HomeMy WebLinkAboutNCG140012_COMPLETE FILE - HISTORICAL_20170630STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/V UGIyoo1
DOC TYPE
`�,1 HISTORICAL FILE
[],MONITORING REPORTS
DOC DATE
❑aol L,--)vJ D
YYYYMMDD
Compliance Inspection Report
Permit: NCG140012 Effective: 07/01/16 Expiration: 06/30/17 Owner : Concrete Supply Co LLC
SOC: Effective: Expiration: Facility: Concrete Supply Co - Mount Airy Plant
county: Surry 139 Tumbling Rock Or
Region: Winston-Salem
Mount Airy NC 27030
Contact Person: Johnie Alexander Title: Phone: 704-372-2930 Ext.2071
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 08/11/2016
Primary Inspector: Sue L Homewood
Sccord2ry Inspector(%):
Certification:
Phone:
Entry Time: 10:30AM Exit Time: 11:30AM
Phone: 336-776-9694
Reason for inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete StormwaterAVastewater Discharge COC
Facility Status: ® Compliant Not Compliant
Question Areas:
® Storm water
(See attachment summary)
Page: 1
Permit: NCG140012 Owner - Facility: Concrete Supply Co Li
Inspection Date: 06/1112016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG140012 Owner - Facility; Concrete Supply Co LLC
Inspection Date: 08/1112016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ® ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑
Comment: Plant manager indicated that plant operations are slow enough that they are able to use/recycle
all water through dust control and truck wash and through evaporation therefore there are no
flows to sample. If pits overflow the water backs upinto the plant yard before it overflows down
into the woods adjcent to the property._
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑
# Were all outfalls observed during the inspection? ® ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ®❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ®❑ ❑
Comment: Secondary containment inspection reports are kept on site. There is no outlet from secondary
containment if necessary they will pump to the pit or hire a 3rd party to pump and remove.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ ❑
Comment: Outfalls exist in the upper waste storage area but they overflow to grassed areas as sheet flow.
_Water from the pit will overflow into the yard/driveway before it reaches the outfall down into the
woods. Truch_wash area overflows down through the yard into the pit._Inspections conducted
3/27/16, 6/24/16, 812116 all note no flow/discharge.
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
® ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
® ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
® ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
® ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
® ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
® ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
® ❑ ❑ ❑
# Does the Plan include a BMP summary?
® ❑ ❑ ❑
# Does the Plan include a Spilt Prevention and Response Plan (SPRP)?
® ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
® ❑ ❑ ❑
# Does the facility provide and document Employee Training?
® ❑ ❑ ❑
Page: 3
Permit: NCG140012 Owner - Facility: Concrete Supply Cc LLC
Inspection Date: 08/11/2016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
# Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑
# Is the Plan reviewed and updated annually? ® ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑
Comment: SPPP dated 5/30112 ammended 3/16/15 and 2/20/16 and recertified 8/3116, Annual training
conducted 10/27/15
Page: 4
RECEIVED
111 APR 15 2014
CENTRAL FILES
DWOIBOG
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE No. NCG140012
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Concrete Supply Co., LLC
is hereby authorized to discharge process wastewater and stormwater from a facility located at
Concrete Supply Co. — Mount Airy Plant
139 Tumbling Rock Dr
Mount Airy
Surry County
to receiving waters designated as unnamed tributary to Lovills Creek, a class WS-IV water in the
Yadkin -Pee Dee River Basin, in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit
No. NCG140000 as attached.
This certificate of coverage shall become effective April 14, 2014.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day April 14, 2014
for Tracy E. Davis,,P.E., Director
Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission
i 5 �
�r Division of Water Quality / Surface Water Protection
1
National Pollutant Discharge Elimination System
NCDENR
'-"" R�ovr+ccs
CA.014°""""`"�° PERMIT NAME/OWNERSHIP CHANGE FORM
e.a »o..,.�a H4� w
FOR AGENCY USE ONLY
Date Received
Year
Month
Day
1. Please enter the permit number for which the change is requested.
NPDES Permit (or) Certificate of Coverage
N C I S 10 N I ,C G 1 4 0 0 1 2
II. Permit status prior to requested change.
a. Permit issued to (company name): ' CEMEX Construction Materials Atlantic, LLC
b. Person legally responsible for permit: Larry McSwain
First Ml last
VP/GM Carolinas
'ritle
101 Young Court
Permit Holder Mailing Address
Greenville SC 29615
City State Zip
(864) 605-9877 (864) 605-9969
Phone Fax
c. Facility name (discharge): CEMEX — Mount Airy
d. Facility address: 139 Tumbling Rock Rd
Address
Mount Airy NC 27030
City State Zip
e. Facility contact person: Johnny M Tapia (803) 327-2494
First / Ml / Last Phone
ill. Please provide the following for the requested change (revised permit).
a. Request for change is a result of: ® Change in ownership of the facility
® Name change of the facility or owner
If other please explain:
b. Permit issued to (company name):
c. Person legally responsible for permit
OUT 1 7 2013
d. Facility name (discharge):
e. Facility address:
f Facility contact person:
Concrete Supply Co., LLC
Henry Batten
First Ml last
President
Title
P.O. Box 5247
Permit Holder Mailing Address
Charlotte
NC 28299.
City
State Zip
(704) 372-2930
Henry. BattenCa ConcreteSupplLCo.com
Phone
E-mail Address
Mount Airy
139
Tumbling Rock Rd- I> -
Address
Mount Airy
NC 27030
City
state Zip
Johnic
Alexander
First
Ml Last
Johnie. Alexander@ConcreteSupplyCo.
(704) 372-2930
corn
�
�
.r,
,.
�,
r
-•
* i
�
'
.�
NPDES PERMIT NAME/OWNERSHIP CHANGE FORM
Page 2 of 2
IV. Permit contact information (if different from the person legally responsible for the permit)
Permit contact: Johnic Alexander
First MI Last
Environmental Manager
Title
P.O Box 5247
Mailing Address
Charlotte NC 28299
City State Zip
(704) 372-2930 Johnie.AlexanderCoconcretesupplyco.com
Phone E-mail Address
V. Will the permitted facility continue to conduct the same industrial activities conducted prior to
this ownership or name change?
x Yes
❑ No (please explain) _
VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS
ARE INCOMPLETE OR MISSING:
X This completed application is required for both name change and/or ownership change requests.
X Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or
a bill of sale) is required for an ownership change request. Articles of incorporation are not
sufficient for an ownership change.
The certifications below must be completed and signed by both the permit holder prior to the change, and the
new applicant in the case of an ownership change request. For a name change request, the signed Applicant's
Certification is sufficient.
PERMITTEE CERTIFICATION (Permit holder prior to ownership change):
I, Larry McSwain, attest that this application for a name/ownership change has been reviewed and is accurate
and complete to the best of my knowledge. I understand that if all required parts of this application are not
completed and that if all required supporting information is not included, this application package will be
returned as incomplete.
Signature Date
APPLICANT CERTIFICATION
I, Henry Batten, attest that this application for a name/ownership change has been reviewed and is accurate
and complete to the best of my knowledge. I understand that if all required parts of this application are not
completed and that if all required supporting information is not included, this application package will be
returned as incomplete.
d -r 0- Z 7 w/13
Signature Date
PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO:
Division of Water Quality
Surface Water Protection Section
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Revised 7I2008
September 19, 2013
Re: Notification of Ownership Change
Mr. Ken Pickle
NCDENR/DEMLR
Stormwater Permitting Program
1612 Mail Service Center
Raleigh, NC 27699-1617
Dear Mr. Pickle,
Effective September 23, 2013 Concrete Supply Co., LLC assumed ownership of (17)
Ready -mix plants previously operated under CEMEX Construction Materials Atlantic,
LLC,. Attached with this letter are the Transfer of Ownership forms and the legal
documentation from the transfer of ownership documents between both entities.
If you have any further questions, please contact Johnie Alexander @ 704-372-2930.
Regards,
enry Batten
President
Concrete Supply Company Co., LLC
//C(x /dooiZ
0133
It
,, rr D ZD 8
rr �� 03 0S
,r r� 0 307
n "03/D
rr " o3l2
n �'4339
r� 03f3
.* tall I i 4,-:
vor, 15
EXECUTION VERSION
ASSET AND CAPITAL CONTRIBUTION AGREEMENT
THIS ASSET AND CAPITAL CONTRIBUTION AGREEMENT (this "Agreement") is
made and entered into this P day of September, 2013, by and among Concrete Supply Co., allorth
Carolina corporation ("CSC"), CEMEX Construction Materials Atlantic, LLC, a Delaware limited
liability company ("CEMEX'), and Conmex Joint Venture, LLC, a North Carolina limited liability
company (the "Company").
W-I-T-N-E-S-S-E-T-H :
WHEREAS, CSC is currently the sole member of the Company; and
WHEREAS, CSC and CEMEX have agreed to each make an asset and capital contribution
(the "Contribution") to the Company pursuant to terms contained herein; and
WHEREAS, subsequent to the Contribution, the Company will own and operate the CSC
Assets and the CEMEX Assets, both of which terms are defined below, in connection with the
business of producing and selling ready -mix concrete;
NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements
contained herein, the receipt, adequacy and sufficiency of which are hereby acknowledged, CSC,
CEMEX and the Company hereby agree as follows:
ARTICLE 1
TRANSFER OF ASSETS
L I Assets To Be Contributed By CSC. Subject to the terms hereinafter set forth,
CSC hereby transfers, conveys, assigns and delivers, and agrees to cause each of its Affiliates (as
defined herein) to transfer, convey, assign and deliver, to the Company those assets or leasehold
interests in leased assets described on Schedule 1.1(a) which are currently owned or leased by CSC
or any of its Affiliates and used or intended for use primarily in the production, sale and distribution
of ready -mix concrete in North Carolina and South Carolina, or which are being utilized or operated
by CSC or any of its Affiliates primarily at its ready -mix concrete business locations in North
Carolina and South Carolina (the "CSC Assets'), and the business associated with said assets (the
"CSC Business"). The CSC Assets include, without limitation, (1) the owned real property
contributed by CSC set forth on Schedule 1.1(a)(i) (the "CSC Owned Real Property'), (ii) the leased
real property contributed by CSC set forth on Schedule 1.1(a)(ii) (the "CSC Leased Real Pro a "),
and (iii) the insurance policies contributed by CSC set forth on Schedule 1.1(a)(iii) (the "CSC
Insurance Policies'). The CSC Owned Real Property and CSC Leased Real Property are referred to
collectively sometimes herein as the "CSC Real Property." Notwithstanding the foregoing, the
assets, properties and rights described on Schedule 1.1(b) (the "Retained CSC Assets"), including,
without limitation, the owned real property listed on Schedule 1.1(b)(i) (the "Retained CSC Owned
Real Property") and the leased real property listed on Schedule 1.1(b)(ii) (the "Retained CSC Leased
Real Property"), shall not be transferred, conveyed, assigned or delivered to the Company under this
Agreement.
1/2436371,18
OCT 1 7,20i3
0 NFL •:n'A.,,®.�+
I at�r
.
:d, �I_ ,
1 , tr rl !'
It •,1 .r •l'':.jr',' r
! ,. a 1.. ;-._!__..
' f' I ifs 1• I
3r .
f - , i.i 1
,!' 1 '•r 'S, �•.1JI �-3 r,I• ' !; 'f•+!
lII�. rS , 1,
,lr.r. I e ,r•
.
, i Sr ,
� � r 1- � r
, Ir r I i _, �I,.
l,i_ �I, t _
�•. _.�
�
:; .%r ir'r,:,. �r � I1,. I;
1 : I ,, .'1+-` i
!,'. i � '- 1
1 � .
' - • .7 ./\.
Y :nrrl �.Ir '+r, ,
r1 -I . _ - ii •.
I ! _ /'
._.
1 i
.:I; ', 1S' { rr �. , L,
a
F ''1r• 1" '<-. I•. � °:.4-L;;r••ri
. _ f i •, 1 .r s,` +." li. '.0 -_ � .1 11 '� >'
• ,I!' � ,LI k• , � f:- . � 1 � .ul' �' �.1:1 �. -.r f � , lt;l,, `i AIL I -, F!'I ,
r T�{ ,a•-•. ! � [ I. .' �e. r!h?.+r '�.�•. 7- - °L. ILl: r ^r. '�« 1: 'r I .
IN WITNESS WHEREOF, this Agreement executed on the day and year first
above written,
CONCRETE SUPPLY CO.
7--
By...
NaM3(-' W�hlkll
its:
CEMEX CONSTRUCTION MATERIALS
ATLANTIC, LLC
By:._
Name:
Its:
CONMEX JOINT VENTURE, LLC
B
Its: psi
I i . . 11 yr - . . k, . V- i'.. 'I 3 . . , i , -
r , i
i, .
above written.
IN WITNESS WHEREOF, this Agreement executed on the day and year first
CONCRETE SUPPLY CO.
By. —
Name:
Its:
CEMEX CONSTRUCTION MATERIALS
ATLANTIC, L
Hy:
Name: CLtl (l- ' ni o a
Its: 9 U'" 0 c �-d
CONMEX JOINT VENTURE, LLC
By.
Name:
Its:
1 /2436371.18 59
KDEDdR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Mr. Johnie Alexander
Concrete Supply Co., LLC
P.O. Box 5247
Charlotte, NC 28299
Dear Mr. Alexander:
John E. Skvarla, III
Secretary
April 14, 2014
Subject: NPDES General Permit NCG140000
Certificates of Coverage -Multiple
Concrete Supply Co., LLC
Formerly CEMEX Construction Materials Atlantic, LLC
Counties - Multiple
Division personnel received your request to revise your stormwater permit Certificates of Coverage
to accurately reflect your new company and/or facility name.
Please find enclosed the revised Certificates of Coverage for the 17 facilities that changed
ownership from CEMEX Construction Materials Atlantic, LLC to Concrete Supply Co., LLC. The
terms and conditions contained in the General Permit remain unchanged and in full effect. These
revised Certificates of Coverage are issued under the requirements of North Carolina General
Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S.
Environmental Protection Agency.
If you have any questions or need further information, please contact the Stormwater Permitting
Program at (919) 807-6300.
Sincerely,
for Tracy E. Davis, P.E., CPM, Director
Division of Energy, Mineral and Land Resources
cc: Mooresville RO, Z. Khan
Winston-Salem RO, M. Gantt
Fayetteville RO, B. Cole
Asheville RO, L. Herbert
Raleigh RO, J. Holley
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section - Land Quality Section
1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX: 919-715-8801
512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: hUp: Uportal.ncdenr.orglweb/Irl
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Deborah Reese, DEMLR Budget Office — please update billing info
Stormwater Permitting Program Files
Central Files
Mecklenburg County DEP, Water Quality, 700 N. Tryon Street, Charlotte, NC 28202
Wake County Environmental Services, Attn: Eric Green, P.O. Box 550, Raleigh, NC 27602
,A
AAN �-�
alm
MCDENR
North Carolina Department of Environment and Natural
Division of Water Quality
Pat McCrory Charles Wakild, RE.
Governor director
April 30, 2013
Mr. Johnny M. Tapia
CEMEX Ready Mix Division
3415 Sandy Ridge Road
Colfax, NC 27235
Subject: General Stormwater Permit Inspection
CEMEX — Mount Airy Plant
Certificate of Coverage # NCG140012
Surry County
Dear Mr. Tapia:
Resources
John Skvarla
Secretary
On April 12, 2013, Gary Hudson of this office met with Mike Holt to perform a General
Stormwater Permit Inspection at the CEMEX Ready Mix Division facility located off of Highway
52 in Mount Airy. This inspection evaluated the areas as designated on the attached inspection
form. Observations from each area are addressed below:
1. Permit
CEMEX Ready Mix Division holds Certificate of Coverage # NCG140012 for the discharge of
stormwater from the facility. The General Permit became effective July 1, 2011 and expires
June 30, 2016.
2. Records/Reports
All monitoring and laboratory records are maintained as specified by the.permit.
3. Facility Site Review
The site appeared very clean and well managed. No concerns were noted.
4._ Effluent/Receiving Waters
Stormwater runoff from the facility reaches the Lovill's Creek, Class "C" waters in, the
Yadkin/Pee-Dee River Basin.
North Carolina Division of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, North Carolina 27107
Phone: 336.771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6748
Internet: www.ncwaterquality.org
An Equal Opportunity l Affirmative Action Employer
NonrthCarolina
;Vatunal`l� f
Mr. Johnny Tapia
Page 2
April 30, 2013
5. Monitoring Program
Part III, Section B of the permit requires that semi-annual qualitative (visual) monitoring be
performed and documented once in the spring (April - June) and once in the fall (September —
November). A review of the facility files found that the qualitative monitoring has been
conducted as required.
Part 111, Section C of the permit requires that analytical monitoring be performed. A review of
the facility files found that the analytical monitoring has been conducted as required.
The analytical monitoring for on -site vehicle maintenance fisted in Section B of the permit is not
required since the CEMEX plant uses less than 55 gallons of new motor oil per month when
averaged over the calendar -year.
Should you have any questions concerning this letter, please contact Gary Hudson or me
at (336) 771-5000.
Sincerely,
W. Corey Basinger
Regional Supervisor
Surface Water Protection Section
cc: NPS Assistance and Compliance Oversight Unit
Central Files — SWP
WSRO,.
Permit: NCG140012
SOC:
County: Surry
Region: Winston-Salem
Compliance Inspection Report
Effective: 07/01/11 Expiration: 06/30/16 Owner: Cemex Construction Materials Atlantic LLC
Effective: Expiration: Facility: Comex- Mount Airy North
139 Tumbling Rock Ln
Contact Person: Johnny M Tapia
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 04/12/2013
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Title:
Entry Time: 08:00 AM
Mount Airy NC 27030
Phone: 803-327-2494
Certification:
Exit Time: 09:00 AM
Phone:
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge
GOC
Facility Status: ■ Compliant Q Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
0
Permit: NCG140012 Owner - Facility: Cemex Construction Materials Atlantic LLC
Inspection Date: 0411212013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG140012 Owner -Facility: Comex Construction Materials Atlantic LLC
Inspection Date: 04/1212013 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
Cl
❑
❑
# Does the Plan include a General Location (USGS) map?
O
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
■
❑
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the facility provide all necessary secondary containment?
■
❑
❑
❑
# Does the Plan include a BMP summary?
®❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
❑
Cl
❑
# Does the facility provide and document Employee Training?
■
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
®❑
❑
❑
# Is the Plan reviewed and updated annually?
■
❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
■
❑
❑
Cl
Has the Stormwater Pollution Prevention Plan been implemented?
■
❑
❑
❑
Comment: .
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑
Comment: .
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑
# Has -the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑
Comment:
Permit and Outfalls
Yes
No
NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
❑
❑ ❑
# Were all outfalls observed during the inspection?
■
❑
❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑
■ ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
■
❑
❑ ❑
Comment: .
Page: 3
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman
Governor Director Secretary
February 29, 2012
Mr. Johnny M. Tapia
CEMEX Ready Mix Division
3415 Sandy Ridge Road
Colfax, NC 27235
Subject: General Stormwater Permit Inspection,
CEMEX — Mount Airy Plant
Certificate of Coverage # NCG140012
Surry County
Dear Mr. Tapia:
On February 28, 2012, Gary Hudson of this office met with Mike Holt to perform a
General Stormwater Permit Inspection at the CEMEX Ready Mix Division facility located off of
Highway 52 in Mount Airy. This inspection evaluated the areas as designated on the attached
inspection form. Observations from each area are addressed below:
1. Permit
CEMEX Ready Mix Division holds Certificate of Coverage # NCG140012 for the discharge of
stormwater from the facility. The General Permit became effective July 1, 2011 and. expires
June 30, 2016.
2. Records/Reports
All monitoring and laboratory records are maintained as specified by the permit.
3. Facility Site Review
The site appeared very clean and well managed. No concerns were noted.
4. Effluent/Receiving Waters
Stormwater runoff from the facility reaches the Lovill's Creek, Class "C" waters in the
Yadkin/Pee-Dee River Basin.
North Carolina Division of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, North Carolina 27107
Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-8748
Internet: www.newaterquality.org
None
rthCarohna
An Equal Opportunity 1 Affirmative Action Employer
Mr. Johnny Tapia
Page 2
February 29, 2012
5. Monitoring Program
Part III, Section B of the permit requires that semi-annual qualitative (visual) monitoring be
performed and documented once in the spring (April - June) and once in the fall (September —
November). A review of the facility files found that the qualitative monitoring has been
conducted as required.
Part Ili, Section C of the permit requires that analytical monitoring be performed. A review of
the facility files found that the analytical monitoring has been conducted as required.
The analytical monitoring for on -site vehicle maintenance listed in Section B of the permit is not
required since the CEMEX plant uses less than 55 gallons of new motor oil per month when
averaged over the calendar year.
Should you have any questions concerning this letter, please contact Gary Hudson or me
at (336) 771-5000.
Sincerely,
W. Corey Basinger
Regional Supervisor
Surface Water Protection Section
cc: NIPS Assistance and Compliance Oversight Unit
Central Files —'SWP
WSRO
Permit: NCG140012
sac:
County: Surry
Region: Winston-Salem
Compliance Inspection Report
Effective: 07/01/1 1 Expiration: 06/30/1 6o Owner: Cemex Construction Materials Atlantic LLC
Effective: Expiration: Facility: Cemex- Mount Airy North
139 Tumbling Rock Ln
Contact Person: John Heider
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02129/2012
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Title:
Entry Time: 08:00 AM
Mount Airy NC 27030
Phone: 336-294-1124
Certification:
Exit Time: 09:00 AM
Phone:
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete StormwaterlWastewater Discharge
COC
Facility Status: 0 Compliant r1 Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NCG140012 Owner - Facility: Cemex Construction Materials Atlantic t! C
Inspection Date: 02/29/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG140012 Owner -Facility: Cemex Construction Materials .Atlantic LLC
Inspection Date: 0212912012 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®
n
n
n
# Does the Plan include a General Location (USGS) map?
®
n
n
n
# Does the Plan include a "Narrative Description of Practices'?
n
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®
n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
®
n
n
n
# Has the facility evaluated feasible alternatives to current practices?
®
n
n
n
# Does the facility provide all necessary secondary containment?
®
n
n
n
# Dees the Ptan include a BMP summary?
!1
n
n
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
n
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®
n
n
n
# Does the facility provide and document Employee Training?
Is
n
n
n
# Does the Plan include a list of Responsible Party(s)?
®
n
n
n
# Is the Plan reviewed and updated annually?
®
❑
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
®
n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
®
[l
n
n
Comment: .
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ® n n n
Comment: .
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ® n n n
# Has the facility conducted its Analytical monitoring from Vehicle klaintenance areas? n n ® n
Comment: .
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ® n n n
# Were all outfalis observed during the inspection? n n n
# If the facility has representative outfali status, is it properly documented by the Division? n n ® n
# Has the facility evaluated all illicit (non stormwater) discharges? ® n n n
Comment:
Page: 3
+i
NC®ENR
North Carolina Department of Environment and Natura
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
September 14, 2011
Mr. Johnny M. Tapia
CEMEX Ready Mix Division
3415 Sandy Ridge Road
Colfax, NC 27235
Subject: General Stormwater Permit Inspection
CEMEX — Mount Airy Plant
Certificate of Coverage # NCG140012
Surry County
Dear Mr. Tapia:
Resources
Dee Freeman
Secretary
On August 30, 2011, Gary Hudson of this office met with Mike Holt to perform a General
Stormwater Permit Inspection at the CEMEX Ready Mix Division facility located off of Highway
52 in Mount Airy. This inspection evaluated the areas as designated on the attached inspection
form. Observations from each area are addressed below:
I. Permit
CEMEX Ready Mix Division holds Certificate of Coverage # NCG140012 for the discharge of
stormwater from the facility. The General Permit became effective July 1, 2011 and expires
June 30, 2016.
2. Records/Reports
All monitoring and laboratory records are maintained as specified by the permit.
3-Facility Site Review
The site appeared very clean and well managed. No concerns were noted.
4. Effluent/Receiving Waters
Stormwater runoff from the facility reaches the Lovill's Creek, Class "C" waters in the
Yadkin/Pee-Dee River Basin.
North Carolina Division of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, North Carolina 27107
Phone: 336-771-50t FAX: 336-771-46301 Customer Service: 1-877-623-6748
lntemet: www.ncwaterquality.org
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
t
Mr. Johnny Tapia
Page 2
September 14, 2011
5. Monitoring Program
Part III, Section B of the permit requires that semi-annual qualitative (visual) monitoring be
performed and documented once in the spring (April - June) and once in the fall (September —
November). A review of the facility files found that the qualitative monitoring has been
conducted as required.
Part III, Section C of the permit requires that analytical monitoring be performed. A review of
the facility files found that the analytical monitoring has been conducted as required.
The analytical monitoring for on -site vehicle maintenance listed in Section B of the permit is not
required since the CEMEX plant uses less than 55 gallons of new motor oil per month when
averaged over the calendar year.
Should you have any questions concerning this letter, please contact Gary Hudson or me
at (336) 771-5000,
Sincerely,
W. Corey Basinger
Regional Supervisor
Surface Water Protection Section
cc: NPS Assistance and Compliance Oversight Unit
Central Files — SWP
{WSRO'
Permit: NCG140012
SOC:
County: Surry
Region: Winston-Salem
Compliance Inspection Report
Effective: 07101/11 Expiration: 06/30/16 Owner: Cemex Construction Materials Atlantic LLC
Effective: Expiration: Facility: Cemex- Mount Airy North
139 Tumbling Rock Ln
Contact Person: John Heider
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 0813012011
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Title:
Entry Time: 08:00 AM
Mount Airy NC 27030
Phone: 336-294-1124
Certification:
Exit Time: 08:30 AM
Phone:
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge
COC
Facility Status: ® Compliant Not Compliant .
Question Areas:
■ Storm Water
(See attachment summary)
Page: 1
Permit: NCG140012 Owner - Facility: Cemex Construction Materials Atlantic LLC
Inspection pate: 08I3D1207 t Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG140042 Owner - Facility: Cemex Construction Materials Atlantic LLC
Inspection Date: 08130/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ® n Q ❑
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Storrnwaier Polluticn Prevention Plan been implemented?
Comment: .
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment: .
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Yes No NA NE
®nnn
Yes No NA NE
®nnn
n n ® n
Yes No NA NE
®nnn
®nnn
❑ n ® n
®nnn
Page: 3
ALI'A
NC®ENR.
North Carolina Department of Environment and Natura
Division of Water Quality
Beverly Caves Perdue Coleen H. Sullins
Governor Director
September 29, 2010
Mr. Johnny M. Tapia
CEMEX Ready Mix Division
3415 Sandy Ridge Road
Colfax, NC 27235
Subject: General Stormwater Permit Inspection
CEMEX — Mount Airy Plant
Certificate of Coverage # NCG140012
Surry County
Dear Mr. Tapia:
Resources
Dee Freeman
Secretary
On September 23, 2010, Gary Hudson of this office met with Clayton
Smith to perform a General Stormwater Permit Inspection at the CEMEX Mount
Airy facility located on Highway 52 in Mount Airy. This inspection evaluated the
areas as designated on the attached inspection form. Observations from each
area are addressed below:
1 Permit
CEMEX Ready Mix Division holds Certificate of Coverage # NCG140012 for the
discharge of stormwater from the facility. The General Permit became effective
August 1, 2009 and expires June 30, 2011.
2. Records/Reports
Part If, Section A of the permit requires the development of a Stormwater
Pollution Prevention Plan (SPPP). A copy of the SPPP was available for review.
The plan contained all of the items required by the stormwater permit.
3. Facility Site Review .
Observations of the two outfalls at the facility did not reveal any concerns. The
site appeared very clean -and well managed.
4. Effluent/Receiving Waters
Stormwater runoff from the facility reaches Lovill's Creek, Class "C" waters in the
Yadkin/Pee-Dee River Basin.
North Carolina 17ivision of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, North Carolina 27107
Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6746
Internet: www.ncwaterquality.org
An Equal Opportunity 1 Affirmative Action Employer
None
rthCaroii
Naturall
Mr. Johnny Tapia
Page 2
September 29, 2010
5. Monitoring Program
Part II, Section F of the permit requires that semi-annual qualitative (visual)
monitoring be performed and documented once in the spring (April - June) and.
once in the fall (September — November). A review of the facility files found that
the qualitative monitoring has been conducted as required.
Part Il, Section C of the permit requires that analytical monitoring be performed.
A review. of the facility files found that the analytical monitoring has been
conducted as required.
The analytical monitoring for on -site vehicle maintenance listed in Section B of
the permit is not required since the CEMEX plant uses less than 55 gallons of
new motor oil per month when averaged over the calendar year.
Should you have any questions concerning this letter, please contact Gary
Hudson or me at (336) 771-5000.
Sincerely,
Steve W. Tedder
Water Quality Regional Supervisor
cc: NIPS Assistance and Compliance Oversight Unit
Central Files — SWP
WSRO-3
z
Permit: NCG140012
SOC:
County: Sury
Region: Winston-Salem
Compliance Inspection Report
Effective: 08/01/09 Expiration: 06/30111 Owner: Cemex Construction Materials Atlantic LLC
Effective: Expiration: Facility: Cemex- Mount Air/ North
1247 Hwy 52 N
Contact Person: John Heider
Directions to Facility:
System Classifications:
Primary ORC:
Secondary.ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09123/2010
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Title:
Entry Time: 08:00 AM
Mount Airy NC 27030
Phone: 336-294-1124
Certification:
Exit Time: 09:00 AM
Phone:
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge
COC
Facility Status: ® Compliant n Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page:1
Permit: NCG140012 Owner - Facility: Cemex Construction Materials Atlantic LLC
Inspection Date: 09/23/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG140012 Owner - Facility: Cemex Construction Materials Atlantic LLC
Inspection Date: 09/23/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? in m n n
# Does the Plan include a General Location (USGS) map?
M
n
n
n
# Does the Plan include a "Narrative Description of Practices'?
®
n
n
n
# Does the Plan include a detailed site map including cutfall locations and drainage areas?
a
n
n
In
# Does the Plan include a list of significant spills occurring during the past 3 years?
Im
n
n
n
# Has the facility evaluated feasible alternatives to current practices?
®n
n
n
# Does the facility provide all necessary secondary containment?
®
n
n
n
# Does the Plan include a BMP summary?
®
n
n
n
# Does the Plan include a Spill Prevention and Response Pian (SPRP)?
®
n
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®
n
n
n
# Does the facility provide and document Employee Training?
®
n
n
n
# Does the Plan include a list of Responsible Party(s)?
®n
n
n
# Is the Plan reviewed and updated annually?
®n
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
®
n
n
n
Has the Stormwater Pollution Prevention Plan been implemented?
n
n
n
Comment:
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®
n
n
n
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
®
n
n
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
00
®
n
Comment: .
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
®
n
00
# Were all outfalls observed during the inspection?
m
0
❑
n
# If the facility has representative outfall status, is it properly documented by the Division?
00.
®
n
# Has the facility evaluated all illicit (non stormwater) discharges?
®
n
n
n
Comment: .
Page: 3
:n
MCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
May 7, 2009
Mr. Kenneth Vanhoy, P.G.
CEMEX Ready Mix Division
3415 Sandy Ridge Road
Colfax, NC 27235
Subject: General Stormwater Permit Inspection
CEMMEX —Mount Airy Plant
Certificate of Coverage # NCG140012
Surry County
Dear Mr. Vanhoy:
Dee Freeman
Secretary
On April 21, 2009, Gary Hudson of this office met with you to perform a General
Stormwater Permit Inspection at the CEM-EX Mount Airy facility located on Highway 52 in Mount
Airy. This inspection evaluated the areas as designated on the attached inspection form.
Observations from each area are addressed below:
1. Permit
CEMEX Ready Mix Division holds Certificate of Coverage # NCG140012 for the discharge of
stormwater from the facility. The General Permit became effective August 1, 2004 and expires
July 31, 2009.
2. Records/Reports
Part II, Section A of the permit requires the development of a Stormwater Pollution Prevention
Plan (SPPP). A copy of the SPPP was available for review. The plan contained all of the items
required by the stormwater permit.
3. Facility Site Review
Observations of the two outfalls at the facility did not reveal any concerns. The site appeared very
clean and well managed.
4. Eftluent[Receiving Waters
Stormwater runoff from the facility reaches Lovill's Creek, Class "C" waters in the Yadkin/Pee-
Dee River Basin.
North Carolina Division of Water Quality, Winston-Salem Regional office
Location: 585 Waughtown St Winston-Salem, North Carolina 27107
Phone: 336-771-50001 FAX: 336-77146301 Customer Service: 1-877-623-6748
Intemet: www,ncwaterquality.org
Nnc
orthCarolina
Naturally
An Equal Opportunity L Affirmative Action Employer
Mr. Kenneth Vanhoy
Page 2
May 7, 2009
i\
5. Monitoring Program
Part U, Section F of the permit requires that semi-annual qualitative (visual) monitoring be
performed and documented once in the spring (April - June) and once in the fall (September —
November). A review of the facility files found that the qualitative monitoring has been conducted
as required.
Part 1I, Section C of the permit requires that analytical monitoring be performed. A review of the
facility files found that the analytical monitoring has been conducted as required.
The analytical monitoring for on -site vehicle maintenance listed in Section B of the permit is not
required since the CEMEX plant uses less than 55 gallons of new motor oil per month when
averaged over the calendar year.
Should you have any questions concerning this letter, please contact Gary Hudson or me at
(336) 771-5000.
Since ely, /
Steve W. Tedder
Water Quality Regional Supervisor
cc: NPS Assistance and Compliance Oversight Unit
Central Files — SWP
WSRO
Compliance Inspection Report
Permit: NCG140012 Effective: 08/01/04 Expiration: 07/31/09 Owner: Cemex Construction Materials Atlantic LLC
SOC: Effective: Expiration: Facility: Cemex- Mount Airy North
County: Surry 1247 Hwy 52 N
Region: Winston-Salem
Mount Airy NC 27030 .
Contact Person: John Heider Title: Phone: 336-294-1124
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 04/21/2009
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Certification: Phone:
Entry Time; 08:00 AM Exit Time: 09:00 AM
Phone:
Reason for Inspection: Routine Inspection Type: Stormwater
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge
COC
Facility Status: ® Compliant ❑ Not Compliant
Question Areas:
8 Storm Water
(See attachment summary)
Page: 1
Permit: NGG140012 Owner - Facility: Cemex Construction Materials Atlantic LLC
Inspection Date: 04/21/2009 Inspection Type: Stormwater Reason for Visit: Routine
Inspection Summary:
Stormwater Pollution Prevention Plan
Yes
No
NA NE
Does the site have a Stormwater Pollution Prevention Plan?
■
n
n
11
# Does the Plan include a General Location (USGS) map?
■
n
n
n
# Does the Plan include a "Narrative Description of Practices"?
■
Q
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
n
# Has the facility evaluated feasible alternatives to current practices?
O
n
n
n
# Does the facility provide all necessary secondary containment?
■
n
n
n
# Does the Plan include a BMP summary?
_ ■
n
n
.n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
0
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
n
n
n
# Does the facility provide and document Employee Training?
■
n
n.
n
# Does the Plan include a list of Responsible Party(s)?
■
n
n
fl
# is the Plan reviewed and updated annually?
■
n
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
■
n
n
n,
Has the Stormwater Pollution Prevention Plan been implemented?
■
n
0
D
Comment:
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
■
n
n
n
Comment:
Page: 2
Michael F. Easley, Coverno
f William G. Ross Jr,, Secretary
North Carolina Department of Environment and Natural Resources
November 14, 2008
Roy J. Schorsch
Cemex Construction Materials Atlantic, LLC
3415 Sandy Ridge Road
Colfax, NC 27235
Dear Mr. Schorsch:
Coleen H. Sullins, Director
Division of Water Quality
RECEIVED
N.C. Dent. of ENR
OV 2 6' 20
Winston-Saie,r.
Regional Gffca
Subject: NPDES General Penn it NCG140000
Certificate of Coverage NCG 140012
Cemex Construction Materials Atlantic, LLC
Fonnerly Cemex Construction Materials, LP
Surry County
On September 8, 2008, Division personnel received your request to revise your stonnwater permit Certificate
of Coverage to accurately include you new company name.
Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General
Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements
of North Carolina General Statutes 143-215.1 and the Memorandum of. Agreement between North Carolina and
the U.S. Environmental Protection Agency.
If you have any questions, please contact the Stormwater Pennitting unit at (919) 807-6303.
Sincerely,
ORIGINAL SIGNED BY
KEN PICKLE
Coleen H. Sullins
cc: DWQ Central Files
Winston-Salem Regional Office
Stormwater Permitting Unit
on`
NCarolina
'Vat
mrn!!y
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Customer Service
Internet; h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 807-6494 1-877-623-6749
An Equal OpportunitylAffirmative Action Employer— 50% Recycled110% Post Consumer Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE No. NCG140012
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
CEMEX CONSTRUCTION MATERIALS ATLANTIC, LLC
is hereby authorized to discharge&tormwater from a facility located at
CEMEX-NORTH MOUNT AIRY
1247 HIGHWAY 52 NORTH
MOUNT AIRY
SURRY COUNTY
to receiving waters designated as a UT of Lovills Creek in the Yadkin Pee -Dee River Basin in accordance
with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, 111, and
1V, V and VI of General Permit No. NCG140000 hereof.
This certificate of coverage shall become effective November 14, 2008.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day November 14, 2008-ORIGINAL sIGNED BY
KFF l PICKLE
for Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
o�� w A 1-
�9Q�
r
1 r
r
t/J r
O 'C
March 21, 2008
Mr. Kenneth Vanhoy, P.G.
CEMEX Ready Mix Division
3415 Sandy Ridge Road
Colfax, NC 27235
Subject: General Stormwater Permit Inspection
CEMEX — Mount Airy Plant
Certificate of Coverage # NCG140012
Surry County
Dear Mr. Vanhoy:
1lichael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
On March 19, 2008, Gary Hudson of this office met with you to perform a General
Stormwater Permit Inspection at the CEMEX Mount Airy facility located on Highway 52 in
Mount Airy. This inspection evaluated the areas as designated on the attached inspection
form. Observations from each area are addressed below:
1. Permit
CEMEX Ready Mix Division holds Certificate of Coverage # NCG140012 for the discharge of
stormwater from the facility. The General Permit became effective August 1, 2004 and
expires July 31, 2009.
2. Records/Reports
Part 11, Section A of the permit requires the development of a Stormwater Pollution
Prevention Plan (SPPP). A copy of the SPPP was available for review. The plan contained
all of the items required by the stormwater permit.
3. Facility Site Review
Observations of the two outfalls at the facility did not reveal any concerns. The site appeared
very clean and well managed.
4. Effluent/Receiving Waters
Stormwater runoff from the facility reaches Lovill's Creek, Class "C" waters in the
Yadkin/Pee-Dee River Basin.
No Carolina
�Naimally
North Carolina Division of Water Quality 585 Waughtown Street Winston Salem, NC 27107
Intemet www.ncwaterguaJ[ty.org
An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper
Phone (336) 771-5000 Customer Service
FAX (336)771-4630 1-877-623-6748
14
Mr. Kenneth Vanhoy
Page #2
March 21, 2008
5. Monitoring Program
Part 11, Section F of the permit requires that semi-annual qualitative (visual) monitoring be
performed and documented once in the spring (April - June) and once in the fall (September
— November). A review of the facility files found that the qualitative monitoring has been
conducted as required.
Part 11, Section C of the permit requires that analytical monitoring be performed. A review of
the facility files found that the analytical monitoring has been conducted as required.
The analytical monitoring for on -site vehicle maintenance listed in Section B of the permit is
not required since the CEMEX plant uses less than 55 gallons of new motor oil per month
when averaged over the calendar year.
Should you have any questions concerning this letter, please contact Gary Hudson or
me at (336) 771-5000.
Sincerely,
4_z"�' ".IA__
Steve W. Tedder
Water Quality Regional Supervisor
cc: NPS Assistance and Compliance Oversight Unit
Central Files — SWP
WSRO
Permit: NCG140012
SOC:
County: Surry
Region: Winston-Salem
Compliance Inspection Report
Effective: 08/01/04 Expiration: 07/31/09 Owner: Cemex Construction Materials L P
Effective: Expiration: Facility: Cemex- Mount Airy North
1247 Hvq 52 N
Contact Person: John Heider
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 03119/2008
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Title:
Entry Time: 11:00 AM
Winston Salem NC 27105
Phone: 336-294-1124
Certification:
Exit Time: 12:30 PM
Phone:
Phone:
Reason for Inspection: Routine Inspection Type: Stormwater
Permit Inspection Type: Ready Mix Concrete StormwaterfWastewater Discharge
COC
Facility Status: ® Compliant Q Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page] 1
,?
Permit: NCG140012 Owner - Facility: Cemex Construction Materials L P
Inspection Date: 03/19/2008 Inspection Type: Stormwater Reason for Visit: Routine
5tcrmwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
®
n
f_1
n
# Does the Plan include a General Location (USGS) map?
®
n
n
n
# Does the Plan include a "Narrative Description of Practices"?
®
n
n
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
®n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
®.n
n
n
# Has the facility evaluated feasible alternatives to current practices?
n
n
n
# Does the facility provide all necessary secondary containment?
®
n
n
n
# Does the Plan include a BMP summary?
®
n
n
n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
®
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
n
n
n
# Does the facility provide and document Employee Training?
n
n
n
# Does the Plan include a list of Responsible Party(s)?
®
n
n
n
# Is the Plan reviewed and updated annually?
®
n
n
n
# Does the Plan include a Stormwater Facility Inspection Program?
®
❑
n
171
Has the Storm,vater Pollution Prevention Plan been implemented?
Ea
n
❑
n
Comment. -
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
®n
n
n
Comment:
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
®
n
n
n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
n
n
®
n
Comment:
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
B3
n
n
# Were ali outfalls observed during the inspection?
®n
n
# If the facility has representative outfail status, is it properly documented by the Division?
n
n
®
n
# Has the facility evaluated all illicit (non stormwater) discharges?
®
n
n
n
Comment
Page: 3