained. However, the valve for the secondary containment for the admixtures was not locked in the closed position as required. Please correct this as soon as possible. Also, there is a Jersey barrier form near the water tanks, along with some oil containers. The oil is used to coat the form. Although it is a small amount, there is some V T . .► Chandler Concrete Co., Inc. Attn: Mr, James Woody Compliance Evaluation Inspections & NOVs NCG140080 — NOV-2009-PC-0934 & NCG140081 — NOV-2009-PC-0935 11 /19/2009 Page 3 of 3 oil spillage around the form that should be properly cleaned up. Chandler may also need to retrain plant personnel on the proper spill cleanup procedures. 10.You are reminded that pursuant to NC General Statute 143-215.6A, the Division may assess civil penalties against Chandler, of up to $25,000 per day, for each violation of NCG140000. Chandler must correct all violations identified above as soon as possible. Additionally, please reply in writing to this NOV within 30 days of receiving it. Your reply should detail corrective actions with implementation schedules for each of the violations identified above in paragraphs 3 through 5 and 7 through 9. Failure to reply may also result in a recommendation to enforce from this office to the Division Director. 11. Thank you for your cooperation in this matter. Should you have any questions, please feel free to contact Mr. Boone or me at (336) 771-5000. Sincer ,lye / teve W. Tedder - Water Quality Regional Supervisor Winston-Salem Region Division of Water Quality Attachments: 1. BIMS Inspection Checklist cc: SWP__ .WSRO J Central Files Stormwater Permitting Unit Permit: NCG140081 SOC: County: Rockingham Region: Winston-Salem Compliance Inspection Report Effective: 08/01/04 Expiration: 07/31/09 Owner: Chandler Concrete Co Inc Effective: Expiration: Facility: Chandler Concrete Co-Plt #104 7699 N NC 87 Contact Person: James J Woody Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s)- Related Permits: Title: Inspection Date: 11/18/2009 Entry Time: 03:00 PM Primary Inspector: Ron Boone 1 Secondary Inspector(s): ' .- Reidsville NC 27320 Phone: 336-226-1181 Certification: Exit Time: 04:00 PM Jill `1 /2-6, i Phone: Phone: 704-663-1699 Ext.2202 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant ® Not Compliant Question Areas: ® Storm water (See attachment summary) Page: 1 Permit: NCG140081 Owner • Facility: Chandler Concrete Co Inc Inspection Date: 11/1812009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Please refer to attached inspection summary letter. Page: 2 Permit: NCG140081 Owner - Facility: Chandler Concrete Co Inc Inspection Date: 11/18/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® n n n # Does the Plan include a General Location (USGS) map? ® n n n # Does the Plan include a "Narrative Description of Practices"? ® n n ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ® n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ In ❑ n # Has the facility evaluated feasible alternatives to current practices? ® n n n # Does the facility provide all necessary secondary containment? ® n n n # Does the Plan include a BMP summary? ® ❑ n 11 # Does the Plan include a Spill Prevention and Response Plan (SPRP)? n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ® n n # Does the facility provide and document Employee Training? ® n n n # Does the Plan include a list of Responsible Party(s)? ® n n n # Is the Plan reviewed and updated annually? L7 ® n n # Does the Plan include a Stormwater Facility Inspection Program? ® n n n Has the Stormwater Pollution Prevention Plan been implemented? n n n Comment: Please refer to attached inspection summary letter. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n ® n n Comment: Please refer to attached inspection summary letter. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ® 00 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ® n Comment: Please refer to attached inspection summary letter. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® n n # Were all outfalls observed during the inspection? ® n n n # If the facility has representative outfall status, is it properly documented by the Division? n n IN n # Has the facility evaluated all illicit (non stormwater) discharges? ® n n Comment: Please refer to attached inspection summary letter. Page: 3 A�n NCDENR North Carolina Department of Environment and Division of Water Quality Michael F. Easley, Governor August 4, 2004 James J Woody Chandler Concrete Co PO Box 131 Burlington, NC 27216 Natural Resources William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director Subject: NPDES Stormwater Permit Coverage Renewal Chandler Concrete Co-Plt # 104 COC Number NCG 140081 Rockingham County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG 140000 the Division of Water Quality (DWQ) is forwarding.herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of General Stormwater Permit NCG140000 • A copy of a discharge monitoring report form • 5 copies of the qualitative monitoring report form Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Department of Environment and Natural Resources, or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater Permitting Unit at (919) 733-5083, ext. 548. cc. Central Files Stormwater Permitting Unit Winston-Salem Regional Office Sincerely, I r�~ for Alan W. Klimek, P.E. Surface Water Protection Section 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 512 N. Salisbury St., Raleigh, North Carolina 27604 NorthCarolina Phone: 919.733.7015I FAX 919-733.24961 Internet: hfpalh2o.enr.state.nc.us/su/stormwater.htmi NaturallyoAn Equal OpportunitylAifirmative Action Employer - 50% Recycled110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCGNCG140081 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.I, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Chandler Concrete Co is hereby authorized to operate a process wastewater treatment system, and is hereby authorized to discharge process wastewater and stormwater from a facility located at Chandler Concrete Co-Plt #104 7699 North NC 87 Reidsville Rockingham County to receiving waters designated as a UT of Wolf Island Creek, a class C stream, in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective August 1, 2004, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 1, 2004. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires B-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/molday Inspection Type Inspector Fac Type 1 u 2 U 31 NCG140061 111 121 05/04/19 117 18 U 19 U 20 U Remarks 211 1 LI I i I I 11_ I I_ I I I 1 I I I I _I I I I I I I _lam I I I I I I 11_ ] I I 11_L_I 11 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 CA ---------- -------------Reserved----------------------- 67 1 1 69 70 L _J 71 U 72 N 73 W 74 751 I I ! L 1- U 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 08:50 AM 05/04/19 04/08/01 Chandler Concrete Co-Plt 4104 Exit Time/Date Permit Expiration Date 7699 N NC 87 Reidsville NC 27320 09:20 AM 05/04/19 09/07/31 Name(s) of Onsite Representative(s)fritles(s)1Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official(TitlelPhone and Fax Number James J Woody,P0 Box 131 Burlington NC 27216//336-226-1181/3365700FWa ted Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date David C Russell WSRO WQ//336-771-4608 Ext.260/ Signature of Management Q A Reviewer AgencylOffice/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. r` PPrmit Yes No NA NF (If the present permit expires in 6 months or less). Has the permittee submitted a new application? ■ ❑ ❑ ❑ Is the facility as described in the permit? ® ❑ ❑ ❑ Are there any special conditions for the permit? ® ❑ ❑ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑ Comment: This facility has a good site plan and monitoring is being performed as required. No problems observed. Mr. Donnie Manring(cell #336 669-6032) was met.